Mahmoud M. El-Kateb, Ph.D
* Project :
Concrete fcu = 40 MPa Normal Portland cement سبق الجاهاد التام- حالة أFull pres
Stressing after: 5 days , Recommended fcui = 26 MPa القطاعات الغير مشرخة- حالة بUncrack
Prestressing case: القطاعات الغير مشرخة- حالة بUncracked state سبق الجاهاد الجازئي- حالة دPartial pres
1.1
Tensile stress 3.8
2.2 at simply supported ends
* Losses in prestressing
* Project : 0
INITIAL LOSSES:
Anchorage slip losses: Clause 5-3-4-2-1
Draw-in = 6 mm
D fpset = 58.7 MPa = 4.2%
Page 4/8
Pre-stressed Concrete Beam Design according to ECP 203-2017 By: Dr. Mahmoud El-Kateb
Version 1.0
* Losses in prestressing
f= 2
fcs* = 9.2 MPa
fcsd* = 1.2 MPa
fcs = 8.0 MPa
D fpcr = 112.7 MPa = 8.1%
Page 5/8
Pre-stressed Concrete Beam Design according to ECP 203-2017 By: Dr. Mahmoud El-Kateb
Version 1.0
* Project : 0
Dimensions:
Comp. Zone
B1
B1 = 1000 mm
ts1
ts1 = 200 mm
a
N.A b= 400 mm Negative
b h= 1000 mm
h
B2 = 1000 mm
ts2 = 200 mm
As ts2
C Cover = 150 mm to prestressting cables
B2
Cover C = 50 mm to traditional RFT
Tension. Zone
Straining actions:
Direction of moment:
Initial stage: MDead = 1200 kN.m Positive moment
Pre-stressing data:
Page 6/8
Pre-stressed Concrete Beam Design according to ECP 203-2017 By: Dr. Mahmoud El-Kateb
Version 1.0
Check of stresses:
fpe =1060 MPa > 0.5 fpu Following approximation may be used
Without contribution of traditional steel RFT:
Beam span = 20 m
hp = 0.35
mp = 0.00448
fps = 1674 MPa
Mu = 3778 kN.m > Mmax Safe, use min traditional RFT
> 1.2 Mcr Safe, use min traditional RFT
Wp = 0.23 < 0.28 Ok
Page 7/8
Pre-stressed Concrete Beam Design according to ECP 203-2017 By: Dr. Mahmoud El-Kateb
Version 1.0
Page 8/8