You are on page 1of 126

METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017

01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
ESTRUCTURAS
01.00.00 OBRAS PROVISIONALES
01.01.00 CARTEL DE OBRA 2.40 X 1.20 M UND 0.00
01.02.00 CASETA PARA ALMACEN Y/O GUARDIANÍA 5.00 X M2 0.00
02.00.00 TRABAJOS PRELIMINARES
02.01.00 LIMPIEZA DE TERRENO m2 0.00
02.02.00 TRAZO Y REPLANTEO PRELIMINAR m2 0.00
02.03.00 DEMOLICION DE ESTRUCTURAS EXISTENTES glb 0.00
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 EXCAVACION P' NIVELACION DE TERRAPLEN m3 0.00
03.02.00 EXCAVACION PARA ZAPATAS HASTA 1.40 m, T. N. m3 0.00
03.03.00 EXCAVACION PARA CIMIENTOS HASTA 1.40 m, T. m3 7.08
03.04.00 EXCAVACIÓN P' CANALETA DESAGUE PLUVAL T. N m3 0.00
03.05.00 RELLENO CON MATERIAL PROPIO m3 0.00
03.06.00 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO 0.00
m2 e = 0.20 M
03.07.00 0.20 m. CON MATERIAL ANTICONTAMINANTE, e m2
RELLENO 0.00
03.08.00 NIVELACION Y APISONADO CON EQUIPO m2 0.00
03.09.00 EXCAVACION P' ASTA DE BANDERA HASTA 1.40 m, m3 0.00
03.10.00 EXCAVACION PARA SARDINELES m3 0.00
03.11.00 EXCAVACION PARA REDES DE AGUA Y DESAGUE m3 36.03
03.12.00 EXCAVACION PARA INSTALACIONES ELECTRICAS m3 10.38
03.13.00 ELIMINACION DE MATERIAL EXCEDENTE m3 0.00
04.00.00 OBRAS DE CONCRETO SIMPLE
04.01.00 SOLADO PARA ZAPATAS, E= 4" m2 0.00
04.02.00 CIMIENTOS CORRIDOS 1:10 + 30% DE PIEDRA G m3 0.76
04.03.00 CONCRETO F'C=175 KG/CM2 PARA SOBRECIMIEN m3 0.00
04.04.00 ENCOFRADO Y DESENCOFRADO PARA SOBRECIM m3 0.00
04.05.00 CONCRETO FC=175 KG/CM2 PARA CANALETA m3 0.97
04.06.00 ENCOF.Y DESENCOF.CANALETA PARA DESAGUE P m3 0.34
04.07.00 CONCRETO FC=140 KG/CM2 PARA SARDINELES m3 0.00
04.08.00 ENCOFRADO Y DESENCOFRADO DE SARDINELES m3 0.00
04.09.00 CONCRETO FC=175 KG/CM2 PARA LOSA m3 0.00
04.10.00 ENCOFRADO Y DESENCOFRADO DE LOSA m3 0.00
04.11.00 CONCRETO F'C=140 Kg/cm2 ASTA DE BANDERA m3 0.00
04.12.00 ENCOFRADO Y DESENCOFRADO DE ASTA DE BA m2 0.00
05.00.00 OBRAS DE CONCRETO ARMADO
05.01.00 ZAPATAS
05.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 0.00
05.01.02 ACERO fy=4200 kg/cm2, GRADO 60 EN ZAPATAS kg 0.00
05.02 VIGAS DE CONEXION Y CIMENTACION
05.02.01 CONCRETO EN VIGAS DE CONEXION Y CIME m3 0.00
05.02.02 ACERO FY= 4200 KG/CM2, EN VIGAS DE C m2 0.00
05.02.03 ENCOFRADO Y DESENCOFRADO EN VIGA DE CON kg 0.00
05.04 COLUMNAS
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
05.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 0.00
05.04.02 ACERO FY= 4200 KG/CM2, EN COLUMNAS kg 0.00
05.04.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 0.00
05.05 VIGAS Y DINTELES
05.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 0.00
05.05.02 ACERO FY= 4200 KG/CM2, EN VIGAS Y DINTELES kg 0.00
05.05.03 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 0.00
05.06.00 LOSAS ALIGERADAS
05.06.01 CONCRETO EN LOSA ALIGERADA F'C=210 KG/C m3 0.00
05.06.02 ACERO FY= 4200 KG/CM2, EN LOSA ALIGERADA kg 0.00
05.06.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIG m2 0.00
05.06.04 LADRILLO HUECO MAQUINADO 12X30X30 P und 0.00
05.06.05 LADRILLO HUECO DE ARCILLA 15X30X30 CM PA und 0.00
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
05.07.00 MESA DE CONCRETO
05.07.01 CONCRETO F'C=210 KG/CM2 PARA MESA DE CO m3 0.00
05.07.02 CONCRETO F'C=210 KG/CM2 PARA MESA DE CO m3 0.00
05.07.03 CONCRETO F'C=210 KG/CM2 PARA MESA DE CO m3 0.00
05.07.04 ACERO FY= 4200 KG/CM2, PARA MESA DE CONC kg 0.00
05.07.05 ENCOFRADO Y DESENCOFRADO DE MESA DE CO m2 0.00
05.08.00 CISTERNA
05.08.01 CONCRETO EN CISTERNA F'C=210 KG/CM2 m3 0.00
05.08.02 ACERO FY= 4200 KG/CM2, EN CISTERNA kg 0.00
05.08.03 ENCOFRADO Y DESENCOFRADO EN CISTERNA m2 0.00
05.09.00 TANQUE ELEVADO
05.09.01 CONCRETO EN TANQUE ELEVADO F'C=210 KG/C m3 0.00
05.09.02 ACERO FY= 4200 KG/CM2, EN TANQUE ELEVADO kg 0.00
05.09.03 ENCOFRADO Y DESENCOFRADO EN CISTERNA m2 0.00
05.10 ESCALERAS
05.10.01 CONCRETO F'C=210 KG/CM2. PARA ESCALERAS m3 0.00
05.10.02 ACERO FY= 4200 KG/CM2, EN CISTERNA m2 0.00
05.10.03 ENCOFRADO Y DESENCOFRADO PARA ESCALERA kg 0.00
01.01.00 GARGOLAS
01.01.01 CONCRETO F'C= 210 KG/CM2. PARA GARGOLAS m2 0.00
01.01.02 ACERO DE REFUERZO FY=4,200 KG/CM2 kg 0.00
01.01.03 ENCOFRADO Y DESENCOFRADO DE GARGOLAS m2 0.00
01.02.00 SOBRECIMIENTOS ARMADOS
01.02.01 CONCRETO EN SOBRECIMIENTO ARMADO F`C=2 m3 0.08
01.02.02 ACERO FY= 4200 KG/CM2, EN SOBRECIMIENTO kg 15.03
01.02.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIE m3 0.00
06.00.00 MUROS Y TABIQUES DE ALBAÑILERIA
06.01.00 MURO DE LADRILLO 9 x 12 x 24 cm, CABEZA M m2 0.00
06.02.00 MURO DE LADRILLO 9 x 12 x 24 cm, SOGA MAQ m2 0.00
06.03.00 MURO DE LADRILLO 9 x 12 x 24 cm, CANTO MA m2 0.00
07.00.00 REVOQUES Y ENLUCIDOS
07.01.00 TARRAJEO PRIMARIO RAYADO C/MORTERO 1:5 x 1 m2 0.00
07.02.00 TARRAJEO EN EXTERIORES C/MORTERO 1:4 x 1.5 m2 0.00
07.03.00 TARRAJEO EN INTERIORES C/MORTERO 1:5 x 1.5 m2 0.00
07.04.00 TARRAJEO EN INTERIORES CON ADITIVO m2 0.00
07.05.00 TARRAJEO DE COLUMNAS C/MORTERO 1:5 x 1.5 m2 0.00
07.06.00 TARRAJEO DE VIGAS C/MORTERO 1:5 x 1.5 cm. m2 0.00
07.07.00 VESTIDURA DE DERRAMES m 0.00
07.08.00 VESTIDURA DE FRISOS m 0.00
07.09.00 JUNTAS DE DILATACION EN MUROS, TECNOPORT m 0.00
07.10.00 BRUÑA DE 1 CM. EN VIGAS Y COLUMNAS m 0.00
08.00.00 CIELORRASOS
08.01.00 CIELORRASO CON MEZCLA CEMENTO - ARENA 1: m1 0.00
09.00.00 PISOS Y PAVIMENTOS
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
09.01.00 FALSO PISO, E=4" C:A:P - 1:4:8 m2 0.00
09.02.00 CONTRAPISO DE 48 MM. m2 0.00
09.03.00 PISO CEMENTO PULIDO Y BRUÑADO E=2'' m2 0.00
09.04.00 PISO CERAMICO 0.30 x 0.30 M. ALTO TRANSITO m2 0.00
09.05.00 VEREDA DE CONCRETO DE 4" m2 0.00
09.06.00 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 0.00
09.07.00 JUNTAS DE DILATACIÓN EN PISOS MORTERO POB m2 357.44
09.08.00 BRUÑA DE 1 CM. EN PISOS Y VEREDAS ml 0.00
09.09.00 PISO DE ADOQUINES DE CONCRETO 10X20x4 CM m2 44.30
10.00.00 ZOCALOS Y CONTRAZOCALOS
10.01.00 ZOCALOS
10.01.01 ZOCALO CERAMICO .20 x .30 m. m2 229.31
10.02.00 CONTRAZOCALOS
10.02.01 CONTRAZOCALO INTERIOR DE CEMENTO H = 20 ml 0.00
10.02.02 CONTRAZOCALO EXTERIOR DE CEMENTO H = 30 ml 0.00
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
11.00.00 COBERTURAS
11.01.00 SUMINISTRO Y COLOCACION DE TEJA ANDINA, 1. m2 826.75
11.02.00 SUMINISTRO Y COLOCACION DE CUMBRERA m 82.79
11.03.00 COLOCACION DE CORREAS, MADERA TORNILLO m 2,052.37
12.00.00 REVESTIMIENTOS
12.01.00 ENCHAPE DE CERAMICO 20x30 cm m2 27.32
13.00.00 CARPINTERIA DE MADERA
13.01.00 PUERTA DE MADERA CEDRO MACIZA m2 0.00
13.02.00 PUERTA DE MADERA CEDRO CONTRAPLACADA m2 0.00
14.00.00 CARPINTERIA METALICA
14.01.00 PUERTA METALICA SEGUN PLANO INCL. COLOC. m2 0.00
14.02.00 REJILLA METÁLICA EN CANALETA PARA DESAGUE m 0.00
14.03.00 VENTANA DE ALUMINIO SISTEMA DIRECTO m2 0.00
14.04.00 PASAMANO TUBO DE F°G° 2" ml 0.00
14.05.00 VENTANA METALICA SEGUN DETALLES m2 0.00
15.00.00 CERRAJERIA
15.01.00 CERRADURA PARA PUERTA EXTERIOR und 0.00
15.02.00 CERRADURA PARA PUERTA INTERIOR und 0.00
16.00.00 VIDRIOS, CRISTALES Y SIMILARES
16.01.00 VIDRIO CRISTAL GRIS 5.5 MM + LAMINADO p2 0.00
17.00.00 PINTURA
17.01.00 PINTURA LÁTEX EN CIELORASO (DOS MANOS) m2 1,137.87
17.02.00 PINTURA LÁTEX EN MUROS EXTERIORES (DOS M m2 988.29
17.03.00 PINTURA LÁTEX EN MUROS INTERIORES (DOS M m2 1,487.44
17.04.00 PINTURA LÁTEX EN VIGAS Y COLUMNAS (DOS M m2 1,339.13
17.05.00 PINTURA ESMALTE EN CONTRAZOCALOS m2 0.00
18.00.00 INSTALACIONES SANITARIAS
18.01.00 SISTEMA DE AGUA FRIA
18.01.01 SALIDA DE AGUA FRIA C/TUB. PVC SAP Ø 1/2" pto 0.00
18.01.02 RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP ml 0.00
18.01.03 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SA ml 0.00
18.01.04 RED DE DISTRIBUCION TUBERIA PVC DE 1/2" ml 0.00
18.01.06 TEE PVC - SAP 3/4" und 0.00
18.01.07 CODO PVC - SAP 1/2" x 90 und 0.00
18.01.08 CODO PVC - SAP 3/4" x 90 und 0.00
18.01.09 REDUCCION PVC PARA RED AGUA POTABLE DE 3/4 und 0.00
18.01.10 VALVULA COMPUERTA DE BRONCE DE 1'' und 0.00
18.01.11 VALVULA COMPUERTA DE BRONCE DE 3/4' und 0.00
18.01.13 VALVULA COMPUERTA DE RIEGO DE 3/4' und 0.00
18.01.14 CAJA DE VALVULAS DE CONCRETO CON TAPA ME und 0.00
18.01.15 CAJA DE VALVULAS DE MADERA und 0.00
18.02.00 SISTEMA DE DESAGUE
18.02.01 SALIDA DE DESAGUE TUBERIA DE 4" pto 0.00
18.02.02 SALIDA DE DESAGUE TUBERIA DE 2" pto 0.00
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
18.02.03 SALIDA DE VENTILACION EN PVC 2" pto 0.00
18.02.04 TUBERIA DE PVC SAL 4" ml 0.00
18.02.05 TUBERIA DE PVC SAL 2" ml 0.00
18.02.06 REGISTRO DE BRONCE 2" und 0.00
18.02.07 REGISTRO DE BRONCE 4" und 0.00
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
18.02.08 SUMIDERO DE BRONCE 2", PROVISION Y COLOC und 0.00
18.02.09 YEE PVC SAL DE 4" A 2" pza 0.00
18.02.10 YEE PVC SAL DE 4" pza 0.00
18.02.11 YEE PVC SAL DE 2" pza 0.00
18.02.12 CODO PVC SAL 2"X45° pza 0.00
18.02.13 CODO PVC SAL 2"X90° pza 0.00
18.02.14 CODO PVC SAL 4"X45° pza 0.00
18.02.15 CODO PVC SAL 4"X90° pza 0.00
18.02.16 TEE PVC-SAL 2" X 2" SANITARIA und 0.00
18.02.17 TEE PVC-SAL 4" X 4" SANITARIA und 0.00
18.02.18 CAJA DE REGISTRO DE 12" X 24" DE CONCRETO und 2.00
18.02.19 TUBERIA PVC SAL 6" ml 27.00
18.02.20 REDUCCION DE PVC SAL DE 4" A 2" und 0.00
18.03.00 APARATOS Y ACCESORIOS SANITARIOS
18.03.01 INODORO TANQUE BAJO und 7.50
18.03.02 INODORO TANQUE BAJO BABY BLANCO und 0.00
18.03.03 LAVATORIO OVALIN 1 LLAVE INC/INSTALACION pza 10.00
18.03.04 LAVATORIO DE PARED BLANCO 1 LLAVE pza 4.00
18.03.05 PAPELERA DE LOSA Y BARRA PLASTICA, ADHESIV und 11.00
18.03.06 DISPENSADOR DE JABON LIQUIDO PVC pza 9.00
18.03.07 URINARIO CORRIDO CON CERAMICO und 0.00
18.03.08 LAVADERO DE COCINA 02 POZAS DE ACERO INO pza 0.00
18.03.09 RODOPLAS DE 6 mm. DE COLOR und 0.00
18.03.10 COLOCACION DE APARATOS SANITARIOS pza 0.00
18.03.12 SUMINISTRO E INSTALACION DEL SISTEMA DE und 0.00
18.03.18 LAVADERO DE ACERO INOXIDABLE UNA POZA - pza 0.00
19.00.00 INSTALACIONES ELECTRICAS
19.01.00 SALIDA DE TECHO C/CABLE AWG TW 2.5MM PVC pto 0.00
19.02.00 SALIDA PARA BRAQUETE POR PARED pto 0.00
19.03.00 SALIDA TOMAC. BIPOLAR DOBLE AWG TW 4.0 mm pto 0.00
19.04.00 SALIDA TOMAC. BIPOLAR DOBLE AWG TW 4.0 mm pto 0.00
19.05.00 SALIDA TOMAC. BIPOLAR TRIPLE AWG TW 4.0 mm pto 0.00
19.06.00 SALIDA PARA INTERRUPTOR SIMPLE C/CABLE AWG pto 0.00
19.07.00 SALIDA PARA INTERRUPTOR DOBLE C/CABLE AWG u 0.00
19.08.00 SALIDA PARA INTERRUPTOR TRIPLE C/CABLE AWG pto 0.00
19.09.00 SALIDA PARA INTERRUPTOR DE CONMUTACION C/ pto 0.00
19.10.00 TABLERO ELECTRICO DISTRIBUCION GAB. METALI und 4.00
19.11.00 TABLERO ELECTRICO DISTRIBUCION GAB. METALI und 1.00
19.12.00 TABLERO ELECTRICO DISTRIBUCION GAB. METALI und 0.50
19.13.00 POZO A TIERRA und 6.00
19.14.00 CAJA DE PASE und 2.00
19.15.00 CABLE ALIMENTADOR DE Th A TG ml 0.00
19.16.00 CABLE ALIMENTADOR A TABLEROS ml 0.00
19.17.00 CABLE ALIMENTADOR A POSTES ml 0.00
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
19.18.00 SALIDA PARA TELEFONO Y DATA und 0.00
METRADOS DE VALORIZACIÓN N° 09 - OCTUBRE 2017
01/10/2017 al 31/10/2017

CANTIDA
ITEM DESCRIPCIÓN UNIDAD
D
20.00.00 ARTEFACTOS ELECTRICOS
20.02.00 ARTEFACTO FLUORESENTE DE 2X36W CON EQUI und 54.00
20.03.00 ARTEFACTO FLUORESENTE DE 1X36W CON EQUI und 0.00
20.04.00 BRAQUETE CON SOQUETE DE PORCELANA und 0.00
20.06.00 REFLECTORES und 0.00
21.00.00 VARIOS
21.01.00 ASTA DE BANDERA und 0.00
21.02.00 PIZARRA ACRILICA und 0.00
21.03.00 FLETE TERRESTRE kg 0.00
21.04.00 PLACA RECORDATORIA und 0.00
21.05.00 LIMPIEZA GENERAL DE OBRA m2 0.00
21.06.00 DISEÑO DE MEZCLA CONCRETO und 0.00
21.07.00 ROTURA DE PROBETAS und 0.00
21.08.00 JARDINERIA m2 0.00
21.09.00 EQUIPAMIENTO DE PLATAFORMA DEPORTIVA und 0.00
22.00.00 EQUIPAMIENTO Y MOBILIARIO
22.01.00 MOBILIARIO ESCOLAR INICIAL und 0.00
22.02.00 MOBILIARIO ESCOLAR PRIMARIA und 0.00
22.03.00 MOBILIARIO ESCOLAR SECUNDARIA und 0.00
22.04.00 MOBILIARIO AREA ADMINISTRATIVA und 0.00
22.06.00 EQUIPAMIENTO DE LABORATORIO und 0.00
22.07.00 EQUIPAMIENTO SALA DE COMPUTO und 0.00
22.08.00 MOBILIARIO PARA COMEDOR und 0.00
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
01.00.00 OBRAS PROVISIONALES -
01.01.00 CARTEL DE OBRA 2.40 X 1.20 M UND 1.00 715.36 715.36 1.00 S/. 715.36
01.02.00 CASETA PARA ALMACEN Y/O GUARDIANÍA 5.00 X 6.00 M M2 30.00 40.00 1,200.00 30.00 S/. 1,200.00
02.00.00 TRABAJOS PRELIMINARES
02.01.00 LIMPIEZA DE TERRENO m2 5,146.07 1.64 8,439.55 5146.07 S/. 8,439.55
02.02.00 TRAZO Y REPLANTEO PRELIMINAR m2 4,580.44 1.59 7,282.90 4580.44 S/. 7,282.90
02.03.00 DEMOLICION DE ESTRUCTURAS EXISTENTES glb 1,096.72 7.59 8,324.10 1096.72 S/. 8,324.10
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 EXCAVACION P' NIVELACION DE TERRAPLEN m3 5,297.81 6.37 33,747.05 5276.20 S/. 33,609.42
03.02.00 EXCAVACION PARA ZAPATAS HASTA 1.40 m, T. N. m3 260.59 27.11 7,064.59 260.59 S/. 7,064.59
03.03.00 EXCAVACION PARA CIMIENTOS HASTA 1.40 m, T. N. m3 1,105.66 26.13 28,890.90 1098.58 S/. 28,705.92
03.04.00 EXCAVACIÓN P' CANALETA DESAGUE PLUVAL T. N. m3 75.23 26.13 1,965.76 75.23 S/. 1,965.76
03.05.00 RELLENO CON MATERIAL PROPIO m3 165.77 13.55 2,246.18 165.77 S/. 2,246.18
03.06.00 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO e = 0.20 M m2 2,527.86 11.05 27,932.85 2527.86 S/. 27,932.85
03.07.00 0.20 m. CON MATERIAL ANTICONTAMINANTE, e=0.20 m
RELLENO m2 9.43 18.65 175.87 9.23 S/. 172.05
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
03.08.00 NIVELACION Y APISONADO CON EQUIPO m2 1,569.84 2.86 4,489.74 1569.84 S/. 4,489.74
03.09.00 EXCAVACION P' ASTA DE BANDERA HASTA 1.40 m, T. N. m3 3.15 33.75 106.31 3.15 S/. 106.31
03.10.00 EXCAVACION PARA SARDINELES m3 11.45 38.57 441.63 11.45 S/. 441.63
03.11.00 EXCAVACION PARA REDES DE AGUA Y DESAGUE m3 144.12 11.91 1,716.47 108.09 S/. 1,287.35
03.12.00 EXCAVACION PARA INSTALACIONES ELECTRICAS EXTERIORES m3 69.19 38.57 2,668.66 58.81 S/. 2,268.36
03.13.00 ELIMINACION DE MATERIAL EXCEDENTE m3 8,755.25 7.06 61,812.07 8754.70 S/. 61,808.20
04.00.00 OBRAS DE CONCRETO SIMPLE
04.01.00 SOLADO PARA ZAPATAS, E= 4" m2 420.24 44.80 18,826.75 420.24 S/. 18,826.75
04.02.00 CIMIENTOS CORRIDOS 1:10 + 30% DE PIEDRA GRANDE m3 209.20 225.32 47,136.94 208.44 S/. 46,965.14
04.03.00 CONCRETO F'C=175 KG/CM2 PARA SOBRECIMIENTOS m3 49.36 376.74 18,595.89 49.36 S/. 18,595.89
04.04.00 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m3 522.73 28.54 14,918.71 522.73 S/. 14,918.71
04.05.00 CONCRETO FC=175 KG/CM2 PARA CANALETA DESAGUE PLUVIAL m3 47.05 374.71 17,630.11 46.09 S/. 17,268.60
04.06.00 ENCOF.Y DESENCOF.CANALETA PARA DESAGUE PLUVIAL m3 347.39 32.31 11,224.17 347.06 S/. 11,213.64
04.07.00 CONCRETO FC=140 KG/CM2 PARA SARDINELES m3 13.08 345.91 4,524.50 13.08 S/. 4,524.50
04.08.00 ENCOFRADO Y DESENCOFRADO DE SARDINELES m3 261.67 29.74 7,782.07 261.67 S/. 7,782.07
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
04.09.00 CONCRETO FC=175 KG/CM2 PARA LOSA m3 117.70 382.85 45,061.45 117.70 S/. 45,061.45
04.10.00 ENCOFRADO Y DESENCOFRADO DE LOSA m3 264.50 31.49 8,329.11 264.50 S/. 8,329.11
04.11.00 CONCRETO F'C=140 Kg/cm2 ASTA DE BANDERA m3 1.13 347.23 392.37 1.13 S/. 392.37
04.12.00 ENCOFRADO Y DESENCOFRADO DE ASTA DE BANDERA m2 1.80 27.17 48.91 1.80 S/. 48.91
05.00.00 OBRAS DE CONCRETO ARMADO
05.01.00 ZAPATAS
05.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 97.16 435.75 42,337.47 97.16 S/. 42,337.47
05.01.02 ACERO fy=4200 kg/cm2, GRADO 60 EN ZAPATAS kg 2,406.05 4.53 10,899.41 2406.05 S/. 10,899.41
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
05.02 VIGAS DE CONEXION Y CIMENTACION -
05.02.01 CONCRETO EN VIGAS DE CONEXION Y CIMENTACION F'C=210 KG/CM2 m3 181.71 431.89 78,478.73 181.71 S/. 78,478.73
05.02.02 ACERO FY= 4200 KG/CM2, EN VIGAS DE CONEXION Y CIMENTACION m2 14,910.45 4.82 71,868.37 14910.45 S/. 71,868.37
05.02.03 ENCOFRADO Y DESENCOFRADO EN VIGA DE CONEXION Y CIMENTACION kg 521.17 27.14 14,144.55 521.17 S/. 14,144.55
05.04 COLUMNAS
05.04.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 161.55 453.83 73,316.24 161.55 S/. 73,316.24
05.04.02 ACERO FY= 4200 KG/CM2, EN COLUMNAS kg 30,198.74 4.82 145,557.93 30115.99 S/. 145,159.06
05.04.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1,893.44 35.04 66,346.14 1702.49 S/. 59,655.17
05.05 VIGAS Y DINTELES
05.05.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 156.58 473.67 74,167.25 153.36 S/. 72,641.03
05.05.02 ACERO FY= 4200 KG/CM2, EN VIGAS Y DINTELES kg 25,544.50 4.82 123,124.49 25411.23 S/. 122,482.12
05.05.03 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1,437.43 40.58 58,330.91 1414.11 S/. 57,384.53
05.06.00 LOSAS ALIGERADAS
05.06.01 CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2 m3 135.63 460.46 62,452.19 135.63 S/. 62,452.19
05.06.02 ACERO FY= 4200 KG/CM2, EN LOSA ALIGERADA kg 12,519.67 4.82 60,344.81 12519.67 S/. 60,344.81
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
05.06.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 1,658.22 35.51 58,883.39 1658.22 S/. 58,883.51
05.06.04 LADRILLO HUECO MAQUINADO 12X30X30 PARA LOSA ALIGERADA und 10,770.54 3.61 38,881.65 10770.54 S/. 38,881.65
05.06.05 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 2,946.58 4.76 14,025.72 2946.58 S/. 14,025.72
05.07.00 MESA DE CONCRETO
05.07.01 CONCRETO F'C=210 KG/CM2 PARA MESA DE CONCRETO m3 1.80 715.25 1,287.45 1.80 S/. 1,287.45
05.07.02 CONCRETO F'C=210 KG/CM2 PARA MESA DE CONCRETO m3 1.63 715.25 1,165.86 1.63 S/. 1,165.86
05.07.03 CONCRETO F'C=210 KG/CM2 PARA MESA DE CONCRETO m3 1.17 715.25 836.84 1.17 S/. 836.84
05.07.04 ACERO FY= 4200 KG/CM2, PARA MESA DE CONCRETO kg 702.68 9.12 6,408.44 702.68 S/. 6,408.44
05.07.05 ENCOFRADO Y DESENCOFRADO DE MESA DE CONCRETO m2 52.37 66.87 3,501.98 52.37 S/. 3,501.98
05.08.00 CISTERNA
05.08.01 CONCRETO EN CISTERNA F'C=210 KG/CM2 m3 8.97 521.32 4,676.24 8.97 S/. 4,675.80
05.08.02 ACERO FY= 4200 KG/CM2, EN CISTERNA kg 1,085.84 4.82 5,233.75 1085.84 S/. 5,233.75
05.08.03 ENCOFRADO Y DESENCOFRADO EN CISTERNA m2 57.49 36.30 2,086.89 57.49 S/. 2,086.89
05.09.00 TANQUE ELEVADO
05.09.01 CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2 m3 3.04 521.32 1,584.81 3.04 S/. 1,584.81
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
05.09.02 ACERO FY= 4200 KG/CM2, EN TANQUE ELEVADO kg 297.16 4.82 1,432.31 297.16 S/. 1,432.31
05.09.03 ENCOFRADO Y DESENCOFRADO EN CISTERNA m2 38.23 36.30 1,387.75 38.23 S/. 1,387.75
05.10 ESCALERAS
05.10.01 CONCRETO F'C=210 KG/CM2. PARA ESCALERAS m3 15.74 420.41 6,617.25 15.74 S/. 6,617.25
05.10.02 ACERO FY= 4200 KG/CM2, EN CISTERNA m2 1,186.77 4.82 5,720.23 1186.77 S/. 5,720.23
05.10.03 ENCOFRADO Y DESENCOFRADO PARA ESCALERA kg 89.86 38.72 3,479.38 89.86 S/. 3,479.38
01.01.00 GARGOLAS
01.01.01 CONCRETO F'C= 210 KG/CM2. PARA GARGOLAS m2 0.20 901.35 180.27 0.20 S/. 180.27
01.01.02 ACERO DE REFUERZO FY=4,200 KG/CM2 kg 12.50 5.33 66.63 12.50 S/. 66.63
01.01.03 ENCOFRADO Y DESENCOFRADO DE GARGOLAS m2 15.00 48.15 722.25 15.00 S/. 722.25
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
01.02.00 SOBRECIMIENTOS ARMADOS
01.02.01 CONCRETO EN SOBRECIMIENTO ARMADO F`C=210 KG/CM2 m3 35.32 473.67 16,730.02 35.24 S/. 16,690.97
01.02.02 ACERO FY= 4200 KG/CM2, EN SOBRECIMIENTO kg 2,147.53 4.82 10,351.09 2128.95 S/. 10,261.54
01.02.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m3 470.98 40.58 19,112.37 470.98 S/. 19,112.55
06.00.00 MUROS Y TABIQUES DE ALBAÑILERIA
06.01.00 MURO DE LADRILLO 9 x 12 x 24 cm, CABEZA MAQUINADO m2 842.00 107.33 90,371.86 842.00 S/. 90,371.86
06.02.00 MURO DE LADRILLO 9 x 12 x 24 cm, SOGA MAQUINADO m2 1,354.39 66.25 89,728.34 1252.02 S/. 82,946.65
06.03.00 MURO DE LADRILLO 9 x 12 x 24 cm, CANTO MAQUINADO m2 34.70 73.16 2,538.65 34.70 S/. 2,538.65
07.00.00 REVOQUES Y ENLUCIDOS
07.01.00 TARRAJEO PRIMARIO RAYADO C/MORTERO 1:5 x 1.5 cm m2 495.29 23.69 11,733.42 495.29 S/. 11,733.32
07.02.00 TARRAJEO EN EXTERIORES C/MORTERO 1:4 x 1.5 cm m2 1,077.46 23.82 25,665.10 1077.46 S/. 25,665.04
07.03.00 TARRAJEO EN INTERIORES C/MORTERO 1:5 x 1.5 cm. m2 2,114.35 22.81 48,228.32 2114.35 S/. 48,228.28
07.04.00 TARRAJEO EN INTERIORES CON ADITIVO m2 56.67 40.72 2,307.60 56.67 S/. 2,307.60
07.05.00 TARRAJEO DE COLUMNAS C/MORTERO 1:5 x 1.5 cm. m2 1,506.20 22.81 34,356.42 1506.20 S/. 34,356.36
07.06.00 TARRAJEO DE VIGAS C/MORTERO 1:5 x 1.5 cm. m2 1,378.96 22.81 31,454.08 1378.96 S/. 31,454.18
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
07.07.00 VESTIDURA DE DERRAMES m 1,066.85 18.52 19,758.06 1066.85 S/. 19,758.00
07.08.00 VESTIDURA DE FRISOS m 501.44 18.57 9,311.74 501.44 S/. 9,311.74
07.09.00 JUNTAS DE DILATACION EN MUROS, TECNOPORT E=1" m 519.01 7.43 3,856.24 519.01 S/. 3,856.21
07.10.00 BRUÑA DE 1 CM. EN VIGAS Y COLUMNAS m 3,267.19 3.81 12,447.99 3267.19 S/. 12,447.99
08.00.00 CIELORRASOS
08.01.00 CIELORRASO CON MEZCLA CEMENTO - ARENA 1:5 m1 1,681.37 32.03 53,854.28 1681.37 S/. 53,854.43
09.00.00 PISOS Y PAVIMENTOS
09.01.00 FALSO PISO, E=4" C:A:P - 1:4:8 m2 961.72 35.34 33,987.18 961.72 S/. 33,987.18
09.02.00 CONTRAPISO DE 48 MM. m2 172.20 39.48 6,798.46 172.20 S/. 6,798.46
09.03.00 PISO CEMENTO PULIDO Y BRUÑADO E=2'' m2 1,041.24 35.09 36,537.11 1041.24 S/. 36,537.11
09.04.00 PISO CERAMICO 0.30 x 0.30 M. ALTO TRANSITO m2 172.20 59.50 10,245.90 0.00 S/. 0.00
09.05.00 VEREDA DE CONCRETO DE 4" m2 1,107.92 45.57 50,487.91 1107.92 S/. 50,487.91
09.06.00 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 283.84 27.00 7,663.68 283.84 S/. 7,663.68
09.07.00 JUNTAS DE DILATACIÓN EN PISOS MORTERO POBRE, E=1" m2 997.03 14.19 14,147.86 639.59 S/. 9,075.75
09.08.00 BRUÑA DE 1 CM. EN PISOS Y VEREDAS ml 3,509.78 2.03 7,124.85 3509.78 S/. 7,124.85
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
09.09.00 PISO DE ADOQUINES DE CONCRETO 10X20x4 CM. m2 443.00 67.69 29,986.67 398.70 S/. 26,988.00
10.00.00 ZOCALOS Y CONTRAZOCALOS
10.01.00 ZOCALOS
10.01.01 ZOCALO CERAMICO .20 x .30 m. m2 327.59 50.82 16,648.12 0.00 S/. 0.00
10.02.00 CONTRAZOCALOS
10.02.01 CONTRAZOCALO INTERIOR DE CEMENTO H = 20 CM ml 690.36 13.19 9,105.85 690.36 S/. 9,105.85
10.02.02 CONTRAZOCALO EXTERIOR DE CEMENTO H = 30 CM ml 416.80 13.68 5,701.82 416.80 S/. 5,701.82
11.00.00 COBERTURAS
11.01.00 SUMINISTRO Y COLOCACION DE TEJA ANDINA, 1.14x0.72 m2 1,653.50 60.57 100,152.50 0.00 S/. 0.00
11.02.00 SUMINISTRO Y COLOCACION DE CUMBRERA m 165.58 51.16 8,471.07 0.00 S/. 0.00
11.03.00 COLOCACION DE CORREAS, MADERA TORNILLO m 2,052.37 17.18 35,259.72 0.00 S/. 0.00
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
12.00.00 REVESTIMIENTOS
12.01.00 ENCHAPE DE CERAMICO 20x30 cm m2 99.17 50.20 4,978.33 0.00 S/. 0.00
13.00.00 CARPINTERIA DE MADERA
13.01.00 PUERTA DE MADERA CEDRO MACIZA m2 66.76 765.36 51,095.43 33.38 S/. 25,547.72
13.02.00 PUERTA DE MADERA CEDRO CONTRAPLACADA m2 42.63 422.68 18,018.85 21.32 S/. 9,009.43
14.00.00 CARPINTERIA METALICA
14.01.00 PUERTA METALICA SEGUN PLANO INCL. COLOC. m2 16.51 306.41 5,058.83 16.51 S/. 5,058.83
14.02.00 REJILLA METÁLICA EN CANALETA PARA DESAGUE PLUVIAL m 191.68 75.20 14,414.34 191.68 S/. 14,414.34
14.03.00 VENTANA DE ALUMINIO SISTEMA DIRECTO m2 300.06 69.29 20,791.16 300.06 S/. 20,791.16
14.04.00 PASAMANO TUBO DE F°G° 2" ml 262.80 62.63 16,459.16 262.80 S/. 16,459.16
14.05.00 VENTANA METALICA SEGUN DETALLES m2 24.32 162.63 3,955.16 24.32 S/. 3,955.16
15.00.00 CERRAJERIA
15.01.00 CERRADURA PARA PUERTA EXTERIOR und 36.00 109.90 3,956.40 0.00 S/. 0.00
15.02.00 CERRADURA PARA PUERTA INTERIOR und 23.00 71.09 1,635.07 0.00 S/. 0.00
16.00.00 VIDRIOS, CRISTALES Y SIMILARES
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
16.01.00 VIDRIO CRISTAL GRIS 5.5 MM + LAMINADO p2 3,249.48 17.49 56,833.41 0.00 S/. 0.00
17.00.00 PINTURA
17.01.00 PINTURA LÁTEX EN CIELORASO (DOS MANOS) m2 1,675.21 17.88 29,952.75 537.34 S/. 9,607.60
17.02.00 PINTURA LÁTEX EN MUROS EXTERIORES (DOS MANOS) m2 1,162.69 12.52 14,556.88 0.00 S/. 0.00
17.03.00 PINTURA LÁTEX EN MUROS INTERIORES (DOS MANOS) m2 2,349.70 12.65 29,723.71 600.13 S/. 7,591.68
17.04.00 PINTURA LÁTEX EN VIGAS Y COLUMNAS (DOS MANOS) m2 2,885.17 13.67 39,440.27 677.60 S/. 9,262.80
17.05.00 PINTURA ESMALTE EN CONTRAZOCALOS m2 271.80 17.41 4,732.04 0.00 S/. 0.00
18.00.00 INSTALACIONES SANITARIAS
18.01.00 SISTEMA DE AGUA FRIA
18.01.01 SALIDA DE AGUA FRIA C/TUB. PVC SAP Ø 1/2" pto 63.00 38.99 2,456.37 60.00 S/. 2,339.40
18.01.02 RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP ml 80.00 12.81 1,024.80 80.00 S/. 1,024.80
18.01.03 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP ml 253.00 10.81 2,734.93 253.00 S/. 2,734.93
18.01.04 RED DE DISTRIBUCION TUBERIA PVC DE 1/2" ml 144.50 7.78 1,124.21 144.50 S/. 1,124.21
18.01.06 TEE PVC - SAP 3/4" und 43.00 6.63 285.09 43.00 S/. 285.09
18.01.07 CODO PVC - SAP 1/2" x 90 und 92.00 4.19 385.48 92.00 S/. 385.48
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
18.01.08 CODO PVC - SAP 3/4" x 90 und 151.00 4.19 632.69 145.00 S/. 607.55
18.01.09 REDUCCION PVC PARA RED AGUA POTABLE DE 3/4" A 1/2" und 59.00 6.13 361.67 59.00 S/. 361.67
18.01.10 VALVULA COMPUERTA DE BRONCE DE 1'' und 2.00 98.52 197.04 0.00 S/. 0.00
18.01.11 VALVULA COMPUERTA DE BRONCE DE 3/4' und 28.00 91.32 2,556.96 0.00 S/. 0.00
18.01.13 VALVULA COMPUERTA DE RIEGO DE 3/4' und 4.00 91.32 365.28 0.00 S/. 0.00
18.01.14 CAJA DE VALVULAS DE CONCRETO CON TAPA METALICA und 6.00 146.11 876.66 0.00 S/. 0.00
18.01.15 CAJA DE VALVULAS DE MADERA und 31.00 117.11 3,630.41 0.00 S/. 0.00
18.02.00 SISTEMA DE DESAGUE
18.02.01 SALIDA DE DESAGUE TUBERIA DE 4" pto 30.00 52.58 1,577.40 30.00 S/. 1,577.40
18.02.02 SALIDA DE DESAGUE TUBERIA DE 2" pto 45.00 32.50 1,462.50 45.00 S/. 1,462.50
18.02.03 SALIDA DE VENTILACION EN PVC 2" pto 52.00 51.82 2,694.64 52.00 S/. 2,694.64
18.02.04 TUBERIA DE PVC SAL 4" ml 184.00 22.66 4,169.44 184.00 S/. 4,169.44
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
18.02.05 TUBERIA DE PVC SAL 2" ml 278.50 17.41 4,848.69 278.50 S/. 4,848.69
18.02.06 REGISTRO DE BRONCE 2" und 2.00 50.78 101.56 2.00 S/. 101.56
18.02.07 REGISTRO DE BRONCE 4" und 46.00 37.22 1,712.12 22.00 S/. 818.84
18.02.08 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 28.00 37.30 1,044.40 14.00 S/. 522.20
18.02.09 YEE PVC SAL DE 4" A 2" pza 54.00 16.67 900.18 54.00 S/. 900.18
18.02.10 YEE PVC SAL DE 4" pza 30.00 18.67 560.10 30.00 S/. 560.10
18.02.11 YEE PVC SAL DE 2" pza 6.00 13.91 83.46 6.00 S/. 83.46
18.02.12 CODO PVC SAL 2"X45° pza 43.00 12.07 519.01 43.00 S/. 519.01
18.02.13 CODO PVC SAL 2"X90° pza 81.00 19.29 1,562.49 81.00 S/. 1,562.49
18.02.14 CODO PVC SAL 4"X45° pza 31.00 16.07 498.17 31.00 S/. 498.17
18.02.15 CODO PVC SAL 4"X90° pza 6.00 16.47 98.82 6.00 S/. 98.82
18.02.16 TEE PVC-SAL 2" X 2" SANITARIA und 38.00 23.76 902.88 38.00 S/. 902.88
18.02.17 TEE PVC-SAL 4" X 4" SANITARIA und 59.00 21.76 1,283.84 59.00 S/. 1,283.84
18.02.18 CAJA DE REGISTRO DE 12" X 24" DE CONCRETO und 10.00 99.57 995.70 8.00 S/. 796.56
18.02.19 TUBERIA PVC SAL 6" ml 160.00 29.22 4,675.20 133.00 S/. 3,886.26
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
18.02.20 REDUCCION DE PVC SAL DE 4" A 2" und 24.00 20.50 492.00 24.00 S/. 492.00
18.03.00 APARATOS Y ACCESORIOS SANITARIOS
18.03.00 APARATOS Y ACCESORIOS SANITARIOS
18.03.01 INODORO TANQUE BAJO und 15.00 356.93 5,353.95 0.00 S/. 0.00
18.03.02 INODORO TANQUE BAJO BABY BLANCO und 9.00 338.17 3,043.53 0.00 S/. 0.00
18.03.03 LAVATORIO OVALIN 1 LLAVE INC/INSTALACION pza 21.00 253.83 5,330.43 0.00 S/. 0.00
18.03.04 LAVATORIO DE PARED BLANCO 1 LLAVE pza 7.00 186.09 1,302.63 0.00 S/. 0.00
18.03.05 PAPELERA DE LOSA Y BARRA PLASTICA, ADHESIVA und 24.00 253.68 6,088.32 0.00 S/. 0.00
18.03.06 DISPENSADOR DE JABON LIQUIDO PVC pza 19.00 45.08 856.52 0.00 S/. 0.00
18.03.07 URINARIO CORRIDO CON CERAMICO und 2.00 490.41 980.82 0.00 S/. 0.00
18.03.08 LAVADERO DE COCINA 02 POZAS DE ACERO INOXIDABLE pza 1.00 744.78 744.78 0.00 S/. 0.00
18.03.09 RODOPLAS DE 6 mm. DE COLOR und 256.00 7.51 1,922.56 0.00 S/. 0.00
18.03.10 COLOCACION DE APARATOS SANITARIOS pza 68.00 30.46 2,071.28 0.00 S/. 0.00
18.03.12 SUMINISTRO E INSTALACION DEL SISTEMA DE BOMBEO und 1.00 3,550.31 3,550.31 0.00 S/. 0.00
18.03.18 LAVADERO DE ACERO INOXIDABLE UNA POZA - LABORATORIOS pza 3.00 476.09 1,428.27 0.00 S/. 0.00
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
19.00.00 INSTALACIONES ELECTRICAS
19.01.00 SALIDA DE TECHO C/CABLE AWG TW 2.5MM PVC SEL 19MM(3/4) pto 155.00 90.35 14,004.25 155.00 S/. 14,004.25
19.02.00 SALIDA PARA BRAQUETE POR PARED pto 57.00 90.82 5,176.74 57.00 S/. 5,176.74
19.03.00 SALIDA TOMAC. BIPOLAR DOBLE AWG TW 4.0 mm PVC SEL 19 mm (3/4") C/T.T. pto 114.00 144.65 16,490.10 114.00 S/. 16,490.10
19.04.00 SALIDA TOMAC. BIPOLAR DOBLE AWG TW 4.0 mm PVC SEL 19 mm (3/4") C/T.T pto 7.00 149.65 1,047.55 7.00 S/. 1,047.55
19.05.00 SALIDA TOMAC. BIPOLAR TRIPLE AWG TW 4.0 mm PVC 19 mm (3/4") C/T.T. pto 10.00 141.95 1,419.50 10.00 S/. 1,419.50
19.06.00 SALIDA PARA INTERRUPTOR SIMPLE C/CABLE AWG TW 2.5 mm PVC SEL 19 mm pto 25.00 88.53 2,213.25 25.00 S/. 2,213.25
19.07.00 SALIDA PARA INTERRUPTOR DOBLE C/CABLE AWG TW mm PVC SEL 19 mm (3/4 u 28.00 91.53 2,562.84 28.00 S/. 2,562.84
19.08.00 SALIDA PARA INTERRUPTOR TRIPLE C/CABLE AWG TW 2.5 mm PVC SEL 19 mm ( pto 1.00 100.53 100.53 1.00 S/. 100.53
19.09.00 SALIDA PARA INTERRUPTOR DE CONMUTACION C/CABLE AWG TW 2.5 mm PVC S pto 8.00 95.53 764.24 8.00 S/. 764.24
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
19.10.00 TABLERO ELECTRICO DISTRIBUCION GAB. METALICO 8 POLOS P/LLAVES DE RI und 8.00 328.28 2,626.24 0.00 S/. 0.00
19.11.00 TABLERO ELECTRICO DISTRIBUCION GAB. METALICO 10 POLOS P/LLAVES DE R und 2.00 457.52 915.04 0.00 S/. 0.00
19.12.00 TABLERO ELECTRICO DISTRIBUCION GAB. METALICO 12 POLOS P/LLAVES DE R und 1.00 567.52 567.52 0.00 S/. 0.00
19.13.00 POZO A TIERRA und 6.00 626.15 3,756.90 0.00 S/. 0.00
19.14.00 CAJA DE PASE und 2.00 53.30 106.60 0.00 S/. 0.00
19.15.00 CABLE ALIMENTADOR DE Th A TG ml 80.00 23.10 1,848.00 0.00 S/. 0.00
19.16.00 CABLE ALIMENTADOR A TABLEROS ml 380.00 23.10 8,778.00 76.00 S/. 1,755.60
19.17.00 CABLE ALIMENTADOR A POSTES ml 385.00 23.10 8,893.50 77.00 S/. 1,778.70
19.18.00 SALIDA PARA TELEFONO Y DATA und 2.00 107.38 214.76 0.00 S/. 0.00
20.00.00 ARTEFACTOS ELECTRICOS
20.02.00 ARTEFACTO FLUORESENTE DE 2X36W CON EQUIPO COMPLETO und 126.00 146.61 18,472.86 0.00 S/. 0.00
20.03.00 ARTEFACTO FLUORESENTE DE 1X36W CON EQUIPO COMPLETO und 39.00 106.61 4,157.79 0.00 S/. 0.00
20.04.00 BRAQUETE CON SOQUETE DE PORCELANA und 57.00 81.54 4,647.78 0.00 S/. 0.00
20.06.00 REFLECTORES und 4.00 1,447.91 5,791.64 0.00 S/. 0.00
21.00.00 VARIOS
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
21.01.00 ASTA DE BANDERA und 2.00 706.61 1,413.22 2.00 S/. 1,413.22
21.02.00 PIZARRA ACRILICA und 16.00 664.94 10,639.04 0.00 S/. 0.00
21.03.00 FLETE TERRESTRE kg 1,452,336.60 0.10 145,233.66 1400592.15 S/. 140,059.21
21.04.00 PLACA RECORDATORIA und 1.00 926.00 926.00 0.00 S/. 0.00
21.05.00 LIMPIEZA GENERAL DE OBRA m2 5,210.11 1.19 6,200.03 4050.00 S/. 4,819.50
21.06.00 DISEÑO DE MEZCLA CONCRETO und 3.00 250.00 750.00 3.00 S/. 750.00
21.07.00 ROTURA DE PROBETAS und 90.00 25.00 2,250.00 90.00 S/. 2,250.00
21.08.00 JARDINERIA m2 3,600.00 18.96 68,256.00 2700.00 S/. 51,192.00
21.09.00 EQUIPAMIENTO DE PLATAFORMA DEPORTIVA und 1.00 5,700.00 5,700.00 1.00 S/. 5,700.00
22.00.00 EQUIPAMIENTO Y MOBILIARIO
22.01.00 MOBILIARIO ESCOLAR INICIAL und 3.00 11,240.00 33,720.00 1.50 S/. 16,860.00
22.02.00 MOBILIARIO ESCOLAR PRIMARIA und 1.00 26,020.00 26,020.00 0.50 S/. 13,010.00
22.03.00 MOBILIARIO ESCOLAR SECUNDARIA und 10.00 4,940.00 49,400.00 5.00 S/. 24,700.00
22.04.00 MOBILIARIO AREA ADMINISTRATIVA und 1.00 22,390.00 22,390.00 0.50 S/. 11,195.00
22.06.00 EQUIPAMIENTO DE LABORATORIO und 1.00 13,340.00 13,340.00 0.50 S/. 6,670.00
METRADOS DE VALORIZACIÓN N° 09 - OC
01/10/2017 al 31/10/2017
obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO
DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR


ÍTEM DESCRIPCIÓN
Und Metrado Unitario Parcial Metrado Parcial

PRESUPUESTO TOTAL
22.07.00 EQUIPAMIENTO SALA DE COMPUTO und 32.00 2,945.00 94,240.00 20.00 S/. 58,900.00
22.08.00 MOBILIARIO PARA COMEDOR und 1.00 14,580.00 14,580.00 0.50 S/. 7,290.00

TOTAL COSTO DIRECTO CD 3,282,065.79 2,640,158.11


GASTOS GENERALES GG 8.000% CD 262,565.26 211,212.65
UTILIDAD UTI 8.000% CD 262,565.26 211,212.65
SUB TOTAL ST = CD + GG + UTI 3,807,196.33 3,062,583.42
FACTOR DE RELACION (1.1) 4,187,915.97 3,368,841.79
IGV 0.00%
TOTAL VALORIZADO 4,187,915.97 3,368,841.79
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL

0.00 S/. 0.00 1.00 S/. 715.36 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 30.00 S/. 1,200.00 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 5,146.07 S/. 8,439.55 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 4,580.44 S/. 7,282.90 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1,096.72 S/. 8,324.10 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 5,276.20 S/. 33,609.42 99.59% 21.61 S/. 137.63 0.41%
0.00 S/. 0.00 260.59 S/. 7,064.59 100.00% - S/. 0.00 0.00%
7.08 S/. 185.00 1,105.66 S/. 28,890.92 100.00% -0.00 -S/. 0.02 0.00%
0.00 S/. 0.00 75.23 S/. 1,965.76 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 165.77 S/. 2,246.18 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 2,527.86 S/. 27,932.85 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 9.23 S/. 172.05 97.83% 0.21 S/. 3.82 2.17%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 1,569.84 S/. 4,489.74 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 3.15 S/. 106.31 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 11.45 S/. 441.63 100.00% - S/. 0.00 0.00%
36.03 S/. 429.12 144.12 S/. 1,716.47 100.00% - S/. 0.00 0.00%
10.38 S/. 400.30 69.19 S/. 2,668.66 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 8,754.70 S/. 61,808.20 99.99% 0.55 S/. 3.87 0.01%

0.00 S/. 0.00 420.24 S/. 18,826.75 100.00% - S/. 0.00 0.00%
0.76 S/. 170.35 209.19 S/. 47,135.50 100.00% 0.01 S/. 1.44 0.00%
0.00 S/. 0.00 49.36 S/. 18,595.89 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 522.73 S/. 14,918.71 100.00% - S/. 0.00 0.00%
0.97 S/. 363.81 47.06 S/. 17,632.41 100.01% -0.01 -S/. 2.30 -0.01%
0.34 S/. 10.83 347.40 S/. 11,224.47 100.00% -0.01 -S/. 0.30 0.00%
0.00 S/. 0.00 13.08 S/. 4,524.50 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 261.67 S/. 7,782.07 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 117.70 S/. 45,061.45 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 264.50 S/. 8,329.11 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1.13 S/. 392.37 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1.80 S/. 48.91 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 97.16 S/. 42,337.47 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 2,406.05 S/. 10,899.41 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL

0.00 S/. 0.00 181.71 S/. 78,478.73 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 14,910.45 S/. 71,868.37 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 521.17 S/. 14,144.55 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 161.55 S/. 73,316.24 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 30,115.99 S/. 145,159.06 99.73% 82.75 S/. 398.87 0.27%
0.00 S/. 0.00 1,702.49 S/. 59,655.17 89.92% 190.95 S/. 6,690.97 10.08%

0.00 S/. 0.00 153.36 S/. 72,641.03 97.94% 3.22 S/. 1,526.22 2.06%
0.00 S/. 0.00 25,411.23 S/. 122,482.12 99.48% 133.27 S/. 642.37 0.52%
0.00 S/. 0.00 1,414.11 S/. 57,384.53 98.38% 23.32 S/. 946.38 1.62%

0.00 S/. 0.00 135.63 S/. 62,452.19 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 12,519.67 S/. 60,344.81 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 1,658.22 S/. 58,883.51 100.00% -0.00 -S/. 0.12 0.00%
0.00 S/. 0.00 10,770.54 S/. 38,881.65 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 2,946.58 S/. 14,025.72 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 1.80 S/. 1,287.45 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1.63 S/. 1,165.86 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1.17 S/. 836.84 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 702.68 S/. 6,408.44 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 52.37 S/. 3,501.98 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 8.97 S/. 4,675.80 99.99% 0.00 S/. 0.44 0.01%
0.00 S/. 0.00 1,085.84 S/. 5,233.75 100.00% -0.00 S/. 0.00 0.00%
0.00 S/. 0.00 57.49 S/. 2,086.89 100.00% 0.00 S/. 0.00 0.00%

0.00 S/. 0.00 3.04 S/. 1,584.81 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 297.16 S/. 1,432.31 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 38.23 S/. 1,387.75 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 15.74 S/. 6,617.25 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1,186.77 S/. 5,720.23 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 89.86 S/. 3,479.38 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 0.20 S/. 180.27 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 12.50 S/. 66.63 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 15.00 S/. 722.25 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL

0.08 S/. 39.05 35.32 S/. 16,730.02 100.00% -0.00 S/. 0.00 0.00%
15.03 S/. 72.46 2,143.98 S/. 10,334.00 99.83% 3.55 S/. 17.09 0.17%
0.00 S/. 0.00 470.98 S/. 19,112.55 100.00% -0.00 -S/. 0.18 0.00%

0.00 S/. 0.00 842.00 S/. 90,371.86 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1,252.02 S/. 82,946.65 92.44% 102.37 S/. 6,781.69 7.56%
0.00 S/. 0.00 34.70 S/. 2,538.65 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 495.29 S/. 11,733.32 100.00% 0.00 S/. 0.10 0.00%
0.00 S/. 0.00 1,077.46 S/. 25,665.04 100.00% 0.00 S/. 0.06 0.00%
0.00 S/. 0.00 2,114.35 S/. 48,228.28 100.00% 0.00 S/. 0.04 0.00%
0.00 S/. 0.00 56.67 S/. 2,307.60 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1,506.20 S/. 34,356.36 100.00% 0.00 S/. 0.06 0.00%
0.00 S/. 0.00 1,378.96 S/. 31,454.18 100.00% -0.00 -S/. 0.10 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 1,066.85 S/. 19,758.00 100.00% 0.00 S/. 0.06 0.00%
0.00 S/. 0.00 501.44 S/. 9,311.74 100.00% -0.00 S/. 0.00 0.00%
0.00 S/. 0.00 519.01 S/. 3,856.21 100.00% 0.00 S/. 0.03 0.00%
0.00 S/. 0.00 3,267.19 S/. 12,447.99 100.00% -0.00 S/. 0.00 0.00%

0.00 S/. 0.00 1,681.37 S/. 53,854.43 100.00% -0.00 -S/. 0.15 0.00%

0.00 S/. 0.00 961.72 S/. 33,987.18 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 172.20 S/. 6,798.46 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1,041.24 S/. 36,537.11 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 172.20 S/. 10,245.90 100.00%
0.00 S/. 0.00 1,107.92 S/. 50,487.91 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 283.84 S/. 7,663.68 100.00% - S/. 0.00 0.00%
357.44 S/. 5,072.00 997.02 S/. 14,147.75 100.00% 0.01 S/. 0.11 0.00%
0.00 S/. 0.00 3,509.78 S/. 7,124.85 100.00% 0.00 S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
44.30 S/. 2,998.67 443.00 S/. 29,986.67 100.00% - S/. 0.00 0.00%

229.31 S/. 11,653.68 229.31 S/. 11,653.68 70.00% 98.28 S/. 4,994.44 30.00%

0.00 S/. 0.00 690.36 S/. 9,105.85 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 416.80 S/. 5,701.82 100.00% - S/. 0.00 0.00%

826.75 S/. 50,076.25 826.75 S/. 50,076.25 50.00% 826.75 S/. 50,076.25 50.00%
82.79 S/. 4,235.54 82.79 S/. 4,235.54 50.00% 82.79 S/. 4,235.54 50.00%
2,052.37 S/. 35,259.72 2,052.37 S/. 35,259.72 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL

27.32 S/. 1,371.24 27.32 S/. 1,371.24 27.54% 71.85 S/. 3,607.09 72.46%

0.00 S/. 0.00 33.38 S/. 25,547.72 50.00% 33.38 S/. 25,547.72 50.00%
0.00 S/. 0.00 21.32 S/. 9,009.43 50.00% 21.32 S/. 9,009.43 50.00%

0.00 S/. 0.00 16.51 S/. 5,058.83 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 191.68 S/. 14,414.34 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 300.06 S/. 20,791.16 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 262.80 S/. 16,459.16 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 24.32 S/. 3,955.16 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 0.00 S/. 0.00 0.00% 36.00 S/. 3,956.40 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 23.00 S/. 1,635.07 100.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 3,249.48 S/. 56,833.41 100.00%

1,137.87 S/. 20,345.09 1,675.21 S/. 29,952.70 100.00% 0.00 S/. 0.05 0.00%
988.29 S/. 12,373.35 988.29 S/. 12,373.35 85.00% 174.40 S/. 2,183.53 15.00%
1,487.44 S/. 18,816.09 2,087.57 S/. 26,407.77 88.84% 262.13 S/. 3,315.94 11.16%
1,339.13 S/. 18,305.85 2,016.73 S/. 27,568.66 69.90% 868.44 S/. 11,871.61 30.10%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 271.80 S/. 4,732.04 100.00%

0.00 S/. 0.00 60.00 S/. 2,339.40 95.24% 3.00 S/. 116.97 4.76%
0.00 S/. 0.00 80.00 S/. 1,024.80 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 253.00 S/. 2,734.93 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 144.50 S/. 1,124.21 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 43.00 S/. 285.09 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 92.00 S/. 385.48 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 145.00 S/. 607.55 96.03% 6.00 S/. 25.14 3.97%
0.00 S/. 0.00 59.00 S/. 361.67 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 2.00 S/. 197.04 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 28.00 S/. 2,556.96 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 4.00 S/. 365.28 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 6.00 S/. 876.66 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 31.00 S/. 3,630.41 100.00%

0.00 S/. 0.00 30.00 S/. 1,577.40 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 45.00 S/. 1,462.50 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 52.00 S/. 2,694.64 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 184.00 S/. 4,169.44 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 278.50 S/. 4,848.69 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 2.00 S/. 101.56 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 22.00 S/. 818.84 47.83% 24.00 S/. 893.28 52.17%
0.00 S/. 0.00 14.00 S/. 522.20 50.00% 14.00 S/. 522.20 50.00%
0.00 S/. 0.00 54.00 S/. 900.18 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 30.00 S/. 560.10 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 6.00 S/. 83.46 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 43.00 S/. 519.01 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 81.00 S/. 1,562.49 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 31.00 S/. 498.17 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 6.00 S/. 98.82 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 38.00 S/. 902.88 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 59.00 S/. 1,283.84 100.00% - S/. 0.00 0.00%
2.00 S/. 199.14 10.00 S/. 995.70 100.00% - S/. 0.00 0.00%
27.00 S/. 788.94 160.00 S/. 4,675.20 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 24.00 S/. 492.00 100.00% - S/. 0.00 0.00%

7.50 S/. 2,676.98 7.50 S/. 2,676.98 50.00% 7.50 S/. 2,676.98 50.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 9.00 S/. 3,043.53 100.00%
10.00 S/. 2,538.30 10.00 S/. 2,538.30 47.62% 11.00 S/. 2,792.13 52.38%
4.00 S/. 744.36 4.00 S/. 744.36 57.14% 3.00 S/. 558.27 42.86%
11.00 S/. 2,790.48 11.00 S/. 2,790.48 45.83% 13.00 S/. 3,297.84 54.17%
9.00 S/. 405.72 9.00 S/. 405.72 47.37% 10.00 S/. 450.80 52.63%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 2.00 S/. 980.82 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 1.00 S/. 744.78 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 256.00 S/. 1,922.56 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 68.00 S/. 2,071.28 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 1.00 S/. 3,550.31 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 3.00 S/. 1,428.27 100.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL

0.00 S/. 0.00 155.00 S/. 14,004.25 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 57.00 S/. 5,176.74 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 114.00 S/. 16,490.10 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 7.00 S/. 1,047.55 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 10.00 S/. 1,419.50 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 25.00 S/. 2,213.25 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 28.00 S/. 2,562.84 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 1.00 S/. 100.53 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 8.00 S/. 764.24 100.00% - S/. 0.00 0.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
4.00 S/. 1,313.12 4.00 S/. 1,313.12 50.00% 4.00 S/. 1,313.12 50.00%
1.00 S/. 457.52 1.00 S/. 457.52 50.00% 1.00 S/. 457.52 50.00%
0.50 S/. 283.76 0.50 S/. 283.76 50.00% 0.50 S/. 283.76 50.00%
6.00 S/. 3,756.90 6.00 S/. 3,756.90 100.00% - S/. 0.00 0.00%
2.00 S/. 106.60 2.00 S/. 106.60 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 80.00 S/. 1,848.00 100.00%
0.00 S/. 0.00 76.00 S/. 1,755.60 20.00% 304.00 S/. 7,022.40 80.00%
0.00 S/. 0.00 77.00 S/. 1,778.70 20.00% 308.00 S/. 7,114.80 80.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 2.00 S/. 214.76 100.00%

54.00 S/. 7,916.94 54.00 S/. 7,916.94 42.86% 72.00 S/. 10,555.92 57.14%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 39.00 S/. 4,157.79 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 57.00 S/. 4,647.78 100.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 4.00 S/. 5,791.64 100.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 2.00 S/. 1,413.22 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 16.00 S/. 10,639.04 100.00%
0.00 S/. 0.00 1,400,592.15 S/. 140,059.21 96.44% 51,744.45 S/. 5,174.45 3.56%
0.00 S/. 0.00 0.00 S/. 0.00 0.00% 1.00 S/. 926.00 100.00%
0.00 S/. 0.00 4,050.00 S/. 4,819.50 77.73% 1,160.11 S/. 1,380.53 22.27%
0.00 S/. 0.00 3.00 S/. 750.00 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 90.00 S/. 2,250.00 100.00% - S/. 0.00 0.00%
0.00 S/. 0.00 2,700.00 S/. 51,192.00 75.00% 900.00 S/. 17,064.00 25.00%
0.00 S/. 0.00 1.00 S/. 5,700.00 100.00% - S/. 0.00 0.00%

0.00 S/. 0.00 1.50 S/. 16,860.00 50.00% 1.50 S/. 16,860.00 50.00%
0.00 S/. 0.00 0.50 S/. 13,010.00 50.00% 0.50 S/. 13,010.00 50.00%
0.00 S/. 0.00 5.00 S/. 24,700.00 50.00% 5.00 S/. 24,700.00 50.00%
0.00 S/. 0.00 0.50 S/. 11,195.00 50.00% 0.50 S/. 11,195.00 50.00%
0.00 S/. 0.00 0.50 S/. 6,670.00 50.00% 0.50 S/. 6,670.00 50.00%
ZACIÓN N° 09 - OCTUBRE 2017
17 al 31/10/2017

Monto Contratado Con IGV : 4,187,915.97


Factor de Relación : 1.10000
Inicio de Plazo Contractual : 08/02/2017
Plazo Contractual : 240 d.c
Término de Plazo Contractual : 05/10/2017

ACTUAL ACUMULADO SALDO


Metrado Parcial Metrado Parcial % Metrado Parcial %

PUESTO TOTAL
0.00 S/. 0.00 20.00 S/. 58,900.00 62.50% 12.00 S/. 35,340.00 37.50%
0.00 S/. 0.00 0.50 S/. 7,290.00 50.00% 0.50 S/. 7,290.00 50.00%

80.44% 206,157.16 6.28% 2,846,315.29 86.72% 435,750.50 13.28%


16,492.57 227,705.22 34,860.04
16,492.57 227,705.22 34,860.04
239,142.32 3,301,725.74 505,470.59
263,056.56 3,631,898.35 556,017.66

263,056.56 3,631,898.35 556,017.66


RESUMEN DE VALORIZACION DE AVANCE N° 09
01/10/2017 al 31/10/2017

obra "MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARC
MODULOS

Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PRESUPUESTO INICIAL ANTERIOR ACTUAL ACUMULADO


ÍTEM DESCRIPCIÓN

Parcial Parcial Parcial Parcial %

I PRESUPUESTO TOTAL 3,282,065.79 2,640,158.11 206,157.16 2,846,315.28 86.72%

TOTAL COSTO DIRECTO CD 3,282,065.79 2,640,158.11 206,157.16 6.28% 2,846,315.28 86.72%


GASTOS GENERALES GG 8.000% CD 262,565.26 211,212.65 16,492.57 227,705.22
UTILIDAD UTI 8.000% CD 262,565.26 211,212.65 16,492.57 227,705.22
SUB TOTAL ST = CD + GG + UTI 3,807,196.33 3,062,583.41 239,142.32 3,301,725.73
FACTOR DE REALCION (1.1) 4,187,915.97 3,368,841.75 263,056.56 3,631,898.32
IGV 18.00% 0.00 0.00 0.00 0.00
TOTAL VALORIZADO 4,187,915.97 3,368,841.75 263,056.56 3,631,898.32
- SAN IGNACIO - CAJAMARCA" -

SALDO

Parcial %

435,750.51 13.28%

435,750.51 13.28%
34,860.04
34,860.04
505,470.61
556,017.68
0.00
556,017.68
CÁLCULO DE LOS "K" DE REAJUSTE MENSUAL - VALORIZACIÓN Nº
obra "MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGN
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

Sub Presupuesto TOTAL

FÓRMULA POLINÓMICA K =0.116*(Ar/Ao)+0.174*(Cr/Co)+0.175*(Ir/Io)+0.319*(Mr/Mo)+0.216*(Ar/Ao)

ÍNDICE
COEF. Feb-17 Mar-17 Apr-17
CÓDIGO IND ELEMENTO % BASE
MONOMIO
OCTUBRE ÍNDICE K ÍNDICE K ÍNDICE

A 05 AGREGADO GRUESO 48.40% 0.116 436.38 441.11 0.116 448.41 0.118 451.25
04 AGREGADO FINO 8.790% 530.96 524.12 542.79 553.18
38 HORMIGON 1.910% 422.28 421.40 428.09 431.31
17 BLOQUE Y LADRILLO 40.900% 590.52 588.21 596.31 603.05
507.470 508.19 516.81 521.91

C 21 CEMENTO PORTLAND TIPO I 58.560% 0.174 462.57 462.57 0.175 459.40 0.174 459.40
93 FRAGUA 0.121% 433.63 437.38 437.38 444.52
92 CERAMICO 0.510% 246.28 247.48 247.48 240.11
91 PISO DE CONCRETO 0.512% 399.20 401.20 401.20 372.22
86 ROTURA DE CONCRETO 0.002% 433.63 437.38 437.38 444.52
79 VIDRIO INCOLORO NACIONAL 0.145% 433.63 437.38 437.38 444.52
75 TUBERIA DE PVC PARA ELECTRICIDAD (SEL)(Reag.74 0.707% 415.95 413.21 413.21 415.34
77 VALVULA DE BRONCE NACIONAL 0.316% 315.060 316.01 315.33 321.27
73 DUCTO TELEFONICO DE PVC 0.909% 541.860 536.20 532.04 535.77
72 TUBERIA DE PVC PARA AGUA 3.652% 415.950 413.21 412.75 415.34
CÁLCULO DE LOS "K" DE REAJUSTE MENSUAL - VALORIZACIÓN Nº
obra "MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGN
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

60 PLANCHA DE POLIURETANO 0.138% 295.990 295.99 295.99 295.99


59 PLANCHA DE ASBESTO-CEMENTO 14.700% 237.700 238.36 237.71 237.71
54 PINTURA LATEX 4.084% 375.630 377.56 402.49 405.23
40 LOSETA 1.110% 378.130 378.29 380.00 378.13
26 CERRAJERIA NACIONAL 1.363% 365.210 366.43 366.43 366.43
24 CERAMICA ESMALTADA Y SIN ESMALTAR 1.506% 246.280 247.48 246.57 240.11
06 ALAMBRE Y CABLE DE COBRE DESNUDO 2.018% 779.100 835.54 831.00 841.06
07 ALAMBRE Y CABLE TIPO TW Y THW 1.190% 574.460 612.03 608.08 615.38
10 APARATO SANITARIO CON GRIFERIA 2.479% 406.380 407.28 407.02 408.62
11 ARTEFACTO DE ALUMBRADO EXTERIOR 0.546% 246.360 243.25 238.07 238.26
12 ARTEFACTO DE ALUMBRADO INTERIOR 5.520% 325.500 323.58 318.51 318.68
53 PETROLEO DIESSEL 0.020% 625.210 692.76 693.42 692.10
415.04 416.61 415.17 415.50
CÁLCULO DE LOS "K" DE REAJUSTE MENSUAL - VALORIZACIÓN Nº
obra "MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGN
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

E 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 32.276% 0.175 433.63 437.38 0.175 438.80 0.174 438.80
29 DÓLAR 2.677% 476.53 437.38 437.38 463.36
30 DOLAR (GENERAL PONDERADO) 11.655% 476.53 470.06 461.49 463.36
32 FLETE TERRESTRE 25.332% 462.71 463.60 463.60 465.79
37 HERRAMIENTA MANUAL 6.058% 295.36 297.42 295.83 295.70
48 MAQUINARIA Y EQUIPO NACIONAL 2.016% 368.83 367.86 365.19 365.31
49 MAQUINARIA Y EQUIPO IMPORTADO 19.986% 303.44 299.32 293.65 293.92

411.44 410.36 408.53 410.05

M 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.319 562.24 563.25 0.320 563.25 0.320 563.25

GGU 03 ACERO DE CONSTRUCCION CORRUGADO 41.266% 0.216 464.71 464.67 0.217 456.59 0.215 453.51
02 ACERO DE CONSTRUCCION LISO 10.223% 482.15 477.63 468.50 464.43
94 ALUMINIO 2.545% 302.38 300.13 300.13 296.25
71 TUBERIA DE FIERRO FUNDIDO 0.023% 672.40 663.27 647.40 648.00
68 TUBERIA DE COBRE 0.014% 216.81 230.70 233.61 235.54
65 TUBERIA DE ACERO NEGRO Y/O GALVANIZADO 0.209% 222.10 221.11 215.22 211.57
56 PLANCHA DE ACERO LAC 1.131% 414.71 498.47 469.27 504.21
51 PERFIL DE ACERO LIVIANO 1.696% 264.41 270.80 263.40 263.89
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 39.791% 702.16 706.95 705.84 708.34
42 MADERA IMPORTADA PARA ENCOF. Y CARPINT. 3.102% 286.61 284.65 284.65 284.79
546.86 549.23 544.05 543.66
CÁLCULO DE LOS "K" DE REAJUSTE MENSUAL - VALORIZACIÓN Nº
obra "MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGN
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

1.000 K = 1.003 K = 1.001 K =

NOTA: EL "K" DEL MES DE OCTUBRE DEL 2016 HA SIDO CALCULADO CON LOS INDICES UNIFICADOS DEL MES DE ENERO DEL 2017, PUBLICADOS EL 15 DE FEBRERO
UAL - VALORIZACIÓN Nº 09 - MES DE OCTUBRE 2017
STRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17

K ÍNDICE K ÍNDICE K ÍNDICE K ÍNDICE K ÍNDICE K ÍNDICE K

0.119 449.52 0.120 450.13 0.121 446.64 0.121 446.20 0.121 448.18 0.121 450.52 0.121
557.06 559.75 555.21 552.63 554.25 545.60
432.20 434.96 434.17 430.86 426.67 426.68
611.55 619.02 628.71 632.43 628.23 625.05
524.91 528.55 530.41 531.43 530.73 529.80

0.174 459.40 0.174 459.400 0.174 465.710 0.176 465.710 0.176 465.710 0.176 465.710 0.176
444.52 444.520 444.520 444.520 444.520 444.520
240.11 240.110 240.110 240.110 240.110 240.110
372.22 372.220 372.220 372.220 372.220 372.220
444.52 444.520 444.520 444.520 444.520 444.520
444.52 444.520 444.520 444.520 444.520 444.520
415.34 415.340 415.340 415.340 415.340 415.340
317.54 318.450 318.020 317.750 317.650 318.400
533.74 537.040 537.930 535.760 534.640 535.260
414.32 418.030 417.890 417.030 416.900 416.950
UAL - VALORIZACIÓN Nº 09 - MES DE OCTUBRE 2017
STRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

295.99 295.990 295.990 295.990 295.990 295.990


237.71 238.530 238.530 238.530 238.530 238.530
405.60 405.600 405.600 405.600 405.600 405.600
378.13 378.130 378.130 378.130 378.130 378.130
366.43 366.430 365.940 365.940 368.550 370.650
247.03 246.790 244.980 241.510 243.740 245.010
830.58 829.840 825.180 830.360 847.680 892.790
608.77 608.190 604.490 607.950 620.150 648.230
401.43 398.060 403.020 407.830 410.190 412.880
233.73 235.400 235.010 233.950 233.560 233.880
317.78 319.230 318.900 318.240 317.990 318.230
692.10 691.440 690.110 674.880 670.240 682.160
415.01 415.28 418.91 419.02 419.61 421.00
UAL - VALORIZACIÓN Nº 09 - MES DE OCTUBRE 2017
STRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

0.174 443.37 0.175 441.50 0.175 440.79 0.175 441.67 0.175 444.64 0.175 444.57 0.175
463.36 463.36 463.36 463.36 463.36 463.36
461.46 466.53 466.08 463.80 462.48 464.58
465.79 465.79 467.18 467.18 467.18 468.00
297.51 298.32 295.88 297.58 297.47 297.54
365.67 366.67 367.13 366.28 366.02 366.18
292.48 295.46 294.92 293.21 292.36 293.03

411.13 411.79 411.61 411.37 412.00 412.57

0.320 563.25 0.320 563.25 0.320 563.25 0.320 563.25 0.320 580.90 0.330 580.90 0.330

0.215 431.87 0.212 440.82 0.214 448.49 0.214 451.95 0.215 460.39 0.217 467.17 0.219
448.33 455.78 463.66 467.84 474.70 485.11
296.25 296.25 296.25 296.25 296.25 296.25
644.81 649.98 648.78 645.02 643.63 644.62
235.11 236.38 236.76 246.08 255.47 258.34
212.45 214.01 214.57 215.52 216.20 228.52
505.18 498.57 461.08 457.14 468.11 480.06
272.43 269.19 267.89 270.23 276.10 291.12
716.35 718.65 711.33 710.90 715.43 716.76
284.08 285.22 284.93 284.08 283.79 284.08
536.40 541.68 542.29 543.94 550.15 554.96
UAL - VALORIZACIÓN Nº 09 - MES DE OCTUBRE 2017
STRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

1.002 K = 1.001 K = 1.004 K = 1.006 K = 1.007 K = 1.019 K = 1.021

DEL 2017, PUBLICADOS EL 15 DE FEBRERO DEL 2017


CÁLCULO DE DEDUCCIONES DE REAJUSTE QUE NO CORR
POR EL ADELANTO DIRECTO
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE
obra CAJAMARCA" - MODULOS
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA
Monto Total del Contrato S/IGV S/. 4,187,915.97
Monto del Adelanto Directo otorgado S/IGV S/. 418,791.60
Fecha de Pago 28-Feb-17

Deducción de Reajuste que no corresponde por Adelanto en Efectivo:


D = V * A / C * ( Kr / Ka - 1) Donde:
D : Deducción de reajuste que no corresponde
V : Valorización ejecutada sin IGV, incluye Fact
A : Adelanto Directo Otorgado sin IGV
C : Monto del Contrato principal sin IGV
Kr : Coeficiente de Reajuste de la Valorización
Ka : Coeficiente de Reajuste del mes en que se

Monto del Contrato por Fórmula (S/IGV) Monto del Adelanto Dire

PRESUPUESTO S/. 4,187,915.97 PRESUPUESTO


S/. 4,187,915.97

Valorizaciones Monto Valorizado


Amortización Kr
Nº Fecha (V)

Sub Presupuesto TOTAL

1 Feb-17 599,518.67 59,951.87 1.003


2 Mar-17 463,663.75 46,366.38 1.001
3 Apr-17 445,925.39 44,592.54 1.002
4 May-17 474,113.22 48,447.01 1.001
5 Jun-17 296,913.84 29,691.38 1.004
6 Jul-17 440,808.23 44,080.82 1.006
7 Aug-17 219,682.49 21,968.25 1.007
8 Sep-17 429,112.19 42,911.22 1.019
9 Oct-17 263,056.56 26,305.66 1.021

TOTAL 3,632,794.34 364,315.12

TOTAL 3,632,794.34 364,315.12


CÁLCULO DE DEDUCCIONES DE REAJUSTE QUE NO CORR
POR EL ADELANTO DIRECTO
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE
obra CAJAMARCA" - MODULOS
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA
SALDO POR AMORTIZAR (SIN IGV)
DE REAJUSTE QUE NO CORRESPONDEN
DELANTO DIRECTO
E N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO -

: Deducción de reajuste que no corresponde


: Valorización ejecutada sin IGV, incluye Factor de Relación

: Monto del Contrato principal sin IGV


: Coeficiente de Reajuste de la Valorización
: Coeficiente de Reajuste del mes en que se otorgó el Adelanto Directo

Monto del Adelanto Directo por Fórmula (S/IGV)

S/. 418,791.60
S/. 418,791.60

Ka Deducción
Feb-17 ( D )

1.003 0.00
1.003 -92.46
1.003 -44.46
1.003 -96.60
1.003 29.60
1.003 131.85
1.003 87.61
1.003 684.53
1.003 472.09

1,172.16
DE REAJUSTE QUE NO CORRESPONDEN
DELANTO DIRECTO
E N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO -

S/. 54,476.48
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Monto Total del Contrato S/IGV #REF!
Monto del Adelanto Directo otorgado S/IGV S/. 500,000.00 #REF!
Fecha de Pago 25-Apr-13
Fórmula a emplear:

D = A * ( Imr - Ima ) / Imo D : Deducción en cada valorización bruta reajustada


A : Adelanto utilizado en la valorización que se reajusta
Imo : Indice a la fecha del presupuesto base, del elemento representativo de
que se encuentra el material o materiales para los cuales se otorgó el a
Ima : Indice del mismo elemento representativo a la fecha efectiva del adelan
Imr : Indice del mismo elemento representativo a la fecha del reajuste

Sub Presupuesto 01 : CONSTRUCCIÓN DE 06 AULAS NIVEL PRIMARIO DE 6 X 8


AGREGADO GRUESO IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 25,036.66 Apr-13 Err:504 Err:504 0.00 434.36 434.36
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!

BLOQUE Y LADRILLO IU = 17

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! 462.57 549.04 549.04
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
HORMIGON IU = 38

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! Err:509 422.16 422.16
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!

ACERO DE CONSTRUCCION CORRUGADO IU = 03

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! Err:509 438.01 438.01
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!

ARTEFACTO DE ALUMBRADO EXTERIOR IU = 11

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! Err:509 193.54 193.54
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
PERFIL DE ACERO IU = 51

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! Err:509 290.77 290.77
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!

PINTURA LATEX IU = 54

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! Err:509 374.03 374.03
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!

CEMENTO PORTLAND TIPO I IU = 21

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! Err:509 457.84 457.84
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA IU = 43

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Feb-17 599,518.67 #REF! Apr-13 #REF! #REF! Err:509 619.56 619.56
2 Mar-17 463,663.75 #REF! Apr-13
3 Apr-17 445,925.39 #REF! Apr-13
4 May-17 474,113.22 #REF! Apr-13
5 Jun-17 296,913.84 #REF! Apr-13
6 Jul-17 440,808.23 #REF! Apr-13
#REF!
#REF!

Sub Presupuesto 02: SERVICIOS HIGIÉNICOS 6 X 6 (02 BATERÍAS)


AGREGADO GRUESO IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 434.36 434.36
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

BLOQUE Y LADRILLO IU = 17

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 549.04 549.04
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
HORMIGON IU = 38

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 422.16 422.16
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

ACERO DE CONSTRUCCION CORRUGADO IU = 03

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 438.01 438.01
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

APARATO SANITARIO CON GRIFERIA IU = 10

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 354.8 354.8
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
TUBERIA DE PVC IU = 72

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 358.85 358.85
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

CEMENTO PORTLAND TIPO I IU = 21

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 457.84 457.84
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

CERAMICA ESMALTADA Y SIN ESMALTAR IU = 24

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 275.31 275.31
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA IU = 43

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 619.56 619.56
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
#REF!
Sub Presupuesto 03: LOSA DEPORTIVA DE 18 X 30
ACERO DE CONSTRUCCIÓN LISO IU = 02

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 442.79 442.79
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

AGREGADO GRUESO IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 434.36 434.36
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

APARATO SANITARIO CON GRIFERIA IU = 10

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 354.8 354.8
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

ARTEFACTO DE ALUMBRADO EXTERIOR IU = 11

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 193.54 193.54
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

CERRAJERIA NACIONAL IU = 26

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 360.42 360.42
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

PINTURA LATEX IU = 54

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 374.03 374.03
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

TUBERIA DE ACERO NEGRO IU = 65

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 241.23 241.23
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA IU = 43

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 619.56 619.56
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
ASFALTO IU = 13

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 1697.48 1697.48
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
#REF!

Sub Presupuesto 04 :CERCO PERIMÉTRICO CARAVISTA


MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA IU = 43

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 619.56 619.56
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

AGREGADO GRUESO IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 434.36 434.36
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

CEMENTO PORTLAND TIPO I IU = 21

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Fecha
#REF! #REF!
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 457.84 457.84
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

ACERO DE CONSTRUCCION CORRUGADO IU = 03

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
ValorizadoOtorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 438.01 438.01
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
#REF!
Sub Presupuesto:05 PORTADA DE INGRESO
AGREGADO GRUESO IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 434.36 434.36
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

HORMIGON IU = 38

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 422.16 422.16
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

PERFIL DE ACERO IU = 51

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 290.77 290.77
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

ACERO DE CONSTRUCCION CORRUGADO IU = 03

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 438.01 438.01
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA IU = 43

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 619.56 619.56
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

CEMENTO PORTLAND TIPO I IU = 21

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 457.84 457.84
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
Sub Presupuesto 06:OBRAS EXTERIORES E INTERIORES
AGREGADO GRUESO IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 434.36 434.36
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

CABLE NYY Y NKY IU = 19

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 679.27 679.27
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

CEMENTO PORTLAND TIPO I IU = 21

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 457.84 457.84
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

MADERA TERCIADA PARA CARPINTERIA IU = 44

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
ValorizadoOtorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 345.91 345.91
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
#REF!
Sub Presupuesto 07:ESCALERA DE CONCRETO
BLOQUE Y LADRILLO IU = 17

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 549.04 549.04
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
CEMENTO PORTLAND TIPO I IU = 21

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 457.84 457.84
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

HORMIGON IU = 38

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 422.16 422.16
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

PERFIL DE ACERO IU = 51

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 290.77 290.77
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
TUBERIA DE PVC IU = 72

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 358.85 358.85
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA IU = 43

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 619.56 619.56
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

ACERO DE CONSTRUCCION CORRUGADO IU = 03

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 438.01 438.01
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
AGREGADO GRUESO IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 434.36 434.36
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!

ARTEFACTO DE ALUMBRADO ANTERIOR IU = 12

Valorización Monto Adelanto COEFICIENTE INDICES


Fecha
Valorizado Otorgado Incidencia
Nº Fecha Pago Coef. Imo Ima Imr
(S/.) (S/.) (%)
1 2 3 4 5 6 7
1 Apr-13 Err:509 #REF! Apr-13 #REF! #REF! Err:509 288.86 288.86
2 May-13 Err:509 #REF! Apr-13
3 Jun-13 Err:509 #REF! Apr-13
4 Jul-13 Err:509 #REF! Apr-13
5 Aug-13 Err:509 #REF! Apr-13
6 Sep-13 Err:509 #REF! Apr-13
#REF!
#REF!

SALDO POR AMORTIZAR (SIN IGV)


CÁLCULO DE REAJUSTE QUE NO CORRES
POR EL ADELANTO ESPECIFICO PARA MAT
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

del presupuesto base, del elemento representativo dentro del


a el material o materiales para los cuales se otorgó el adelanto
elemento representativo a la fecha efectiva del adelanto
elemento representativo a la fecha del reajuste

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:504 0.00 Err:504 Err:504 Err:504

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
#REF! #REF! #REF! #REF! #REF!

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5


Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509
AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

Adelanto Monto Máximo Adelanto


Amortización Deducción (D)
Utlizado Utilizable deducible
8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
Err:509 #REF! #REF! Err:509 Err:509

CONTROL DE AMORTIZACION
DEL ADELANTO P/MATERIALES
Adelanto otorgado 500,000.00
VAL. MES MONTO SALDO
1 Apr-13 Err:509 Err:509
2 May-13
3 Jun-13
4 Jul-13
5 Aug-13
6 Sep-13
TOTAL Err:509

SALDO POR AMORTIZAR (SIN IGV) Err:509


AJUSTE QUE NO CORRESPONDEN
TO ESPECIFICO PARA MATERIALES
DEDUCCION DE REAJUSTE QUE NO CORRESPONDE POR EL ADELAN
ESPECIFICO PARA MATERIALES
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!

Monto Total del Contrato S/IGV #REF!


Monto del Adelanto para Materiales otorgado S/IGV S/. 92,819.66
Fecha de Pago 13-Sep-11

Fórmula a emplear: D : Deducción en cada valorización bruta reajustada


A : Adelanto utilizado en la valorización que se reajusta
D = A * ( Imr - Ima ) / Imo Imo : Indice a la fecha del presupuesto base, del elemento representativo de
que se encuentra el material o materiales para los cuales se otorgó el
Ima : Indice del mismo elemento representativo a la fecha efectiva del adela
Imr : Indice del mismo elemento representativo a la fecha del reajuste

CEMENTO PORTLAND TIPO I IU = 21

Valorización Monto Adelanto COEFICIENTE INDICES Monto


Fecha Adelanto Adelanto
Valorizado Otorgado Incidencia Máximo
Nº Fecha Pago Coef. Imo Ima Imr Utlizado deducible
(S/.) (S/.) (%) Utilizable
1 2 3 4 5 6 7 8=1x3x4 9=2x5/6 10
1 #REF! #REF! 28,380.95 Sep-11 0.174 58.560% 462.57 462.57 462.57 #REF! 28,380.95 #REF!
2 #REF! 0.00 #REF!
3 #REF! 0.00 #REF!

ACERO DE CONSTRUCCIÓN CORRUGADO IU = 03

Valorización Monto Adelanto COEFICIENTE INDICES Monto


Fecha Adelanto Adelanto
Valorizado Otorgado Incidencia Máximo
Nº Fecha Pago Coef. Imo Ima Imr Utlizado deducible
(S/.) (S/.) (%) Utilizable
1 2 3 4 5 6 7 8=1x3x4 9=2x5/6 10
1 #REF! #REF! 12,329.43 Sep-11 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! Err:509 Err:509
2 #REF! 0.00 Err:509
3 #REF! 0.00 Err:509

AGREGADO GRUESO IU = 05
DEDUCCION DE REAJUSTE QUE NO CORRESPONDE POR EL ADELAN
ESPECIFICO PARA MATERIALES
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!

Monto Total del Contrato S/IGV #REF!


Monto del Adelanto para Materiales otorgado S/IGV S/. 92,819.66
Fecha de Pago 13-Sep-11

Fórmula a emplear: D : Deducción en cada valorización bruta reajustada


A : Adelanto utilizado en la valorización que se reajusta
D = A * ( Imr - Ima ) / Imo Imo : Indice a la fecha del presupuesto base, del elemento representativo de
que se encuentra el material o materiales para los cuales se otorgó el
Ima : Indice del mismo elemento representativo a la fecha efectiva del adela
Imr : Indice del mismo elemento representativo a la fecha del reajuste

Valorización Monto Adelanto COEFICIENTE INDICES Monto


Fecha Adelanto Adelanto
Valorizado Otorgado Incidencia Máximo
Nº Fecha Pago Coef. Imo Ima Imr Utlizado deducible
(S/.) (S/.) (%) Utilizable
1 2 3 4 5 6 7 8=1x3x4 9=2x5/6 10
1 #REF! #REF! 52,109.28 Sep-11 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! Err:509 Err:509
2 #REF! 0.00 Err:509
3 #REF! 0.00 Err:509
DEDUCCION DE REAJUSTE QUE NO CORRESPONDE POR EL ADELAN
ESPECIFICO PARA MATERIALES
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!

Monto Total del Contrato S/IGV #REF!


Monto del Adelanto para Materiales otorgado S/IGV S/. 92,819.66
Fecha de Pago 13-Sep-11

Fórmula a emplear: D : Deducción en cada valorización bruta reajustada


A : Adelanto utilizado en la valorización que se reajusta
D = A * ( Imr - Ima ) / Imo Imo : Indice a la fecha del presupuesto base, del elemento representativo de
que se encuentra el material o materiales para los cuales se otorgó el
Ima : Indice del mismo elemento representativo a la fecha efectiva del adela
Imr : Indice del mismo elemento representativo a la fecha del reajuste

CONTROL DE AMORTIZACION
DEL ADELANTO P/MATERIALES
Adelanto otorgado
VAL. MES MONTO
1 #REF! #REF!
2 #REF!
3 #REF!

TOTAL #REF!

SALDO POR AMORTIZAR (SIN IGV) #REF!


QUE NO CORRESPONDE POR EL ADELANTO
FICO PARA MATERIALES

: Indice a la fecha del presupuesto base, del elemento representativo dentro del
que se encuentra el material o materiales para los cuales se otorgó el adelanto
: Indice del mismo elemento representativo a la fecha efectiva del adelanto
: Indice del mismo elemento representativo a la fecha del reajuste

Deducción
Amortización
(D)
11=8x6/5 12=8x(7-6)/5
#REF! #REF!

Deducción
Amortización
(D)
11=8x6/5 12=8x(7-6)/5
#REF! Err:509
QUE NO CORRESPONDE POR EL ADELANTO
FICO PARA MATERIALES

: Indice a la fecha del presupuesto base, del elemento representativo dentro del
que se encuentra el material o materiales para los cuales se otorgó el adelanto
: Indice del mismo elemento representativo a la fecha efectiva del adelanto
: Indice del mismo elemento representativo a la fecha del reajuste

Deducción
Amortización
(D)
11=8x6/5 12=8x(7-6)/5
#REF! Err:509
QUE NO CORRESPONDE POR EL ADELANTO
FICO PARA MATERIALES

: Indice a la fecha del presupuesto base, del elemento representativo dentro del
que se encuentra el material o materiales para los cuales se otorgó el adelanto
: Indice del mismo elemento representativo a la fecha efectiva del adelanto
: Indice del mismo elemento representativo a la fecha del reajuste

CONTROL DE AMORTIZACION
DEL ADELANTO P/MATERIALES
92,819.66
SALDO
#REF!
CÁLCULO DE REAJUSTE QUE NO CORRESPONDEN
POR EL ADELANTO ESPECIFICO PARA MATERIALES
Obra :
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS
Proceso : LP-SM-1-2016-MDH/CS-1
Contrato : 001-2016
Entidad : MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación : HURANGO - SAN IGNACIO - CAJAMARCA
Contratista : CONSORCIO PUERTO CIRUELO
Residente : ING°. ALEX CASTRO ALDANA
Inspector : ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

Monto Total del Contrato S/IGV S/. 4,187,915.97


Monto del Adelanto Directo otorgado S/IGV S/. 837,583.19 #REF!
Fecha de Pago 28-Feb-17

Fórmula a emplear:

D = A * ( Imr - Ima ) / Imo D : Deducción en cada valorización bruta reajustada


A : Adelanto utilizado en la valorización que se reajusta
Imo : Indice a la fecha del presupuesto base, del elemento representativo dentro del
que se encuentra el material o materiales para los cuales se otorgó el adelanto
Ima : Indice del mismo elemento representativo a la fecha efectiva del adelanto
Imr : Indice del mismo elemento representativo a la fecha del reajuste

PRESUPUESTO TOTAL

AGREGADO GRUESO IU = 5

Valorización Monto Adelanto COEFICIENTE INDICES Monto


Fecha Adelanto Adelanto
Valorizado Otorgado Incidencia Máximo Amortización Deducción (D)
Nº Fecha Pago Coef. Imo Ima Imr Utlizado deducible
(S/.) (S/.) (%) Utilizable
1 2 3 4 5 6 7 8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
1 Feb-17 599,518.67 90,991.47 Feb-17 0.116 48.400% 436.38 441.11 441.11 33,659.38 90,015.77 56,356.40 432.77 0.00
2 Mar-17 463,663.75 90,991.47 Mar-17 0.116 48.400% 436.38 441.11 542.79 26,031.94 90,015.77 63,983.84 24,208.97 6,065.65
3 Apr-17 445,925.39 90,991.47 Apr-17 0.116 48.400% 436.38 441.11 451.25 25,036.04 90,015.77 64,979.74 30,368.89 581.75
4 May-17 474,113.22 90,991.47 May-17 0.116 48.400% 436.38 441.11 449.52 26,618.61 90,015.77 63,397.16 32,288.56 513.00
5 Jun-17 296,913.84 90,991.47 Jun-17 0.116 48.400% 436.38 441.11 450.13 16,669.93 90,015.77 73,345.84 20,220.74 344.57
6 Jul-17 440,808.23 90,991.47 Jul-17 0.116 48.400% 436.38 441.11 446.64 24,748.74 90,015.77 65,267.04 30,020.39 313.63
7 Aug-17 219,682.49 90,991.47 Aug-17 0.116 48.400% 436.38 441.11 446.20 12,333.85 90,015.77 77,681.92 14,961.05 143.86
8 Sep-17 429,112.19 90,991.47 Sep-17 0.116 48.400% 436.38 441.11 448.18 24,092.07 90,015.77 65,923.70 5,613.42 390.33
9 Oct-17 263,056.56 90,991.47 Oct-17 0.116 48.400% 436.38 441.11 450.52 14,769.05 90,015.77 75,246.73 68.52 318.48

BLOQUE Y LADRILLO IU = 62

Valorización Monto Adelanto COEFICIENTE INDICES Monto


Fecha Adelanto Adelanto
Valorizado Otorgado Incidencia Máximo Amortización Deducción (D)
Nº Fecha Pago Coef. Imo Ima Imr Utlizado deducible
(S/.) (S/.) (%) Utilizable
1 2 3 4 5 6 7 8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
1 Feb-17 599,518.67 137,379.86 Feb-17 0.116 40.900% 590.52 588.21 588.21 28,443.56 137,919.37 109,475.81 360.37 0.00
2 Mar-17 463,663.75 137,379.86 Mar-17 0.116 40.900% 590.52 588.21 596.31 21,998.06 137,919.37 115,921.31 20,159.05 301.74
3 Apr-17 445,925.39 137,379.86 Apr-17 0.116 40.900% 590.52 588.21 603.05 21,156.48 137,919.37 116,762.89 25,288.47 531.67
4 May-17 474,113.22 137,379.86 May-17 0.116 40.900% 590.52 588.21 611.55 22,493.83 137,919.37 115,425.55 26,887.00 889.06
5 Jun-17 296,913.84 137,379.86 Jun-17 0.116 40.900% 590.52 588.21 619.02 14,086.78 137,919.37 123,832.59 16,838.01 734.97
6 Jul-17 440,808.23 137,379.86 Jul-17 0.116 40.900% 590.52 588.21 628.71 20,913.71 137,919.37 117,005.67 24,998.27 1,434.34
7 Aug-17 219,682.49 137,379.86 Aug-17 0.116 40.900% 590.52 588.21 632.43 10,422.62 137,919.37 127,496.76 12,458.21 780.48
8 Sep-17 429,112.19 137,379.86 Sep-17 0.116 40.900% 590.52 588.21 628.23 20,358.80 137,919.37 117,560.58 4,674.35 1,379.73
9 Oct-17 263,056.56 137,379.86 Oct-17 0.116 40.900% 590.52 588.21 625.05 12,480.46 137,919.37 125,438.92 57.06 778.60

CEMENTO PORTLAND TIPO I IU = 05

Valorización Monto Adelanto COEFICIENTE INDICES Monto


Fecha Adelanto Adelanto
Valorizado Otorgado Incidencia Máximo Amortización Deducción (D)
Nº Fecha Pago Coef. Imo Ima Imr Utlizado deducible
(S/.) (S/.) (%) Utilizable
1 2 3 4 5 6 7 8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
1 Feb-17 599,518.67 334,283.84 Feb-17 0.174 58.560% 462.57 462.57 462.57 61,087.60 334,283.84 273,196.24 777.01 0.00
2 Mar-17 463,663.75 334,283.84 Mar-17 0.174 58.560% 462.57 462.57 459.40 47,244.74 334,283.84 287,039.10 43,592.15 -323.77
3 Apr-17 445,925.39 334,283.84 Apr-17 0.174 58.560% 462.57 462.57 459.40 45,437.30 334,283.84 288,846.54 56,342.25 -311.38
4 May-17 474,113.22 334,283.84 May-17 0.174 58.560% 462.57 462.57 459.40 48,309.48 334,283.84 285,974.36 59,903.76 -331.07
5 Jun-17 296,913.84 334,283.84 Jun-17 0.174 58.560% 462.57 462.57 459.40 30,253.86 334,283.84 304,029.98 37,514.78 -207.33
6 Jul-17 440,808.23 334,283.84 Jul-17 0.174 58.560% 462.57 462.57 465.71 44,915.89 334,283.84 289,367.95 55,695.70 304.90
7 Aug-17 219,682.49 334,283.84 Aug-17 0.174 58.560% 462.57 462.57 465.71 22,384.42 334,283.84 311,899.42 27,756.68 151.95
8 Sep-17 429,112.19 334,283.84 Sep-17 0.174 58.560% 462.57 462.57 465.71 43,724.13 334,283.84 290,559.71 10,078.41 296.81
9 Oct-17 263,056.56 334,283.84 Oct-17 0.174 58.560% 462.57 462.57 465.71 26,803.99 334,283.84 307,479.85 123.03 181.95
CÁLCULO DE REAJUSTE QUE NO CORRESPONDEN
POR EL ADELANTO ESPECIFICO PARA MATERIALES
Obra :
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS
Proceso : LP-SM-1-2016-MDH/CS-1
Contrato : 001-2016
Entidad : MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación : HURANGO - SAN IGNACIO - CAJAMARCA
Contratista : CONSORCIO PUERTO CIRUELO
Residente : ING°. ALEX CASTRO ALDANA
Inspector : ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

Monto Total del Contrato S/IGV S/. 4,187,915.97


Monto del Adelanto Directo otorgado S/IGV S/. 837,583.19 #REF!
Fecha de Pago 28-Feb-17

Fórmula a emplear:

D = A * ( Imr - Ima ) / Imo D : Deducción en cada valorización bruta reajustada


A : Adelanto utilizado en la valorización que se reajusta
Imo : Indice a la fecha del presupuesto base, del elemento representativo dentro del
que se encuentra el material o materiales para los cuales se otorgó el adelanto
Ima : Indice del mismo elemento representativo a la fecha efectiva del adelanto
Imr : Indice del mismo elemento representativo a la fecha del reajuste

ACERO DE CONSTRUCCION CORRUGADO IU = 03

Valorización Monto Adelanto COEFICIENTE INDICES Monto


Fecha Adelanto Adelanto
Valorizado Otorgado Incidencia Máximo Amortización Deducción (D)
Nº Fecha Pago Coef. Imo Ima Imr Utlizado deducible
(S/.) (S/.) (%) Utilizable
1 2 3 4 5 6 7 8=1x3x4 9=2x5/6 10 11=8x6/5 12=8x(7-6)/5
1 Feb-17 599,518.67 292,147.44 Feb-17 0.216 41.266% 464.71 464.67 464.67 53,437.83 292,172.59 238,734.76 679.65 0.00
2 Mar-17 463,663.75 292,147.44 Mar-17 0.216 41.266% 464.71 464.67 456.59 41,328.46 292,172.59 250,844.12 38,101.56 -718.59
3 Apr-17 445,925.39 292,147.44 Apr-17 0.216 41.266% 464.71 464.67 453.51 39,747.36 292,172.59 252,425.23 49,448.40 -954.53
4 May-17 474,113.22 292,147.44 May-17 0.216 41.266% 464.71 464.67 431.87 42,259.87 292,172.59 249,912.72 52,574.13 -2,982.77
5 Jun-17 296,913.84 292,147.44 Jun-17 0.216 41.266% 464.71 464.67 440.82 26,465.28 292,172.59 265,707.30 32,924.60 -1,358.26
6 Jul-17 440,808.23 292,147.44 Jul-17 0.216 41.266% 464.71 464.67 448.49 39,291.25 292,172.59 252,881.34 48,880.96 -1,368.02
7 Aug-17 219,682.49 292,147.44 Aug-17 0.216 41.266% 464.71 464.67 451.95 19,581.30 292,172.59 272,591.29 24,360.46 -535.98
8 Sep-17 429,112.19 292,147.44 Sep-17 0.216 41.266% 464.71 464.67 460.39 38,248.73 292,172.59 253,923.86 8,815.57 -352.27
9 Oct-17 263,056.56 292,147.44 Oct-17 0.216 41.266% 464.71 464.67 467.17 23,447.43 292,172.59 268,725.16 107.61 126.14

CONTROL DE AMORTIZACION
DEL ADELANTO P/MATERIALES
Adelanto otorgado 837,583.19
VAL. MES MONTO SALDO
1 Feb-17 2,249.80 835,333.40
2 Mar-17 126,061.74 709,271.65
3 Apr-17 161,448.01 547,823.65
4 May-17 171,653.46 376,170.19
5 Jun-17 107,498.13 268,672.06
6 Jul-17 159,595.33 109,076.73
7 Aug-17 79,536.40 29,540.33
8 Sep-17 29,181.75 358.58
9 Oct-17 356.23 2.35
TOTAL 837,580.84

SALDO POR AMORTIZAR (SIN IGV) S/. 2.35


CÁLCULO DEL REINTEGRO AUTORIZADO

obra "MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGN
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PROGRAMADO EJECUTADO REINTEGRO


VALORIZ. Nº FECHA V K R V K R BRUTO
V * (K-1) V * (K-1) AUTORIZADO

Sub Presupuesto TOTAL

1 Feb-17 S/. 165,773.80 1.003 497.32 S/. 599,518.67 1.003 1,798.56 S/. 1,798.56
2 Mar-17 S/. 467,439.37 1.001 467.44 S/. 463,663.75 1.001 463.66 S/. 463.66
3 Apr-17 S/. 647,173.20 1.002 1,294.35 S/. 445,925.39 1.002 891.85 S/. 891.85
4 May-17 S/. 701,713.33 1.001 701.71 S/. 474,113.22 1.001 474.11 S/. 474.11
5 Jun-17 S/. 488,754.78 1.004 1,955.02 S/. 296,913.84 1.004 1,187.66 S/. 1,187.66
6 Jul-17 S/. 585,755.76 1.006 3,514.53 S/. 440,808.23 1.006 2,644.85 S/. 2,644.85
7 Aug-17 S/. 495,659.09 1.007 3,469.61 S/. 219,682.49 1.007 1,537.78 S/. 1,537.78
8 Sep-17 S/. 635,646.65 1.019 12,077.29 S/. 429,112.19 1.019 8,153.13 S/. 8,153.13
9 Oct-17 S/. 0.00 - - S/. 263,056.56 1.021 5,524.19 5,524.19
Anterior 8,998.47
TOTAL 4,187,915.97 23,977.27 3,632,794.34 22,675.79 22,675.79
Actual 8,153.13
REINTEGRO AUTORIZADO

OSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

DEDUCCIONES
REINTEGRO
EFECTIVO MATERIALES
AUTORIZADO
A*V*(K/Ka-1)/C

- - S/. 1,798.56
-92.46 5,325.03 -S/. 4,768.91
-44.46 -152.49 S/. 1,088.80
-96.60 -1,911.78 S/. 2,482.49
29.60 -486.05 S/. 1,644.11
131.85 684.84 S/. 1,828.16
87.61 540.31 S/. 909.86
684.53 1,714.59 S/. 5,754.01
472.09 1,405.17 S/. 3,646.93
Anterior 10,737.08
1,172.16 7,119.63 14,384.00
Actual 3,646.92
RESUMEN DE VALORIZACIÓN Nº 09 - OCTUBRE 2
01/10/2017 al 31/10/2017

"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SA
obra
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

Monto Val. Acum. Valorizacion


DESCRIPCION
Contratado Anterior Actual

DETALLE DE LA VALORIZACION CONTRACTUAL


Costo Directo 3,282,065.79
Gastos Generales 8.00% 262,565.26
Utilidad 8.00% 262,565.26
Subtotal 3,807,196.33
Factor de Realcion 1.1 4,187,915.97
Total Contractual x F.R. 4,187,915.97

% de Avance a la fecha 80.44% 6.28%

2 Reajustes, Inc. Deducciones ( R )


2.1 Valorización Contractual 10,737.08 3,646.92

10,737.08 3,646.92

Total de Reajustes 10,737.08 3,646.92


Valorizacion Bruta ( VB = V + R ) 3,379,578.87 266,703.48

3 Amortizaciones ( A )

3.1 Adelanto directo


3.2.1 Valorización Contractual S/. 418,791.60 364,315.12 26,305.66

418,791.60 364,315.12 26,305.66

3.2 Adelanto Especifico Para Materiales


3.2.1 Valorización Contractual 854,802.61 854,802.61 356.23
RESUMEN DE VALORIZACIÓN Nº 09 - OCTUBRE 2
01/10/2017 al 31/10/2017

"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SA
obra
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

Monto Val. Acum. Valorizacion


DESCRIPCION
Contratado Anterior Actual

854,802.61 854,802.61 356.23

Total de Amortizaciones ( A ) 1,273,594.21 1,219,117.73 26,661.89

Valorizacion Neta ( VN = VB - A ) 2,160,461.14 240,041.60

Retención Garantía Fiel Cumplimiento ( Rt ) 0.00 0.00

Valorizacion Líquida Total 2,160,461.14 240,041.60

Impuesto General a las Ventas ( IGV ) 18.00% 0.00 0.00

Monto a Cancelar al Contratista en la Presente Valorización S/. 240,041.60

SON: DOCIENTOS CUARENTA MIL CUARENTA Y UNO CON 60/1OO SOLES

Ø  VALORIZACION N° 09 MES DE OCTUBRE DEL 2017, la suma de S/263,056.56


(DOSCIENTOS SESENTA y TRES MIL CINCUENTAISEIS CON 56/100 SOLES) sin IGV
Ø  MONTO A CANCELAR AL CONTRATISTA S/ 240,041.60 (DOSCIENTOS CUARENTA M
CUARENTA y UNO CON 60/100 SOLES), sin IGV.

Sin otro particular, quedo de usted.

Atentamente.
RIZACIÓN Nº 09 - OCTUBRE 2017
0/2017 al 31/10/2017

16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Val. Acum. % Saldo por


Actual Avance Valorizar

86.72% 13.28%

14,384.00

14,384.00

14,384.00
3,646,282.35

390,620.78

390,620.78 28,170.82

855,158.84 -356.23
RIZACIÓN Nº 09 - OCTUBRE 2017
0/2017 al 31/10/2017

16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS

Val. Acum. % Saldo por


Actual Avance Valorizar

855,158.84 -356.23

1,245,779.62 27,814.59

2,400,502.73

0.00

2,400,502.73

0.00

CON 60/1OO SOLES

17, la suma de S/263,056.56


TAISEIS CON 56/100 SOLES) sin IGV, por los servicios de obra.
041.60 (DOSCIENTOS CUARENTA MIL
), sin IGV.
PORCENTAJE DE AVANCE PROGRAMADO VS EJECUTADO (CURVA S)
100% 100.00%

90%
84.82%
80% 80.46%

72.99%
70% 70.22%
Avance Acumulado de Obra(%)

64.97%
60% 59.00%
C
54.45%
L
50% L
47.36%
47.33%
P
E
40%
36.03%

30% 30.57%
25.39%
20%
2; 14.32% 15.12%
10%
2; 3.96%

0% 1; 0.00%
1; 0.00%
0 50 100 150 200 250

Plazo (días)

MONTOS y/o PORCENTAJES VALORIZADOS PROGRAMADOS MONTOS y/o PORCENTAJES VALORIZADOS EJEC

NUEVOS SOLES PORCENTAJES NUEVOS SOLES


DIAS PLAZO PARCIAL ACUMULADO PARCIAL ACUMULADO MES - AÑO DIAS PLAZO PARCIAL ACUMULADO
0 Días S/. 0.00 S/. 0.00 0.00% 0.00% 0d 0.00
28 Días S/. 165,773.80 S/. 165,773.80 3.96% 3.96% Feb-17 28d 599,518.67 599,518.67
59 Días S/. 467,439.37 S/. 633,213.16 11.16% 15.12% Mar-17 59d 463,663.75 1,063,182.42
89 Días S/. 647,173.20 S/. 1,280,386.36 15.45% 30.57% Apr-17 89d 445,925.39 1,509,107.81
120 Días S/. 701,713.33 S/. 1,982,099.69 16.76% 47.33% May-17 120d 474,113.22 1,983,221.03
150 Días S/. 488,754.78 S/. 2,470,854.47 11.67% 59.00% Jun-17 150d 296,913.84 2,280,134.87
181 Días S/. 585,755.76 S/. 3,056,610.23 13.99% 72.99% Jul-17 181d 440,808.23 2,720,943.10
212 Días S/. 495,659.09 S/. 3,552,269.32 11.84% 84.82% Aug-17 212d 219,682.49 2,940,625.59
240 Días S/. 635,646.65 S/. 4,187,915.97 15.18% 100.00% Sep-17 240d 429,112.19 3,369,737.78
270 Días 270d 263,056.56 3,632,794.34
4,187,915.97 100.00% 3,632,794.34

Nota: Los montos incluyen Costo Directo, Gastos Generales, Utilidad y Factor de Relación
PROGRAMADO VS EJECUTADO (CURVA S)
100.00%

84.82%
80.46%

72.99%
70.22%
64.97%

59.00%
Column P
54.45%
Linear (Column P)
Linear (Column P)
47.36%
47.33%
PROGRAMADO
EJECUTADO

150 200 250

lazo (días)

MONTOS y/o PORCENTAJES VALORIZADOS EJECUTADOS

PORCENTAJES
PARCIAL ACUMULADO
0.00% 0.00%
14.32% 14.32%
11.07% 25.39%
10.65% 36.03%
11.32% 47.36%
7.09% 54.45%
10.53% 64.97%
5.25% 70.22%
10.25% 80.46%
6.28% 86.74%
86.74%
RESUMEN - CALENDARIO DE AVANCE DE OBRA VALORIZADO

obra
"MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" - MODULOS
Proceso LP-SM-1-2016-MDH/CS-1
Contrato 001-2016
Entidad MUNICIPALIDAD DISTRITAL DE HUARANGO
Ubicación HURANGO - SAN IGNACIO - CAJAMARCA
Contratista CONSORCIO PUERTO CIRUELO
Residente ING°. ALEX CASTRO ALDANA
Supervisor ING°. TULIO ENRIQUE ESPINOZA ORDINOLA

PLAZO DE EJECUCIÓN = 240 D.C.


PARCIAL Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17
ITEM DESCRIPCIÓN
(S/.) 1/02/17 28/02/17 1/03/17 31/03/17 1/04/17 30/04/17 1/05/17 31/05/17 1/06/17 30/06/17 1/07/17

28 Días 31 Días 30 Días 31 Días 30 Días 31 Días

I COSTO DIRECTO 3,282,065.79 129,916.77 366,331.79 507,189.02 549,932.08 383,036.66

TOTAL COSTO DIRECTO OFERTADO ( CD ) 3,282,065.79 129,916.77 366,331.79 507,189.02 549,932.08 383,036.66 459,056.24
GASTOS GENERALES OFERTADOS ( GG = 8.0000% CD ) 262,565.26 10,393.34 29,306.54 40,575.12 43,994.57 30,642.93 36,724.50
UTILIDAD OFERTADA ( UTI = 8.00% CD ) 262,565.26 10,393.34 29,306.54 40,575.12 43,994.57 30,642.93 36,724.50
SUB TOTAL ( CD + GG + UTI ) 3,807,196.33 150,703.45 424,944.88 588,339.27 637,921.21 444,322.53 532,505.24
FACTOR DE REALCION 4,187,915.97 165,773.80 467,439.37 647,173.20 701,713.33 488,754.78 585,755.76
TOTAL 4,187,915.97 165,773.80 467,439.37 647,173.20 701,713.33 488,754.78 585,755.76

PORCENTAJE DE AVANCE MENSUAL 3.96% 11.16% 15.45% 16.76% 11.67% 13.99%


PORCENTAJE DE AVANCE ACUMULADO 3.96% 15.12% 30.57% 47.33% 59.00% 72.99%
RIZADO

Valor Referencial (S/IGV) S/. 3,807,196.33


Monto Contrato (S/IGV) S/. 4,187,915.97
Factor de Relación 1.10000
Plazo de Ejecución 240 d.c

240 D.C.
Jul-17 Aug-17 Sep-17 Oct-17
31/07/17 1/08/17 31/08/17 1/09/17 30/09/17 1/10/17 10/10/17

31 Días 31 Días 28 Días 0 Días

459,056.24 388,447.56 0.00 498,155.68

459,056.24 388,447.56 498,155.68


36,724.50 31,075.80 39,852.45
36,724.50 31,075.80 39,852.45
532,505.24 450,599.17 577,860.59
585,755.76 495,659.09 635,646.65
585,755.76 495,659.09 635,646.65

13.99% 11.84% 15.18%


72.99% 84.82% 100.00%
ADELANTO ESPECÍFICO PARA MATERIALES E INSU
(CÁLCULO DE MONTOS MÁXIMOS POR INCIDENCIA DE FÓRMULA POL
Obra : "MEJORAMIENTO DEL COMPLEJO EDUCATIVO SAN JOSE N° 16506 PUERTO CIRUELO, DISTRITO D
MODULOS
Proceso : LP-SM-1-2016-MDH/CS-1
Ubicación : HURANGO - SAN IGNACIO - CAJAMARCA
Contratista : CONSORCIO PUERTO CIRUELO
Valor Referencial : S/. 3,807,196.33 Sin IGV
Monto Contratado : S/. 4,187,915.97 Sin IGV
Factor de Relación : 1.10000
Área Geográfica : 1

Monto Máximo por incidencia de Fórmula Polinómica:

Monto Máximo = C.I. x % Incidencia x Saldo Bruto por Valorizar x FR x I

Donde:
C.I. : Coeficiente de Incidencia del Elemento Representativo
% Incidencia : Porcentaje de Incidencia del Elemento Representativo en el Monomio
F.R. : Factor de Relación
Ima : Índice del Elemento Representativo a la Fecha del Adelanto
Imo : Índice del Elemento Representativo a la Fecha Base

Presupuesto Base, Según Expediente Técnico Aprobado:

PRESUPUESTO TOTAL SIN

Presupuesto Base, Según Expediente Técnico Aprobado por Subpresupuestos:

PRESUPUESTO TOTAL
COSTO DIRECTO S/. 3,282,065.79
GASTOS GENERALES S/. 262,565.26
UTILIDAD S/. 262,565.26
SUB TOTAL S/. 3,807,196.32
IGV S/. 0.00
RESUPUESTO TOTAL SIN IGV S/. 3,807,196.32

PRESUPUESTO TOTAL

FÓRMULA POLINÓMICA
K =0.116*(Ar/Ao)+0.174*(Cr/Co)+0.175*(Ir/Io)+0.319*(Mr/Mo)+0.216*(Ar/Ao)

SALDO BRUTO
COEFIC. DE % DE POR VALORIZAR
IU ELEMENTO REPRESENTATIVO INCIDENCIA INCIDENCIA
SALDO BRUTO
COEFIC. DE % DE POR VALORIZAR
IU ELEMENTO REPRESENTATIVO INCIDENCIA INCIDENCIA
(SIN IGV)
1 2 3

05 AGREGADO GRUESO 0.116 48.400% 3,807,196.32


17 BLOQUE Y LADRILLO 0.116 40.900% 3,807,196.32
21 CEMENTO PORTLAND TIPO I 0.174 58.560% 3,807,196.32
03 ACERO DE CONSTRUCCION CORRUGADO 0.216 41.266% 3,807,196.32

SUB TOTAL
IGV (18.00%)
TOTAL CON IGV
% DEL MONTO DEL

CUAD

SUB TOTAL
IGV (18.00%)
TOTAL CON IGV
% DEL MONTO DEL CONT
MATERIALES E INSUMOS
DENCIA DE FÓRMULA POLINÓMICA)
° 16506 PUERTO CIRUELO, DISTRITO DE HUARANGO - SAN IGNACIO - CAJAMARCA" -

ia x Saldo Bruto por Valorizar x FR x Ima / Imo

resentativo en el Monomio

cha del Adelanto Feb-17


Oct-16

COSTO DIRECTO S/. 3,282,065.79


GASTOS GENERALES S/. 262,565.26
UTILIDAD S/. 262,565.26
SUB TOTAL S/. 3,807,196.32
IGV S/. 0.00
PRESUPUESTO TOTAL SIN IGV S/. 3,807,196.32

TOTAL
S/. 3,282,065.79
S/. 262,565.26
S/. 262,565.26
S/. 3,807,196.32
S/. 0.00
S/. 3,807,196.32

MONTO
Imo Ima MONTO MÁXIMO
F.R. SOLICITADO
MONTO
Imo Ima MONTO MÁXIMO
F.R. SOLICITADO

Oct-16 Feb-17 (SIN IGV) (SIN IGV)


4 5 6 7=1x2x3x4x6/5

1.10000 436.38 441.11 216,068.12 90,991.47


1.10000 590.52 588.21 179,922.04 137,379.86
1.10000 462.57 462.57 387,931.98 334,283.84
1.10000 464.71 464.67 339,323.56 292,147.44

SUB TOTAL 1,123,245.70 854,802.61


IGV (18.00%) - -
TOTAL CON IGV 1,123,245.70 854,802.61
% DEL MONTO DEL CONTRATO 20.41%

CUADRO RESUMEN

MONTO
MONTO MÁXIMO
SOLICITADO
SUB TOTAL 1,123,245.70 854,802.61
IGV (18.00%) - -
TOTAL CON IGV 1,123,245.70 854,802.61
% DEL MONTO DEL CONTRATO 20.41%