You are on page 1of 1

Detail Y 52

18

129
Y
2 17 3 164
RS
163
136
X
Sealant connection
off true plan
"RS"
off true plan

off true plan


Detail X

38
40

39 37

87

Design:

DP = Double piston
PM = Primary metal, secondary soft seated
SI = Secondary injection of sealant
136 Stem seal H-Ecopur RS = Replaceable stem seal, under full pressure
129 Journal TStE 355 ~A350LF2 through emergency sealant connection ®
87 Trunnion TStE 355; 76µm (0,003") ENP ~A350LF2; 76µm (0,003") ENP 01 WS = Welded stem
52 Seal Ring (Fire safe) Graphit / Graphite
40 Load Spring Inconel X750
Erstellt /
38, 39, 163, 164 O-Ring FPM (Viton) Letze Änderung / Last Modification created 16.03.2016 Reinegger Art.-Nr. / Part-No.
Bearbeitet /
01: 0,003" ENP in 76 m (0,003") edited 05.10.2016 Reinegger
37 Seat ring 1.4006 (X 12 Cr 13), ~A 182 F6a, ENP
Freigegeben /
approved 18.10.2016 Meyer
Gewicht / kg Zeichn.-Nr. / Ä / Rev.
18 Operation stem TStE 460; 76µm (0,003") ENP ~A350 LF6 CL1; 76µm (0,003") ENP 01 Weight / kg Ball valve Type GF Drawing-No.
17 Ball plug A350LF2; 76µm (0,003") ENP 01
3 Flange A350LF2 NPS 30 CL150-600 J34299 PDM.
ab
01 05.10.2016 JR
2 Body shell P355NL1 A537 Cl.1 A / Rev. Datum / Date Name / Name
Pos. Part Name Material Reference Material Dimension in mm - Die Angaben entsprechen dem Stand der Entwicklung - Änderungen vorbehalten
dimension in mm - the information corresponds to the state of the development - subject to changes
VERVIELFÄLTIGUNG (§15ff URGH) UND WEITERGABE (§§ 1,17,18 UWG), NICHT GESTATTET. ALLE RECHTE (§§ 12, 135 PATG, § 2 GBMG) VORBEHALTEN. ZUWIDERHANDLUNGEN (§ 97 URGH, 19 UWG, §§ 823, 826 BGB, § 8 PTG) WERDEN VERFOLGT.
this drawing shall neither be reproduced (§15ff URGH) nor handed to third parties (§§ 1,17,18 UWG). All rights are being Preserved violations will be procecuted (§§ 97 URGH, 19 UWG, §§ 823, 826 BGB, § 8 PTG)