TRACK MAINTAINANCE DETAILS

Dt-15/7/18- Grass cutting at platform area from Ch-8300 to ch-8500

Dt-16/7/18-Grass cutting at platform area from ch-8500 to ch-8700

Dt-17/7/18-Grass cutting in platform area from ch-8700 to ch-8900

Dt-18/7/18-Profiling,dressing & boxing from ch-8150 to ch-8300

Dt-19/7/18-Profilling,dressing & boxing from ch-8300 to ch-8500

Dt-20/7/18-Profillng,dressing & boxing from ch-8500 to ch-8721

Dt-21/7/18-Ballast dressing in line no.2 from ch-8200 to ch-8510

Dt-22/7/18-Cess repairing in line no.2 damaged due to heavy rain in ch-8620

Dt-23/7/18-Repairing of bridge no.3(1*.6m dia HP) & bridge no.4(1*.7m dia HP)
ballast filling washed out from track at ch-3054.52 & ch-3186

Dt-24/7/18-Drain cleaning from ch-5350 to ch-5400 & grass cutting from ch-5350
to ch-5400(L/S)

Dt-25/7/18-Drain cleaning from ch-5400 to ch-5520(R/S)

Dt-26/7/18-Top point packing and toung rail repair from ch-8100 to ch-8175 &
grass cutting in the same chainage.

Dt-27/7/18-Drain cleaning & grass cutting from ch-5520 to ch-5760(R/S)

Dt-28/7/18-Drain cleaning from ch-5300 to ch-5450(L/S)

Dt-29/7/18-Grass cutting & drain cleaning from ch-5100 to ch-5300.

Dt-30/7/18-Cess cleaning at power plant L/C

Dt-31/7/18-Cess cleaning at power plant L/C.


Dt-1/8/18-Track renewal and coneret work at smelter L/C near aluminium
unloading silo.

Dt-2/8/18-Cess cleaning at power L/C and grass cutting at power L/C approach.

Dt-4/8/18-L/C paver block shifting from coal gate to smelter.

Cheak rail flange way cleaning at power L/C.

Grass cutting from Ch-7800 to Ch-8000.

Dt-5/8/18-Grass cutting at N.H L/C approach and biharipada S.H L/C approach.

Dt-6/08/18- Grass cutting from Ch-7500 to Ch-7800.

Paver block shifting from coal gate to smelter.

Dt-7/8/18-Through packing from Ch-5000 to Ch-5100.

Dt-8/8/18-Dressing from Ch-7650 to Ch-8000.

Platform area line no.2 cess boulder packing.

Dt-9/8/18-Drain cleaning L/S from Ch-5500 to Ch-5700.

Dt-10/8/18- Drain cleaning from Ch-5300 to Ch-5500.

Dt-11/8/18-Drain cleaning Ch-5200 to Ch-5300.

Dressing from Ch-7200 to Ch-7350.

Repairing of bridge No.3(ISMB fitting,plate wielding & ballast packing)

Dt-12/8/18-Boxing & profiling from Ch-4100 to Ch-4200.

Dt-13/8/18-Ballast removal,abutment cleaning,ISMB installation,plate wielding at


bridge no.03.

Dt-14/8/18-Form work,reinforcement bar winding and concereating of deck slab


of bridge No.03.
Dt-15/8/18-Ballast filling,sleeper fitting and packing at bridge No-03.

15 no. of labours and technical staff from T.S Ashok & Co.pvt.Ltd were involved in
this opearations.