TOWER B07-T03 Date26/05/2007

S. Total
Tower Levels CLOSE OUT

Trade
S.No Snag Description - 73 SIGNATURE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

1 COMPLETE IDENTIFICATION. M 1 1 0 19
2 FLEXIBLE DUCT INSTALLED INSTEAD OF RIGID DUCT FOR SD IN SL1 & SL2. M 1 1
3 CHP ID TO BE PROVIDED M 1 1
4 CHP INSULATION DAMAGES TO BE REPAIR M 1 1
5 CWS FLOW ARROW DIRECTION TO BE PROVIDED. M 1 1
6 CHP INSULATION TO BE COMPLETED. M 1 1
7 CHWP ID TO BE PROVIDED. M 1 1
8 CDP ID & INSULATION TO BE COMPLETED. M 1 1
9 PUMP ID TO BE PROVIDED. M 1 1
10 RPOVIDE DIELECTRIC UNION BETWEEN DISSIMILAR MATERIALS. M 1 1
11 CHWP INSULATION TO BE COMPLETED. M 1 1
12 CHWP INSULATION DAMAGES TO BE REPAIR. M 1 1
13 PVC PIPES FOR SOIL STACK. VENT & WASTE PIPES ID TO BE PROVIDED. M 1 1
14 HEAT EXANGER DRAIN PAIN TO BE PROVIDED. M 1 1
15 PROVEDE DIELECTRIC UNION BETWEEN DISSIMILAR MATERIALS. M 1 1
16 PUMP ID TO BE PROVIDED. M 1 1
17 CDP ID&INSULATIONTO BE COMPLETED. M 1 1
18 STORM RISER ID TO BE PROVIDED. SR3/SR1 M 1 1 1 1 1 5
19 SPRINKLER PIPE FLUSHING AND TESTING TO BE DONE. FF 1 1 1 0 1 0 0 4
20 SPRINKLER PIPE IN LOBBY TO BE TESTED. FF 1 0 1
21 FINAL HYDRO TEST AND FLUSHING OF SPRINKLER (CHW) SYSTEM. ALL FLATS FF 1 1 1 1 1 1 1 1 1 1 10
26 COMPLETE INSTALLATION OF SPRINKLER HEADS IN KITCHEN AREA AND FLUSHING DONE. FF 1 1
Mechanical Snags Sub Total 1 0 0 0 0 1 2 1 1 0 0 6 1 2 1 0 0 0 0 0 3 2 3 0 0 0 3 2 0 0 0 9 0 0 1 0 0 0 39 SIGNATURE
1 THE EM LIGHTING SYSTEM SHALL BE FULLY INTEGRATED, INTER FACED WITH BMS&FIRE ALARAM SYSTEM. A&P E 1 1 2
2 RECTIFY OR ADJUST CABLE TRAY TOUCHING TO BUSBAR. A&P E 1 1
3 GSM CABLE NOT YET INSTALLED. ETI 1 1
4 GSM ANTENNA NOT INSTALLED. ETI 1 1 2
5 LIFT MONITORING CABLE NOT YET TERMINATED. KONE 1 1
6 TO PROVIDE ACP TERMINAL BLOCK LABEL. SCN 1 1 1 3
7 WIRING FOR DB IN POOL PLANT ARE NOT DONE. BL 1 1
8 TO COMPLETE SWIMMING POOL LIGHTING. BL 1 1
9 PROVIDE COVER ON OPENING IN GARBAGE CHUTE. CHAB GC 1 1
10 TO INSTALL HOOPER DOOR DEVICES. CHAB GC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 24
11 SEAL OFF OR COVER UNUSED BOX INSIDE GARBAGE CHUTE. CHAB GC 1 1
Electrical Snags Sub Total 0 0 0 0 0 0 0 0 0 0 0 4 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 2 1 1 3 3 1 38 SIGNATURE
2 PLENUMS ACOUSTIC LINING REMAIN SUBJECT TO SUCCESSFUL ACOUSTIC TEST. M COMM 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 0 1 1 1 1 1 1 12
3 DOOR UNDER CUT IN TOILETS DOORS TO BE CLARIFIED. ALL FLATS M COMM 1 1 1 1 1 1 1 1 8
4 WATER METER TO BE INSTALLED. SR3 M COMM 1 1 1 1 4
5 STRAIGHT TEE IN SOIL ATRACKS REMAIN SUBJECT TO DM APPROVAL. M COMM 1 1
6 WATER METER NOT YET INSTALLED. M COMM 1 1 1 1 1 1 1 1 1 1 1 11
Commissioning Snags Sub Total 0 0 0 0 0 1 0 1 0 0 0 0 1 2 2 1 1 2 1 1 2 1 1 2 2 2 1 1 2 2 2 0 1 1 1 1 1 0 36 SIGNATURE
1 ALL MEP SERVICES TO BE CLEAN FROM DERIS & DUST. MC 1 1
2 All MEP SERVICES SHOULD BE DUST PRIOR TO CEILING CLOUSURE MC 1 1
3 WASTE MATERIALS DEBRIS ABOVE GYPSUM BOARDS TO BE REMOVED. ALL FLATS MC 1 1
4 CLEAN ALL MEP SERVICES IN CORE AREA / LOBBY AREA. MC 1 1 2
5 MECHANICAL SERVICES IN SHAFT TO BE CLEANED. MC 1 1 1 1 1 1 6
6 CLEAN ALL MEP SERVICES IN CORRIDOR AND SERVICE LOBBY. MC 1 1
7 ALL TEMPARARY PLASTIC COVER TO BE REMOVED. MC 1
8 CIVIL WORK AROUND DUCT SLEEVES TO BE CLOSED. MC 1 1
9 PROVIDE FIRE BARRIER TO THE SLAB OPENING EC 1 1
10 FIRE BARRIER ON SLAB OPENING TO BE COMPLETED. EC 1 1
11 REMOVE PAINT ON ALL EXPOSED CONDUIT AND BOXES. EC 1 1
12 CARRY OUT FINAL CLEANING MC 1 1
13 FIRE SEAL SLAB OPENING. EC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 34
14 PROVIDE SLAB OPENING. EC 1 1 2
Civil Snags Sub Total 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 2 1 1 1 3 2 1 1 3 2 2 3 1 2 2 1 2 2 53 SIGNATURE
TOTAL 2 1 1 1 1 3 3 3 2 1 1 12 4 5 5 3 3 4 3 3 8 5 6 4 6 5 6 5 6 5 5 17 4 4 5 5 6 3 166