Sl. No. Description Unit


Qty

1 RMC With IPS Screeding - 50-75MM thick Sqf 10,289


2 Applying PCC Sqf 6,603
3 Brick Bat Coba /Suken Filling cf 6,603
4 Fixing of Flooring (Floor & Landing)
a Cutting & Fixing of Imported Marble Flooring Sqf 6,500
b Cutting & Fixing of Kota Flooring Sqf 1,050
c Cutting & Fixing of Vitrified Tile- Flooring Sqf 1,050
d Cutting & Fixing of Ceramic Tile Flooring Sqf 8,750
5 Fixing of Skirting (Floor & Staircase)
a Cutting & Fixing of Marble Skirting Rf 1,275
b Cutting & Fixing of Kota Skirting Rf 1,150
c Cutting & Fixing of Tile Skirting Rf 1,550
6 Fixing of Staircase Treads
a Cutting & Fixing of Marble Treads Rf 2,050
c Cutting & Fixing of Kota Treads Rf 975
e Cutting & Fixing of Tile Treads Rf 1,275
7 Fixing of Staircase Riser
b Cutting & Fixing of Marble Risers Rf 2,250
d Cutting & Fixing of Kota Risers Rf 1,075
f Cutting & Fixing of Tile Risers Rf 1,450
8 Fixing of Dado (Internal & External)
a Cutting & Fixing of Ceramic Tile dado with Rough Plaster Sqf 7,750
b Cutting & Fixing of Vitrified Tile dado with Rough Plaster Sqf 2,550
Cutting and Fixing of External Granite Cladding Dry/Wet including
c Sqf 2,750
grooves /chamfering

d Cutting and Fixing of italian marble Cladding including grooves /chamfering Sqf 2,025

9 Cutting & Fixing of Granite Window Cill Rf 975


10 Cutting and Fixing of Granite Moulding with polish Rf 1,375
Granite Counter including edge chamfering, moulding, making opening/
hole for sink/ washbasin, mixer, soap dispenser & mirror olishing of
11 moulding & cut edge, filling of silicon at junction wherever required. Rf 492

Total (Excluding Tax)


Note:- On an above rates Material Lifting & Shifting charges @ 5% will be extra on actual work done.
GST 18% will be extra as applicable.
Note : 10% Interim & Final Retention
5% Deduction for ESIC & PF

Thanking You

For Sub-Contractor

Authorised Signatory
a Project

AS PER WO

Proposed Remarks
Rate Amount

18.27 187,988
16.75 110,584
16.75 110,584
- -
68.51 445,331
36.54 38,367
30.45 31,973
30.45 266,438
- -
24.36 31,059
21.32 24,512
21.32 33,038
- -
33.50 68,665
30.45 29,689
22.84 29,118
- -
27.41 61,661
21.32 22,914
21.32 30,907
- -
36.54 283,185
36.54 93,177
91.35 251,213

76.13 154,153

30.45 29,689
30.45 41,869
161,050

327.34

2,537,162
be extra on actual work done.
S.No Location Pannel Glass Size Top Bottam
1 Back side(1st floor) 1 1.555 1.553
2 1.555 1.558
3 1.535 1.55
4 1.485 1.485
5 1.522 1.522
6 1.525 1.525
7 1.438 1.438
8 1.495 1.495

2 Front(1stfloor) 1 1.753 1.75


2 1.752 1.748
3 1.246 1.246

3 Front(1stfloor) 1 1.595 1.597


2 1.795 1.797
3 1.245 1.245
4 0.467 0.467

4 Back side(2nd floor) 1 1.263 1.263


2 1.228 1.23
3 1.248 1.248
4 1.277 1.275
5 1.237 1.237

5 Back side(2nd floor) 1 1.38 1.382


2 1.374 1.377
3 1.377 1.38

6 Front side(2nd floor)

6 Swiming poll 1 1.515 1.515


2 1.509 1.509
3 1.506 1.506