c. PPE
Fire preventions: a. Fire Extinguisher
a. Evidence of fire
extinguisher is provided
at certain location inside
PP and SS area,
b. Fire training for the
worker,
c. Evacuation route for fire.
b. HSE Training
Evidence of implementation of
legal regulation & procedure
related with HSE such as:
3.
a. Lifting Equipment,
b. HSE Trainings.
c. Safety campaign
c. Safety Campaign
Evidence of emergency
4. Emergency and rescue drill N/A for period APR – JUN 2018
responce and rescue drill (if any)
B. HYGIENE CONTROL
1. Clinic and Emergency Response Emergency Response Facility is A. Clinic N/A
facility available at site B. Emergency Response Facilty
Statistic data of worker illness N/A, due to no workers illness
2. N/A
during January – March 2018 during this period
3. Health training and awareness No Health training for this period N/A
4. Charity event (if any) No charity event for this period N/A
C. WASTE CONTROL
B. N/A
Evidence and documentation
that hazardous material (HM) N/A
and hazardous waste (HTW) Due to not available hazardous material
produced during construction
activity managed properly
including:
a. HM and HTW temporary
4 storage recent condition
b. HM and HTW symbol
and labelling
c. HM and HTW Spill
prevention availability
d. HTW transporting by
third party
f. N/A