You are on page 1of 1

P02 P03 P04 P05 P06 P07 P09 P10 P11 P12 P13 P14 P15 P16 P17

FOR CONSTRUCTION

D14114-0100D - DD - A - 116
REFER TO DWG NO.
PA
79200
NOTES:

MATCH LINE
4800 10001000 2300 1000 5780 4320 8000 8500 8500 8500 8500 8500 8500
TO UTILITY CHAMBER ACOUSTICS DESIGN LEGEND

9950
SOUND INSULATION REQUIREMENTS FOR WALLS
PLOT BOUNDARY
INDICATION TO UTILITY CHAMBER 45. Minimum STC45
50. Minimum STC50
STORM 55. Minimum STC55
COLLECTOR 60. Minimum STC60
TANK
P B 080 SPECIAL SOUND INSULATION REQUIREMENTS
PB

SLOPE @5%
Special Acoustic Requirements

NOTES
60. 1. BLOCK WALLS:

9100
-ALL JOINTS BETWEEN BLOCKS, VERTICAL AND HORIZONTAL,SHALL BE FILLED WITH
MORTAR TO THE FULL LENGTH, DEPTH AND HEIGHT OF THE CONCRETE BLOCKS

60.
ELECTRICAL -NO CAVITIES OR HOLES ARE ACCEPTED IN THE MORTAR
-ALL BLOCK WALLS SHALL BE PLASTERED FROM BOTH SIDES
ROOM
P B 038
2. FSTC (FIELD SOUND TRANSMISSION CLASS) TEST SHOULD BE REALIZED BY THE
PARKING UTILITIES
CONTRACTOR AS PER ASTM E-336-09 OR THE LATEST IN DATE.
40 P B 079
? CORRIDOR 3.NO "BACK TO BACK" INSTALLATIONS ARE ACCEPTED.

60. ? ? ? PWIRED
B FENCE
056 4. MINIMUM DISTANCE BETWEEN ELECTRICAL OR OTHER ELEMENTS TO BE INSTALLED IN THE
WALLS SHOULD BE APPROVED BY THE ENGINEERS AND SHOWN ON THE SHOP DRAWINGS.
DN

PC 5.THE CONTRACTORS ARE REQUIRED TO PROVIDE SHOP DRAWINGS


SHOWING :

2000
? -THE INTERSECTION BETWEEN WALLS OF THE SAME TYPE AND / OR DIFFERENT TYPES
-THE INTERSECTION OF WALLS WITH THE FLOORS AND THE CEILINGS
? -THE INTERSECTION OF THE FALSE CEILING WITH THE WALLS
PD ? ? ?
? ? 6. ALL THE COMPOSITION OF WALLS SHOULD HAVE A TEST CONFIRMING THE STC INDICATED

? ? ? SLOPE @10%
TO UTILITY CHAMBER TOWER A LIFT

6000
LOBBY
P L01 75
KEY PLAN
?
PE
?
PLOT BOUNDARY LINE PLOT BOUNDARY LINE

?
? ? ?
? ? ?
PF
?

A B C
8500

PLOT BOUNDARY LINE


SLOPE @5%

PG

PLOT BOUNDARY LINE

WIRED FENCE
60.
60. 60. 40 60. 40
17000

? 40

60.
PH PH 2 15/12/2016 AS CLOUDED D.H
FIRE CLOSET ELECTRICAL
P B 027
ROOM
1 25/08/2016 AS CLOUDED D.H
P B 058
0 26/06/2016 APPROVED ISSUE D.H.
? 60. TRANSFORMER
Revision Date Revision Subject Approved

60.
MDB ROOM ROOM

60.
P B 029 P B 030
100250

Job #
? Designed
S.P.
D14114-0100D
PI
Drawn
S.P.
Date
60. ? 26/06/2016 Checked D.H.
WIRED FENCE Scale
1:200@A1 Approved
M.T.
UTILITIES
CORRIDOR
8500

P B 001

Project Name:

PJ

55.
55.

?
?

DESIGN AND TD FOR


55.
55.

? ? ?

MBR DUBAI HILLS


55.
8500

55. 55. FTR-B-01


P B 051

B
SU

PK N

UMM SUQEIM ROAD

AL MARABEA ROAD
MULBERRY PHASE III
SITE (PA-17_04)
30,859.09
SQM.

AL KHAIL ROAD
8500

6010

6010
WIRED FENCE
PLOT NO. :PA_17_04 PROPOSED
COMMERCIAL

- DEVELOPMENT

DN
40
DN
60. LOCATION : DUBAI
PL
55. -
?

55.

55.
? ? ? CLIENT: Emaar Properties PJSC
P.O.Box 9440
STORM WATER
Dubai
8500

TANK 60. 55.


P L01 521 United Arab Emirates

OWNER: Emaar Properties PJSC


P.O.Box 9440
PM
Dubai
ETS
United Arab Emirates
P B 055
60.

CONSULTANT:
8500

60.

DUBAI - BEIRUT - CAIRO

PN 60.
LPG SUB-CONSULTANT:
P B 056
60.
5200

?
DN
? ? ?
DN

40 60.
PO
ELECTRICAL RAPID DOOR

UP
UP
DRAWING TITLE:
A - BASEMENT-PART 1 OF 3-ACOUSTICS

A - BASEMENT-PART 1 OF 3-ACOUSTICS
1 1 : 200 D14114-0100D MBR TD AC -101 2
PROJECT NO. BUILDING TYP PHASE TRADE SHEET NUMBER REV

You might also like