You are on page 1of 42

RB OIL AND GAS DIVISION

RB OIL & GAS DIVISION


Managing tomorrow today
1
OBJECTIVES

To highlight the following:


1. About RB Oil & Gas Division
2. Company Milestones
3. Brief Scope of Services
4. Organization Chart
5. Detailed Scope of Services
6. Competitive Edge
7. Project Experience

2
1. ABOUT RB OIL & GAS
DIVISION

3
1. ABOUT RB OIL & GAS DIVISION

RB Oil & Gas Division (RB O&G) was established in 2008 with the birth of
RB Solutions Sdn. Bhd. (RBS). RBS is a subsidiary of Right Balance Sdn. Bhd.
(RBSB), which involves in manpower supply for Planning & Preparation,
Turnaround (TA)/Shutdown teams.

This was followed by the setting up of RB Materials Sdn. Bhd. (RBM) and
RB Green Tech Sdn. Bhd. (RBGTH) in 2009 and 2010, respectively to
undertake trading of Oil & Gas equipment and Integrated Environment
Services, respectively.

RB Plant Services Sdn. Bhd. (RBPS) was set up in 2011 to undertake


maintenance and fabrication work.

With the exception of RBGTH, all the subsidiary companies are licensed to
PETRONAS.

4
2. COMPANY MILESTONES

5
2.0 RB MILESTONE

• Opened up branch in Labuan


• Completion of Fabrication
Yard in Paka
• Launched Graduate Talent
Program (24 fresh graduates
Started various Plant Maintenance and participated in the program)
Integrated Waste Management Works:
• Piping leak rectification • 7 Years of Operation Excellence
2011
• Channel head rectification 2013
• Small Bore rectification
• Tank Base repair 7
• Waste characterization study
2012 2014
2010 • Secured Scheduled waste • Secured project for supply of
• Joint bid with UGR for TA management and transportation manpower for PCG
Management Technical contract from CUFK (1+1) Turnaround (1 Year) Contract
Services contract with • Secured Preventive maintenance • Supplied professional and
PTSSB Contract from PPTSB (1+1) skilled manpower to the
2008 • Secured TA P & P contract for.
PCG (2012-2013) covering PDH, •
PCESB Turnaround 2014.
Secured Plant Preventive
Optimal & Petlin Maintenance Contract with
• Secured TA P & P contract for. PP(T)SB (3+1) year
PCG (2012-2015 + 2 years
extension)
2009
• Joint bid with UGR for Project UGR - United Group Resources Pty Ltd, Australia
Recovery Consultancy PTSSB – PETRONAS Technical Services Sdn Bhd
Services contract with PTSSB CUFK – Centralised Utility Facility Kertih
• Secured TA P&P contract for PCG – Petronas Chemical Group
PPTSB PPTSB – Petronas Penapisan Terengganu Sdn. Bhd.
PCESB – Petronas Chemicals Ethylene Sdn. Bhd.

6
3.0 BRIEF SCOPE OF SERVICES

7
3.0 BRIEF SCOPE OF SERVICES
3.1 Manpower Supply

• TA Planning, Preparation and Execution teams


• Operation Maintenance teams

3.2 Fabrication & Maintenance

• Mechanical and E&I Equipment Maintenance


• Blasting & Painting
• Declogging of pipe and sewer

3.3 Integrated Waste Management

• Industrial chemical cleaning & decontamination, degreasing, acid pickling &


passivation
• Waste characterization, segregation, packaging and disposal

3.4 Trading

• E & I Equipment
• HSE Equipment

8
4. ORGANIZATION CHART

9
4.1 RB (O&G) ORGANIZATION CHART
RB OIL & GAS DIVISION
ORGANIZATION CHART 2015

BOARD OF DIRECTORS

CEO
(AZMAN)

CEO OFFICE

) (TBA)
RISK
BIZ DEVT / TRADING CORPORATE HSE
MANAGEMENT
(IZAM SYAHARADZI) (SAADIAH)
(TBA)

TA MANAGEMENT/
MAINT/FAB ENVIRONMENTAL
MANPOWER BUSS SUPPORT DIVISION
DIVISION DIVISION DIVISION
(TBA)
(NORALIMIN)) (ROSMADI) (RAFIQ)

PROJECT )
TENDER & CORPORATE FINANCE &
ASSET SERVICE
) QA/QC
PROPOSAL SERVICES ACCOUNT
MANAGEMENT SUPPORT (SAYED
(RAJA MOHD (ZAINUDIN) (NORAZIHAN)
(NORALIMIN) (RAJA MOHD JUNAIDI)
KAMAL)
KAMAL)

10
5. DETAILED SCOPE OF
SERVICES

11
5.1 MANPOWER SUPPLY FOR TA PLANNING, PREPARATION &
EXECUTION

Provide Full Planning and Preparation teams, in access of


200 personnel comprising
• TA Advisor
• Snr. Planning & Preparation Engineer
• Mechanical Engineer
• E&I Engineer
• Planner
• Material Coordinator
• Logistic Coordinator
• HSE Coordinator
• QAQC Coordinator
• Scheduler
• Cost and Contract Executive
• JIT Coordinator
• Catalyst Change Leader

Provide Integrated Planning Team to establish TA Norms

12
5.1 MANPOWER SUPPLY FOR TA PLANNING, PREPARATION &
EXECUTION (cont’d)

Provide for TA execution teams comprises:

• Mechanical Fitter with Confined Space


• Welder with Confined Space
• Insulator
• Instrument Technician
• Fire Watcher
• Helper with Confined Space
• Scaffolder Level 1
• Pipe Fitter
• Millwright
• Standby person
• Foreman

Manpower Database

• Comprehensive Manpower Database of about 686 competent


professional personnel and 150 workers

13
5.1a TA PLANNING & PREPARATION MANPOWER DATABASE

Manpower Databank: 686 TA Personnel

Manpower
90

80 77
70
70
61 61
58
60 56

48 48
50

40 37
30 30
28
30
20
18
20 15
13
10 4

14
5.2 OPERATION MAINTENANCE TEAM

Manpower Capabilities

• Provide manpower for Operating Performance, and


Asset Integrity Management Department

Manpower Database

• Database of about 100 competent personnel


comprising Process Engineers, Mechanical/Rotating
Engineers, Instrument & Control Engineers and
Electrical Engineers.

15
5.2a MANPOWER CAPABILITES

MANAGING
Area of Manpower Supply DIRECTOR/ CHIEF
EXECUTIVE OFFICER

SENIOR MANAGER GENERAL MANAGER


SENIOR GENERAL GENERAL MANAGER SENIOR MANAGER SENIOR MANAGER HEAD
(HEALTH, SAFETY, (HUMAN RESOURCE GENERAL MANAGER
MANAGER (TECHNICAL SERVICES (LEGAL & CORPORATE (SUPPLY CHAIN (MG3 REVAMP
DIVISION) ENVIRONMENT & MANAGEMENT & (FINANCE)
(PLANT DIVISION) AFFAIR) MANAGEMENT) PROJECT)
SECURITY) ADMINISTRATION)

FINANCE &
PEOPLE PLANNING &
PRODUCTION TECHNOLOGY ENVIRONMENT ACCOUNTS LEGAL PROCESS
PLANNING STRATEGY
(PPMSB)

ANALYTICAL SAFETY, FIRE FINANCE & PUBLIC AFFAIRS


TALENT
ENGINEERING TECHNOLOGY PREVENTION & ACCOUNTS & LAND SOURCING ENGINEERING
MANAGEMENT
SERVICES CONTROL (MRC) MATTERS

PROJECT CAPABILITY MANAGEMENT CONTRACT PROCUREMENT


REFINERY OCCUPATIONAL CONTROL &
ENGINEERING & MANAGEMENT ACCOUNTING MANAGEMENT
PLANNING HEALTH SERVICES
SERVICES

OPERATING
ASSET INTEGRITY HR SERVICES WAREHOUSING
PERFORMANCE SECURITY
MANAGEMENT
IMPROVEMENT

16
5.2b OPERATION MAINTENANCE STRUCTURE

OPERATION MANAGER

ADMIN/HR EXECUTIVE

AREA MANAGER (2A)

HSE EXECUTIVE AND QA/QC

Executive Non Executive


Process Engineer Process Technician/Boardman
Mechanical/Rotating Engineer Mechanical/Rotating Technician Area of Manpower
Instrument and Control Instrument and Control Supply
Engineer Technician
Electrical Engineer Electrical technician
HSE Executive Authorized Gas Tester (AGT)

17
5.2c MANPOWER DATABASE FOR PROFESIONAL OPERATION
MAINTENANCE

Manpower Databank: 112 Professional Personnel

Manpower
40

35
35
30 32

25

20

15 17

10
11
5 8
3 3 3
0
Mechanical QA/QC Engineer Chemical HSE Executive Electrical and Process Engineer Rotating Civil Engineer
Engineer Engineer Instrument Engineer
Engineer

18
5.3 FABRICATION & MAINTENANCE CAPABILITIES

Routine Plant maintenance


• Tank repair and maintenance and desludging
• Pipe and sewer declogging work
• Blasting and painting
• Valve inspection and services
• UPV/PV and tank preparation for DOSH inspection
• Piping replacement work
• Insulation work
• Civil works

Plant Preventive Maintenance


• Involve in Plant Preventive Maintenance for Mechanical and E&I
Equipment

Fabrication Facilities
• Facilitated by Fabrication Yard in Paka

19
5.3 FABRICATION & MAINTENANCE CAPABILITIES

Term Contract Corrugated Plate Interceptor (CPI)


Overhaul

• Cleaning and replacement of damaged equipment at CPI Unit at


PETRONAS Penapisan (Terengganu) Sdn Bhd
• Replacement includes supply of honeycomb structure Corrugated
Plate Pack

20
5.3 FABRICATION & MAINTENANCE CAPABILITIES

Corrugated Plate Interceptor (CPI) Overhaul

Sample of Corrugated Sheet Supplied

21
5.3c FABRICATION YARD

107

Dimension:
Land : 11452 𝒎𝟐
Office : 24m x 12m
Workshop : 24m x 24m

Located at :
Lot 17681, Taman Industri Paka (TIP),
Mukim Kuala Paka,
Daerah Dungun,
Terengganu Darul Iman.

22
5.4 INTEGRATED WASTE MANAGEMENT

Waste Management

• Waste handling and transportation


• Waste sampling and characterization
• Liaise with DOE on regulatory matters
• Waste disposal and recovery

Chemical Cleaning

• Chemical cleaning and decontamination


• Degreasing, acid pickling and passivation

23
5.5 TRADING SERVICES

Material & Equipment Supply

• Batteries
• Portable Mercury Detector
• Portable Fire Extinguisher
• Instrument Tools – Fire & Gas Tools
• Smoke Detector
• Flame Detector

24
6. COMPETITIVE EDGE

25
6.0 COMPETITIVE EDGE

PEOPLE
• Availability and access to key competent, multi-skilled, experienced, physically fit
and high integrity permanent, contract professional staff and skilled manpower.

CAPITAL
• Strong financial standing – leverage against group financial strength (Refer to
Financial Results).

FACILITIES
• Close proximity of regional office in Paka and Labuan for administration to
clients.
• Close proximity of Fabrication & Maintenance workshop in Paka, Terengganu to
clients.

TOOLS AND METHODOLOGY


• Procedure, Job Method Statement, related documents and equipment for
Maintenance job

HSE TRACK RECORD


• Over 1 Million man-hours without LTI.
• Best Contractor Performance Awards by PPTSB (Refer to award certificates).

26
6.1 FINANCIAL RESULTS

RB Group Revenue RB O&G Revenue TOTAL EMPLOYEES


150
250 218 35 30.7 250
149 29.8
191 30
200 200
146 149 150 25
6 6
150 20 150
146 RB Oil&Gas
14 Million 175
Millions 15 22 13 154 107
100 100 117 RBGroup
10 6 6
50 50 92 103
5
34 34 35
0 0 0
2010 2011 2012 2013 2014 2010 2011 2012 2013 2014 2010 2011 2012 2013 2014

Financial Leverage Group financial strength support

Financial Institution Strong support from bankers: RHB, Ambank, Maybank

27
6.2 COMPETITIVE EDGE – AWARD FOR BEST CONTRACTOR
PERFORMANCE

107

28
6.2 COMPETITIVE EDGE – AWARD FOR BEST CONTRACTOR
PERFORMANCE (cont’d)

107

29
7. PROJECT EXPERIENCE

30
7.1 RBS WORK EXPERIENCES

CLIENT REF: completion


NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) date

1 Safety Person Service for GPP5 TA May 2009 PGB 1-Apr-09 174,720.00 completed May-09

2 Civil/Logistic Engineer GPP-5 (May 2009 to Aug 2010) PGB 19-Aug-10 139,640.00 completed Jul-10

3 Personnel for Scheduled waste maintenance PGB 1-Jul-09 32,700.00 completed Sep-09

Metallic structural/piping leak rectification (small bore &


4 PGB 23-Sep-09 100,840.00 completed Oct-09
big bore) at process area GPP 3 TA Nov 2009

5 Safety personnel for GPP3 2009 & ET 3&4 2010 TA PGB 29-Sep-09 192,514.00 completed Nov-09

6 Schedule Waste management for GPP A & B for 3 months PGB 13-Oct-09 32,700.00 completed Nov-09

Provision of Manpower for KR-1 and KR-2 TA 2011


7 PPTSB Nov’09 7,712,973.93 completed Oct-11
Planning and Preparation team (approx. 21 months)
Supply manpower, tools & consumable for isolation block
8 valve removal installation during GPP 3 TA November PGB 8-Oct-09 85,984.20 completed Nov-09
2009
To supply manpower, consumables and equipment for
9 PGB 26-Nov-09 222,990.75 completed Dec-09
repair & refurbish work for R-702AB Blowers

10 Mechanical - Rectify channel head leak PGB 7-Dec-09 102,494.90 completed Dec-09

31
7.1 RBS WORK EXPERIENCES (cont’d)

CLIENT REF: completion


NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) date

Provision on manpower, supervision, tools, materials &


consumables for GPP shutdown at Gas Processing Plant,
11 PGB 16-Dec-09 111,110.00 completed Jan-10
Complex A, Kerteh – mechanical rectification work at T4-
661/T4-354/M4-351
Supply of Safety Personnel – medic for GPP 4 mini
12 PGB 24-Dec-09 5,904.00 completed Jan-10
shutdown 25 Dec 2009
Supply of Safety Personnel for ET 3/4 during TA 2010 (ET
13 PGB 29-Dec-09 79,210.00 completed Feb-10
Unit 3 24.1.2010-7.2.2010 & ET Unit 4 18.2.2010-4.3.2010)
Provision of manpower for schedule waste mgmt. for GPP A
14 PGB 3-Jan-10 32,700.00 completed Mar-10
& B for 3 months (Jan 2010 – March 2010)
Metallic structural/piping - small bore rectification at GPP2
15 PGB 2-Mar-10 149,297.85 completed Mar-10
TA
Provision of one (1) qualified Scheduler for TA 2011
16 MTBE 17-Mar-10 328,100.00 completed Jul-11
planning, preparation, execution and post shutdown
Pressure & unpressurised vessel – to perform preparation
17 PGB 28-Jun-10 174,600.00 completed Jul-10
works for DOSH
18 GPP4 Leak rectification (Metallic structural/piping work) PGB 11-Jul-10 193,890.00 completed Sep-10
To perform Loading/unloading of Molsieve (Pressure &
19 PGB 13-Jul-10 230,750.00 completed Jul-10
Unpressurized vessel)
20 Supply of material coordinator and planner MTBE 8-Aug-10 319,320.00 completed Jul-11

32
7.1 RBS WORK EXPERIENCES (cont’d)

CLIENT REF: completion


NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) date

21 Supply of senior planning and preparation personnel ETHYLENE 7-Oct-10 352,276.93 completed Nov-11

22 Leak rectification for GPP1 PGB 2-Sep-10 132,081.50 completed Oct-10


23 Tank base repair using ACT Tape System PGB 2-Nov-10 243,449.00 completed Dec-10
24 To Fabricate Platform for AGO 2/3/4 PGB 1-Nov-10 163,857.00 complete Dec-11
25 To perform characterization Study PGB 1-Nov-10 110,580.00 completed Dec-10
26 Tank base repair using ACT Tape System PGB 26-Feb-11 243,449.00 completed Mar-11

Desludging Activity and Transportation of Schedule Waste


27 PGB 11-Mar-11 87,250.00 completed Nov-11
for CUFK

28 Engagement 1 shutdown Material Planner MTBE 25-May-11 114,100.00 completed Dec-11


29 Manpower supply for electrical planner MTBE 1-Jun-11 171,360.00 completed Apr-12
30 Material Planner for TA 2011/12 PGB 2-Jun-11 34,720.00 completed Dec-11
31 To perform & complete coating bolt and nuts structure PGB 30-Jun-11 51,916.80 completed Sept-11
Manpower supply for Scheduler, Mechanical Planner &
32 MTBE 8-Aug-11 46,386.22 completed Dec-11
Material Coordinator

33
7.1 RBS WORK EXPERIENCES (cont’d)

CLIENT REF: completion


NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) date
Q-101A, Q-101B rubber lining replacement (fixed roof
33 PGB 20-Sep-11 239,000.00 completed Dec-11
storage tank)

34 Manpower shutdown planning team 2012 for PPTSB PPTSB Oct-11 970,252.91 completed Jun-12

35 Engagement 1 Senior TA Planner MTBE Oct-11 156,600.00 completed Mar'12

36 DPCU3 SD: Pre & Post Mercury (Hg) Sampling PGB 1-Dec-11 18,500.00 completed Dec-11
37 Waste Characterisation Study (POD) PGB 30-Nov-11 66,500.00 completed Dec-11
38 Material Planner for TA 2012 PGB 29-Dec-11 19,875.00 completed March-11
Term contract for supplying manpower for
39 equipment/machine plan preventive maintenance (PPM) PPTSB Jan-12 2,487,247.82 completed Dec-13
services for PPTSB
40 Analysis of heavy metal in sludge PGB 30-Jan-2012 1,113.75 completed Feb-12
Provision of manpower supply to support turnaround
41 centralized services for planning and preparation of PCGB Feb-12 21,072,662-90 completed Dec-13
turnaround in the year of 2012 to 2013
Manpower supply for Mechanical Planner & Material
42 MTBE 22-March-12 28,025.00 completed 31-Jan-12
Coordinator
Analysis on the metal materials collected at instrument air
43 PGB 5-April-12 2,300.00 completed Apr-12
regulator element
Desludging Activity and Transportation of Schedule Waste
44 PGB 3-Apr-12 227,210.00 completed Apr-13
for CUFK

34
7.1 RBS WORK EXPERIENCES (cont’d)

CLIENT REF: completion


NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) date
Term contract/price agreement for the provision of
45 manpower supply to support VCM Sdn Bhd for planning and VCM 7-May-12 503,211.20 completed 6-May-13
preparation of turnaround in the year of 2012 to 2013
Term contract for manpower shutdown planning team 2012
46 PPTSB 1-July-12 581,676.72 completed 30-Oct-12
for Petronas Penapisan (Terengganu) Sdn Bhd (PPTSB)

47 Service for vacuum truck for PRR GPP3 PGB 18-June-12 45,000.00 completed Jul-12

Provision of manpower supply to support PSR-1 TA 2013 for


48 PPMSB Jul-12 225,000.00 completed Apr-13
planning & preparation at PP(M)SB
49 Oil removal at GPP B (scheduled waste transportation) PGB 9-Jul-12 254,199.00 completed Sep-12
Provision of manpower supply to support turnaround
50 centralized services for planning and preparation of PCGB Aug-12 **30,000,000.00 ongoing Jul-15
turnaround in the year of 2012 to 2015
51 Scheduler for GPP3 REVTA (TFDD) PGB Sept-12 124,842.00 completed Feb-13
Short term contract for manpower supply for shutdown
52 PPTSB Nov-12 325,447.52 completed Dec-12
team 2013 for PPTSB
53 PSR2 SD2013 Manpower Supply TA Planner PPMSB Dec-12 75,483.87.00 completed June-13
Scheduled Waste Transportation - Waste Characterization
54 PCSB 27-Dec-12 182,000.00 completed Jan-13
Study for PMO
Short term contract for manpower supply for shutdown
55 PPTSB Jan-13 270,387.93 completed Feb-13
team 2013 for PPTSB
56 Waste Characterisation Study (POD) PGB 8-Jan-13 72,300.00 completed March’13

35
7.1 RBS WORK EXPERIENCES (cont’d)
CLIENT REF: completion
NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) date
Supply of Manpower for 2013, 2014 & 2015 Shutdown
57 Planning, Preparation and Execution Activity at Petronas PPTSB March-13 5,963,448.00 Jul-15
ongoing
Penapisan (Terengganu) Sdn Bhd
PGB
58 Tank Rubber Lining Replacement May-13 445,167.36 completed 11-Sept

59 RBS-PPTSB-2013-08-16-CP GDA (INST) PPTSB Sept-13 19,782-00 completed Sept -13


60 To Fabricate, Supply & Deliver Plate Pack (Material: ISO,FRP) PPTSB Oct-13 204,016.00 completed Nov-13
61 Soft Soap Rhythm 35 PDB Dec-13 16,250.00 completed Jan-14
62 Sewer Unclog Project PPTSB Dec’13 489,062.40 completed Jan-May-14
63 Flush out contaminated bearing oil PPTSB Dec’13 95,816.00 completed Aug-14
64 GDA Rejuvenation CDU at PPTSB Minerva Jan’14 36,960-00 completed Feb-14
Servicing Pressure Relief Valve and Mechanical Valve for
routine/shutdown. (RV PPM 18M : 241RV-428- BT1 AREA,
65 PPTSB Jan’14 100,000-00 completed Jun-14
PPM RV 18M : 223RV-030 BT2 & PPM RV 12MONTH :
RV9023 (BT3))
Provision of paramedic and ambulance services during
66 PCESB Jan’14 42,000-00 completed May-14
EPMSB Major Turnaround 2014
Term Contract to Supply of Analyzer & Metering manpower
67 PPTSB Feb’14 1,080,000.00 ongoing Jun-16
Support for PPTSB
Provision of Manpower Supply For 2014 Turnaround
68 Execution For Petronas Chemicals Group Berhad PCGB Feb’14 4,269,490.00 completed May-14
(PCGB)("Works)
69 Safety Consultancy (Rent 9Kg ABC Dry Powder Fire Ext) Instep March’14 42,840-00 completed March-14

36
7.1 RBS WORK EXPERIENCES (cont’d)

CLIENT REF: completion


NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) date
Term Contract for Supplying Manpower for
70 Equipment/Machine PPM (Planned Preventive Maintenance PPTSB March-14 **4,500,000-00 ongoing Mar-17
at Petronas Penapisan Terengganu Sdn Bhd ("WORKS")
Provision of Manpower Supply (Engineer) for Passivation Empayar
71 Feb-14 11,010.00 completed Mar-14
Project at TITAN Harmoni
Provision of Manpower Supply (Engineer) for Chemical Empayar
72 March-14 13,436.00 Completed Apr-14
Cleaning at PCESB Harmoni
73 To refurbish LO structure (Unit 1&2) PGB Jul-14 221,689.97 completed Oct-14
74 Safety & Security Equipment Instep Oct-14 28,560.00 completed Dec-14
To Supply Manpower, Equipment & Consumables to Replace
75 Minerva Oct-14 8,000.00 completed Dec-14
Sampling Tube at Cooling Tower CRU GDA 4035 PPTSB
Term Contract for Sewer Unclogging And Hydrocarbon
Movement in OMS Area at Petronas Penapisan (Terengganu)
76 PPTSB Nov-14 **870,000.00 Ongoing Nov-16
Sdn Bhd, PP(T)SB For Duration of Two (2) Years with another
extension option of One (1) Year
77 DAC Sewer Unclogging PPTSB Jan-15 138,885.00 Completed Feb-15

37
7.2 RBM WORK EXPERIENCES
CLIENT REF: completion
NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE date
1 Tube, Switch, KIDD, Detector Switch, 100S PCSB 6-Jun-11 USD 700 completed Jun-11
2 Supply of portable vapour analyser Newfield 10-Oct-11 RM74,750.00 completed Oct-11

Supply and Replace Push Button Oil Pump At PGB - RO,


3 13-Dec-11 RM15,605.80 completed Feb-12
Ayer Tawar City Gate, Setiawan RO, PGB SETIAWAN
completed
4 Mercury Survey Meter Newfield 4-Sep-12 RM5,670.00 Sep-12
completed
5 Flame Detector, Durag Newfield 8-Nov-12 RM64,800.00 Jan-13
Aluminium Tag, Material: Aluminium plate completed
6 Newfield 18-Dec-12 RM900.00 Jan-13
x1mm thick, Size: 2.25x3x1mm thick(hxw)
completed
7 Detector, Flame, Durag, D-LX100, UL/34EX PCSB (LBS) 5-Feb-13 RM21,017.50 Apr-13
Detector, Heat, ND601EX conventional Rate completed
8 Talisman Energy 4-Mar-13 RM6,825.00 May-13
or Rise
completed
21-Mar-13 RM2,625.00 May-13
completed
9 Tester, Smoke Detector, Home Safegrd,25s PCSB 18-Dec-2013 RM330.00 Apr-13
completed
10 Nozzle, Fuel, Auto, TD11A, AL, NBR PCSB 15-Apr-2013 RM1,140.00 May-2013

11 Detector,Smoke,MR601T,THORN,53X109MM PCSB 29-Apr-2013 RM4,914.00 completed June-13


completed
12 Tester, Smoke Detector, Home Safegrd,25S PCSB 30-Apr-2013 RM330.00 May-2013
completed
13 Tester, Smoke Detector, Home Safegrd,25S PCSB 07-May-2013 RM1,980.00 May-13

38
7.2 RBM WORK EXPERIENCES (cont’d)

CLIENT REF: completion


NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE date
14 Detector,autronica,bhh31a,smoke,opticaL PCSB May’13 11,088.00 completed Jun’13
15 Detector,sa,sieger,2104b2111rxshort,ch4 PCSB July’13 126,654.00 completed Oct’13
Tube ammonia, detector, cms air kit, chip
July’13 & completed
16 ammonia 6406130, chip ammonia OPTIMAL 23,464.00 Oct’13
Aug’13
6406020, chip benzene,
17 Tester, smoke detector, home safegrd,25s PCSB Aug’13 1,790.00 completed Oct’13
SW (KOREA) API STD, A 216-WCB, Body Y-
18 KSK Sept’13 2,940.00 completed Oct’13
Strainer, Bolted Cover
19 DETECTOR, SMOKE, TYCO# 601PH-M EXXON Nov’13 1,382.10 completed Jan’14
20 Portable Fire Extinguisher Petrofac March’14 43,195.00 completed Apr’14
EPCC Terminal Control System Upgrading
21 PDB May’15 235,000.00 Ongoing TBA
Project at PDB Labuan Fuel Terminal
22 To supply calibrated Themometer PGB Jun’15 1,636.00 Completed Aug’15

39
7.3 RBPS WORK EXPERIENCES

CLIENT REF.
COMPLETION
NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) DATE

Mechanical and Associated TA work for Kerteh


1 PGB Feb-14 172,500.00 Completed Jun-11
Shared Marine Facilities
Provision of manpower, supervision, tools,
equipment, material and consumables for stainless
2 steel piping replacement project from T4-752 to M4- PGB Mar-14 209,475.00 Completed Apr-14
755 at GP Gas Processing Plant Complex A (Metallic
structural/piping - SS line replacement)
3 PR : Tank Base Repair PGB Nov-14 137,280.00 Completed Jan-14
MECH MAINT-SPECIAL COATING (Perform Blasting &
4 MTBE Mar-14 45,636.00 Completed Apr-14
Painting)
5 Rectification of Overhead Crane & Services PGB Mar-14 40,180.00 Completed May-14
To Perform Air Fin Cooler Cleaning (Kerteh
6 PGB Mar-14 73,996.00 Completed May-14
Compressor Station B)
Interim Contract For Insulation at Petronas Chemicals
7 PCGB Jun-14 510,731.06 Completed Dec-14
Fertiliser Kedah Sdn Bhd (PCFKSB)

8 To perform major cleaning SWD GPP6 PGB Jun-14 217,813.50 Completed Oct-14
9 Compabloc E140B cleaning PPTSB Jun-14 93,327.50 Completed Oct-14
10 KR2 Mixed LPG Bullet Overhaul PPTSB Oct-14 495,450.00 Completed Mar-15

40
7.3 RBPS WORK EXPERIENCES (cont’d)

CLIENT REF.
COMPLETION
NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) DATE

11 Surface Preparation, Painting & Coating (GEBENG) PGB Nov-14 51,823.13 Completed Dec-14

12 UPV Blowdown Drum Servicing & Inspection PGB Nov-14 480,000.00 Completed Jan-15

13 PSU,88-264V,24V,8.4A,MEANWELL,RSP20024 PP(M)SB Nov-14 1,176.00 Completed Dec-14


PRESSURE & UNPRESSURIZED VESSEL (D981 Sphere
14 PP(T)SB Nov-14 424,480.50 Completed Jan-15
Tank)
15 HRSG A Removal & Installation Spade Blad PGB Nov-14 103,000.00 Completed Jan-15
TO FABRICATE AS PER SAMPLE. MATERIALS #
16 Petrofac Dec-14 5,250.00 Completed Dec-14
STAINLESS STEEL

17 HEAT EXCHANGERS, CONDENSERS & COOLER PCMTBE Jan-15 125,183.92 Completed Jan-15

18 INTERNAL PAINTING FOR DAF VESSEL IETS PGB Jan-15 277,286.80 Ongoing TBA
Project : Provision of Manpower, Equipment,Tools,
Consumables, Mob Demob and Admin for the Job of TOYO Eng Jan-15 824,834.00 Completed Jan-15
19 Blending for Benfield Solutions.

41
7.3 RBPS WORK EXPERIENCES (cont’d)

CLIENT REF.
COMPLETION
NO CONTRACT NAME CLIENT STATUS
RO/PO DATE VALUE (RM) DATE
Provision of Manpower, Equipment, Tools, and
20 Consumables for Corrugated Plate Interceptor (CPI) PP(T)SB Jan-15 **900,000.00 Ongoing TBA
Overhaul
21 Batteries Supply Talisman Feb-15 9,122.00 Ongoing TBA

22 Provision of Mixing Equipment for GPP3 PGB Mar-15 805,000.00 Completed Mar-15

23 Provision of Mixing Equipment for GPP2 PGB May-15 870,000.00 Completed May-15

To supply and deliver stud bolt & nuts fluro-coated


24 PDB Aug’15 13,312.18 Ongoing TBA
type for replacement all sphere tank flanges

42

You might also like