You are on page 1of 5

Project Inspection Division / IAG

Typical Inspection Plan (TIP) Index


General Notes:
1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not
covered by the following SATIPs,
2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular
activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.
Number
Index
Form
Type

Rev
Sub

Typical Inspection Plan (TIP) Title Discipline


No.
Notes

SATIP A 114 01 Earthwork - Site Preparation, Excavation and Backfill Civil 1


SATIP B 006 01 Fireproofing Concrete Civil 1
SATIP H 003 01 Coating Application on Concrete Surfaces Civil 1
SATIP L 450 01 On-Land and Near-Shore Pipelines Civil 1
SATIP M 006 01 Security Fencing and Gates Civil 1
SATIP M 100 01 Concrete Masonry Units & Building Bricks Civil 1
SATIP M 100 02 Water Proofing of Roof Slabs Civil 1
SATIP M 100 03 Structural Steel for Buildings Civil 1
SATIP M 100 04 Pre-engineered Metal Buildings Civil 1
SATIP M 100 05 Gypsum Wall Board System Civil 1
SATIP M 100 06 Ceramic Wall and Floor Tiles Civil 1
SATIP M 100 07 Metal Doors and Windows Civil 1
SATIP M 100 08 Acoustical False Ceiling Civil 1
SATIP M 100 09 Glass and Glazing Civil 1
SATIP M 100 10 Resilient Vinyl Composition Floor Tile and Base Civil 1
SATIP O 101 01 Security Fence and Gates Type SSD1 Standard Security Fence Civil 1
SATIP Q 001 01 Portland Cement Concrete - Batch Plants Management Civil 1
SATIP Q 001 02 Cast-In-Place Portland Cement Concrete Civil 1
SATIP Q 001 03 Pre-Cast Concrete Fence Posts at Fabrication Yards Civil 1
SATIP Q 001 04 Structural Precast/Prestressed Concrete at Fabrication Yard Civil 1
SATIP Q 006 01 Asphalt Paving - Batch Plants Management Civil 1
SATIP Q 006 02 Asphalt Paving Civil 1
SATIP Q 006 03 Foamed Asphalt Stabilization Civil 1
SATIP Q 010 01 Cement Based Non-Shrink Grouting Civil 1
SATIP Q 011 01 Epoxy Grout for Machinery Support Civil 1
SATIP S 070 01 Earthwork – Excavation and Backfill For Under Ground Utilities Civil 1
SATIP P 103 01 AC UPS Systems Electrical 1
SATIP P 103 02 Direct Current Power Systems Electrical 1
SATIP P 104 01 Low Voltage (600V to 1kV) Cable Electrical 1
SATIP P 104 02 Medium Voltage (1.001kV to 35 kV) Cable Electrical 1
SATIP P 104 03 Cable Tray, Fittings, and Accessories Electrical 1
SATIP P 104 04 Boxes (Junction, Terminal, and Pull), Wire Troughs and Wireways Electrical 1
SATIP P 104 05 Above-Grade Conduit, Fittings, and Accessories Electrical 1
SATIP P 104 07 Below-Grade Conduit, Fittings, and Accessories Electrical 1
SATIP P 104 08 HVAC Equipment Electrical 1
SATIP P 104 10 High Voltage (35.001 kV to 69 kV) Cable Electrical 1
SATIP P 104 11 Very High Voltage (above 69 kV) Cable Electrical 1
SATIP P 104 12 Receptacles and Cord-Connected Equipment Electrical 1
SATIP P 107 01 Over-head Transmission and Distribution Systems Electrical 1
SATIP P 111 01 Grounding / Bonding Electrical 1
SATIP P 111 02 Lightning Protection Systems Electrical 1
SATIP P 113 01 LV Induction Motors Electrical 1
SATIP P 113 02 M.V. Induction Motors (Nameplate Voltage: 4 kV, 6.6 kV, and 13.2 kV) Electrical 1
SATIP P 113 03 Diesel-Generator Set Electrical 1
SATIP P 114 01 Annunciator Metering and Protection Relaying Cabinets Electrical 1

page 1 of 5
Project Inspection Division / IAG
Typical Inspection Plan (TIP) Index
General Notes:
1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not
covered by the following SATIPs,
2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular
activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.
Number
Index
Form
Type

Rev
Sub

Typical Inspection Plan (TIP) Title Discipline


No.
Notes

SATIP P 116 01 MV Switchgear Electrical 1


SATIP P 116 02 MV Controlgear Electrical 1
SATIP P 116 03 LV Switchgear and Switchboards Electrical 1
SATIP P 116 04 LV Controlgear TIP Electrical 1
SATIP P 116 05 Switchracks and Distribution Racks Electrical 1
SATIP P 116 06 Fire Water Pump / Motor / Controller Electrical 1
SATIP P 116 07 LV Panelboards Electrical 1
SATIP P 116 08 MV (max 35 kV) Non-seg Busduct Electrical 1
SATIP P 116 10 MV (max. 15kV) Cablebus Electrical 1
SATIP P 116 11 LV Non-seg Busduct Electrical 1
SATIP P 116 13 Variable Speed Drive (VSD) Electrical 1
SATIP P 119 01 HV Switchyard Electrical 1
SATIP P 121 01 Dry Type Transformers Electrical 1
SATIP P 121 02 Power Transformers Electrical 1
SATIP P 121 03 Overhead Transformers Electrical 1
SATIP P 121 04 Pad Mounted Transformers Electrical 1
SATIP P 123 01 Light Fixtures and Lighting Systems Electrical 1
Factory Assembled (packaged) and
SATIP P 515 01 Electrical 1
Auxiliary Electrical Equipment
SATIP X 600 02 Impressed Current Cathodic Protection Electrical 1
SATIP K 001 01 Centrifugal & Axial Fan HVAC 1
SATIP K 001 02 Air Handing Units HVAC 1
SATIP K 001 03 HVAC Metal Duct System HVAC 1
SATIP K 001 04 Chilled Water Piping HVAC 1
SATIP K 001 05 Chilled Water System HVAC 1
SATIP K 001 06 Packaged Air Conditioning Units (PACU) HVAC 1
SATIP K 001 07 Refrigerant piping HVAC 1
SATIP K 001 08 Air Filteration Devices HVAC 1
SATIP K 001 09 Through-The-Wall and Window-Mounted Air Conditioners HVAC 1
Air Ventilation / C ooling Systems (Exhaust Hoods and Passively Cooled
SATIP K 001 10 HVAC 1
Shelters)
SATIP K 001 11 A / C Split System HVAC 1
SATIP K 001 12 Testing, Adjustind and Balancing of HVAC Systems HVAC 1
SATIP J 100 01 Flow Instrumentation Instrumentation 1
SATIP J 200 01 Pressure Instrumentation Instrumentation 1
SATIP J 300 01 Liquid Level Instrumentation Instrumentation 1
SATIP J 400 01 Temperature Instrumentation Instrumentation 1
SATIP J 700 01 Motor Operated Valves (MOV) and Control Valves (CV) Instrumentation 1
SATIP J 900 01 Instrumentation Control Loop Checking Instrumentation 1
SATIP J 902 01 Metallic Instrumentation and Control Cable Instrumentation 1
SATIP J 902 03 Factory Assembled (Packaged) Auxiliary Instrumentation Systems Instrumentation 1
SATIP J 902 04 Fiber Optic Cable Instrumentation 1
SATIP J 902 05 Electronic Control Systems - DCS ESD PLC SCADA Instrumentation 1
Instrumentation Racks and Panels (open); Terminal Boxes and
SATIP J 902 06 Instrumentation 1
Instrument Cabinets (enclosed)
SATIP J 903 01 Intrinsically Safe (IS) Systems Instrumentation 1
SATIP J 904 01 Foundation Fieldbus System-Cables and accessorires Instrumentation 1

page 2 of 5
Project Inspection Division / IAG
Typical Inspection Plan (TIP) Index
General Notes:
1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not
covered by the following SATIPs,
2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular
activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.
Number
Index
Form
Type

Rev
Sub

Typical Inspection Plan (TIP) Title Discipline


No.
Notes

SATIP J 003 01 Instrumentation Piping and Tubing Instrumentation 1


SATIP A 004 01 Pneumatic Pressure Testing Mech 1
SATIP A 004 02 Pressure Testing-Hydrostatic Test of Plant Piping Mech 1
SATIP A 004 03 Pressure Testing- Hydrostatic Test of Pipelines Mech 1
SATIP A 004 04 Pressure Testing of Pressure Vessels Mech 1
SATIP A 004 05 Leak Testing Per SAES-A-004 Mech 1
SATIP B 006 02 Intumiscent Fire Proofing Mech 1
SATIP B 019 01 Portable Fire Protection Equipment Installation Mech 1
SATIP D 001 01 Pressure Vessel Installation Mech 1
SATIP D 100 01 Construction of Atmospheric Tanks (API 650) * Mech *
SATIP D 109 01 Shop Fabricated Storage Tank Installation Mech 1
SATIP E 004 01 Heat Exchanger Installation - Shell and Tube Mech 1
SATIP E 007 01 Air Cooled Heat Exchanger- Fin Fan Cooler Mech 1
SATIP F 001 04 Power Boiler - Packaged Type Mech 1
SATIP F 001 01 Fired Heaters Field Installation Mech 1
SATIP F 007 01 Elevated Flare--Stack, Tip & Igniter Mech 1
SATIP G 115 01 Lubrication, Shaft Sealing and Oil System for Rotating Equipment Mech 1
SATIP G 005 01 Centrifugal Pump Mech 1
SATIP G 006 01 Positive Displacement Pump Mech 1
SATIP H 002 01 Cement Lining of Pipes and Fittings Mech 1
SATIP H 002 02 External FBE Coating of Field Welded Joints Mech 1
SATIP H 100 01 Paint Application of liquid Coating System for Industrial facilities Mech 1
SATIP H 002 06 Renovation and Repair Coating for Submerged Services-APCS 113 Mech 1
SATIP H 002 08 Pipe Internal Coating and Installation Mech 1
SATIP H 002 09 Hand-Applied Tape Wrapping of Buried Piping Mech 1
SATIP H 002 10 Heat Shrink Sleeves Installation Mech 1
SATIP H 002 11 Renovation & Repair Coating for Submerged Services-APCS 113C Mech 1
SATIP Y 101 01 Installation of Metering Skid for Hydrocarbon Gas Mech 1
SATIP J 600 01 Safety Relief Valve Installation Mech 1
SATIP J 901 01 Instrument Air Supply System Mech 1
SATIP J 901 02 Instrument Air Distribution Piping Installation Mech 1
SATIP K 402 01 Centrifugal Gas Compressor Mech 1
SATIP K 403 02 Reciprocating Compressor for process air or gas services Mech 1
SATIP K 511 01 Diesel Engine Installation Mech 1
SATIP L 108 01 Valve Installation Mech 1
SATIP L 052 01 Hot Tap Installation Mech 1
SATIP L 052 02 Stopple Fitting Installation Mech 1
SATIP L 350 01 On-Plot Metallic Piping Installation (excluding Brazed Piping) Mech 1
SATIP L 350 02 Piping Tie-In Installation Mech 1
SATIP L 350 05 Fire Water Distribution Piping Installation Mech 1
SATIP L 350 06 Plant Piping - Steam & Steam Condensate Piping Mech 1

page 3 of 5
Project Inspection Division / IAG
Typical Inspection Plan (TIP) Index
General Notes:
1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not
covered by the following SATIPs,
2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular
activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.
Number
Index
Form
Type

Rev
Sub

Typical Inspection Plan (TIP) Title Discipline


No.
Notes

SATIP L 350 07 Cement Lined Pipe Installation Mech 1


SATIP L 350 08 Shop Fabrication -Piping and Miscellaneous Steel Structures Mech 1
SATIP L 350 09 Utility Piping Installation-Plant Air and Nitrogen Gas Mech 1
SATIP L 410 01 Pipelines- Well Head Piping Mech 1
SATIP L 420 01 Scraper Trap Station Mech 1
SATIP L 450 03 Cross Country Above Ground Pipeline Mech 1
SATIP L 450 04 Cross Country Buried Pipeline Mech 1
SATIP L 450 05 Reconditioned Buried Line Mech 1
SATIP L 450 06 Pipeline-Tie-in Installation Mech 1
SATIP M 001 01 Structural Steel-Piperacks, Miscellaneous Steel Supports,Aluminum Structures Mech 1
SATIP N 001 01 Cold Insulation Mech 1
SATIP N 110 01 Castable Refractory Installation Mech 1
SATIP N 120 01 Extreme Erosion Resistant Refractory Installation Mech 1
SATIP N 130 01 Refractory System -Fireclay Bricks Installation Mech 1
SATIP N 140 01 Refractory Ceramic Fiber Installation Mech 1
SATIP N 001 02 Hot Insulation Mech 1
SATIP NDE LPT 01 Liquid Penetrant Testing Mech 1
SATIP NDE MPI 01 Magnetic Particle Testing Mech 1
SATIP NDE UT 01 Ultrasonic Testing Mech 1
SATIP NDT RT 01 Radiographic Testing Mech 1
SATIP S 020 01 Process Plant Oily Water Sewer System Mech 1
SATIP W 010 01 Welding of Pressure Vessel Mech 1
SATIP W 011 01 Welding of On-Plot Piping Mech 1
SATIP W 012 01 Welding of Pipelines Mech 1
SATIP W 014 01 Welding of Overlays and Cladding Restoration Mech 1
SATIP W 016 01 Welding of Special Corrosion Rresistant Materials-including Duplex SS Mech 1
SATIP W 017 01 Welding of API Tanks Mech 1
SATIP B 069 01 Emergency Eyewash/Shower System Plumbing 1
SATIP S 010 01 Gravity Sewer Piping and Sewer Manhole Plumbing 1
SATIP S 010 02 Lift Station and Piping / Force Main Plumbing 1
SATIP S 030 01 Storm Drain Plumbing 1
SATIP S 040 01 Water Distribution Piping Plumbing 1
SATIP S 050 01 Bldg. Sprinklers and Standpipe System Plumbing 1
SATIP S 060 01 Electric Water Heaters Plumbing 1
SATIP S 060 02 Drinking Fountain Plumbing 1
SATIP S 060 03 Skid Mounted Reverse Osmosis System Plumbing 1
SATIP S 060 04 Plumbing Fixtures and Fixture Fittings Plumbing 1
SATIP S 060 05 Roof Drainage Piping System Plumbing 1
SATIP S 060 06 Building Sanitary Drainage, Waste and Vent (DWV) Piping Plumbing 1
SATIP S 060 07 Neutralization Tank, Indirect Waste & Special Waste Plumbing 1
SATIP S 060 08 Copper Piping Plumbing 1
SATIP S 070 02 Irrigation Piping Plumbing 1

page 4 of 5
Project Inspection Division / IAG
Typical Inspection Plan (TIP) Index
General Notes:
1-Contractor is required to submit its own ITP(s) for Saudi Aramco review and approval prior proceeding for subjects not
covered by the following SATIPs,
2- For activities (checklists) missing in any of the SATIPs provided by Saudi Aramco, Contractor may add that particular
activity and submit the revised SATIP(s) for Saudi Aramco review and approval prior proceeding with the task.
Number
Index
Form
Type

Rev
Sub

Typical Inspection Plan (TIP) Title Discipline


No.
Notes

SATIP S 070 03 Thermoplastic & RTR Piping Plumbing 1


SATIP T 151 01 Direct Current Power Systems (-48 and -24 VDC) Telecomms 1
SATIP T 481 01 Powered In-Plant Communication Systems Telecomms 1
SATIP T 492 01 Communication Systems Telecomms 1
SATIP T 624 01 Fiber Optic Communications Cable Telecomms 1
SATIP T 628 01 Copper Communication Cable (OSP/ISP/CO) Telecomms 1
SATIP T 744 01 Communication Towers and Facilities (ISP/CO) Telecomms 1
SATIP T 911 01 Outside Plant (OSP) Ductbanks Telecomms 1
SATIP T 938 01 Outside Plant (OSP) System Telecomms 1
SATIP T 916 01 Building Premises Distribution System (PDS) Telecomms 1

*SATIP was generated by Saudi Aramco for this subject with input from the subcontractor in the field and is now availabl in the field.
Please contact the field personnel regarding this issue (Apllicable to Hawiyah project only)

page 5 of 5

You might also like