TIME SHEET & REKAPITULASI HASIL PENGOLAHAN AIR LIMBAH PENGEBORAN

Customer : PT. GEO LINK NUSANTARA Rig No : KK # 01 ( PT. GEO LINK NUSANTARA )

Sumur : PDB - 01 Bulan : JUNI S/D JULI 2011

Sub Pekerjaan : DRILLING WASTE WATER TREATMENT

JUNI 2011 JULI 2011

NO EQUIPMENT DESCRIPTION REMARKS


25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Wastewater Treatment Package (to ON SITE √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 30 days


1 include equipment, man power, spare
parts & chemical) PROCESS √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ 30 days proses
108.46

131.01
133.69

224.46

172.03
172.92
194.85
189.23
186.06
183.93
184.18
154.13

184.92
184.25
159.16
171.64
182.86
162.08
173.12
177.06
186.52

176.41
171.92
211.12
62.06
96.23

77.36

102.7

178.3
211.3

2 Wastewater to be treated (cubic meter) WORK TOTAL = 4,903.96 M3

Made Out by ;
PT. ASRY AMANAH TIMUR ACKNOWLEDGED BY VERIFIED BY
( ) ( ) ( )

ENGINEER COMPANY MAN HSE PT .GEO LINK NUSANTARA


TIME SHEET PERSONIL

Customer : PT. PERTAMINA EP Rig No : PDSI # 41.3 / N 110 UE

Sumur : RDM - 001 Bulan : MARET 2019

Sub Pekerjaan : DRILLING WASTE WATER TREATMENT

MARET 2019
NO NAMA PERSONIL REMARKS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 AGUS DWI WAHYU √ √ √ √ √ √ - - - - - - - - - - - - - - - - - - - - - - - - - ON JOB 6 DAYS


2 DANANG SAPUTRO √ √ √ √ √ √ - - - - - - - - - - - - - - - - - - - - - - - - - ON JOB 6 DAYS
3 TEGUH WINARNO √ √ √ √ √ √ - - - - - - - - - - - - - - - - - - - - - - - - - ON JOB 6 DAYS
4 ARIS SUHARTONO √ √ √ √ √ √ - - - - - - - - - - - - - - - - - - - - - - - - - ON JOB 6 DAYS

Note √ ON JOB − 0FF JOB

Made Out by ; VERIFIED BY ACKNOWLEDGED BY


PT. EKA PAKSI SEJATI PT.PERTAMINA EP PT. PERTAMINA EP

Danang Saputro Chandra Yudha / Fitriansyah Ariefandin


ENGINEER ON DUTY HSE KOORDINATOR COMPANY MAN