2 PIPE MATERIALS

Pipe and fittings for the various services shall be in accordance with the following table :

PIPE CLASS PIPE DESCRIPTION FITTINGS / JOINTS

A Galvanized mild steel to BS-1387 Galvanized mild steel fittings to BS-1740 and
‘medium’ grade flange joints to BS-4504 screw joint to BS-21 for
pipe size up to 50 mm dia. flanged joints for pipe
size 65 mm dia. and above or mechanical
coupling (victaulic).

B Black steel pipe to BS-1387 Black mild steel fitting to BS-1740 and flanged
‘medium’ grade joints to BS-4504 screw joint to BS-21 for pipe
size 50 mm dia. flanged joints for pipe size 65
mm dia. and above or mechanical coupling
(victaulic).

C Light gauge copper pipe to BS- Copper soldered fittings to BS-864 Part 2 or
2871 Table-X for internal capillary joints and slip-in flange welded to pipe
services and general engineering to BS-4504 from pipe size 65 mm dia. and above.
and Table-Y for ground pipe-
work.

D Unplasticised PVC pipe JIS-6741 uPVC fittings to JIS-6739 Class VP


Class VP

E Unplasticised PVC pipe JIS-6741 uPVC fittings to JIS-6739 Class AW


Class AW

F Polypropylene Pipe to BS-4991 Polypropylene fittings, heat fusion welding up to


Series-1 ( PPR ) Type III PN-20 80 mm dia. and butt joint for 100 mm above.

G Polypropylene Pipe to BS-4991 Polypropylene fittings, heat fusion welding up to


Series-1 ( PPR ) Type III PN-10 80 mm dia. and butt joint for 100 mm above.

H Polyethilene Pipe to SNI 06- Poly-ethilene fittings, compression joint up to 50


4829-2005 Class PN-10 mm dia., electrofusion up to 150 mm dia. and
segmented for 150 mm above.

I Cast Iron Pipe to ASTM A 888 Cast Iron fittings to ASTM-A-74. Connect with
and CISPI 301 Coupling to ASTM-C-1277 and 1540. Gaskets to
ASTM-C-564.

a:\Plb-Drg\spec\ Sec. 3/2


Hotel TRANS Bali

3 PIPEWORK CLASSES

Pipe-work and fittings for the various shall be in accordance with the following table :

PIPE WORK CLASS


SYSTEM / SERVICES

Cold Water Deepwells. D

Main Distribution Lineout. G

Inside the room after branch valves G

Vertical Pipe after branch from


main pipe G

Plant Room D

Hot Water Plant Rooms F


Others F

LP Gas All B

Swimming Pool After the break tank, all D

Soil, combined soil and waste Room & Toilet E


Inside shaft E
Out from shaft to STP/Inspection
chamber I
Kitchen & Laundry I

Waste and Vent Underground E


Above ground E

Sewage and waste pumping pipe All D

Waste Pipe, discharge from sinks,


basin, etc. All E

Fuel oil pipe-work All B

Rainwater Pipe Exposed E


Cast-in E