You are on page 1of 4

2019 Tentative List Of Wayne County/ DPS - Roads Division Construction Proposed Projects

Pro. Location Dist Limit 1 Limit 2 Surface Prep HMA (Asphalt) City/Township approx Tenitive Dates
No. (Road Name) From S. OR W. To N. OR E. Milling Inches Mix Design Recommendation City / TWP length in Ft
1 South Wayne Yard 3 Parking Lot Driveways Over-Lay 1.5"HMA 5E10 Wayne TBM 5.1.19
2 CMY 3 Parking Lot Driveways 2" Mill/ Fill Deep Conditioning/ Fill 2.0"HMA 5E10 Detroit TBM 3 Next Saturdays
3 I-94 N. Service Drive 3 W of Belleville @ 2018 New Pavement Belleville Intersection 2" Mill & Fill 2" HMA, 5E10 Van Buren Twp 1350+- Beg/ May
4 Huron River Drive 4 202' W. of Hoeft Road W. of Ormond Drive at Beg/ Curve 3.5" Mill & Fill 1.5" HMA, 5E10/ 2" HMA, 4E10 Van Buren Twp 2825+- Beg/ May
5 I-94 S. Service Drive 3 E. of Monetrey Dr.@2014/2015 New Pvmnt E. of Monetrey Dr. @ 2016 New Pavement 2" Mill & Fill 2" HMA, 5E3 Van Buren Twp 1053+- Mid/ May
6 Wayne Road 3 Wayne/Vining Rd- End of Cocrete Sec. Goddard Road/ Good Asphalt Sec. 2" Mill & Fill 2" HMA, 5E10 City of Romulus 2250+- Mid/ May
7 Merriman 3 I-94 overpass RXR tracks 2" Mill & Fill 2" HMA, 5E10, High Stress Romulus 1075 TBD***
8 Ecorse 3 Good Paevment at 42368 Ecorse WB W. of Haggerty @ 2017 New Pavement 2" Mill & Fill 2" HMA, 5E10 Van Buren Twp 1475 End/ May
9 Ecorse 3 East of Cogswell @ East Bridge Deck RXR@ End/tapper E./Main Entrance of GM 2" Mill & Fill 2" HMA, 5E10, City of Romulus 2350+- End/ May
10 Van Born 3 Gutterline at the East Side of Hannan Rd. W. of Cogswell S. Leg Intersection, Beg/ Rad 2" Mill & Fill 2" HMA, 5E10, Romulus/ Wayne 2630+- TBD***
11 Hannan Road 3 N. Michigan/ At the End of Concrete Sec Glenwood Road 2" Mill & Fill 2" HMA, 5E10 Canton/ Wayne 2770+- TBD**
12 Ridge Road 3 County Line Good Pavement at Proctor Intersect. 2" Mill & Fill 2" HMA, 5E3 Canton Twp. 800+- Beg/ June
13 Joy Road 2 E. of Ravine Drive @ 2018 New Pavement W. of Dakota Street 2" Mill & Fill 2" HMA, 5E10 Livonia/Westland 1950+- Mid/ June
14 Inkster 2 Fargo Grandriver 2" Mill & Fill 2" HMA, 5E10 Redford Twp End/ June
15 2-3 Locations/ Redford Towns 2 TBD TBD 2.5" Overlay 2.5" HMA 5E1 Redford Twp TBM Beg/ July
16 Schoolcraft all lanes 2 Minehart Drive W. of Eckless Inters. @ 2018 New Pvmnt. 3.5"Mill & Fill 2" HMA, 5E10/ 2" HMA, 4E10 Plymouth Twp. 2125+- Beg/ July
17 Northville 2 Conceret Sec S. of 5 Mile Road East Leg Conceret Sec N. of 5 Mile Road East Leg 2" Mill & Fill 2" HMA, 5E10 Northville Twp. 220+- Mid/ July
18 Five Mile Road 2 East Gutterline of Northville Rd. Parkhurst Rd ( N./Schoolcraft Road) 2" Mill & Fill 2" HMA, 5E10 Northville Twp. 1340+- End/ July
19 Beck Road 2 N. of 6 Mile Beg of Asphalt Pavement Sec. S . Of Curtis Road 2" Mill & Fill 2" HMA, 5E10 Northville Twp. 2000+- TBD**
20 N. Territorial Road 2 APP. 735' W of Beck Rd. Cl. APRX. 385' W of Beck Rd. Cl. 2" Mill & Fill 2" HMA, 5E10 Northville Twp. 350'+- End/ July
21 N. Territorial Rd. WB/ Rt. Ln. 2 Concrete Sec @ E. of N. ST. Andrews Dr. APRX. 735' W of Beck Rd. Cl. At New Pavement 2" Mill & Fill 2" HMA, 5E10 Northville Twp. 500+- End/ July
22 Mound Road 1 Six Mile Nevada 2" Mill & Fill 2" HMA, 5E10 City of Detroit 19+- Beg/ Aug
23 Raupp Road 5 Nly Of Oakwood Blvd. @ Gutterline Sly of Schaefer/ Beg. of Concrete Sec. 2" Mill & Fill 2" HMA, 5E10 City of Melvindale 1660+- Beg / Aug
24 W. Jefferson 5 S. of Visger@18&17 New Pavm./ Trvlng Ln. City of Ecorse Limits-Florance/ Traveling Lanes 2" Mill & Fill 2" HMA, 5E10 City of Ecorse 1900+- TBD**
25 Allen Road 5 S. of Wick Road SN of Wik Road 2" Mill & Fill 2" HMA, 5E10 City of Allen Park 650+- Beg / Aug
26 Eureka- (EB) RT/ Lane 5 350' E. of Beech Daly at 2018 new pvmnt W. of Westlake at White Pavement Mark 2" Mill & Fill 2" HMA, 5E10 City of Taylor 2200+- Mid/ Aug
27 Trenton Road 5 S. of Leroy St. @ 2018 New Pavement S. of Eureka Road @2019 FEO Project Limit 2" Mill & Fill 2" HMA, 5E10 City of Southgate 2600+- TBD**
28 King Road 4 E of Allen Road Beg/ Taper W. of Douglas St. 2" Mill & Fill 2" HMA, 5E10 WDHVN/ BRWN 2300+- End/ Aug
29 King Road 4 E. of Grange at 2018 New Pavement W. of Fort Inters. At White Pavement Mark 2" Mill & Fill 2" HMA, 5E10, Riverview/Trenton 3000+- End/ Aug
30 W. Jefferson (SB&Turning Ln) 4 N. Gibraltar Road S. of Vreeland Road 2" Mill & Fill 2" HMA, 5E10 City of Gibraltar 3000+- Beg/ Sep
31 Van Horn 4 E of Odette (Conn. the Dots) E. of Middle Belt Intersection 2"Mill 1.5" HMA, 5E10/ 2" HMA, 4E10 Huron Twp 1415+- Mid/ Sep
32 Middle Belt 4 N. of King @ 2016 New pavement S. of New Fath Chappel Church 2" Mill & Fill 2" HMA, 5E10 Huron Twp 2500+- Mid/ Sep
33 Middle Belt 4 S. of Prescott At 2017 New Paement S. of Pennsylvania New Pavement 2" Mill & Fill 2" HMA, 5E10 Huron Twp 1673+- End/ Sep
34 3-Locations/ Sumpter Twp 4 Pending meeting with the township TBD TBD Sumpter Twp TBM TBD
2018 Deferred Projects Total of 22 Comm.
THIS LIST IS SUBJECT TO CHANGE AND MODIFICATIONS INCLUDING
Anticipated paving locations to be added as per Township **Coordination needed with W.C. Engineering
SCHEDUELING AFTER WINTER FIELD REVIEW AND EVALUATION Intiative Program ***Coordination with Mncplty/WCAA/MDOT
Distance Southern or Western Start Date Completion Date Number of Lane Miles Construction Cost
# Location (Road Name) Northern or Eastern Limit Scope of Design and Construction City/ Township
(mi) Limit (tentative) (tentative) Lanes (mi) ($Million)

2019 Road Construction Projects

1 Outer Drive 2.0 7 Mile Livernois HMA Resurfacing of Existing Pavement Detroit 2018 July-19 4 8 $3.26

2 5 Mile Road NA 5 Mile Beck Road Intersection Pavement Widening (Concrete) Northville 2018 June-19 2 0 $0.79

3 Haggerty Road 0.21 5 Mile 6 Mile Concrete Pavement Livonia 2018 June-19 5 1.05 $0.63

4 Warren 0.95 Beck Road Canton Center HMA Resurfacing of Existing Pavement Canton Twp 2018 June-19 2 1.9 $1.63

5 Wayne Rd. 0.44 Michigan Ave Glenwood HMA Resurfacing of Existing Pavement Wayne 2018 June-19 5 2.2 $0.78

6 Middlebelt Rd. 0.92 Goddard Wick HMA Resurfacing of Existing Pavement Romulus 2018 June-19 5 4.6 $1.80

7 Haggerty Rd. 0.92 Haggerty Ecorse HMA Resurfacing of Existing Pavement Van Buren Twp 2018 June-19 4 3.68 $1.40

8 Chandler Park Dr. 0.69 Dickerson Alter HMA full width milling Resurfacing Detroit Apr-19 August-19 4 2.76 $1.62

9 Allen Rd. NA Allen Rd W. Outer Drive Traffic Signal Improvement Allen Park Jul-19 May-19 5 0 $0.36

10 Joy Rd. NA Joy Rd West of Southfield Green Storm Water Infrastructure Detroit Apr-19 July-19 4 0 $0.62

11 Sheldon Rd. NA Sheldon Rd Goldsmith Traffic Signal Improvement Plymouth Apr-19 May-19 5 0 $0.25

12 Wyoming Rd. 0.47 Ford Rd CSX Railroad Crossing HMA Resurfacing of Existing Pavement Detroit 2018 July-19 5 2.35 $0.13

13 Sibley Rd. 1.03 Telegraph Racho Concrete Pvmt Reconstruction & Culvert Replacement Brownstown Twp 2018 May-19 2 2.06 $0.34

14 Van Horn Rd. 0.71 Inkster Arsenal HMA Full Depth Reclamation & Culvert Replacement Brownstown Twp 2018 May-19 2 1.42 $0.33

15 Merriman 1.01 Ecorse Van Born HMA Resurfacing of Existing Pavement Romulus Jul-19 October-19 5 5.05 $1.65

16 Eureka Rd. 1.54 Toledo Ford/M-85) HMA Resurfacing of Existing Pavement Southgate Jul-19 November-19 5 7.7 $1.54

17 Inkster 1.01 Five Mile Rd. Six Mile Rd. HMA Resurfacing of Existing Pavement Livonia Jul-19 October-19 4 4.04 $1.70

18 Pennsylvania Rd. 0.99 East Fort Street W. Jefferson HMA Resurfacing of Existing Pavement Wyandotte Jul-19 May-20 5 4.95 $1.30

19 E.N. Hines Dr. 1.15 Outer Drive Ford Ramp HMA Resurfacing of Existing Pavement Dearborn Heights Aug-19 November-19 2 2.3 $1.50

20 Tireman Rd. 0.99 Greenfield Schaefer HMA Resurfacing of Existing Pavement Detroit & Dearborn Aug-19 October-19 4 3.96 $1.45

21 Greenfield 0.5 West Chicago Plymouth HMA Resurfacing of Existing Pavement Detroit Aug-19 October-19 5 2.5 $1.10
Schaefer Hwy
22 0.38 I-75 Dix Street HMA Resurfacing of Existing Pavement Detroit Aug-19 November-19 5 1.9 $0.80

23 Wyoming Rd. 0.52 CSX Railroad Warren HMA Resurfacing of Existing Pavement Dearborn Aug-19 November-19 5 2.6 $0.81

24 Allen Rd. 1.01 Gibralter Vreeland HMA Resurfacing of Existing Pavement Ecorse Sep-19 November-19 4 4.04 $0.90

25 Jefferson Rd. 1.01 Wyandotte Outer Drive HMA Resurfacing of Existing Pavement Ecorse Sep-19 May-20 5 5.05 $2.56

26 Greenfield 0.81 Rotunda Dr. Michigan Ave. HMA Resurfacing of Existing Pavement Dearborn Sep-19 June-20 5 4.05 $1.50

27 Cherry Hill Rd. 1.84 Canton Center Haggerty HMA Resurfacing of Existing Pavement Canton Twp Sep-19 September-20 2 3.68 $5.10

28 Beck Rd. NA Beck Rd. Six Mile Rd. Traffic Signal and Intersection Widening Northville Twp September-19 November-19 2 0 $0.55

29 Jefferson Rd. 1.15 Sibley Pennsylvania HMA Resurfacing of Existing Pavement Riverview October-19 November-19 4 4.6 $2.60

30 Seven Mile Road 0.75 Wyoming Outer Drive HMA Resurfacing of Existing Pavement Detroit October-19 November-19 4 3 $3.80
Total 23.0 19 89.44 $42.80
2019 Bridge Construction Projects

1 Waltz Road Bridge Waltz Rd. Huron River Dr Bridge Reconstruction Huron Twp 2018 May-19 2.80

2 Dix Toledo Bridge Allen Rd. Pennsylvania Rd Deck Replacement, Approach Pavt & HMA Resurfacing Southgate 2018 July-19 7.00

3 Hines Drive Bridges Temporary Supports Various Apr-19 July-19 0.60


4 Lilly Rd. Bridge Lilly Lower Rouge River Bridge Reconstruction Canton Twp Jul-19 November-19 1.80
5 Allen Rd. Bridge Allen Rd. Brownstown Creek Bridge Reconstruction Gibralter Nov-19 June-20 1.50

6 Pennsylvania Rd. Bridge Pennsylvania Blakely Drain Bridge Reconstruction Taylor & Brownstown Sep-19 December-19 1.50

7 West Rd. Bridge West Rd. Frank & Poet Drain Bridge Replacement Trenton Nov-19 May-20 4.08
8 Grosse Ile Parkway Bridge Grosse Ile Parkway Trenton Channel Phase 1 - Foundation & Pier Improvement Grosse Ile Nov-19 June-20 1.00
9 East River Road Bridge East River Rd. North Hickory Canal Bridge Reconstruction Grosse Ile Oct-19 May-20 1.80
10 Allen Rd. Bridge Allen Rd. Ecorse Creek Bridge Rehabilitation Allen Park Dec-19 May-20 1.90
Total $23.98