You are on page 1of 1
A.C. MOJARES CONSTRUCTION, INC. megs Ue The aa itosancs constnuche 2nd Fr CM Bldg 409 Tancang Soa ve ying cues ( a NOS tise Sow Ret No LET-OPTIA. se March 9, 2018 Emmanuel A. De Villa Head, South Water Source & Faciities Const Maynilad Water Service, Inc. 172 A Villegas St, Arroceros Comp... Ermita, Manila Contract No. WS-17-WTP.03 Project Name: Proposed Brine Line for the Putatan Water Treatment Plant 2 Sir, ‘As discussed in our coordination meeting last March 6, 2018, we are transmitting herewith the following working drawings deemed necessary in the implementation of the above stated project for your approval, to wit; Proposed Interconnection along Nia Road near WTP 1 Proposed Connection Detail 1, Butterfly Valve Detail and Fullbore FM Detail Proposed Connection Detail 2'at Lake Proposed Diffuser Assembly and End Connection Detail Proposed Revised Pre-Cast Concrete Pipe Weight Hydro Testing Scheme for Segment 1 & Segment 2 Hoping you find the above documents in order. Thank you very much, Sincerely yours, ie res President