REPARACIÓN DE DAÑOS EN EL CANAL TALAMBO ZAÑA POR FENÓMENO EL NIÑO COSTERO 2017, VALLE JEQUETEPEQUE, PROVINCIA DE CHEPÉN - DEPARTAMENTO

DE LA LIBERTAD - SINIESTRO I

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
ITEM DESCRIPCION UND.
Precio Parcial Precio Parcial Precio Parcial Precio Parcial
Metrado Metrado Metrado Metrado
(S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)

01 OBRAS PROVISIONALES 27,230.28 24,009.48 24009.48 28,326.40 900.00


01.01 CARTEL DE OBRA und 1.00 1,810.98 1,810.98 1.00 1,810.98 1,810.98 1.00 1,576.21 1,576.21 0.00 1,576.21 0.00
01.02 CASETA PARA ALMACEN DE MATERIALES Y/O GUARDIANIA m2 60.00 236.08 14,164.80 60.00 182.40 10,944.00 60.00 176.93 10,615.80 0.00 176.93 0.00
01.03 BAÑOS PORTATILES PARA OBRA glb 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00 1.00 2,250.00 2,250.00 0.00 2,250.00 0.00
01.04 AGUA PARA CONSUMO DE PERSONAL OBRERO mes 1.00 250.00 250.00 1.00 250.00 250.00 1.00 250.00 250.00 1.00 250.00 250.00
01.05 CONSUMO DE ENERGIA ELECTRICA mes 1.00 4,000.00 4,000.00 1.00 4,000.00 4,000.00 1.00 4,000.00 4,000.00 1.00 400.00 400.00
01.06 SEÑALIZACIÓN Y SEGURIDAD EN CAMPAMENTO mes 1.00 250.00 250.00 1.00 250.00 250.00 1.00 250.00 250.00 1.00 250.00 250.00
01.07 VIGILANCIA Y RESGUARDO EN OBRA mes 1.00 4,504.50 4,504.50 1.00 4,504.50 4,504.50 1.00 9,384.39 9,384.39 0.00 9,384.39 0.00
02 TRABAJOS PRELIMINARES 38,745.28 38,745.28 38745.28 48,933.21 44,733.21
02.01 MOVILIZACION Y DESMOVILIZACION, MAQUINARIAS Y EQUIPOS glb 1.00 15,470.88 15,470.88 1.00 15,470.88 15,470.88 1.00 14,583.84 14,583.84 1.00 14,583.84 14,583.84
02.02 TRAZO, NIVELACION Y REPLANTEO día 2.00 616.73 1,233.46 2.00 616.73 1,233.46 2.00 662.30 1,324.60 2.00 662.30 1,324.60
02.03 DEMOLICION DE LOSAS DE CONCRETO SIMPLE m3 75.20 94.76 7,125.95 75.20 94.76 7,125.95 102.08 163.17 16,656.39 102.08 163.17 16,656.39
02.04 CAMINO DE ACCESO - HABILITACION km 1.00 3,236.92 3,236.92 1.00 3,236.92 3,236.92 1.00 3,640.31 3,640.31 1.00 3,640.31 3,640.31
02.05 MONITOREO Y VIGILANCIA glb 1.00 3,150.00 3,150.00 1.00 3,150.00 3,150.00 1.00 4,200.00 4,200.00 0.00 4,200.00 0.00
02.06 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 8,528.07 8,528.07 1.00 8,528.07 8,528.07 1.00 8,528.07 8,528.07 1.00 8,528.07 8,528.07
03 MOVIMIENTO DE TIERRAS 175,752.28 168,252.11 155809.83 164,656.52 164,656.52
03.01 DESCOLMATACIÓN C/MAQUINARIA EN CAJA DE CANAL m3 245.70 12.52 3,076.16 245.70 12.52 3,076.16 245.70 10.91 2,680.59 245.70 10.91 2,680.59
03.02 CORTE DE TERRENO EN CAJA DE CANAL C/MAQUINARIA m3 285.60 8.92 2,547.55 285.60 5.51 1,573.66 285.60 4.45 1,270.92 285.60 4.45 1,270.92
03.03 RELLENO COMPACTADO CON MATERIAL PROPIO PARA CONFORMACIÓN DE PLATAF m3 1,364.00 13.54 18,468.56 882.00 13.54 11,942.28 882.00 13.58 11,977.56 882.00 13.58 11,977.56
03.04 REFINE Y PERFILADO EN CAJA DE CANAL m2 915.88 9.68 8,865.72 915.88 9.68 8,865.72 915.88 6.93 6,347.05 915.88 6.93 6,347.05
03.05 MEJORAMIENTO DE CAMINO DE SERVICIO m2 7,382.40 18.81 138,862.94 7,382.40 18.81 138,862.94 7,382.40 18.81 138,862.94 7,382.40 18.81 138,862.94
03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 761.89 5.16 3,931.35 761.89 5.16 3,931.35 797.61 4.41 3,517.46 797.61 4.41 3,517.46
04 CONCRETO SIMPLE 88,888.40 71,900.48 71900.48 83,303.48 83,303.48
04.01 SOLADO PARA REVESTIMIENTO DE CANAL e=3cm m2 369.76 13.36 4,939.99 369.76 0.00 0.00 0.00 13.36 0.00 0.00 13.36 0.00
04.02 CONCRETO f'c=175 kg/cm2 PARA REVESTIMIENTO DE CANAL e=7cm m3 64.11 480.17 30,783.70 64.11 480.17 30,783.70 91.59 468.33 42,894.34 91.59 468.33 42,894.34
04.03 ENCOFRADO Y DESENCOFRADO m2 69.07 51.14 3,532.24 69.07 51.14 3,532.24 69.07 42.19 2,914.06 69.07 42.19 2,914.06
04.04 CONCRETO CICLOPEO f'c=140 kg/cm2 + 25% P.M. m3 166.39 298.29 49,632.47 126.00 298.29 37,584.54 126.00 297.58 37,495.08 126.00 297.58 37,495.08
05 VARIOS 21,241.10 17,553.30 17553.3 17,719.07 17,719.07
05.01 JUNTA ELASTOMÉRICA m 366.65 22.86 8,381.62 366.65 22.86 8,381.62 366.65 22.65 8,304.62 366.65 22.65 8,304.62
05.02 SELLADO DE FISURAS EN LOSA DE CONCRETO m 14.40 17.50 252.00 14.40 17.50 252.00 14.40 17.37 250.13 14.40 17.37 250.13
05.03 DESVIO Y BOMBEO DE AGUA EN CANAL pto 8.00 1,114.96 8,919.68 8.00 1,114.96 8,919.68 8.00 1,145.54 9,164.32 8.00 1,145.54 9,164.32
5.04 FLETE glb 1.00 3,687.80 3,687.80 0.00 3,687.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO 351,857.34 320,460.65 308,518.37 308,518.27 342,938.68 311,312.28
GASTOS GENERALES 15.00% 52,778.60 48,069.10 46,277.76 51,440.80 43,962.96
UTILIDAD 10.00% 35,185.73 32,046.07 30,851.83 34,293.87 31,131.23
SUB TOTAL 439,821.67 400,575.82 385,647.96 428,673.35 386,406.47
IGV 18.00% 79,167.90 72,103.65 69,416.63 77,161.20 69,553.16
TOTAL PRESUPUESTO 518,989.57 472,679.47 455,064.59 505,834.55 455,959.63
SUPERVISION 4.75% 24,630.01 22,432.25 21,596.29 22,432.25 18,201.26
EXPEDIENTE TECNICO 12,455.75 10,000.00 10,000.00 10,000.00 10,000.00
GASTOS ADMINISTRATIVOS 4,982.30 0.00 0.00 0.00 0.00
ACTUALIZACION DE EXPEDIENTE TECNICO 0.00 0.00 0.00 0.00 2,500.00
REPARACIÓN DE DAÑOS EN EL CANAL TALAMBO ZAÑA POR FENÓMENO EL NIÑO COSTERO 2017, VALLE JEQUETEPEQUE, PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD - SINIESTRO I

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
ITEM DESCRIPCION UND.
Precio Parcial Precio Parcial Precio Parcial Precio Parcial
Metrado Metrado Metrado Metrado
(S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)

INVERSION TOTAL 561,057.63 505,111.72 486,660.88 538,266.80 486,660.89


DETALLE DE GASTOS GENERALES
PROYECTO: REPARACIÓN DE DAÑOS EN EL CANAL TALAMBO ZAÑA POR
FENÓMENO EL NIÑO COSTERO 2017, VALLE JEQUETEPEQUE,
PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD -
SINIESTRO I Fecha: SETIEMBRE-2018

DURACION: 1 Meses Costo Directo de Obra: 311,312.28

CANTIDA
ITEM DESCRIPCION UNIDAD P.UNIT. P.PARCIAL % del C.D.
D

A GASTOS FIJOS 9,962.96 3.20%

1 GASTOS DE CONCURSO Y FIRMA DE CONTRATO 1,000.00

Documentos de Presentación (adquisición de Bases y G glb 1 300.00 300.00 0.10%

Visitas a la zona de ejecución de la Obra glb 1 200.00 200.00 0.06%

Elaboración de la propuesta glb 1 200.00 200.00 0.06%

Constancias para contratacion de OSCE glb 1 100.00 100.00 0.03%

Requisitos para suscripcion de contrato glb 1 200.00 200.00 0.06%

2 GASTOS FINANCIEROS - FIANZAS 2,490.50

Fianza por Garantía de Fiel Cumplimiento ((Vigencia has glb 1 622.62 622.62 0.20%

Fianza por Garantía de Adelanto en Efectivo glb 1 622.62 622.62 0.20%

Fianza por Garantía de Adelanto en Materiales glb 1 1,245.25 1,245.25 0.40%

3 SEGUROS Y OBLIGACIONES 1,692.46

Póliza de Seguros Complementario de Trabajo de Riesg glb 1 180.00 180.00 0.06%

Poliza de Seguros ESSALUD + Vida para los trabajado und 15 49.31 739.65 0.24%

SENCICO (0.2% presupuesto sin IGV) glb 1 772.81 772.81 0.25%

4 GASTOS PARA LIQUIDACION DE OBRA 4,030.00

Elaboracion de la liquidacion de obra glb 1 3,500.00 3,500.00 1.12%

Elaboracion de planos y metrados para Recepcion de glb 1 500.00 500.00 0.16%

Cuaderno de obra glb 1 30.00 30.00 0.01%

5 ENSAYOS DE LABORATORIO 750.00

Diseño de mezcla und 1 350.00 350.00 0.11%

Rotura de probetas de concreto und 10 40.00 400.00 0.13%

Ensayo de proctor modificado und 0 400.00 0.00 0.00%

B GASTOS VARIABLES 34,000.00 10.92%

1 PERSONAL PROFESIONAL Y AUXILIAR 15,000.00

Ing. Residente de Obra Mes 1 7,000.00 7,000.00 2.25%

Ing. Asistente de Obra Mes 1 4,000.00 4,000.00 1.28%

Administrador de obra Mes 1 4,000.00 4,000.00 1.28%

2 PERSONAL TECNICO Y OTROS 7,200.00

Maestro de Obra Mes 1 4,000.00 4,000.00 1.28%

Almacenero Mes 1 1,200.00 1,200.00 0.39%

Guardian Mes 2 1,000.00 2,000.00 0.64%

3 GASTOS OPERATIVOS Y DE OFICINA 11,800.00

Equipos de Computo y Oficina mes 1 2,500.00 2,500.00 0.80%


Camionetas Pick Up Doble Cabina 4 x 4 mes 1 9,000.00 9,000.00 2.89%

Copias, impresiones y similares mes 1 300.00 300.00 0.10%

TOTAL 43,962.96 14.12%


REPARACIÓN DE DAÑOS EN EL CANAL TALAMBO ZAÑA POR FENÓMENO EL NIÑO COSTERO 2017, VALLE JEQUETEPEQUE, PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD - SINIESTRO II

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
ITEM DESCRIPCION UND.
Precio Parcial Precio Parcial Precio Parcial Precio
Metrado Metrado Metrado Metrado
(S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)

01 OBRAS PROVISIONALES 37,579.92 36,222.02 39,506.75


01.01 CARTEL DE OBRA und 1.00 1,810.98 1,810.98 1.00 1,231.00 1,231.00 1.00 1,576.21 1,576.21 1.00 1,576.21
01.02 CASETA PARA ALMACEN DE MATERIALES Y/O GUARDIANIA m2 32.00 203.13 6,500.16 32.00 178.82 5,722.24 32.00 176.93 5,661.76 32.00 176.93
01.03 BAÑOS PORTATILES PARA OBRA glb 2.00 750.00 1,500.00 2.00 750.00 1,500.00 2.00 2,250.00 4,500.00 2.00 2,250.00
01.04 AGUA PARA CONSUMO DE PERSONAL OBRERO mes 2.00 250.00 500.00 2.00 250.00 500.00 2.00 250.00 500.00 2.00 250.00
01.05 CONSUMO DE ENERGIA ELECTRICA mes 2.00 4,000.00 8,000.00 2.00 4,000.00 8,000.00 2.00 4,000.00 8,000.00 2.00 400.00
01.06 SEÑALIZACIÓN Y SEGURIDAD EN CAMPAMENTO mes 2.00 250.00 500.00 2.00 250.00 500.00 2.00 250.00 500.00 2.00 250.00
01.07 VIGILANCIA Y RESGUARDO EN OBRA mes 2.00 9,384.39 18,768.78 2.00 9,384.39 18,768.78 2.00 9,384.39 18,768.78 0.00 9,384.39
02 TRABAJOS PRELIMINARES 64,002.52 64,002.52 92,100.59
02.01 MOVILIZACION Y DESMOVILIZACION, MAQUINARIAS Y EQUIPOS glb 1.00 15,470.88 15,470.88 1.00 15,470.88 15,470.88 1.00 14,583.84 14,583.84 1.00 14,583.84
02.02 TRAZO, NIVELACION Y REPLANTEO día 2.00 616.73 1,233.46 2.00 616.73 1,233.46 2.00 662.30 1,324.60 2.00 662.30
02.03 DEMOLICION DE LOSAS DE CONCRETO SIMPLE m3 321.70 94.76 30,484.29 321.70 94.76 30,484.29 361.57 163.17 58,997.38 361.57 163.17
02.04 CAMINO DE ACCESO - HABILITACION km 1.00 3,236.92 3,236.92 1.00 3,236.92 3,236.92 1.00 3,640.31 3,640.31 1.00 3,640.31
02.05 RETIRO DE GEOMEMBRANA EN CANAL glb 1.00 848.90 848.90 1.00 848.90 848.90 1.00 826.39 826.39 1.00 826.39
02.06 MONITOREO Y VIGILANCIA glb 1.00 4,200.00 4,200.00 1.00 4,200.00 4,200.00 1.00 4,200.00 4,200.00 0.00 4,200.00
02.07 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 8,528.07 8,528.07 1.00 8,528.07 8,528.07 1.00 8,528.07 8,528.07 1.00 8,528.07
03 MOVIMIENTO DE TIERRAS 205,598.70 195,364.96 179,395.26
03.01 DESCOLMATACIÓN C/MAQUINARIA EN CAJA DE CANAL m3 9,024.99 12.52 112,992.87 9,024.99 12.52 112,992.87 9,024.99 10.91 98,462.64 9,024.99 10.91
03.02 CORTE DE TERRENO EN CAJA DE CANAL C/MAQUINARIA m3 8.10 8.92 72.25 8.10 5.51 44.63 8.10 4.45 36.05 8.10 4.45
03.03 CONFORMACION DE CAJA DE CANAL m2 302.05 24.06 7,267.32 302.05 24.06 7,267.32 302.05 29.10 8,789.66 302.05 29.10
03.04 REFINE Y PERFILADO EN CAJA DE CANAL m2 1,633.48 9.68 15,812.09 1,633.48 7.09 11,581.37 1,633.48 6.93 11,320.02 1,633.48 6.93
03.05 MEJORAMIENTO DE CAMINO DE SERVICIO m2 604.00 18.81 11,361.24 604.00 9.35 5,647.40 604.00 18.81 11,361.24 604.00 18.81
03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 11,258.32 5.16 58,092.93 11,207.63 5.16 57,831.37 11,207.63 4.41 49,425.65 11,207.63 4.41
04 CONCRETO SIMPLE 137,545.23 124,158.24 140,006.72
04.01 SOLADO PARA REVESTIMIENTO DE CANAL e=3cm m2 87.05 13.36 1,162.99 0.00 0.00 0.00 0.00 13.36 0.00 0.00 13.36
04.02 CONCRETO f'c=175 kg/cm2 PARA REVESTIMIENTO DE CANAL e=7cm m3 119.51 480.17 57,385.12 119.51 480.17 57,385.12 159.38 468.33 74,642.44 159.38 468.33
04.03 ENCOFRADO Y DESENCOFRADO m2 380.61 51.14 19,464.40 141.58 51.14 7,240.40 141.58 42.19 5,973.26 141.58 42.19
04.04 CONCRETO CICLOPEO f'c=140 kg/cm2 + 25% P.M. m3 199.58 298.29 59,532.72 199.58 298.29 59,532.72 199.58 297.58 59,391.02 199.58 297.58
05 VARIOS 80,689.42 80,689.42 81,930.39
05.01 JUNTA ELASTOMÉRICA m 1,199.77 22.86 27,426.74 1,199.77 22.86 27,426.74 1,199.77 22.65 27,174.79 1,199.77 22.65
05.02 SELLADO DE FISURAS EN LOSA DE CONCRETO m 114.80 17.50 2,009.00 114.80 17.50 2,009.00 114.80 17.37 1,994.08 114.80 17.37
05.03 DEVIO Y BOMBEO DE AGUA EN CANAL pto 42.00 1,114.96 46,828.32 42.00 1,114.96 46,828.32 42.00 1,145.54 48,112.68 42.00 1,145.54
05.04 FLETE glob 1.00 4,425.36 4,425.36 1.00 4,425.36 4,425.36 1.00 4,648.84 4,648.84 1.00 4,648.84
COSTO DIRECTO 525,415.79 500,437.16 532,939.71
GASTOS GENERALES 15.00% 78,812.37 75,065.57 79,940.96
UTILIDAD 10.00% 52,541.58 50,043.72 53,293.97
SUB TOTAL 656,769.74 625,546.45 666,174.64
IGV 18.00% 118,218.55 112,598.36 119,911.44
TOTAL PRESUPUESTO 774,988.29 738,144.81 786,086.08
REPARACIÓN DE DAÑOS EN EL CANAL TALAMBO ZAÑA POR FENÓMENO EL NIÑO COSTERO 2017, VALLE JEQUETEPEQUE, PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD - SINIESTRO II

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
ITEM DESCRIPCION UND.
Precio Parcial Precio Parcial Precio Parcial Precio
Metrado Metrado Metrado Metrado
(S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)

SUPERVISION 4.75% 36,779.11 35,030.60 35,030.60


EXPEDIENTE TECNICO 11,400.00 11,400.00 11,400.00
GASTOS ADMINISTRATIVOS 0.00 0.00 0.00
ACTUALIZACION DE EXPEDIENTE TECNICO 0.00 0.00 0.00
INVERSION TOTAL 823,167.40 784,575.41 832,516.68
COSTERO 2017, VALLE JEQUETEPEQUE, PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD - SINIESTRO II

COSTO DE REPARACION DEL


DAÑO ACTUALIZADO -
REAJUSTADO

Parcial
(S/.)

13,537.97
1,576.21
5,661.76
4,500.00
500.00
800.00
500.00
0.00
87,900.59
14,583.84
1,324.60
58,997.38
3,640.31
826.39
0.00
8,528.07
179,395.26
98,462.64
36.05
8,789.66
11,320.02
11,361.24
49,425.65
140,006.72
0.00
74,642.44
5,973.26
59,391.02
81,930.39
27,174.79
1,994.08
48,112.68
4,648.84
502,770.93
75,634.13
50,277.09
628,682.15
113,162.79
741,844.94
COSTERO 2017, VALLE JEQUETEPEQUE, PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD - SINIESTRO II

COSTO DE REPARACION DEL


DAÑO ACTUALIZADO -
REAJUSTADO

Parcial
(S/.)

28,830.48
11,400.00
0.00
2,500.00
784,575.42
DETALLE DE GASTOS GENERALES
PROYECTO: REPARACIÓN DE DAÑOS EN EL CANAL TALAMBO ZAÑA POR
FENÓMENO EL NIÑO COSTERO 2017, VALLE JEQUETEPEQUE,
PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD -
SINIESTRO II Fecha: SETIEMBRE-2018

DURACION: 2 Meses Costo Directo de Obra: 502,770.93

CANTIDA
ITEM DESCRIPCION UNIDAD P.UNIT. P.PARCIAL % del C.D.
D

A GASTOS FIJOS 7,634.13 1.52%

1 GASTOS DE CONCURSO Y FIRMA DE CONTRATO 0.00

Documentos de Presentación (adquisición de Bases y G glb 0 300.00 0.00 0.00%

Visitas a la zona de ejecución de la Obra glb 0 200.00 0.00 0.00%

Elaboración de la propuesta glb 0 200.00 0.00 0.00%

Constancias para contratacion de OSCE glb 0 100.00 0.00 0.00%

Requisitos para suscripcion de contrato glb 0 200.00 0.00 0.00%

2 GASTOS FINANCIEROS - FIANZAS 4,022.17

Fianza por Garantía de Fiel Cumplimiento ((Vigencia has glb 1 1,005.54 1,005.54 0.20%

Fianza por Garantía de Adelanto en Efectivo glb 1 1,005.54 1,005.54 0.20%

Fianza por Garantía de Adelanto en Materiales glb 1 2,011.08 2,011.08 0.40%

3 SEGUROS Y OBLIGACIONES 2,811.96

Póliza de Seguros Complementario de Trabajo de Riesg glb 1 360.00 360.00 0.07%

Poliza de Seguros ESSALUD + Vida para los trabajado und 15 79.64 1,194.60 0.24%

SENCICO (0.2% presupuesto sin IGV) glb 1 1,257.36 1,257.36 0.25%

4 GASTOS PARA LIQUIDACION DE OBRA 0.00

Elaboracion de la liquidacion de obra glb 0 3,500.00 0.00 0.00%

Elaboracion de planos y metrados para Recepcion de glb 0 500.00 0.00 0.00%

Cuaderno de obra glb 0 30.00 0.00 0.00%

5 ENSAYOS DE LABORATORIO 800.00

Diseño de mezcla und 0 350.00 0.00 0.00%

Rotura de probetas de concreto und 20 40.00 800.00 0.16%

Ensayo de proctor modificado und 0 400.00 0.00 0.00%

B GASTOS VARIABLES 68,000.00 13.53%

1 PERSONAL PROFESIONAL Y AUXILIAR 30,000.00

Ing. Residente de Obra Mes 2 7,000.00 14,000.00 2.78%

Ing. Asistente de Obra Mes 2 4,000.00 8,000.00 1.59%

Administrador de obra Mes 2 4,000.00 8,000.00 1.59%

2 PERSONAL TECNICO Y OTROS 14,400.00

Maestro de Obra Mes 2 4,000.00 8,000.00 1.59%

Almacenero Mes 2 1,200.00 2,400.00 0.48%

Guardian Mes 4 1,000.00 4,000.00 0.80%

3 GASTOS OPERATIVOS Y DE OFICINA 23,600.00

Equipos de Computo y Oficina mes 2 2,500.00 5,000.00 0.99%


Camionetas Pick Up Doble Cabina 4 x 4 mes 2 9,000.00 18,000.00 3.58%

Copias, impresiones y similares mes 2 300.00 600.00 0.12%

TOTAL 75,634.13 15.04%


DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

01 OBRAS PRELIMINARES 169,985.33


### 152,151.58
### 150,119.22 88,850.45
01.01 MOVILIZACION Y DESMOVILIZACION glb 1.00 52,222.95 52,222.95 1.00 52,222.95 52,222.95 1.00 52,222.95 52,222.95 1.00 52,222.95 52,222.95
01.02 ALMACEN, CASETA DE GUARDIANIA, OTROS glb 1.00 5,000.00 5,000.00 1.00 5,000.00 5,000.00 1.00 5,000.00 5,000.00 60.00 178.82 10,729.20
01.03 CARTEL DE OBRA und 1.00 1,850.00 1,850.00 1.00 1,231.00 1,231.00 1.00 1,231.00 1,231.00 1.00 1,231.00 1,231.00
01.04 TRAZO Y REPLANTEO m2 ### 0.37 92,412.38 ### 0.37 75,197.63 ### 0.36 73,165.27 10.00 616.73 6,167.30
01.05 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 18,500.00 18,500.00 1.00 18,500.00 18,500.00 1.00 18,500.00 18,500.00 1.00 18,500.00 18,500.00
02 LIMPIEZA DE VEGETACION 202,854.83
### 202,854.83
### 197,271.67 27,915.80
02.01 LIMPIEZA DE VEGETACION m2 ### 1.09 202,854.83 ### 1.09 202,854.83 ### 1.06 197,271.67 ### 0.15 27,915.80
03 DESCOLMATACION DE CAUCE 57,951.00
### 57,951.00
### 61,758.00 61,758.00
03.01 DESCOLMATACION DE CAUCE m3 10,575.00 5.48 57,951.00 10,575.00 5.48 57,951.00 10,575.00 5.84 61,758.00 10,575.00 5.84 61,758.00
04 MOVIMIENTO DE TIERRAS 2,959,065.82
### 1,654,804.55
### 1,755,322.02 1,788,337.45
04.01 EXCAVACION DE SOCAVAMIENTOS m3 19,888.81 5.64 112,172.89 19,888.81 5.48 108,990.68 19,888.81 3.82 75,975.25 19,888.81 5.48 108,990.68
04.02 ELIMINACION DE MATERIAL EXCEDENTE m3 24,861.01 2.31 57,428.93 24,861.01 2.31 57,428.93 24,861.01 2.58 64,141.41 24,861.01 2.58 64,141.41
04.03 RELLENO DE SOCAVAMIENTO m3 23,398.60 82.72 1,935,532.19 23,398.60 49.74 1,163,846.36 23,398.60 53.57 1,253,463.00 23,398.60 53.57 1,253,463.00
04.04 TRANSPORTE DE MATERIAL DE RELLENO D<1 km m3 23,398.60 7.43 173,851.60 23,398.60 7.43 173,851.60 23,398.60 8.46 197,952.16 23,398.60 8.46 197,952.16
04.05 TRANSPORTE DE MATERIAL DE RELLENO D>1 km m3 ### 1.61 680,080.21 93,594.40 1.61 150,686.98 93,594.40 1.75 163,790.20 93,594.40 1.75 163,790.20
05 PAVIMENTOS 595,474.89
### 473,310.17
### 486,184.68 485,499.42
05.01 PERFILADO Y COMPACTADO DE SUBRASANTE EN ZONA DE CORTE m3 17,131.50 2.58 44,199.27 17,131.50 2.58 44,199.27 17,131.50 2.62 44,884.53 17,131.50 2.58 44,199.27
05.02 SUPERFICIE DE RODADURA m3 5,139.45 66.61 342,338.76 5,139.45 42.84 220,174.04 5,139.45 43.11 221,561.69 5,139.45 43.11 221,561.69
05.03 TRANSPORTE DE MATERIAL GRANULAR D<1 km m3 5,139.45 7.43 38,186.11 5,139.45 7.43 38,186.11 5,139.45 7.13 36,644.28 5,139.45 7.13 36,644.28
05.04 TRANSPORTE DE MATERIAL GRANULAR D>1 km m3 ### 1.66 170,750.75 ### 1.66 170,750.75 ### 1.78 183,094.18 ### 1.78 183,094.18
06 MAMPOSTERIA DE PIEDRA 2,524,538.87
### 2,318,002.34
### 2,375,562.38 2,448,642.29
06.01 DEMOLICION DE MAMPOSTERIA DAÑADA 805,440.12
### 805,440.12
### 818,358.50 838,186.10
06.01.01 DEMOLICION DE ESTRUCTURAS DE MAMPOSTERIA m3 2,647.21 266.90 706,540.35 2,647.21 266.90 706,540.35 2,647.21 270.93 717,208.61 2,647.21 278.42 737,036.21
06.01.02 TRANSPORTE DE MATERIAL DEMOLIDO D<1 km m3-km 2,647.21 8.86 23,454.28 2,647.21 8.86 23,454.28 2,647.21 8.96 23,719.00 2,647.21 8.96 23,719.00
06.01.03 TRANSPORTE DE MATERIAL DEMOLIDO D>1 km m3-km 39,708.15 1.90 75,445.49 39,708.15 1.90 75,445.49 39,708.15 1.95 77,430.89 39,708.15 1.95 77,430.89
06.02 CONFORMACION DE BASE Y REPARACION DE MAMPOSTERIA DAÑADA 1,715,350.00
### 1,508,813.47
### 1,553,517.63 1,607,332.44
06.02.01 EXCAVACION DE BASE m3 3,142.22 5.64 17,722.12 3,142.22 5.48 17,219.37 3,142.22 5.95 18,696.21 3,142.22 5.95 18,696.21
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 3,927.78 2.31 9,073.17 3,927.78 2.31 9,073.17 3,927.78 2.58 10,133.67 3,927.78 2.58 10,133.67
06.02.03 RELLENO DE BASE m3 3,307.61 82.72 273,605.50 3,307.61 49.74 164,520.52 3,307.61 33.47 110,705.71 3,307.61 49.74 164,520.52
06.02.04 TRANSPORTE DE MATERIAL DE RELLENO D<1 km m3-km 3,307.61 7.43 24,575.54 3,307.61 7.43 24,575.54 3,307.61 8.46 27,982.38 3,307.61 8.46 27,982.38
06.02.05 TRANSPORTE DE MATERIAL DE RELLENO D>1 km m3-km 77,011.57 1.61 123,988.63 77,011.57 1.61 123,988.63 77,011.57 1.75 134,770.25 77,011.57 1.75 134,770.25
06.02.06 CONSTRUCCION TEMPORAL DE ATAGUIAS und 23.00 4,663.90 107,269.70 23.00 4,663.90 107,269.70 23.00 4,656.75 107,105.25 23.00 4,656.75 107,105.25
06.02.07 COLOCACION DE MAMPOSTERIA DE PIEDRA m3 2,646.08 438.05 1,159,115.34 2,647.21 401.24 1,062,166.54 2,647.21 432.20 1,144,124.16 2,647.21 432.20 1,144,124.16
06.03 SELLADO DE MAMPOSTERIA EXISTENTE 3,748.75
### 3,748.75
### 3,686.25 3,123.75
06.03.01 SELLADO DE FISURAS m 125.00 29.99 3,748.75 125.00 29.99 3,748.75 125.00 29.49 3,686.25 125.00 24.99 3,123.75
COSTO DIRECTO 6,509,870.74 4,859,074.47 5,026,217.97 4,901,003.41
GASTOS GENERALES 15.00% 976,480.61 728,861.17 753,932.70 735150.51 531,431.10
UTILIDAD 10.00% 650,987.07 485,907.45 502,621.80 490,100.34
SUB TOTAL 8,137,338.42 6,073,843.09 6,282,772.47 5,922,534.85
IGV 18.00% 1,464,720.92 1,093,291.76 1,130,899.04 1,066,056.27
DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

TOTAL PRESUPUESTO 9,602,059.34 7,167,134.85 7,413,671.51 6,988,591.12


SUPERVISION 4.75% 455,690.95 340,135.21 351,835.26 331,661.95
EXPEDIENTE TECNICO 12,455.75 12,455.75 12,455.75 12,455.75
GASTOS ADMINISTRATIVOS 0.00 0.00 0.00 0.00
ACTUALIZACION DE EXPEDIENTE TECNICO 0.00 0.00 0.00 15,000.00
INVERSION TOTAL 10,070,206.04 7,519,725.81 7,777,962.52 7,347,708.82
LIMITE
DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN SANTA ELENA, SANTA ELENA I, BOCATOMA JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

01 OBRAS PROVISIONALES 11,534.96


### 11,534.96
### 15,652.57 25,800.61
01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60Mx2.40M und 1.00 1,065.96 1,065.96 1.00 1,065.96 1,065.96 1.00 918.22 918.22 1.00 1,576.21 1,576.21
01.02 CASETA P/GUARDIANIA Y/O DEPÓSITO m2 25.00 78.76 1,969.00 25.00 78.76 1,969.00 25.00 79.47 1,986.75 60.00 178.82 10,729.20
01.03 ALQUILER DE LOCAL PARA LA OBRA mes 4.00 1,500.00 6,000.00 4.00 1,500.00 6,000.00 4.00 1,500.00 6,000.00 0.00 1,500.00 0.00
01.04 ZONA DE POLVORIN mes 1.00 2,500.00 2,500.00 1.00 2,500.00 2,500.00 1.00 6,747.60 6,747.60 2.00 6,747.60 13,495.20
02 DREN SANTA ELENA Y DREN SANTA ELENA I 3,254,679.95
### 1,846,706.85
### 1,884,827.05 1,884,827.05
02.01 OBRAS PRELIMINARES 111,251.53
### 71,041.36
### 73,137.62 73,137.62
02.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 80,340.00 80,340.00 1.00 40,129.83 40,129.83 1.00 40,129.83 40,129.83 1.00 40,129.83 40,129.83
02.01.02 EXTRACCION DE PIEDRA GRANDE EN CANTERA PARA MAMPOSTERIA m3 77.04 111.24 8,569.93 77.04 111.24 8,569.93 77.04 118.50 9,129.24 77.04 118.50 9,129.24
02.01.03 CORTE Y HABILITACION DE PIEDRA PARA MAMPOSTERIA SEGUN DISEÑO m3 77.04 56.65 4,364.32 77.04 56.65 4,364.32 77.04 60.51 4,661.69 77.04 60.51 4,661.69
02.01.04 TALLADO Y PERFILADO DE PIEDRA PARA MAMPOSTERIA SEGUN DISEÑO m3 77.04 233.35 17,977.28 77.04 233.35 17,977.28 77.04 249.44 19,216.86 77.04 249.44 19,216.86
02.02 PUENTE MARRANITO PROG. 0+070 (01 UND) 22,051.54
### 0.00
### 0.00 0.00
02.02.01 TRABAJOS PRELIMINARES 9,810.39 0.00 0.00 0.00
02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 18.70 3.54 66.20 0.00 3.54 0.00 0.00 3.78 0.00 0.00 3.78 0.00
02.02.01.02 TRAZO Y REPLANTEO m2 18.70 1.56 29.17 0.00 1.56 0.00 0.00 1.73 0.00 0.00 1.73 0.00
02.02.01.03 DEMOLICION DE EST. DE CONCRETO ARMADO, CON MARTILLO NEUMATICO m3 27.82 349.21 9,715.02 0.00 349.21 0.00 0.00 357.48 0.00 0.00 357.48 0.00
02.02.02 MOVIMIENTO DE TIERRAS 1,872.00 0.00 0.00 0.00
02.02.02.01 EXCAVACION EN TERRENO CONGLOMERADO m3 22.12 32.87 727.08 0.00 32.87 0.00 0.00 35.07 0.00 0.00 35.07 0.00
02.02.02.02 RELLENO CON MATERIAL PROPIO m3 13.70 17.77 243.45 0.00 17.77 0.00 0.00 18.22 0.00 0.00 18.22 0.00
02.02.02.03 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 45.30 19.90 901.47 0.00 19.90 0.00 0.00 17.06 0.00 0.00 19.90 0.00
02.02.03 OBRAS DE CONCRETO 9,783.21 0.00 0.00 0.00
02.02.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 23.80 81.42 1,937.80 0.00 81.42 0.00 0.00 87.06 0.00 0.00 87.06 0.00
02.02.03.02 CONCRETO EN f'c=210 kg/cm2 m3 5.40 612.06 3,305.12 0.00 612.06 0.00 0.00 556.68 0.00 0.00 612.06 0.00
02.02.03.03 ACERO FY= 4200 KG/CM2 GRADO 60 kg 350.14 4.00 1,400.56 0.00 4.00 0.00 0.00 4.00 0.00 0.00 4.00 0.00
02.02.03.04 CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% P.M. m3 6.00 404.50 2,427.00 0.00 404.50 0.00 0.00 420.06 0.00 0.00 420.06 0.00
02.02.03.05 CONCRETO f'c=175 kg/cm2 m3 1.40 509.09 712.73 0.00 509.09 0.00 0.00 510.35 0.00 0.00 510.35 0.00
02.02.04 ENTABLADO 585.94 0.00 0.00 0.00
02.02.04.01 ENTABLADO DE MADERA TORNILLO TABLAS DE 8'' X 4'' X 1.7 M m2 9.44 62.07 585.94 0.00 62.07 0.00 0.00 64.59 0.00 0.00 64.59 0.00
02.03 ALCANTARILLA TIPO PUENTE (01 UND) 4,223.90
### 2,181.39
### 2,404.46 2,404.46
02.03.01 TRABAJOS PRELIMINARES 1,244.38 700.96 838.02 838.02
DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

02.03.01.01 DEMOLICIÓN DE MAMPOSTERÍA m3 3.40 266.71 906.81 1.70 266.71 453.41 1.70 278.42 473.31 1.70 278.42 473.31
02.03.01.02 LIMPIEZA DE TERRENO MANUAL m2 66.19 3.54 234.31 66.19 2.18 144.29 66.19 3.78 250.20 66.19 3.78 250.20
02.03.01.03 TRAZO Y REPLANTEO m2 66.19 1.56 103.26 66.19 1.56 103.26 66.19 1.73 114.51 66.19 1.73 114.51
02.03.02 MOVIMIENTO DE TIERRAS 101.49 42.39 36.34 36.34
02.03.02.01 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 5.10 19.90 101.49 2.13 19.90 42.39 2.13 17.06 36.34 2.13 17.06 36.34
02.03.03 CONCRETO SIMPLE 2,878.03 1,438.04 1,530.10 1,530.10
02.03.03.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 KG/ m2 14.81 194.33 2,878.03 7.40 194.33 1,438.04 7.40 206.77 1,530.10 7.40 206.77 1,530.10
02.04 PUENTE EN DREN SAN DEMETRIO 1,076.83
### 1,010.48
### 1,057.42 1,057.42
02.04.01 TRABAJOS PRELIMINARES 239.30 239.30 250.10 250.10
02.04.01.01 DEMOLICIÓN DE MAMPOSTERÍA m3 0.84 266.71 224.04 0.84 266.71 224.04 0.84 278.42 233.87 0.84 278.42 233.87
02.04.01.02 LIMPIEZA Y DESBROCE TERRENO m2 3.34 3.01 10.05 3.34 3.01 10.05 3.34 3.13 10.45 3.34 3.13 10.45
02.04.01.03 TRAZO Y REPLANTEO m2 3.34 1.56 5.21 3.34 1.56 5.21 3.34 1.73 5.78 3.34 1.73 5.78
02.04.02 MOVIMIENTO DE TIERRAS 188.47 122.12 116.71 116.71
02.04.02.01 REFINE Y NIVELACION DE CAJA m2 3.34 16.24 54.24 3.34 7.22 24.11 3.34 7.51 25.08 3.34 7.51 25.08
02.04.02.02 COMPACTACION DE LA BASE m2 3.34 7.08 23.65 3.34 7.08 23.65 3.34 5.95 19.87 3.34 5.95 19.87
02.04.02.03 RELLENO COMPACTADO MANUAL-CON MATERIAL DE PRÉSTAMO m3 1.04 82.40 85.70 1.04 47.58 49.48 1.04 48.49 50.43 1.04 48.49 50.43
02.04.02.04 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 1.25 19.90 24.88 1.25 19.90 24.88 1.25 17.06 21.33 1.25 17.06 21.33
02.04.03 CONCRETO SIMPLE 649.06 649.06 690.61 690.61
02.04.03.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 KG/ m2 3.34 194.33 649.06 3.34 194.33 649.06 3.34 206.77 690.61 3.34 206.77 690.61
02.05 ENTREGAS 71,109.59
### 44,063.77
### 45,935.37 45,935.37
02.05.01 ENTREGA SUPERFICIAL TIPO I PROG. 1+034 SANTA ELENA (01 UND) 17,482.12
### 9,286.37
### 9,762.57 9,762.57
02.05.01.01 TRABAJOS PRELIMINARES 351.14 351.14 379.36 379.36
02.05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 68.85 3.54 243.73 68.85 3.54 243.73 68.85 3.78 260.25 68.85 3.78 260.25
02.05.01.01.02 TRAZO Y REPLANTEO m2 68.85 1.56 107.41 68.85 1.56 107.41 68.85 1.73 119.11 68.85 1.73 119.11
02.05.01.02 MOVIMIENTO DE TIERRAS 10,244.92 2,257.98 2,309.82 2,309.82
02.05.01.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 33.73 6.12 206.43 33.73 7.22 243.53 33.73 7.51 253.31 33.73 7.51 253.31
02.05.01.02.02 COMPACTACION DE LA BASE m2 33.73 7.08 238.81 33.73 7.08 238.81 33.73 5.95 200.69 33.73 5.95 200.69
02.05.01.02.03 EXCAVACION EN TERRENO CONGLOMERADO m3 57.77 32.87 1,898.90 21.17 32.87 695.86 21.17 35.07 742.43 21.17 35.07 742.43
02.05.01.02.04 RELLENO COMPACTADO MANUAL-CON MATERIAL DE PRÉSTAMO AFIRMA m3 81.45 82.40 6,711.48 15.84 47.58 753.67 15.84 48.49 768.08 15.84 48.49 768.08
02.05.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50m) m3 72.21 16.47 1,189.30 19.80 16.47 326.11 19.80 17.44 345.31 19.80 17.44 345.31
02.05.01.03 CONCRETO SIMPLE 2,675.21 2,675.21 2,860.27 2,860.27
02.05.01.03.01 SOLADO e=4", MEZCLA 1:10 C:H m2 3.60 28.95 104.22 3.60 28.95 104.22 3.60 34.64 124.70 3.60 34.64 124.70
02.05.01.03.02 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 13.23 194.33 2,570.99 13.23 194.33 2,570.99 13.23 206.77 2,735.57 13.23 206.77 2,735.57
02.05.01.04 CONCRETO ARMADO 4,210.85 4,002.04 4,213.12 4,213.12
02.05.01.04.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 22.20 81.42 1,807.52 22.20 81.42 1,807.52 22.20 87.06 1,932.73 22.20 87.06 1,932.73
02.05.01.04.02 CONCRETO EN f'c=210 kg/cm2 m3 2.22 612.06 1,358.77 2.22 518.00 1,149.96 2.22 556.68 1,235.83 2.22 556.68 1,235.83
02.05.01.04.03 ACERO FY= 4200 KG/CM2 GRADO 60 kg 261.14 4.00 1,044.56 261.14 4.00 1,044.56 261.14 4.00 1,044.56 261.14 4.00 1,044.56
02.05.02 ENTREGA SUPERFICIAL TIPO II PROG. 1+260 SANTA ELENA I (01 UND) 7,993.77
### 4,906.03
### 5,167.63 5,167.63
02.05.02.01 TRABAJOS PRELIMINARES 2,371.78 1,455.43 1,522.51 1,522.51
02.05.02.01.01 DEMOLICIÓN DE MAMPOSTERÍA m3 8.36 266.71 2,229.70 5.13 266.71 1,368.22 5.13 278.42 1,428.29 5.13 278.42 1,428.29
02.05.02.01.02 LIMPIEZA DE TERRENO MANUAL m2 27.86 3.54 98.62 17.10 3.54 60.53 17.10 3.78 64.64 17.10 3.78 64.64
DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

02.05.02.01.03 TRAZO Y REPLANTEO m2 27.86 1.56 43.46 17.10 1.56 26.68 17.10 1.73 29.58 17.10 1.73 29.58
02.05.02.02 MOVIMIENTO DE TIERRAS 207.96 127.56 109.35 109.35
02.05.02.02.01 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 10.45 19.90 207.96 6.41 19.90 127.56 6.41 17.06 109.35 6.41 17.06 109.35
02.05.02.03 CONCRETO SIMPLE 5,414.03 3,323.04 3,535.77 3,535.77
02.05.02.03.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 27.86 194.33 5,414.03 17.10 194.33 3,323.04 17.10 206.77 3,535.77 17.10 206.77 3,535.77
02.05.03 ENTREGA SUPERFICIAL TIPO IV PROG. 4+240 (01 UND) 27,397.47
### 15,584.78
### 15,897.36 15,897.36
02.05.03.01 TRABAJOS PRELIMINARES 4,517.23 4,517.23 4,706.95 4,706.95
02.05.03.01.01 DEMOLICION DE EST. DE CONCRETO ARMADO, CON MARTILLO NEUMATI m3 2.35 349.21 820.64 2.35 349.21 820.64 2.35 357.48 840.08 2.35 357.48 840.08
02.05.03.01.02 DEMOLICIÓN DE MAMPOSTERÍA m3 13.04 266.71 3,477.90 13.04 266.71 3,477.90 13.04 278.42 3,630.60 13.04 278.42 3,630.60
02.05.03.01.03 LIMPIEZA DE TERRENO MANUAL m2 42.88 3.54 151.80 42.88 3.54 151.80 42.88 3.78 162.09 42.88 3.78 162.09
02.05.03.01.04 TRAZO Y REPLANTEO m2 42.88 1.56 66.89 42.88 1.56 66.89 42.88 1.73 74.18 42.88 1.73 74.18
02.05.03.02 MOVIMIENTO DE TIERRAS 9,348.75 8,230.33 8,171.57 8,171.57
02.05.03.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 13.32 6.12 81.52 13.32 6.12 81.52 13.32 7.51 100.03 13.32 7.51 100.03
02.05.03.02.02 COMPACTACION DE LA BASE m2 334.48 7.08 2,368.12 334.48 7.08 2,368.12 334.48 5.95 1,990.16 334.48 5.95 1,990.16
02.05.03.02.03 EXCAVACION EN TERRENO CONGLOMERADO m3 79.55 32.87 2,614.81 79.55 32.87 2,614.81 79.55 35.07 2,789.82 79.55 35.07 2,789.82
02.05.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50m) m3 99.43 16.47 1,637.61 99.43 16.47 1,637.61 99.43 17.44 1,734.06 99.43 17.44 1,734.06
02.05.03.02.05 RELLENO COMPACTADO MANUAL-CON MATERIAL DE PRÉSTAMO AFIRMA m3 32.12 82.40 2,646.69 32.12 47.58 1,528.27 32.12 48.49 1,557.50 32.12 48.49 1,557.50
02.05.03.03 CONCRETO SIMPLE 3,129.04 2,837.22 3,018.84 3,018.84
02.05.03.03.01 SOLADO DE 4" MEZCLA 1:12 CEMENTO - HORMIGON m2 10.08 28.95 291.82 0.00 28.95 0.00 0.00 29.93 0.00 0.00 29.93 0.00
02.05.03.03.02 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 14.60 194.33 2,837.22 14.60 194.33 2,837.22 14.60 206.77 3,018.84 14.60 206.77 3,018.84
02.05.03.04 CONCRETO ARMADO 10,148.95 0.00 0.00 0.00
02.05.03.04.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 94.49 81.42 7,693.38 0.00 81.42 0.00 0.00 87.06 0.00 0.00 87.06 0.00
02.05.03.04.02 CONCRETO EN f'c=210 kg/cm2 m3 2.22 612.06 1,358.77 0.00 612.06 0.00 0.00 556.68 0.00 0.00 556.68 0.00
02.05.03.04.03 ACERO FY= 4200 KG/CM2 GRADO 60 kg 274.20 4.00 1,096.80 0.00 4.00 0.00 0.00 4.00 0.00 0.00 4.00 0.00
02.05.03.05 COLOCADO E INTALACION DE ENTREGA SUPERFICIAL COLAPSADA 253.50 0.00 0.00 0.00
02.05.03.05.01 IZAMIENTO DE ESTRUCTURA UTILIZANDO GRUAS und 1.00 253.50 253.50 0.00 253.50 0.00 0.00 238.80 0.00 0.00 238.80 0.00
02.05.04 ENTREGA SUPERFICIAL TIPO V PROG. 4+680 MD (01 UND) 11,013.37
### 10,768.58
### 11,398.68 11,398.68
02.05.04.01 TRABAJOS PRELIMINARES 3,531.84 3,287.05
### 3,438.40 3,438.40
02.05.04.01.01 DEMOLICIÓN DE MAMPOSTERÍA m3 11.92 266.71 3,179.18 11.92 266.71 3,179.18 11.92 278.42 3,318.77 11.92 278.42 3,318.77
02.05.04.01.02 LIMPIEZA DE TERRENO MANUAL m2 69.15 3.54 244.79 0.00 3.54 0.00 0.00 3.78 0.00 0.00 3.78 0.00
02.05.04.01.03 TRAZO Y REPLANTEO m2 69.15 1.56 107.87 69.15 1.56 107.87 69.15 1.73 119.63 69.15 1.73 119.63
02.05.04.02 MOVIMIENTO DE TIERRAS 973.42 973.42
### 1,035.55 1,035.55
02.05.04.02.01 EXCAVACION EN TERRENO CONGLOMERADO m3 18.21 32.87 598.56 18.21 32.87 598.56 18.21 35.07 638.62 18.21 35.07 638.62
02.05.04.02.02 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50m) m3 22.76 16.47 374.86 22.76 16.47 374.86 22.76 17.44 396.93 22.76 17.44 396.93
02.05.04.03 CONCRETO SIMPLE 6,508.11 6,508.11
### 6,924.73 6,924.73
02.05.04.03.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 33.49 194.33 6,508.11 33.49 194.33 6,508.11 33.49 206.77 6,924.73 33.49 206.77 6,924.73
02.05.05 ENTREGA SUPERFICIAL TIPO V PROG. 4+874 MD (01 UND) 7,222.86
### 3,518.01
### 3,709.13 3,709.13
02.05.05.01 TRABAJOS PRELIMINARES 993.47 993.47 1,036.68 1,036.68
02.05.05.01.01 DEMOLICION DE EST. DE CONCRETO ARMADO, CON MARTILLO NEUMATI m3 1.11 349.21 387.62 1.11 349.21 387.62 1.11 357.48 396.80 1.11 357.48 396.80
02.05.05.01.02 DEMOLICIÓN DE MAMPOSTERÍA m3 1.55 266.71 413.40 1.55 266.71 413.40 1.55 278.42 431.55 1.55 278.42 431.55
02.05.05.01.03 LIMPIEZA DE TERRENO MANUAL m2 34.89 3.54 123.51 34.89 3.54 123.51 34.89 3.78 131.88 34.89 3.78 131.88
DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

02.05.05.01.04 TRAZO Y REPLANTEO m2 44.19 1.56 68.94 44.19 1.56 68.94 44.19 1.73 76.45 44.19 1.73 76.45
02.05.05.02 MOVIMIENTO DE TIERRAS 66.27 66.27 56.81 56.81
02.05.05.02.01 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 3.33 19.90 66.27 3.33 19.90 66.27 3.33 17.06 56.81 3.33 17.06 56.81
02.05.05.03 CONCRETO SIMPLE 2,458.27 2,458.27 2,615.64 2,615.64
02.05.05.03.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 12.65 194.33 2,458.27 12.65 194.33 2,458.27 12.65 206.77 2,615.64 12.65 206.77 2,615.64
02.05.05.04 CONCRETO ARMADO 3,704.85 0.00 0.00 0.00
02.05.05.04.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 22.20 81.42 1,807.52 0.00 81.42 0.00 0.00 87.06 0.00 0.00 87.06 0.00
02.05.05.04.02 CONCRETO EN f'c=210 kg/cm2 m3 2.22 612.06 1,358.77 0.00 612.06 0.00 0.00 556.68 0.00 0.00 556.68 0.00
02.05.05.04.03 ACERO FY= 4200 KG/CM2 GRADO 60 kg 134.64 4.00 538.56 0.00 4.00 0.00 0.00 4.00 0.00 0.00 4.00 0.00
02.06 CAIDA 81,834.22
### 28,400.95
### 29,823.93 29,823.93
02.06.01 CAIDA INCLINADA H=1.00M PROG. 1+000 (01 UND) 16,863.22
### 6,193.13
### 6,535.67 6,535.67
02.06.01.01 TRABAJOS PRELIMINARES 10,374.54 2,306.53 2,400.27 2,400.27
02.06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 109.22 3.54 386.64 109.22 3.54 386.64 109.22 3.78 412.85 109.22 3.78 412.85
02.06.01.01.02 TRAZO Y REPLANTEO m2 109.22 1.56 170.38 109.22 1.56 170.38 109.22 1.73 188.95 109.22 1.73 188.95
02.06.01.01.03 DEMOLICIÓN DE MAMPOSTERÍA m3 33.67 266.71 8,980.13 6.00 266.71 1,600.26 6.00 278.42 1,670.52 6.00 278.42 1,670.52
02.06.01.01.04 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 42.08 19.90 837.39 7.50 19.90 149.25 7.50 17.06 127.95 7.50 17.06 127.95
02.06.01.02 CONCRETO SIMPLE 6,488.68 3,886.60 4,135.40 4,135.40
02.06.01.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 33.39 194.33 6,488.68 20.00 194.33 3,886.60 20.00 206.77 4,135.40 20.00 206.77 4,135.40
02.06.02 CAIDA INCLINADA H=1.00M PROG. 1+135 (01 UND) 16,863.22
### 4,755.84
### 4,918.13 4,918.13
02.06.02.01 TRABAJOS PRELIMINARES 10,374.54 4,755.84
### 4,918.13 4,918.13
02.06.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 109.22 3.54 386.64 109.22 3.54 386.64 109.22 3.78 412.85 109.22 3.78 412.85
02.06.02.01.02 TRAZO Y REPLANTEO m2 109.22 1.56 170.38 109.22 1.56 170.38 109.22 1.73 188.95 109.22 1.73 188.95
02.06.02.01.03 DEMOLICIÓN DE MAMPOSTERÍA m3 33.67 266.71 8,980.13 14.40 266.71 3,840.62 14.40 278.42 4,009.25 14.40 278.42 4,009.25
02.06.02.01.04 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 42.08 19.90 837.39 18.00 19.90 358.20 18.00 17.06 307.08 18.00 17.06 307.08
02.06.02.02 CONCRETO SIMPLE 6,488.68 0.00 0.00 0.00
02.06.02.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 33.39 194.33 6,488.68 0.00 194.33 0.00 0.00 206.77 0.00 0.00 206.77 0.00
02.06.03 CAIDA INCLINADA H=1.00M PROG. 1+400 (01 UND) 16,863.22
### 11,258.85
### 11,834.46 11,834.46
02.06.03.01 TRABAJOS PRELIMINARES 10,374.54 4,770.17 4,930.41 4,930.41
02.06.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 109.22 3.54 386.64 109.22 3.54 386.64 109.22 3.78 412.85 109.22 3.78 412.85
02.06.03.01.02 TRAZO Y REPLANTEO m2 109.22 1.56 170.38 109.22 1.56 170.38 109.22 1.73 188.95 109.22 1.73 188.95
02.06.03.01.03 DEMOLICIÓN DE MAMPOSTERÍA m3 33.67 266.71 8,980.13 14.40 266.71 3,840.62 14.40 278.42 4,009.25 14.40 278.42 4,009.25
02.06.03.01.04 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 42.08 19.90 837.39 18.72 19.90 372.53 18.72 17.06 319.36 18.72 17.06 319.36
02.06.03.02 CONCRETO SIMPLE 6,488.68 6,488.68 6,904.05 6,904.05
02.06.03.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 33.39 194.33 6,488.68 33.39 194.33 6,488.68 33.39 206.77 6,904.05 33.39 206.77 6,904.05
02.06.04 CAIDA INCLINADA H=1.00M PROG. 1+638 (01 UND) 16,863.22
### 6,193.13
### 6,535.67 6,535.67
02.06.04.01 TRABAJOS PRELIMINARES 10,374.54 2,306.53
### 2,400.27 2,400.27
02.06.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 109.22 3.54 386.64 109.22 3.54 386.64 109.22 3.78 412.85 109.22 3.78 412.85
02.06.04.01.02 TRAZO Y REPLANTEO m2 109.22 1.56 170.38 109.22 1.56 170.38 109.22 1.73 188.95 109.22 1.73 188.95
02.06.04.01.03 DEMOLICIÓN DE MAMPOSTERÍA m3 33.67 266.71 8,980.13 6.00 266.71 1,600.26 6.00 278.42 1,670.52 6.00 278.42 1,670.52
02.06.04.01.04 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 42.08 19.90 837.39 7.50 19.90 149.25 7.50 17.06 127.95 7.50 17.06 127.95
02.06.04.02 CONCRETO SIMPLE 6,488.68 3,886.60 4,135.40 4,135.40
DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

02.06.04.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 33.39 194.33 6,488.68 20.00 194.33 3,886.60 20.00 206.77 4,135.40 20.00 206.77 4,135.40
02.06.05 CAIDA INCLINADA H=0.60M PROG. 1+980 (01 UND) 14,381.34
### 0.00
### 0.00 0.00
02.06.05.01 TRABAJOS PRELIMINARES 8,819.62 0.00 0.00 0.00
02.06.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 93.01 3.54 329.26 0.00 3.54 0.00 0.00 3.78 0.00 0.00 3.78 0.00
02.06.05.01.02 TRAZO Y REPLANTEO m2 93.01 1.56 145.10 0.00 1.56 0.00 0.00 1.73 0.00 0.00 1.73 0.00
02.06.05.01.03 DEMOLICIÓN DE MAMPOSTERÍA m3 28.62 266.71 7,633.24 0.00 266.71 0.00 0.00 278.42 0.00 0.00 278.42 0.00
02.06.05.01.04 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 35.78 19.90 712.02 0.00 19.90 0.00 0.00 17.06 0.00 0.00 17.06 0.00
02.06.05.02 CONCRETO SIMPLE 5,561.72 0.00 0.00 0.00
02.06.05.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 28.62 194.33 5,561.72 0.00 194.33 0.00 0.00 206.77 0.00 0.00 206.77 0.00
02.07 PUENTE EN LA INTERSECCIÓN SANTA ELENA - SANTA ELENA I 26,455.08
### 0.00
### 0.00 0.00
02.07.01 TRABAJOS PRELIMINARES 5,668.93 0.00 0.00 0.00
02.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 97.01 3.54 343.42 0.00 3.54 0.00 0.00 3.78 0.00 0.00 3.78 0.00
02.07.01.02 TRAZO Y REPLANTEO m2 97.01 1.56 151.34 0.00 1.56 0.00 0.00 1.73 0.00 0.00 1.73 0.00
02.07.01.03 DEMOLICIÓN DE MAMPOSTERÍA m3 19.40 266.71 5,174.17 0.00 266.71 0.00 0.00 278.42 0.00 0.00 278.42 0.00
02.07.02 MOVIMIENTO DE TIERRAS 1,934.20 0.00 0.00 0.00
02.07.02.01 COMPACTACION DE LA BASE m2 191.40 7.08 1,355.11 0.00 7.08 0.00 0.00 5.95 0.00 0.00 5.95 0.00
02.07.02.02 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 29.10 19.90 579.09 0.00 19.90 0.00 0.00 17.06 0.00 0.00 17.06 0.00
02.07.03 CONCRETO SIMPLE 18,851.95 0.00 0.00 0.00
02.07.03.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 KG/ m2 97.01 194.33 18,851.95 0.00 194.33 0.00 0.00 206.77 0.00 0.00 206.77 0.00
02.08 PUENTE EN EL DREN SANTA ELENA I 3,217.93
### 3,217.93
### 3,366.30 3,366.30
02.08.01 PUENTE VEHICULAR N° 01 PROG. 1+960 (01 UND) 706.11
### 706.11 740.72 740.72
02.08.01.01 TRABAJOS PRELIMINARES 461.25 461.25 480.19 480.19
02.08.01.01.01 TRAZO Y REPLANTEO m2 56.15 1.56 87.59 56.15 1.56 87.59 56.15 1.73 97.14 56.15 1.73 97.14
02.08.01.01.02 DEMOLICIÓN DE MAMPOSTERÍA m3 1.26 266.71 336.05 1.26 266.71 336.05 1.26 278.42 350.81 1.26 278.42 350.81
02.08.01.01.03 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 1.89 19.90 37.61 1.89 19.90 37.61 1.89 17.06 32.24 1.89 17.06 32.24
02.08.01.02 CONCRETO SIMPLE 244.86 244.86 260.53 260.53
02.08.01.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 1.26 194.33 244.86 1.26 194.33 244.86 1.26 206.77 260.53 1.26 206.77 260.53
02.08.02 PUENTE VEHICULAR N° 02 PROG. 2+874 (01 UND) 1,255.91
### 1,255.91
### 1,312.79 1,312.79
02.08.02.01 TRABAJOS PRELIMINARES 793.40 793.40 820.68 820.68
02.08.02.01.01 TRAZO Y REPLANTEO m2 56.15 1.56 87.59 56.15 1.56 87.59 56.15 1.73 97.14 56.15 1.73 97.14
02.08.02.01.02 DEMOLICIÓN DE MAMPOSTERÍA m3 2.38 266.71 634.77 2.38 266.71 634.77 2.38 278.42 662.64 2.38 278.42 662.64
02.08.02.01.03 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 3.57 19.90 71.04 3.57 19.90 71.04 3.57 17.06 60.90 3.57 17.06 60.90
02.08.02.02 CONCRETO SIMPLE 462.51 462.51 492.11 492.11
02.08.02.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 2.38 194.33 462.51 2.38 194.33 462.51 2.38 206.77 492.11 2.38 206.77 492.11
02.08.03 PUENTE VEHICULAR N° 03 PROG. 4+666 (01 UND) 1,255.91
### 1,255.91
### 1,312.79 1,312.79
02.08.03.01 TRABAJOS PRELIMINARES 793.40 793.40 820.68 820.68
02.08.03.01.01 TRAZO Y REPLANTEO m2 56.15 1.56 87.59 56.15 1.56 87.59 56.15 1.73 97.14 56.15 1.73 97.14
02.08.03.01.02 DEMOLICIÓN DE MAMPOSTERÍA m3 2.38 266.71 634.77 2.38 266.71 634.77 2.38 278.42 662.64 2.38 278.42 662.64
02.08.03.01.03 ELIMINACION DE MATERIAL DEMOLIDO Y ESCOMBROS m3 3.57 19.90 71.04 3.57 19.90 71.04 3.57 17.06 60.90 3.57 17.06 60.90
02.08.03.02 CONCRETO SIMPLE 462.51 462.51 492.11 492.11
02.08.03.02.01 MAMPOSTERIA DE PIEDRA E=0.40M ASENTADA EN CONCRETO F'C=175 K m2 2.38 194.33 462.51 2.38 194.33 462.51 2.38 206.77 492.11 2.38 206.77 492.11
DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.

Precio Precio Precio Precio


Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.)
(S/.) (S/.) (S/.) (S/.)

02.09 MEJORAMIENTO DE DRENES 2,933,459.33


### 1,696,790.97
### 1,729,101.95 1,729,101.95
02.09.01 TRABAJOS PRELIMINARES 46,165.43 41,453.27 42,104.79 42,104.79
02.09.01.01 LIMPIEZA DE DREN CON MAQUINARIA m3 9,052.62 5.09 46,077.84 8,144.06 5.09 41,453.27 8,144.06 5.17 42,104.79 8,144.06 5.17 42,104.79
02.09.01.02 TRAZO Y REPLANTEO m2 56.15 1.56 87.59 0.00 1.56 0.00 0.00 1.73 0.00 0.00 1.73 0.00
02.09.02 MOVIMIENTO DE TIERRAS 2,887,293.90 1,655,337.70 1,686,997.16 1,686,997.16
02.09.02.01 CONTROL TOPOGRÁFICO m 6,758.82 3.04 20,546.81 0.00 3.04 0.00 0.00 3.32 0.00 0.00 3.32 0.00
02.09.02.02 RELLENO COMPACTADO MATERIAL DE PRESTAMO AFIRMADO m3 34,790.62 82.40 2,866,747.09 34,790.62 47.58 1,655,337.70 34,790.62 48.49 1,686,997.16 34,790.62 48.49 1,686,997.16
03 FLETE 22,273.60
### 22,273.60
### 22,273.60 22,273.60
03.01 FLETE TERRESTRE glb 1.00 22,273.60 22,273.60 1.00 22,273.60 22,273.60 1.00 22,273.60 22,273.60 1.00 22,273.60 22,273.60
COSTO DIRECTO 3,288,488.51
### 1,880,515.41 1,922,753.22 1,932,901.26
GASTOS GENERALES 15.00% 493,273.28 282,077.31 288,412.98 289935.19 283,217.94
UTILIDAD 10.00% 328,848.85 188,051.54 192,275.32 193,290.13
SUB TOTAL 4,110,610.64 2,350,644.26 2,403,441.52 2,409,409.33
IGV 18.00% 739,909.92 423,115.97 432,619.47 433,693.68
TOTAL PRESUPUESTO 4,850,520.56 2,773,760.23 2,836,060.99 2,843,103.01
SUPERVISION 4.75% 230,194.20 131,636.08 134,592.72 134,926.92
EXPEDIENTE TECNICO 14,548.55 14,548.55 14,548.55 14,548.55
GASTOS ADMINISTRATIVOS 0.00 0.00 0.00 0.00
ACTUALIZACION DE EXPEDIENTE TECNICO 0.00 0.00 0.00 10,000.00
INVERSION TOTAL 5,095,263.31 2,919,944.86 2,985,202.26 3,002,578.48

A+B
COSTO DIRECTO 9,798,359.25### -1,010.41 6,738,579.47 6,739,589.88### 6,948,971.19 6,833,904.67
GASTOS GENERALES 15.00% 1,469,753.89### -151.56 1,010,786.92 1,010,938.48### 1,042,345.68 814,649.04
UTILIDAD 10.00% 979,835.93### -101.04 673,857.95 673,958.99### 694,897.12 683,390.47
SUB TOTAL 12,247,949.07### -1263.01 8,423,224.34 8,424,487.35### 8,686,213.99 8,331,944.18
IGV 18.00% 2,204,630.83### -227.34 1,516,180.38 1,516,407.72### 1,563,518.52 1,499,749.95
TOTAL PRESUPUESTO 14,452,579.90### -1490.35 9,939,404.72 9,940,895.07### 10,249,732.51 9,831,694.13
SUPERVISION 4.75% 685,885.15### -70.73 471,700.56 471,771.29### 486,427.98 466,588.87
EXPEDIENTE TECNICO 27,004.30### 0 27,004.30 27,004.30### 27,004.30 27,004.30
GASTOS ADMINISTRATIVOS 0.00### 0 0.00 0.00### 0.00 0.00
ACTUALIZACION DE EXPEDIENTE TECNICO 0.00### 0 0.00 0.00### 0.00 25,000.00
INVERSION TOTAL 15,165,469.35### -1,561.08 ### 10,439,670.66### 10,763,164.79 10,350,287.30
15,165,469.34 10,438,109.59 -325,055.20 87,822.29
DETALLE DE GASTOS GENERALES
PROYECTO: DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL
SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA
DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE
Fecha: SETIEMBRE-2018

DURACION: 5 Meses Costo Directo de Obra: 4,901,003.41

CANTIDA
ITEM DESCRIPCION UNIDAD P.UNIT. P.PARCIAL % del C.D.
D

A GASTOS FIJOS 83,431.10 1.70%

1 GASTOS DE CONCURSO Y FIRMA DE CONTRATO 1,000.00

Documentos de Presentación (adquisición de Bases y G glb 1 300.00 300.00 0.01%

Visitas a la zona de ejecución de la Obra glb 1 200.00 200.00 0.00%

Elaboración de la propuesta glb 1 200.00 200.00 0.00%

Constancias para contratacion de OSCE glb 1 100.00 100.00 0.00%

Requisitos para suscripcion de contrato glb 1 200.00 200.00 0.00%

2 GASTOS FINANCIEROS - FIANZAS 39,208.03

Fianza por Garantía de Fiel Cumplimiento ((Vigencia has glb 1 9,802.01 9,802.01 0.20%

Fianza por Garantía de Adelanto en Efectivo glb 1 9,802.01 9,802.01 0.20%

Fianza por Garantía de Adelanto en Materiales glb 1 19,604.01 19,604.01 0.40%

3 SEGUROS Y OBLIGACIONES 34,043.07

Póliza de Seguros Complementario de Trabajo de Riesg glb 1 2,790.00 2,790.00 0.06%

Poliza de Seguros ESSALUD + Vida para los trabajado und 25 776.32 19,408.00 0.40%

SENCICO (0.2% presupuesto sin IGV) glb 1 11,845.07 11,845.07 0.24%

4 GASTOS PARA LIQUIDACION DE OBRA 6,030.00

Elaboracion de la liquidacion de obra glb 1 5,000.00 5,000.00 0.10%

Elaboracion de planos y metrados para Recepcion de glb 1 1,000.00 1,000.00 0.02%

Cuaderno de obra glb 1 30.00 30.00 0.00%

5 ENSAYOS DE LABORATORIO 3,150.00

Diseño de mezcla und 1 350.00 350.00 0.01%

Rotura de probetas de concreto und 20 40.00 800.00 0.02%

Ensayo de proctor modificado und 5 400.00 2,000.00 0.04%

B GASTOS VARIABLES 448,000.00 9.14%

1 PERSONAL PROFESIONAL Y AUXILIAR 232,500.00

Ing. Residente de Obra Mes 5 9,000.00 45,000.00 0.92%

Ing. Asistente de Obra Mes 5 5,000.00 25,000.00 0.51%

Especialista en Hidraulica Fluvial Mes 5 7,500.00 37,500.00 0.77%

Especialista en Hidrogeologia Mes 5 7,500.00 37,500.00 0.77%

Especialista en Seguridad y Salud Mes 5 7,500.00 37,500.00 0.77%

Especialista en Costos y Presupuestos Mes 5 5,000.00 25,000.00 0.51%

Administrador de obra Mes 5 5,000.00 25,000.00 0.51%

2 PERSONAL TECNICO Y OTROS 89,000.00


Auxiliar Contable Mes 5 4,000.00 20,000.00 0.41%

Cadista Mes 5 4,000.00 20,000.00 0.41%

Maestro de Obra Mes 5 5,000.00 25,000.00 0.51%

Almacenero Mes 5 1,800.00 9,000.00 0.18%

Guardian Mes 10 1,500.00 15,000.00 0.31%

3 GASTOS OPERATIVOS Y DE OFICINA 66,250.00

Equipos de Computo y Oficina mes 5 3,500.00 17,500.00 0.36%

Camionetas Pick Up Doble Cabina 4 x 4 mes 5 9,000.00 45,000.00 0.92%

Copias, impresiones y similares mes 5 750.00 3,750.00 0.08%

4 SERVICIOS DIVERSOS 60,250.00

Alimentacion mes 65 600.00 39,000.00 0.80%

Vivienda / Hospedaje mes 5 2,500.00 12,500.00 0.26%

Viaticos y Gastos de personal mes 35 250.00 8,750.00 0.18%

TOTAL 531,431.10 10.84%


DETALLE DE GASTOS GENERALES
PROYECTO: DAÑOS A LA INFRAESTRUCTURA HIDRÁULICA EN DREN I-I, DEL
SISTEMA DE RIEGO Y DRENAJE ETAPA I-A (PAQUETE Nº 2) SUB ZONA
DE LA PARTE BAJA DEL VALLE JEQUETEPEQUE
Fecha: SETIEMBRE-2018

DURACION: 3 Meses Costo Directo de Obra: 1,932,901.26

CANTIDA
ITEM DESCRIPCION UNIDAD P.UNIT. P.PARCIAL % del C.D.
D

A GASTOS FIJOS 39,414.11 2.04%

1 GASTOS DE CONCURSO Y FIRMA DE CONTRATO 1,000.00

Documentos de Presentación (adquisición de Bases y G glb 1 300.00 300.00 0.02%

Visitas a la zona de ejecución de la Obra glb 1 200.00 200.00 0.01%

Elaboración de la propuesta glb 1 200.00 200.00 0.01%

Constancias para contratacion de OSCE glb 1 100.00 100.00 0.01%

Requisitos para suscripcion de contrato glb 1 200.00 200.00 0.01%

2 GASTOS FINANCIEROS - FIANZAS 15,463.21

Fianza por Garantía de Fiel Cumplimiento ((Vigencia has glb 1 3,865.80 3,865.80 0.20%

Fianza por Garantía de Adelanto en Efectivo glb 1 3,865.80 3,865.80 0.20%

Fianza por Garantía de Adelanto en Materiales glb 1 7,731.61 7,731.61 0.40%

3 SEGUROS Y OBLIGACIONES 13,570.90

Póliza de Seguros Complementario de Trabajo de Riesg glb 1 1,404.00 1,404.00 0.07%

Poliza de Seguros ESSALUD + Vida para los trabajado und 24 306.17 7,348.08 0.38%

SENCICO (0.2% presupuesto sin IGV) glb 1 4,818.82 4,818.82 0.25%

4 GASTOS PARA LIQUIDACION DE OBRA 6,030.00

Elaboracion de la liquidacion de obra glb 1 5,000.00 5,000.00 0.26%

Elaboracion de planos y metrados para Recepcion de glb 1 1,000.00 1,000.00 0.05%

Cuaderno de obra glb 1 30.00 30.00 0.00%

5 ENSAYOS DE LABORATORIO 3,350.00

Diseño de mezcla und 1 350.00 350.00 0.02%

Rotura de probetas de concreto und 25 40.00 1,000.00 0.05%

Ensayo de proctor modificado und 5 400.00 2,000.00 0.10%

B GASTOS VARIABLES 243,750.00 12.61%

1 PERSONAL PROFESIONAL Y AUXILIAR 117,000.00

Ing. Residente de Obra Mes 3 9,000.00 27,000.00 1.40%

Ing. Asistente de Obra Mes 3 5,000.00 15,000.00 0.78%

Especialista en Hidraulica Fluvial Mes 3 7,500.00 22,500.00 1.16%

Especialista en Hidrogeologia Mes 0 7,500.00 0.00 0.00%

Especialista en Seguridad y Salud Mes 3 7,500.00 22,500.00 1.16%

Especialista en Costos y Presupuestos Mes 3 5,000.00 15,000.00 0.78%

Administrador de obra Mes 3 5,000.00 15,000.00 0.78%

2 PERSONAL TECNICO Y OTROS 53,400.00


Auxiliar Contable Mes 3 4,000.00 12,000.00 0.62%

Cadista Mes 3 4,000.00 12,000.00 0.62%

Maestro de Obra Mes 3 5,000.00 15,000.00 0.78%

Almacenero Mes 3 1,800.00 5,400.00 0.28%

Guardian Mes 6 1,500.00 9,000.00 0.47%

3 GASTOS OPERATIVOS Y DE OFICINA 39,750.00

Equipos de Computo y Oficina mes 3 3,500.00 10,500.00 0.54%

Camionetas Pick Up Doble Cabina 4 x 4 mes 3 9,000.00 27,000.00 1.40%

Copias, impresiones y similares mes 3 750.00 2,250.00 0.12%

4 SERVICIOS DIVERSOS 33,600.00

Alimentacion mes 36 600.00 21,600.00 1.12%

Vivienda / Hospedaje mes 3 2,500.00 7,500.00 0.39%

Viaticos y Gastos de personal mes 18 250.00 4,500.00 0.23%

TOTAL 283,164.11 14.65%


REPARACIÓN DE DAÑOS EN LA TOMA DE CAPTACIÓN DEL RIO JEQUETEPEQUE POR FENÓMENO EL NIÑO COSTERO 2017, VALLE JEQUETEPEQUE, PROVINCIA DE CHEPÉN - DEPARTAMENTO DE LA LIBERTAD

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.
Precio Parcial Precio Parcial Precio Parcial Precio Parcial
Metrado Metrado Metrado Metrado
(S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)

01 OBRAS PROVISIONALES 5,678.26 5,678.26 5,558.11 5,558.11


01.01 CARTEL DE OBRA DE 3.60 X 2.40M GLB 1.00 1,225.26 1,225.26 1.00 1,225.26 1,225.26 1.00 1,105.11 1,105.11 1.00 1,105.11 1,105.11
01.02 BAÑOS PORTATILES PARA OBRA mes 1.00 700.00 700.00 1.00 700.00 700.00 1.00 700.00 700.00 1.00 700.00 700.00
01.03 AGUA PARA CONSUMO DE PERSONAL OBRERO mes 1.00 150.00 150.00 1.00 150.00 150.00 1.00 150.00 150.00 1.00 150.00 150.00
01.04 CONSUMO DE ENERGIA ELECTRICA mes 1.00 350.00 350.00 1.00 350.00 350.00 1.00 350.00 350.00 1.00 350.00 350.00
01.05 SEÑALIZACION Y SEGURIDAD EN OBRA mes 1.00 250.00 250.00 1.00 250.00 250.00 1.00 250.00 250.00 1.00 250.00 250.00
01.06 VIGILINCIA Y RESGUARDO EN OBRA mes 1.00 3,003.00 3,003.00 1.00 3,003.00 3,003.00 1.00 3,003.00 3,003.00 1.00 3,003.00 3,003.00
02 TRABAJOS PRELIMINARES 25,856.73 25,856.73 29,387.56 29,387.56
02.01 MOVILIZACION Y DESMOVILIZACION GLB 1.00 9,920.00 9,920.00 1.00 9,920.00 9,920.00 1.00 12,932.00 12,932.00 1.00 12,932.00 12,932.00
02.02 LIMPIEZA, DESBROCE Y ELIMINACION DE VEGETACION DIA 2.00 677.14 1,354.28 2.00 677.14 1,354.28 2.00 260.71 521.42 2.00 260.71 521.42
02.03 TRAZO, NIVELACION Y REPLANTEO DIA 2.00 252.14 504.28 2.00 252.14 504.28 2.00 716.60 1,433.20 2.00 716.60 1,433.20
02.04 CAMINO DE ACCESO - HABILITACION m 50.00 47.20 2,360.00 50.00 47.20 2,360.00 50.00 58.25 2,912.50 50.00 58.25 2,912.50
02.05 MONITOREO Y VIGILANCIA GLB 1.00 8,168.17 8,168.17 1.00 8,168.17 8,168.17 1.00 8,038.44 8,038.44 1.00 8,038.44 8,038.44
02.06 MITIGACION DEL IMPACTO AMBIENTAL GLB 1.00 3,550.00 3,550.00 1.00 3,550.00 3,550.00 1.00 3,550.00 3,550.00 1.00 3,550.00 3,550.00
03 MOVIMIENTO DE TIERRAS 336,804.29 68,128.89 90,553.73 90,553.73
03.01 DESCOLMATACIÓN DE CAUCE DE RÍO CON MAQUINARIA m3 ### 2.58 142,300.11 0.00 2.58 0.00 0.00 0.00 0.00 0.00 0.00
03.02 CONFORMACION DE DIQUE CON RELLENO DE MATERIAL PROPIO m3 7,690.18 6.87 52,831.54 7,690.18 6.87 52,831.54 7,690.18 9.41 72,364.59 7,690.18 9.41 72,364.59
03.03 COMPACTADO DE MATERIAL DE RELLENO m2 2,217.74 0.96 2,129.03 2,217.74 0.96 2,129.03 2,217.74 0.91 2,018.14 2,217.74 0.91 2,018.14
03.04 EXCAVACION DE UÑA PARA ANCLAJE DE GEOTEXTIL m3 73.09 51.41 3,757.56 73.09 51.41 3,757.56 73.09 53.15 3,884.73 73.09 53.15 3,884.73
03.05 CORTE, PERFILADO Y REFINE TALUD m2 2,614.10 3.60 9,410.76 2,614.10 3.60 9,410.76 2,614.10 4.70 12,286.27 2,614.10 4.70 12,286.27
03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 ### 2.13 126,375.29 0.00 2.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04 COLOCACION DE GEOTEXTIL 20,844.11 20,844.11 18,160.58 18,160.58
04.01 COLOCACION DE MALLA GEOTEXTIL m2 2,080.25 10.02 20,844.11 2,080.25 10.02 20,844.11 2,080.25 8.73 18,160.58 2,080.25 8.73 18,160.58
COSTO DIRECTO 389,183.39 120,507.99 143,659.98 143,659.98
GASTOS GENERALES 15.00% 58,377.51 18,076.20 21,549.00 21,549.00
UTILIDAD 10.00% 38,918.34 12,050.80 14,366.00 14,366.00
SUB TOTAL 486,479.24 150,634.99 179,574.98 179,574.98
IGV 18.00% 87,566.26 27,114.30 32,323.50 32,323.50
TOTAL PRESUPUESTO 574,045.50 177,749.29 211,898.48 211,898.48
SUPERVISION 7.00% 40,183.19 12,442.45 14,832.89 14,832.89
EXPEDIENTE TECNICO 30,250.00 30,250.00 30,250.00 30,250.00
INVERSION TOTAL 644,478.69 220,441.74 256,981.37 256,981.37
LIMITE

ENRROCADO DE PROTECCION BOCATOMA JEQUETEPEQUE

AJUSTE TOTAL COSTO DE REPARACION DEL


COSTO DE REPARACION DEL
PRESUPUESTO DE RECLAMO (COSTO DE REPARACION DEL DAÑO ACTUALIZADO -
DAÑO ACTUALIZADO
DAÑO) REAJUSTADO
Item Descripción Und.
Item Descripción Und.
Precio Parcial Precio Parcial Precio Parcial Precio Parcial
Metrado Metrado Metrado Metrado
(S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)

05 OBRAS PRELIMINARES 15,099.08 6,496.36 93,602.49 93,602.49


05.01 TRAZO Y REPLANTEO m2 371.54 1.56 579.60 160.58 1.56 250.50 160.58 1.77 284.23 160.58 1.77 284.23
05.02 CONTROL TOPOGRAFICO día 371.54 3.04 1,129.48 160.58 3.04 488.16 160.58 542.08 87,047.21 160.58 542.08 87,047.21
05.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA PESADA GLB 1.00 13,390.00 13,390.00 0.43 13,390.00 5,757.70 0.43 14,583.84 6,271.05 0.43 14,583.84 6,271.05
06 MOVIMIENTO DE TIERRAS 32,376.06 0.00 0.00 0.00
06.01 CONFORMACION Y SEMICOMPACTACION DE DIQUE SECO m3 5,409.52 3.37 18,230.08 0.00 3.37 0.00 0.00 3.39 0.00 0.00 3.39 0.00
06.02 PERFILADO Y ACABADO DE TALUD DE DIQUE m2 3,987.79 2.08 8,294.60 0.00 2.08 0.00 0.00 2.08 0.00 0.00 2.08 0.00
06.03 EXCAVACION DE UÑA PARA CIMENTACION m3 2,135.54 2.74 5,851.38 0.00 2.74 0.00 0.00 3.82 0.00 0.00 3.82 0.00
07 ENROCADO DE PROTECCION 337,141.51 91,591.92 332,783.07 332,783.07
07.01 EXTRACCION DE ROCAS CON EXPLOSIVOS m3 0.00 31.27 0.00 0.00 31.27 0.00 0.00 256.95 0.00 0.00 256.95 0.00
07.02 SELECCION Y ACOPIO DE ROCA m3 ### 5.36 53,682.87 4,328.74 5.36 23,202.05 4,328.74 4.55 19,695.77 4,328.74 4.55 19,695.77
07.03 CARGUIO Y TRANSPORTE DE ROCA D< 1Km m3 ### 9.05 90,639.91 0.00 9.05 0.00 0.00 50.50 0.00 0.00 50.50 0.00
07.04 CARGUIO Y TRANSPORTE DE ROCA D> 1Km, CARRETERA LA BARRANCA m3 ### 0.98 44,168.16 4,226.74 0.98 4,142.21 4,226.74 57.80 244,305.57 4,226.74 57.80 244,305.57
07.05 ACOMODO DE ROCA EN UÑA DE DIQUE m3 6,064.76 5.27 31,961.29 2,621.23 5.27 13,813.88 2,621.23 11.74 30,773.24 2,621.23 11.74 30,773.24
07.06 DESMONTADO DE ENROCADO EN DIQUE 01 m3 6,562.81 11.22 73,634.73 2,836.49 11.22 31,825.42 2,836.49 5.64 15,997.80 2,836.49 5.64 15,997.80
07.07 GEOTEXTIL NO TEJIDO 300 gr/m2 m2 0.00 13.71 0.00 0.00 13.71 0.00 0.00 9.53 0.00 0.00 9.53 0.00
07.08 ACOMODO DE ROCA EM TALUD DE DIQUE m3 3,452.65 12.47 43,054.55 1,492.25 12.47 18,608.36 1,492.25 14.75 22,010.69 1,492.25 14.75 22,010.69
08 VARIOS 756.50 756.50 782.22 782.22
08.01 LIMPIEZA FINAL DE OBRA GLB 1.00 756.50 756.50 1.00 756.50 756.50 1.00 782.22 782.22 1.00 782.22 782.22
COSTO DIRECTO 385,373.15 98,844.78 427,167.78 427,167.78
GASTOS GENERALES 15.00% 57,805.97 14,826.72 64,075.17 64,075.17
UTILIDAD 10.00% 38,537.32 9,884.48 42,716.78 42,716.78
SUB TOTAL 481,716.44 123,555.98 533,959.73 533,959.73
OBRA : MEJORAMIENTO Y REHABILITACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA U
DE SAN JUAN DE LURIGANCHO

FECHA DE PRECIOS: 3/31/2015


ANALISIS DE GASTOS GENERALES Y UTILIDAD
Datos: Obra
Liquidacion
1.00 GASTOS GENERALES FIJOS (No Relacionados Directamente con el Tiempo de Ejecución

1.01 GASTOS DEL CONCURSO Y CONTRATACIÓN:


Documentos de Presentación (adquisición de Bases y Gastos Notariales)
Visitas a la zona de ejecución de la Obra
Fianzas: Contratación
Fianza por Garantía de Fiel Cumplimiento ((Vigencia hasta la liquidación)
Fianza por Garantía de Adelanto en Efectivo
Fianza por Garantía de Adelanto en Materiales
Seguros: Contratación
Póliza de Seguros C.A.R. Contra Todo Riesgo (vigencia durante ejecución de la obra) (2.05%)
Póliza de Seguros Complementario de Trabajo de Riesgo (vigencia durante ejec. de obra)
Poliza de Seguros ESSALUD + Vida para los trabajadores
Ley de Seguridad y Salud Ocupacional - Examenes Ocupacionales - Personal Administrcion de Obra
Ley de Seguridad y Salud Ocupacional - Examenes Ocupacionales- Personal de Obra
Expediente:
Elaboración de la Propuesta

1.02 GASTOS INDIRECTOS VARIOS:


Legales y Notariales de la Organización
Inscripción en el Registro Nacional de Proveedores
Seguro de las Instalaciones de la Empresa
Pagos por Trámites y Autorizaciones en Control Impacto Ambiental, MC, Disponibilidad Terreno
Pagos para Autorización Municipal, Derechos de Trámite y Control, Carta Fianza
Pagos al Servicio Municipal de Transporte Urbano
Pagos a Empresas de Servicio y Municipalidad por planos actualizados serv. existentes
Pagos por verificación de Estudio de Suelos detallado
Otros Gastos Financieros u Obligaciones Fiscales
Actividades Previas al Inicio de Obra (Permisos, Trámites, Adquisicion de Materiales, Plan de Desvio de Transito y otros)
TOTAL GASTOS GENERALES FIJOS :

2.00 GASTOS GENERALES VARIABLES (Relacionados Directamente con el Tiempo de Ejecución de l

2.01 GASTOS DE ADMINISTRACIÓN EN OBRA:

Personal: Cant. Jornada


Ingeniero Principal Residente de la Obra 1.00 x 1 x
Ing. Especialista (Civil, en mecánica suelos) 1.00 x 1/2 x
Ing. Costos - Valorizaciones y Programación de Obras 1.00 x 1/2 x
Ing. Esp. en Impacto Ambiental 1.00 x 1/2 x
Ing. Seguridad e Higiene Ocupacional 1.00 x 1/2 x
Ingeniero Asistente de Residente de Obra 1.00 x 1/2 x
Maestro de Obras ...................................... 1.00 x 1 x
Topografo Técnico ...................................... 1.00 x 1/2 x
Almacenero ...................................... 1.00 x 1 x
Sueldos, Bonif. y Benef. Personal de Guardianía :
Guardianía (OG) ...................................... 1.00 x 1 x
Seguros: Montos Estimados ......................................
Gastos por recepción y liquidación:
Personal profesional y técnico p/recepción y liquidación de obra
Monto Factor
Utiles de Oficina, Amortización de Equipos:
Útiles de Oficina 900 1
Equipos de Cómputo, calculadoras, etc. 800 1
Equipos de Topografía, de dibujo, winchas, etc. 4300 1/2
Equipos de mecánica de suelos 2200 1/2
Mantenimiento de Servicios para la obra :
Servicio de Electricidad 800 1
Servicio de Radio - Telefonía 600 1
Servicio de Agua Potable 900 1
Otros Servicios: Comedor, Duchas, etc. 700 1
Dispositivos Complementarios de Seguridad:
Extintores 6Kg (1 tipo PQS, 1 tipo CO2), Botiquin Primeros Auxilios (1), EPPs
Señaleticas de seguridad, camilla,recipientes de desechos s/espec., policias, señaleros / señales de desvio de transito, etc.........

Vehículos para Movilidad y Transporte interno: Cant. Jornada

Camioneta operada 2 Ton (Principal) 1.00 x 1 x


Movilidad (Recepción y Liquidación de Obra) 1.00 x 1/4 x
2.02 GASTOS DE ADMINISTRACIÓN EN OFICINA

Sueldos,Bonif. y Benef. Personal Administrativo: Cant. Jornada


Contador 1.00 x 20% x
Secretaria 1.00 x 20% x

Local - Oficina Principal Monto Factor


Depreciación o Alquiler de Local Central c/mobiliario 1200 20%
Utiles de Oficina, Amortización de Equipos:
Útiles de Oficina 800 20%
Equipos de Cómputo, calculadoras, plotter, etc. 900 20%
Servicios de Fotocopiado, Video, foto, Fax, etc. 600 20%
Mantenimiento de Servicios de Of. central:
Servicio de Electricidad 800 20%
Servicio de Radio - Telefonía 800 20%
Servicio de Agua Potable 800 20%
Servicio de Manteniemiento y Seguridad 800 20%
Dispositivos Complementarios de Seguridad
Extintores 6Kg (1 tipo PQS, 1 tipo CO2), Botiquin Primeros Auxilios (1)
Gastos de administracion en oficina - recepción y Liq de obra
Gastos de administracion en oficina - recepción y Liq de obra

2.03 GASTOS FINANCIEROS COMPLEMENTARIOS


Fianzas: Renovaciones
Renovación de Fianza por Garantía de Adelanto en Efectivo
Renovación de Fianza por Garantía de Adelanto en Materiales

TOTAL GASTOS GENERALES VARIABLES :

TOTAL GASTOS GENERALES FIJOS Y VARIABLES ( 1 y 2 ):


UTILIDAD:

TOTAL GASTOS GENERALES Y UTILIDAD:


Y ALCANTARILLADO DE LA URB. LOS JAZMINES - DISTRITO
IGANCHO

RALES Y UTILIDAD
Obra 4 meses
Liquidacion 1 mes
ctamente con el Tiempo de Ejecución de la Obra)

S/.
400.00
600.00

870.92
1,306.38
1,741.86

4,383.16
1,741.84
800.00
2,950.00
12,250.00

700.00

600.00
1,438.77
500.00
3,250.00
1,741.86
1,423.73
1,200.00
900.00
861.07
svio de Transito y otros) 11,517.00
51,176.58

mente con el Tiempo de Ejecución de la Obra)

Periodo S/.
4.00 meses 58,336.00
3.00 meses 16,356.00
4.00 meses 26,306.00
4.00 meses 21,808.00
4.00 meses 24,344.00
4.00 meses 17,038.00
4.00 meses 19,084.00
3.00 meses 7,156.50
4.00 meses 14,028.00

4.00 meses 9,356.00


6,039.91

Global 13,505.17
Periodo S/.

4.00 meses 3,600.00


4.00 meses 3,200.00
3.00 meses 6,450.00
3.00 meses 3,300.00

4.00 meses 3,200.00


4.00 meses 2,400.00
4.00 meses 3,600.00
4.00 meses 2,800.00

Estimado 11,250.00
de desvio de transito, etc.........
Estimado 15,220.00

Periodo S/.

4.00 meses 25,572.00


1.00 glb 1,598.25

Periodo S/.
4.00 meses 5,046.40
4.00 meses 2,616.80

Periodo S/.
4.00 meses 960.00

4.00 meses 640.00


4.00 meses 720.00
4.00 meses 480.00

4.00 meses 640.00


4.00 meses 640.00
4.00 meses 640.00
4.00 meses 640.00

Estimado 1,038.40

Gbl 3,255.80

1,451.55
1,451.55

335,768.33

386,944.91
199,713.50

586,658.41