Population
Pipe Section Previous Local Total
A B C D=B+C
ZY 0 7000 7000
TY 0 9300 9300
UY 0 1116 1116
YX 0 11400 11400
RX 0 2858 2858
SX 0 2901 2901
VW 0 17255 17255
QW 0 2071 2071
PW 0 24047 24047
WX 0 11430 11430
89378
Q(m3/min) Max Rate Pipe Diamete(mm)
Q ADD (m3/c/min) supply rate of supply(m3/min) CRIMPS AND
BURGES
E=0.00000069*220 F=D*E G=2.5*F H
1.06 2.66 225
1.41 3.53 250
0.17 0.42 100
1.73 4.33 300
0.000152 0.43 1.08 150
0.44 1.10 150
2.62 6.55 350
0.31 0.79 150
3.65 9.13 375
1.74 4.34 300
Pipe Length(m) Head Loss (m) Actual Head Loss Velocity(m/s)
m/1000m
I J K L
600 7.5 4.5 1.07
380 7 2.66 1.15
400 15 6 0.85
500 4.5 2.25 1
350 10.75 3.76 0.95
300 11.5 3.45 1
550 4.5 2.48 1.1
200 6 1.2 0.7
250 5.75 1.44 1.3
450 4.5 2.025 1
Ground Net
Hydraulic Level (m) Level (m) Head Available
Assume (m)
M N O
153.25 135 18.25
155.09 132 23.09
151.75 134 17.75
157.75 140 17.75
156.24 139 17.24
156.55 142 14.55
155.50 138 17.50
156.78 136 20.78
156.54 137 19.54
157.98 141 16.98
160 130 30
Avg Daily Avg
Plot No. Population Demand(lpcd) Demand(LPD)
1 500 220 110000
2 500 220 110000
3 500 220 110000
4 500 220 110000
5 500 220 110000
6 500 220 110000
7 500 220 110000
8 500 220 110000
9 500 220 110000
10 500 220 110000
11 500 220 110000
12 500 220 110000
13 500 220 110000
14 500 220 110000
15 1200 220 264000
16 2000 220 440000
1116
41,42,43,44,45,46,
47,48,49,50,51,52,
Between Y and T 53,54
9300
15,16,17,18,19,20
2901
55,56,57,58,59,60,
Between X and R 61,62,63,64,65,66
2858
DIMENSIONS:
WIDTH = 3.8951497222
= 4
Length = 10
= 10
So OK
TOTAL AMOUNT OF GRIT PRODUCED
Assume
AMOUNT OF GRIT PRODUCED = 0.04
Frequency of Sludge Withdrawl = 3
Quantitly of wastewater in 3 days = 147.4737
AMOUNT OF GRIT PRODUCED = 5.898948 �^3
min
Litres
�^3
m
�^2
m
m
�^2
m^3/m^2/day
So OK
m^3/ML
days
ML
�^3
Assume
Detention Time (td) = 5 Hours
so OK
SUMMARY OF DESIGN
Dimensions 26X78X6.5