You are on page 1of 1

Explanation:

B
Walkway 1 Walkway 1
01 (width 1.50m) 02 03 01 (width 1.50m) 02 03 1. Transformation between absolute and relative coordinates:
6.10 6.09 1.20 3.30 East North

1.50

1.50
7.62 0.60 9.05
Absolute coordinates
UTM (m) 486343.550 3501020.120

A A Relative coordinates
(m) 0.000 0.000
5.45 2.84 7.65

1.68
03. Electrical 03. Electrical

2.93
4 02. Visitor 4 02. Visitor
and I&C room and I&C room

2.60
Toilet Toilet
3 3 0.40 2. Elevation measurements in meters.
1.35 1.35 1.20

4.66
01. Additional 01. Additional (Note: Reference here should be the same as for the survey drawings)

4.66

4.66
5.00
4 4

1.50
inspection area inspection area
3. Measurements in meters.
A A 5.50 1.99
FM 04. Staff toilet Mild FM 04. Staff toilet Mild

1.87

2.60
+0.47 +0.47 4.
+0.00 slope +0.00 slope

1.20
200 05. Corridor A' 200 05. Corridor A'
4 +0.47 +0.47 4 +0.47 +0.47 5. The facade precast concrete panels arrangement is orientative as well as the anchorage
B B system.The system shall be defined according to supplier and subject to approval.
As per approval 4 As per approval 0.75 2.40 0.85 1.10 2.36 0.90 8.92
4 6. Building perimeter sidewalk shall be adjusted according to document

1.49
1.50
Survey point: +0.17 8% Mild slope Mild slope Survey point: +0.17 8% Mild slope Mild slope 4011-DRA-ABE-066-360-0001_Urbanization drawing
E: 56.660 +0.45 +0.45 E: 56.660 +0.45 +0.45
7. In IFD document, general urbanization elevations are shown in relative coordinates.

0.40
N: 969.730 N: 969.730
+0.15 +0.15
3.76 1.57 1.99 1.21 8.76
17.28 8. This document is not for construction.
FM200 protects

B'

B'
the Electrical
2 2 References:
Room - 4011-DRA-ABE-000-000-0006_Power block layout
- 4011-DRA-ABE-075-422-0078_Rev02 Electrical layout Social facilities Build

List of abbreviations:

- TOC: Top of concrete


- FFL: Finish floor level

4 4

04 2019/03/25 Electrical layout & technical floor IFD ADSC ALNM RPR VTM
03 2018/05/25 Revision IFD AFF DGV RPR VTM
02 2016/03/20 SEC comments IFD MRP DGV RPR VTM
01 2016/10/18 SEC comments IFD MCH DGV VMB VTM
00 2016/08/01 First edition IFD AIRS CSG JNM / NPS VTM
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
Location:

Client: P. Engineer (if applicable):


Stamp: Signature: P.Eng.No:

EPC Contractor: EPC Subcontractor:


Consultant:
ABENER
Project: Supplier:
CONSTRUCTION OF
Waad Al-Shamal ISCCPP
Scale: General Buildings Drawing No.:

Title & Subtitles:


4011-DRA-ABE-057-370-0040
1:100 Civil works Sheets: Sheet No.:
Architecture. Basic plans 01 00
Size:
Social facilities Building Int. Drawing No.
A1 Plant, dimensioned, elevation & section views
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No

You might also like