The Streamlined Requisitioning Process (SRP) is a procedure whereby certain


equipment can be ordered from suppliers who have been identified and have agreed to
supply equipment under the defined SRP and in accordance with the supplier-specific
Streamlined Requisitioning Process Manuals (SRPMs). This procedure is outlined in
Praxair Standard PO-205.

As of the date this SRPM volume was issued, it contained the Table of Contents
for each of the Cameron Product Lines (PLs). The Table of Contents should be
considered a “reference only” for the Product Line documents. To ensure that the most
recent revisions are being used on a project, before requisitioning a Product Line
compressor per the SRPM scope of supply, the requisitioning engineer should contact:
Paul Harris at (716) 879-4709 [for T-plants and N-plants]
or
Ancy Alexander at (716) 879-2382 [for N-Plants].

Specification: In most cases, a generic Engineering Specification (ES) for


Cameron Turbocompressor’s PL-x has been pre-completed as far as possible. It shall
not be used to purchase equipment for a project without a project-specific ES number
and modification of parameters to reflect project-specific requirements.

Pricing: The pricing for the Product Line is based on the scope of supply stated in
the generic ES. Changing or adding to the scope of supply may result in an increase in
price and an additional engineering fee from Cameron.

Technical Scope: Technical scope for the Product Line machines purchased under
this agreement shall be as defined by the ES listed on the Table of Contents. The
particular ambient conditions, flow and pressure requirements, and aero design
selected for that particular project shall be indicated in the project-specific specification.

Motors: (a) Praxair will supply the motors for the T-Plant type compressors. Refer
to the– Motor Requirements Section of this volume for a copy of a generic compressor
motor specification, WR2 value, and speed/torque curve.
(b) Praxair will supply the motors for the N-Plant type compressors. Call
one of the individuals listed above to get a copy of a pre-completed motor specification
and speed/torque curve for the appropriate WR2 value.

Page 1 of 1
STREAMLINED REQUISITION PROCESS MANUAL

Cameron

Centrifugal Compressors—Product Lines


Volume 1

Table of Contents

1. Product Line PL4

2. Product Line PL2XL

3. Product Line PL3XL

4. Product Line PLL3

5. Product Line PL2e

6. Product Line PL15 (Pending)

7. Product Line MPL4 (Pending)

8. Cameron Model TAC-2000

9. Cameron Model TA-2000

10. Cameron Model TA-3000

11. Cameron Model TA-6000

12. Cameron Model TA-11000

Other Related Documents:


Vol.2 of this SRPM is titled: "Praxair Inc. Centrifugal Compressors--Nitrogen/Air SRPM Volume 2 of 2"

Page 1 of 1
STREAMLINED REQUISITION PROCESS MANUAL

Table of Contents
Cameron PL-4 Product Line*
Model # 4MSGE-9A/15 or 4MSG-16
Baseload (Main) Air Compressor

Document Number Revision

1) Requisitioning Instructions PL4 Dec-2001

2) Praxair, Inc. ES Specifications and Data Sheets


• Reference Project - (MSG-16) ES-18032 0
• Reference Project - (MSG-9A) ES-16864 2
(Praxair to issue PL generic specification on next Project)

3) SSP and SSR Templates – Reference Only


• Supplier Surveillance Plan (SSP) Template Dec-2001
• Supplier Submittal Requirements (SSR) Template Dec-2001

4) Recommended Spare Parts List


• Generic List for MSG-16 N/A
• Generic List for MSG-9A N/A

5) Motor specifications
• Motor Specification Template (MSG-16) IL-0918 23
• Motor Specification Template (MSG-9A) IL-0918 23

6) Process & Instrumentation Diagrams


• Gas, Water and Vibration FF7065-04500 5

7) Wiring Drawings
• Wiring, Compressor – MSG-16 3403497-14277 2
• Wiring, Compressor – MSG-9A 3403497-00973 2
(Cameron to issue PL generic drawings on next Project)

9) Other Documents
• Valve Spec – PL4 Aftercooler Cooling Water TV805W E
• Standard Notes for Valve Specifications A-2275100 C

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
STREAMLINED REQUISITION PROCESS MANUAL

Table of Contents
Cameron PL-2XL Product Line*
Model # yRxMSGEP-9D or –9D/15
Baseload (Main) Air with Booster Air Compressor

Document Number Revision

1) Requisitioning Instructions PL2XL Dec-01

2) Praxair, Inc. ES Specifications and Data Sheets


• Generic Product Line Specification ES-20045 0

3) SSP and SSR Templates – Reference Only


• Supplier Surveillance Plan (SSP) Template Dec-01
• Supplier Submittal Requirements (SSR) Template Dec-01

4) Recommended Spare Parts List


• Generic List for 6R3MSGEP-9D 27-Oct-01

5) Motor specifications
• Motor Specification Template - 6R3MSGEP-9D IL-0918 23
• Pump Bracket Drawing 3404995-04201 7

6) Process & Instrumentation Diagrams


• Gas, Water and Vibration FF7065-02509 3
• Bill of Material – Gas, Water and Vibration Ref. F12191 24-Apr-01
• Lubrication System FF7066-02509 6
• Bill of Material – Lube Oil Ref. F12191 24-Apr-01

7) Wiring Drawings
• Wiring, Compressor - 6R3MSGEP-9D 3403497-01062 2
(Cameron to issue PL generic drawing on next Project)
• Junction Box Specification PL3XL-9110-580 1 (pending)
• Panel Layout Drawing 540150-12062 0

8) Other Documents
• Valve Spec – PL2XL Aftercooler Cooling Water TV805W B
• Standard Notes for Valve Specifications A-2275100 B (reference)
See PL4 Product Line Tab – Part 8 for copy

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
STREAMLINED REQUISITION PROCESS MANUAL

Table of Contents
Cameron PL-3XL Product Line*
Model # yRxMSGEP+9AD or +9AD/15
Baseload (Main) Air with Booster Air Compressor

Document Number Revision

1) Requisitioning Instructions PL3XL Dec-01

2) Praxair, Inc. ES Specifications and Data Sheets


• Reference Project (60Hz) ES-22629 0
)

3) SSP and SSR Templates – Reference Only


• Supplier Surveillance Plan (SSP) Template Dec-01
• Supplier Submittal Requirements (SSR) Template Dec-01

4) Recommended Spare Parts List N/A


• Generic List for 6R3MSGEP+9AD

5) Motor specifications
• Motor Specification Template - 6R3MSGEP+9AD IL-0918 23
• Pump Bracket Drawing 3404995-04155 4

6) Process & Instrumentation Diagrams


• Gas, Water and Vibration FF7065-03509 4
• Lubrication System FF7066-03509 6

7) Wiring Drawings
• Wiring, Compressor - 6R3MSGEP+9AD 3403497-14276 5
(Cameron to issue PL generic drawing on next Project)
• Junction Box Specification PL2-PL3XL-580 1
• Panel Layout Drawing 540150-12062 0

8) Other Documents
• Valve Spec – PL3XL Aftercooler Cooling Water TV805W C
• Standard Notes for Valve Specifications A-2275100 C
See PL4 Product Line Tab – Part 8 for copy

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
STREAMLINED REQUISITION PROCESS MANUAL

Table of Contents
Cameron PLL-3 Product Line*
Model # 5R3MSGEP-7ARCD or –7ARCD/15
Feed-Recycle Nitrogen Compressor

Document Number Revision

1) Requisitioning Instructions PLL3 Dec-01

2) Praxair, Inc. ES Specifications and Data Sheets


• Generic Product Line Specification - 60Hz Application ES-17772 1
• Generic Product Line Specification - 50Hz Application ES-20703 1

3) SSP and SSR Templates – Reference Only


• Supplier Surveillance Plan (SSP) Template Dec-01
• Supplier Submittal Requirements (SSR) Template Dec-01

4) Recommended Spare Parts List


• Generic List for 5R3MSGEP-7ARCD or –7ARCD 21-Jul-00

5) Motor specifications
• Motor Specification Template IL-0918 23

6) Process & Instrumentation Diagrams


• Gas, Water and Vibration FF7065-03734 5
• Bill of Material – Gas, Water and Vibration FF7065-12818 8-Feb-02
• Lubrication System FF7066-03734 12
• Bill of Material – Lube Oil FF7066-12818 8-Feb-02

7) Wiring Drawings
• Wiring, Compressor - 5R3MSGEP-7ARCD or –7ARCD 3403497-01050 3
(Cameron to issue PL generic drawing on next Project)
• Junction Box Specification PLL3-9117-580 1 (pending)
• Panel Layout Drawing 540150-12064 1

8) Other Documents blank

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
STREAMLINED REQUISITION PROCESS MANUAL

Table of Contents
Cameron PL-2e Product Line*
Model # 6R3MSGE-3BD or -3BD/30
Baseload (Main) Air with Recycle Compressor

Document Number Revision

1) Requisitioning Instructions PL2e Dec-01

2) Praxair, Inc. ES Specifications and Data Sheets


• Generic Product Line Specification ES-20526 1

3) SSP and SSR Templates – Reference Only


• Supplier Surveillance Plan (SSP) Template Dec-01
• Supplier Submittal Requirements (SSR) Template Dec-01

4) Recommended Spare Parts List N/A


• Generic List for 6R3MSGE-3BD/30

5) Motor specifications
• Motor Specification Template - 6R3MSGE-3BD/30 IL-0918 23
• Pump Bracket Drawing 3404995-04256 0

6) Process & Instrumentation Diagrams


• Gas, Water and Vibration FF7065-02510 2
• Bill of Material – Gas, Water and Vibration Ref. X12472 27-Oct-01
• Lubrication System FF7066-02510 3
• Bill of Material – Lube Oil Ref. X12472 27-Oct-01

7) Wiring Drawings
• Wiring, Compressor - 6R3MSGEP-9D 3403497-01097 3
(Cameron to issue PL generic drawing on next Project)
• Junction Box Specification PL2e-580 0
• Panel Layout Drawing 540150-12472 0

8) Other Documents blank

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
Streamlined Requisition Process Manual

Table of Contents
Cameron TAC-2000*
3-stage, Air-cooled Centrifugal Air Compressor
Baseline ES-20728

Document Number Revision

1) Requisitioning Instructions

2) Praxair, Inc. ES Specification and Data Sheets ES-20728 2

3) Supplier Surveillance Plan (SSP) Template – Reference Only

4) Supplier Submittal Requirements (SSR) Template – Reference Only

5) Sample Performance Curves

6) Cameron/Praxair TAC-2000 Pricing

7) Cameron Internal Compressor Specification


(To be obtained and inserted here during first project.)

8) Blank Painting/Cleaning Certification Form

9) Recommended Spare Parts List 6/19/01

10) Installation Arrangement Drawing FF9001-12915 3

11) P&ID – Process, Lube Oil, Cooling Air FF9007-12915 1

12) Wiring Drawing FF7059-12915, shts 1-5 2

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand
alone document.
Streamlined Requisition Process Manual

Table of Contents
CameronTA-2000*
3-stage, Centrifugal Air Compressor
Baseline ES-20729

Document Number Revision

1) Requisitioning Instructions

2) Praxair, Inc. ES Specification and Data Sheets ES-20729 0

3) Supplier Surveillance Plan (SSP) Template – Reference Only

4) Supplier Submittal Requirements (SSR) Template – Reference Only

5) Sample Performance Curves 11/19/01

6) Cameron/Praxair TA-2000 Pricing

7) Cameron Internal Compressor Specification


(To be inserted here after receipt of drawings on first project.)
8) Blank Painting/Cleaning Certification Form

9) Recommended Spare Parts List 1/2/01

10) General Arrangement Drawing (“IA”)


(To be inserted here after receipt of drawings on first project.)

11) P&ID – Gas, Cooling Air, Lubrication


(To be inserted here after receipt of drawings on first project.)

12) Wiring Drawing


(To be inserted here after receipt of drawings on first project.)

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
Streamlined Requisition Process Manual

Table of Contents
Cameron TA-3000*
3-stage, Centrifugal Air Compressor
Baseline ES-20730

Document Number Revision

1) Requisitioning Instructions

2) Praxair, Inc. ES Specification and Data Sheets ES-20730 0

3) Supplier Surveillance Plan (SSP) Template – Reference Only

4) Supplier Submittal Requirements (SSR) Template – Reference Only

5) Sample Performance Curves 11/19/01

6) Cameron/Praxair TA-3000 Pricing

7) Cameron Internal Compressor Specification


(To be inserted here after receipt of drawings on first project.)

8) Blank Painting/Cleaning Certification Form

9) Recommended Spare Parts List 1/2/01

10) Motor specification EDR-G-012 3

11) General Arrangement Drawing (“IA”)


(To be inserted here after receipt of drawings on first project.)

12) P&ID – Gas, Cooling Air, Lubrication


(To be inserted here after receipt of drawings on first project.)

13) Wiring Drawing


(To be inserted here after receipt of drawings on first project.)

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
STREAMLINED REQUISITION PROCESS MANAUL

Table of Contents
Product Line
Cameron’s TA-6000*
(Baseline ES-20623)

Document Number Revision/Date


1) Requisition Instruction Sheet

2) Praxair, Inc. ES Specification and Data Sheets 20623 0

3) Supplier Surveillance Plan(SSR) – Reference Only TA-6000 SSR 0


(based on SSR for Moses Lake, WA project)

4) Supplier Submittal Requirements (SSP) – Reference Only TA-6000 SSP 0


(based on SSP for Moses Lake, WA project)

5) Cameron Praxair Pricing 12/31/01

6) Cameron’s Internal Compressor Specification N/A

7) List of Minor and Major Spares 6/7/01

8) Installation Arrangement Drawing FF9001-06000 2

9) P & ID – Gas, Oil, and Water FF9007-06000 2

10) Terminal Box Wiring Drawing (based on Moses Lake) FF6990-12762 0

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.
STREAMLINED REQUISITION PROCESS MANUAL

Table of Contents
Cameron’s Product Line
Cameron’s TA-11000*
(Baseline ES-20624)

Document Number Revision/Date


1) Requisition Instruction Sheet

2) Praxair, Inc. ES Specification and Data Sheets 20624 0

3) Supplier Surveillance Plan (SSR) – Reference Only TA-11000 SSR 0


(based on SSR for Moses Lake, WA project)

4) Supplier Submittal Requirements (SSP) – Reference Only TA-11000 SSP 0


(based on SSP for Moses Lake, WA project)

5) Praxair/Cameron Turbo Air Pricing

6) Cameron’s Internal Compressor Specification (Generic)

7) Installation Arrangement Drawing (Generic) FF6705-12697 2

8) P & ID – Gas and Water (Generic) FF7065-12697 3

9) P & ID – Oil (Generic) FF7066-12697 2

*
This document is intended to be used with the Product Line Requisition Instructions, and is not a stand alone
document.

You might also like