B I L L OF Q U A N T I T I E S
ITEM NO. DESCRIPTION UNIT QTY. UNIT COST AMOUNT
PREPARED BY:
PREPARED BY:
Engr. Benedicto B. Ramos II
Authorized Managing Officer
BENRAM CONSTRUCTION
III REINFORCING STEEL
QUANTITY = 0.000 KGS.
SCOPE OF WORK:
Includes: Fabrication and Installation of Reinforcing Steel Bars and Tie Wire for:
1. Columns kgs.
2. Wall Footings
3. Beams/Lintel Beams
4. Footing Tie Beam
5. Catch Basin
6. Floor Slabs
7. Stairs and Landings
( On Paper Estimate)
IV STRUCTURAL CONCRETE
(Includes 28 days curing period)
QUANTITY = 0.00 CU.M.
SCOPE OF WORK:
Includes: Concrete Works for:
1. Columns
2. Wall Footings
3. Beams/Lintel Beams
4. Footing Tie Beam
5. Catch Basin
6. Floor Slabs
7. Stairs and Landings
QTY L W
1. Columns
C-1 6 3.49 0.25
C-2 3 3.49 0.25
C-3 1 3.49 0.3
C-4 2 3.49 0.25
C-5 4 2.1 0.25
2. Wall Footings
Wall Footings 1 16.29 0.4
3. Beams/Lintel Beams
2B-1 1 20.775 0.25
2B-2 1 33.319 0.2
2B-3 1 15.325 0.2
RB-1 1 41.6 0.2
RB-2 1 28.561 0.2
CB-1 1 3.6 0.2
LB-1 1 66.3 0.15
LB-2 1 127.9 0.1
5. Catch Basin
a. Catch Basin 6 0.6 0.6
6. Floor Slabs
a. Slab on Grade 1 1 6.9 9.15
b. 2nd Floor Slab 1 8.15 6.936
V STEELWORKS
QUANTITY = 0.00 KGS.
SCOPE OF WORK:
Includes: Supply, Fabrication and Installation of:
1. Trusses
2. Anchor Bolts
3. Base Plates
4. C. Purlins & Steel Cleats
5. Stair Railings
6. Fascia Backing
7. Sag Rods
nd Tie Wire for:
0.25 1.30875
0.25 0.654375
0.2 0.2094
0.25 0.43625
0.25 0.525
0.4 2.0775
0.35 2.33233
0.3 0.9195
0.3 2.496
0.3 1.71366
0.3 0.216
0.2 1.989
0.15 1.9185
0.25 0.057
0.6 0.0855
0.3 1.14
0.125 0.657875
0.125 0.112813
Total: 37.7855 8.2531
Portalift: 7.06605 1.41321
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
CONTRACT NAME: SITE DEVELOPMENT FOR GAS STATION
0
PREPARED BY: