TANK HEIGHT 160 meters

Population
Pipe Section Previous Local Total

A B C D=B+C
ZY 0 7000 7000
TY 0 9300 9300
UY 0 1116 1116
YX 0 11400 11400
RX 0 2858 2858
SX 0 2901 2901
VW 0 17255 17255
QW 0 2071 2071
PW 0 24047 24047
WX 0 11430 11430
89378
Q(m3/min) Max Rate Pipe Diamete(mm)
Q ADD (m3/c/min) supply rate of supply(m3/min) CRIMPS AND
BURGES
E=0.00000069*220 F=D*E G=2.5*F H
1.06 2.66 225
1.41 3.53 250
0.17 0.42 100
1.73 4.33 300
0.000152 0.43 1.08 150
0.44 1.10 150
2.62 6.55 350
0.31 0.79 150
3.65 9.13 375
1.74 4.34 300
Pipe Length(m) Head Loss (m) Actual Head Loss Velocity(m/s)
m/1000m
I J K L
600 7.5 4.5 1.07
380 7 2.66 1.15
400 15 6 0.85
500 4.5 2.25 1
350 10.75 3.76 0.95
300 11.5 3.45 1
550 4.5 2.48 1.1
200 6 1.2 0.7
250 5.75 1.44 1.3
450 4.5 2.025 1
Ground Net
Hydraulic Level (m) Level (m) Head Available
Assume (m)
M N O
153.25 135 18.25
155.09 132 23.09
151.75 134 17.75
157.75 140 17.75
156.24 139 17.24
156.55 142 14.55
155.50 138 17.50
156.78 136 20.78
156.54 137 19.54
157.98 141 16.98
160 130 30
Avg Daily Avg
Plot No. Population Demand(lpcd) Demand(LPD)
1 500 220 110000
2 500 220 110000
3 500 220 110000
4 500 220 110000
5 500 220 110000
6 500 220 110000
7 500 220 110000
8 500 220 110000
9 500 220 110000
10 500 220 110000
11 500 220 110000
12 500 220 110000
13 500 220 110000
14 500 220 110000
15 1200 220 264000
16 2000 220 440000

17 2500 220 550000

18 1200 220 264000

19 2000 220 440000

20 2500 220 550000


21 2500 220 550000

22 2000 220 440000

23 1200 220 264000

24 2500 220 550000

25 2030 220 446600

26 1200 220 264000


27 1000 220 220000
28 1000 220 220000
29 1091 220 240020
30 1119 220 246180
31 1000 220 220000
32 1000 220 220000
33 1300 220 286000
34 1890 220 415800
35 1548 220 340560
36 1178 220 259160
37 1000 220 220000
38 898 220 197560
39 1238 220 272360
40 1993 220 438460
41 700 220 154000
42 600 220 132000
43 800 220 176000
44 700 220 154000
45 700 220 154000
46 500 220 110000
47 800 220 176000
48 800 220 176000
49 700 220 154000
50 800 220 176000
51 600 220 132000
52 600 220 132000
53 500 220 110000
54 500 220 110000
55 250 220 55000
56 250 220 55000
57 250 220 55000
58 250 220 55000
59 218 220 47960
60 250 220 55000
61 230 220 50600
62 245 220 53900
63 250 220 55000
64 244 220 53680
65 221 220 48620
66 200 220 44000
67 550 220 121000
68 600 220 132000
69 621 220 136620
70 150 220 33000
71 150 220 33000
72 55 220 12100
73 87 220 19140
74 98 220 21560
75 41 220 9020
76 10 220 2200
77 39 220 8580
78 44 220 9680
79 58 220 12760
80 55 220 12100
81 51 220 11220
82 60 220 13200
83 55 220 12100
84 58 220 12760
85 49 220 10780
86 38 220 8360
87 44 220 9680
88 62 220 13640
89 61 220 13420
90 80 220 17600
91 71 220 15620
92 200 220 44000
93 230 220 50600
94 170 220 37400
95 175 220 38500
96 199 220 43780
97 180 220 39600
98 155 220 34100
99 75 220 16500
100 100 220 22000
101 155 220 34100
102 150 220 33000
103 145 220 31900
104 190 220 41800
105 181 220 39820
106 107 220 23540
107 188 220 41360
108 151 220 33220
109 150 220 33000
110 2300 220 506000
111 1800 220 396000
112 2450 220 539000
113 1890 220 415800
114 1200 220 264000
115 1501 220 330220
116 1991 220 438020
117 2055 220 452100
118 2500 220 550000
119 2450 220 539000
120 580 220 127600
121 1090 220 239800
122 560 220 123200
123 780 220 171600
124 900 220 198000
89378 220 19663160
Avg Daily Avg
Total Population Demand(lpcd) Demand(LPD)

89378 220 19663160


Previous Blocks Population Served

From point Z None 0


From Point Y None 0
From Point X None 0
From Point V None 0
From Point W None 0
From Point T None 0
From Point U None 0
From Point R None 0
From Point S None 0
From Point Q None 0
From Point P None 0
Local Blocks Population Served
1,2,3,4,5,6,7,8,9,10
Between Z and Y ,11,12,13,14
7000
72,73,74,75,76,77,
78,79,80,81,82,83,
84,85,86,87,88,89,
Between Y and U 90,91

1116
41,42,43,44,45,46,
47,48,49,50,51,52,
Between Y and T 53,54
9300
15,16,17,18,19,20

Between X and Y 11400


92,93,94,95,96,97,
98,99,100,101,102
,103,104,105,106,
Between X and S 107,108,109

2901
55,56,57,58,59,60,
Between X and R 61,62,63,64,65,66
2858

Between X and W 21,22,23,24,25,26 11430


110;111,112;113;1
14;115;116;117;11
Between W and P 8;119;120;121;122
;123;124
24047

Between W and Q 67,68,69,70,71 2071

Between V and W 27,28,29,30,31,32,


33,34,35,36,37,38,
39,40 17255
DESIGN OF GRIT CHAMBER
AVERAGE WATER DEMAND (ADD) = 19663160
Qdesign PEAK DAILY DEMAND (3* ADD) = 49157900

DIMENSIONS:

Assume Detention Time (td) = 5


VOLUME OF BASIN (Qdesign*td) = 113791.43518519
= 113.7914351852
Assume Depth = 3
Area of GRIT CHAMBER = 37.9304783951�^2
Length:Width = 2.5:1

WIDTH = 3.8951497222
= 4
Length = 10
= 10

Actual Surface Area = 40�^2


Check For SLR
SLR (Qdesign/Surface Area) = 1228.9475

So OK
TOTAL AMOUNT OF GRIT PRODUCED
Assume
AMOUNT OF GRIT PRODUCED = 0.04
Frequency of Sludge Withdrawl = 3
Quantitly of wastewater in 3 days = 147.4737
AMOUNT OF GRIT PRODUCED = 5.898948 �^3

AMOUNT OF AIR REQUIRED:


Assume
Amount of air required = 0.5 m^3/min per meter leng
chamber
Air required = 5
Summary of Design
Dimensions of Basin LxWxD 10x4x3.6
Frequency of Grit Removal 3 days
Amount of Grit produced per day 5.9 m^3
Amount of Air required 5 m^3/min
F GRIT CHAMBER
LPD
LPD

min
Litres
�^3
m
�^2

m
m

�^2

m^3/m^2/day

So OK

m^3/ML
days
ML
�^3

0.5 m^3/min per meter length of


chamber
m^3/min
SEDIMENTATION TANK
Peak Water Flow = 49157900 LPD

Assume
Detention Time (td) = 5 Hours

Volume of Tank (W.F * td) = 10241229.1667 Litres


= 10241.2291667 �^3
Add 20% for Sludge Storage
Volume of Tank (1.2* initial volume) = 12289.475 �^3
Assume
Depth of Tank = 6m

Surface Area of Tank = 2048.24583333�^2


Assume
Length:width = 3:01
so
Width = 26.1294586839 m
= 26 m
Length = 78 m

Actual Volume = 12168


�^3
CHECK FOR SURFACE FLOW
SOR(Qdesign/A) = 24.2395956607

so OK

SUMMARY OF DESIGN
Dimensions 26X78X6.5