Project: 1483 - Al Maryah Central Mall

FCU Air Balancing Commissioning Status Tracker

Asset Code
Item
Engineers Plant Ref Description Location Comments
No.
Building / Sequential Des. Vol.
Category Floor Level
Zone No. (l/s)

FAN COIL UNIT


1 FCU-B4-095 FCU BCC1 BASEMENT 4 091 FAN COIL UNIT ELECTRICAL ROOM (PUMP ROOM 06799) 146 Done

3 FCU-B3-049 FCU BCC1 BASEMENT 3 141 FAN COIL UNIT PUBLIC LOBBY 07549 408 Ceiling chanel cutting not done
17 FCU-B1-043 FCU BCC1 BASEMENT 1 332 FAN COIL UNIT BOH CORRIDOR 09886 280 Ceiling not comp[leted
32 FCU-00-051 FCU BCC2 GROUND FLOOR 399 FAN COIL UNIT BOH CORRIDOR 10556 130.7941071 Control panel damaged/ ALEMCO AREA
34 FCU-00-057 FCU BCC2 GROUND FLOOR 405 FAN COIL UNIT FOH CORRIDOR 10557 416 Control panel not reachable
FCU-00-073 FCU BCC2 GROUND FLOOR FAN COIL UNIT BOH CORRIDOR 10983 131 Power Isolate By Alemco
FCU-00-074 FCU BCC2 GROUND FLOOR FAN COIL UNIT BOH CORRIDOR 10983 131 Power Isolate By Alemco
82 FCU-L2-076 FCU BCC2 LEVEL 02 567 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
83 FCU-L2-077 FCU BCC2 LEVEL 02 568 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
84 FCU-L2-078 FCU BCC2 LEVEL 02 569 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
85 FCU-L2-079 FCU BCC2 LEVEL 02 570 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
86 FCU-L2-080 FCU BCC2 LEVEL 02 571 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
87 FCU-L2-081 FCU BCC2 LEVEL 02 572 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
88 FCU-L2-082 FCU BCC2 LEVEL 02 573 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
89 FCU-L2-083 FCU BCC2 LEVEL 02 574 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
90 FCU-L2-084 FCU BCC2 LEVEL 02 575 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
91 FCU-L2-085 FCU BCC2 LEVEL 02 576 FAN COIL UNIT BRIDGE SOUTH 420 will be updated later
98 FCU-L3-010 FCU BCC2 LEVEL 03 587 FAN COIL UNIT CORRIDOR (FAM ROOM 13641) 420 Control panel not reachable 17/11/2018
99 FCU-L3-016 FCU BCC2 LEVEL 03 593 FAN COIL UNIT BOH CORRIDOR 13564 234 Control panel not reachable 17/11/2018
104 FCU-L3-021 FCU BCC2 LEVEL 03 598 FAN COIL UNIT F&B TERRACE COVERED 13419 408 No Thermostat Installed
111 FCU-L3-031 FCU BCC2 LEVEL 03 608 FAN COIL UNIT ELECTRICAL ROOM 13747 620 PAP required for filter removal 17/11/18
133 FCU-L3-073 FCU BCC2 LEVEL 03 650 FAN COIL UNIT CORRIDOR (FAM ROOM 13634) 420 TAP & PAP cutting required 22/11/2018
141 FCU-L4-022 FCU BCC2 LEVEL 04 681 FAN COIL UNIT IDF ROOM 14801 163 Auto programming required,22/11/2018
Ceiling Incomplete & PAP for Control Panel
FAN COIL UNIT 420 required , Grill marking and cutting balance
142 FCU-L4-023 FCU BCC2 LEVEL 04 682 CORRIDOR 14554 17/11/2018
145 FCU-L4-026 FCU BCC2 LEVEL 04 685 FAN COIL UNIT ETISALAT ROOM 14833 634 Auto programming required,22/11/2018
146 FCU-L4-027 FCU BCC2 LEVEL 04 686 FAN COIL UNIT IDF ROOM 14800 259 Motor Burnout
148 FCU-L4-029 FCU BCC2 LEVEL 04 688 FAN COIL UNIT CORRIDOR 14554 420 FCU Controller Burnout
149 FCU-L4-030 FCU BCC2 LEVEL 04 689 FAN COIL UNIT CORRIDOR 14554 420 Ready
150 FCU-L4-031 FCU BCC2 LEVEL 04 690 FAN COIL UNIT CORRIDOR 14554 420 Short Circuit in FCU Controller
151 FCU-L4-032 FCU BCC2 LEVEL 04 691 FAN COIL UNIT CORRIDOR 14554 420 Short Circuit in FCU Controller
152 FCU-L4-033 FCU BCC2 LEVEL 04 692 FAN COIL UNIT CORRIDOR 14554 420 Short Circuit in FCU Controller
153 FCU-L4-034 FCU BCC2 LEVEL 04 693 FAN COIL UNIT CORRIDOR 14554 420 Short Circuit in FCU Controller
CX Update

Incomplete Grill Installation, Thermostat


JLW-MC-A-WIR-004891
programming interchange Low Spped and High
Speed interchange.
19/12/2018

WORK Completed / Elctrical works to follow


James L Williams
CST 2 Miscellaneous Commissioning Status Tracker
City Of Lights, Abu Dhabi
Asset Code Mech system Controls
Item Actual Plant
Engineers Plant Ref Building / Floor Sequential Description Location Fed From Des. Flow rate Obt. Flow rate Obt. Duty Wit. Duty Witnessed Consultant Witnessed Consultant Test Sheets Comments Action By Action Date
No. Category Power On Pre-Com Comm WIR No. Pre-Com Comm
Zone Level No. (L/S) (L/S) % % Date Accepted Date Accepted Filed

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

1
2
3

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

1
2
3
4
5
6
7
8
9
10
11
12
13
14

1
2
3

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
30
31
32
33
34
35
36

37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

1
2
James L Williams
CST 2 Miscellaneous Commissioning Status Tracker
City Of Lights, Abu Dhabi
Asset Code Mech system Controls
Item Actual Plant
Engineers Plant Ref Building / Floor Sequential Description Location Fed From Des. Flow rate Obt. Flow rate Obt. Duty Wit. Duty Witnessed Consultant Witnessed Consultant Test Sheets Comments Action By Action Date
No. Category Power On Pre-Com Comm WIR No. Pre-Com Comm
Zone Level No. (L/S) (L/S) % % Date Accepted Date Accepted Filed
3
4
5
6
7
8
9
10

1
2
3

1
2

1
2
3
4
5
6
7

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77

78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106

107
108
109
110
111
112
113
114
115
James L Williams
CST 2 Miscellaneous Commissioning Status Tracker
City Of Lights, Abu Dhabi
Asset Code Mech system Controls
Item Actual Plant
Engineers Plant Ref Building / Floor Sequential Description Location Fed From Des. Flow rate Obt. Flow rate Obt. Duty Wit. Duty Witnessed Consultant Witnessed Consultant Test Sheets Comments Action By Action Date
No. Category Power On Pre-Com Comm WIR No. Pre-Com Comm
Zone Level No. (L/S) (L/S) % % Date Accepted Date Accepted Filed
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167

168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217

218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259

Summary of Miscellaneous Commissioning and Testing


Total No. Pre- Total No.
SYSTEMS Qty Total Witnessed Total Accepted % Complete
Commissioned Commissioned
LIFTS 0 0 0 0 0 #DIV/0!
ESCALATORS 0 0 0 0 0 #DIV/0!
SWIMMING POOLS / PLUNGE POOLS 0 0 0 0 0 #DIV/0!
WATER FEATURES 0 0 0 0 0 #DIV/0!
ROLLER SHUTTERS 0 0 0 0 #DIV/0!
IRRIGATION PUMPS 0 0 0 0 0 #DIV/0!
GARBAGE COMPACTOR 0 0 0 0 #DIV/0!
LINEN CHUTES 0 0 0 0 0 #DIV/0!
GARBAGE CHUTES 0 0 0 0 0 #DIV/0!
GARRAGE DOORS 0 0 0 0 0 #DIV/0!
BTU METERING SYSTEM 0 0 0 0 0 #DIV/0!
Summary of Miscellaneous 0 0 0 0 #DIV/0!

to be confirmed
James L Williams
GAS SYSTEM Commissioning Status Tracker
City Of Lights, Abu Dhabi

Asset Code Mech system


Item Action
Engineers Plant Ref. Building / Sequentia Description Location QTY SIZE WIR DATE Des. Vol. Obt. Vol. Obt. Duty Wit. Duty Satisfactory Consultant Comments Action By
No. Category Level Pre-Com Comm WIR No. Date
Zone l No. (m3/s) (m3/s) % % Witnessed Date Accepted

GAS SYSTEM
JLW-WIR-P-262
1 RISER-B1 TO P5 GAS C01 001 PRESSURE TESTING RISER 1 7/26/2013 1 0 NA NA NA NA JLW-WIR-P-535

2 RISER - L6 TO 30 GAS C01 002 PRESSURE TESTING RISER


JLW-WIR-P-262
1 1 0 JLW-WIR-P-394
7/26/2013 NA NA NA NA JLW-WIR-P-535

3 RISER - L32 TO 57 GAS C01 003 PRESSURE TESTING RISER


1 1 0 JLW-WIR-P-394
JLW-WIR-P-451
NA NA NA NA JLW-WIR-P-535

4 RISER -L58 TO 61 GAS C01 004 PRESSURE TESTING RISER


1 0 0
NA NA NA NA

5 GAS METER ROOM GAS C01 GF 006 PRESSURE TESTING GAS METER ROOM 1 0 0 NA NA NA NA

6 BASEMENT 1 GAS C01 B1 006 HORIZONTAL PRESSURE TESTING BASMENT 1 JLW-WIR-M-507


1 4/18/2013 1 0
NA NA NA NA JLW-WIR-P-535

7 LEVEL 59 GAS C01 59 006 HORIZONTAL PRESSURE TESTING LEVEL 59


1 0 0
NA NA NA NA

8 GAS DETECTION PANEL GAS C01 GF 005 PANEL TESTING 1 0 0 NA NA NA NA

Summary of GAS SYSTEM Commissioning and Testing


Total No. Pre- Total No. Satisfactory
SYSTEMS Qty Total Accepted % Complete
Commissioned Commissioned Witnessed
TESTING (PIPE) 7 4 0 0 0 34%

PANEL TESTING 1 0 0 0 0 0%

Summary 8 4 0 0 0 30%