You are on page 1of 26

KALAU MAU MENGCOPY HARUS KE BAWAH

* **********
. 145,020,000.00 ********** Model (1-3) 1
. ********** ********** ********** **********
Seratus Empat Puluh Lima Juta Dua Puluh Ribu Rupiah.
********** ******************** ********** ********** ********** **********
********** Satu Dua Tiga Empat Lima Enam ***
********** Ribu Juta Milyar ***
********** 000145020000 ***
********** ******************** ********** ********** ********** **********
********** 000 1 ***
********** 0 ***
********** Sepuluh ***
********** 0 ***
********** 0 ***
********** ***
********** ***
********** ***
********** ***
********** 020 2 ***
********** 0 Dua Puluh ***
********** Sepuluh ***
********** 2 ***
********** 0 Dua Puluh ***
********** Dua Puluh Dua Puluh ***
********** Dua Puluh Ribu ***
********** ***
********** ***
********** 145 3 ***
********** 1 Empat Puluh ***
********** Seratus Lima Belas ***
********** 4 Lima ***
********** 5 Empat Puluh Lima ***
********** Empat Puluh LimaEmpat Puluh Lima ***
********** Seratus Empat Puluh Lima Juta ***
********** ***
********** ***
********** 000 4 ***
********** 0 ***
********** Sepuluh ***
********** 0 ***
********** 0 ***
********** ***
********** ***
********** ***
********** 000 1 ***
********** 0 ***
********** Sepuluh ***
********** 0 ****
********** 0 ***
********** ***
********** ***
********** 51 00 0 ***
********** 51 ********** ********** **********
51 00 Seratus Empat Puluh Lima Juta Dua Puluh Ribu
********** Seratus Empat PulSeratus E* Seratus Empat Puluh Lima Juta Dua Puluh Ribu
********** Seratus Empat PulSeratus E* Seratus Empat Puluh Lima Juta Dua Puluh Ribu Rupiah
1 Seratus Empat Puluh Lima Juta Dua Puluh Ribu Rupiah.
2 Seratus Empat Puluh Lima Juta Dua Puluh Ribu Rupiah.
3 Seratus Empat Puluh Lima Juta Dua Puluh Ribu Rupiah.
********** ******************** ********** ********** ********** **********
Puluh Ribu
Puluh Ribu
Puluh Ribu Rupiah
PEMERINTAH PROVINSI JAWA BARAT
DINAS PERKEBUNAN
BALAI PROTEKSI TANAMAN PERKEBUNAN
Jln.Pasirjati KM.10 Ujungberung Telp./Fax.022 7804075
Bandung 40616

RENCANA ANGGARAN BIAYA


ENGINEER ESTIMATE

KEGIATAN :
PENINGKATAN SARANA DAN PRASARANA
DINAS PERKEBUNAN PROVINSI JAWA BARAT

PEKERJAAN :
PENGADAAN CANOPY
BALAI PROTEKSI TANAMAN PERKEBUNAN
DINAS PERKEBUNAN PROVINSI JAWA BARAT
TAHUN ANGGARAN 2019
LOKASI :
Jln.Pasirjati KM.10, Jati endah Kec. Cilengkrang
KABUPATEN BANDUNG
REKAPITULASI
ENGINEER ESTIMATE
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
PEKERJAAN : PENGADAAN CANOPY
BALAI PROTEKSI TANAMAN PERKEBUNAN
DINAS PERKEBUNAN PROVINSI JAWA BARAT
LOKASI : Jln.Pasirjati KM.10, Jati endah Kec. Cilengkrang
TAHUN ANGGARAN : 2014

No. URAIAN PEKERJAAN

A. PEKERJAAN CANOPY TYPE. A

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN GALIAN,URUGAN DAN PONDASI CANOPY

III. PEKERJAAN KONTRUKSI ATAP

B. PEKERJAAN CANOPY TYPE B.

I. PEKERJAAN GALIAN,URUGAN DAN PONDASI

II PEKERJAAN KONTRUKSI ATAP

C. PEKERJAAN CANOPY TYPE C.

I. PEKERJAAN GALIAN,URUGAN DAN PONDASI 11

II. PEKERJAAN KONTRUKSI ATAP - 62

D. PEKERJAAN CANOPY TYPE D.

I. PEKERJAAN GALIAN,URUGAN DAN PONDASI 11


II. PEKERJAAN KONTRUKSI ATAP - 62
E. PEKERJAAN KANSTEEN DAN PAVING BLOK E.
I. PEKERJAAN GALIAN,URUGAN DAN PASANGAN 11
F. PEK. LAIN LAIN
11
JUMLAH TOTAL
PPN 10%
JUMLAH + PPN
DIBULATKAN
Terbilang :
Seratus Empat Puluh Lima Juta Dua Puluh Ribu Rupiah.

Bandung, Februari 2019

CV.MITRA NASIONAL CONSU

BERLIANTO HADIKUSUMA S.
RINCIAN
ENGINEER ESTIMATE
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
PEKERJAAN : PENGADAAN CANOPY
BALAI PROTEKSI TANAMAN PERKEBUNAN
DINAS PERKEBUNAN PROVINSI JAWA BARAT
LOKASI : Jln.Pasirjati KM.10, Jati endah Kec. Cilengkrang
TAHUN ANGGARAN : 2019

No. URAIAN PEKERJAAN VOL. SAT.

1 2 3 4
A. PEKERJAAN CANOPY TYPE. A
I. PEKERJAAN PERSIAPAN 12.60
1 Administrasi dan dokumentasi 1.00 Ls
2 Air Dan Listrik Kerja 1.00 Ls
JUMLAH - I
II. PEKERJAAN GALIAN,URUGAN DAN PONDASI CANOPY
1 Pek. Galian Tanah 0.60 m3
2 Pek. Urugan Tanah kembali 0.41 m3
3 Pek. Buangan Tanah sekitar lokasi 0.41 m3
4 Pek. Cor Beton Pondasi Beton tumbuk 0.19 m3
5 Pek. Plesteran Kolom Fedestal 0.80 m2
6 Pek. Acian Kolom fedestal 0.80 m2
7 Pek. Cat Kolom fedestal 0.80 m2
JUMLAH - II
III. PEKERJAAN KONTRUKSI ATAP 6.00 62
1 Pek. Pasang Tiang Canal 2XC.75.75 (Bajaringan) 32.00 m1
2 Pek. Pasang Rangka Kuda-kuda Canal C.75.75 Bajaringan (Melintang) 32.00 m1
3 Pek. Pasang Rangka Kuda-kuda Canal C.75.75 Bajaringan (Memanjang) 62.00 m1
4 Pek. Pasang Rangka Reng/Gording TR 32.45 Bajaringan 116.40 m1
5 Pek. Pasang penutup atap spandek t=0,4mm 58.20 m2
6 Pek. Pasang Aluminium foil 58.20 m2
JUMLAH - III
SUB TOTAL - A
B. PEKERJAAN CANOPY TYPE B.
I. PEKERJAAN GALIAN,URUGAN DAN PONDASI 11
1 Pek. Cor Beton Pondasi Beton tumbuk 0.19 m3
2 Pek. Plesteran Kolom Fedestal 1.28 m2
3 Pek. Acian Kolom fedestal 1.28 m2
4 Pek. Cat Kolom fedestal 1.28 m2
JUMLAH - I
II. PEKERJAAN KONTRUKSI ATAP - 62
1 Pek. Pasang Tiang Canal 2XC.75.75 (Bajaringan) 52.00 m1
RINCIAN
ENGINEER ESTIMATE
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
2 Pek. Pasang Rangka Kuda-kuda Canal C.75.75 Bajaringan (Melintang) 60.00 m1
3 Pek. Pasang Rangka Kuda-kuda Canal C.75.75 Bajaringan (Memanjang) 36.00 m1
4 Pek. Pasang Rangka Reng/Gording TR 32.45 Bajaringan 110.00 m1
5 Pek. Pasang Aluminium foil 55.00 m2
6 Pek. Pasang penutup atap Spandek t=0,4mm 55.00 m2

SUB TOTAL - B
C. PEKERJAAN CANOPY TYPE C.
I. PEKERJAAN GALIAN,URUGAN DAN PONDASI 11
1 Pek. Cor Beton Pondasi Beton tumbuk 0.14 m3
2 Pek. Plesteran Kolom Fedestal 0.96 m2
3 Pek. Acian Kolom fedestal 0.96 m2
JUMLAH - I
II. PEKERJAAN KONTRUKSI ATAP - 62
1 Pek. Pasang Tiang Canal 2XC.75.75 (Bajaringan) 18.00 m1
2 Pek. Pasang Rangka Kuda-kuda Bajaringan C.75.75+TR 32.45 22.40 m2
3 Pek. Pasang Aluminium foil 22.40 m2
4 Pek. Pasang penutup atap Metal rof t=0,4mm 22.40 m2
5 Pek. Pasang Buwungan Metal roof t=0,4mm 7.00 m2

SUB TOTAL - C
D. PEKERJAAN CANOPY TYPE D.
I. PEKERJAAN GALIAN,URUGAN DAN PONDASI 11
1 Pek. Cor Beton Pondasi Beton tumbuk 0.36 m3
2 Pek. Plesteran Kolom Fedestal 2.40 m2
3 Pek. Acian Kolom fedestal 2.40 m2
JUMLAH - I
II. PEKERJAAN KONTRUKSI ATAP - 62
1 Pek. Pasang Tiang Canal 2XC.75.75 (Bajaringan) 89.60 m1
2 Pek. Pasang Rangka Kuda-kuda Bajaringan C.75.75+TR 32.45 88.00 m2
3 Pek. Pasang Aluminium foil 88.00 m2
4 Pek. Pasang penutup atap Metal roof t=0,4mm 88.00 m2
5 Pek. Pasang Buwungan Metal roof t=0,4mm 25.00 m2
JUMLAH - I
SUB TOTAL - D
E. PEKERJAAN KANSTEEN DAN PAVING BLOK E.
I. PEKERJAAN GALIAN,URUGAN DAN PASANGAN 11
1 Pek. Bongkaran rabat existing 1.00 ls
2 Pek. Pas. Bowpalnk 30.10 m1
3 Pek. Galian tanah 1.44 m3
4 Pek. Pas. Dinding kansteen Bata 20.00 m2
5 Pek. Plesteran kansteen bata 40.00 m2
6 Pek. Acian kansteen bata 40.00 m2
7 Pek. Urugan pasir 3.47 m2
8 Pek. Pas .paving blok T=6 cm 36.96 m2
9 Pek. Pengecatan dinnding kastin dan fedestal 12.60 m2
SUB TOTAL - E
F. PEK. LAIN LAIN
1 Pek. Pengecatan kanstin area parkir bawah 83.00 m2
2 Pek. Pengecatan kanstin area parkir atas 39.00 m2
2 Pek. Perbaikan tiang Canopy depan R. Aula 1.00 Ls
RINCIAN
ENGINEER ESTIMATE
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA
SUB TOTAL - F

JUMLAH TOTAL A,B,C D,E,F


PPN 10%
JUMLAH + PPN
DIBULATKAN
AWA BARAT
UNAN
N PERKEBUNAN
Fax.022 7804075

RAN BIAYA
STIMATE

N PRASARANA
SI JAWA BARAT

NOPY
PERKEBUNAN
NSI JAWA BARAT
N 2019
ec. Cilengkrang
UNG
JUMLAH TOTAL JUMLAH TOTAL
HARGA HARGA
( Rp ) ( Rp )

23,718,458.40

2,150,000.00

367,218.40

21,201,240.00

21,799,547.20

346,547.20

21,453,000.00

11,775,647.46

250,940.79

11,524,706.67

46,590,885.31

627,351.97
45,963,533.33
20,176,194.50
20,176,194.50
7,776,000.00 7,776,000.00

131,836,732.86
13,183,673.29
145,020,406.15
145,020,000.00

Puluh Ribu Rupiah.

Bandung, Februari 2019


Dibuat Oleh
Konsultan Perencana
CV.MITRA NASIONAL CONSULT
KONSULTANT

BERLIANTO HADIKUSUMA S.SOS


Direktur
HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
5 6 = (5 X 3 )

750,000.00 750,000.00
1,400,000.00 1,400,000.00
2,150,000.00

82,300.00 49,380.00
27,400.00 11,179.20
36,000.00 14,688.00
813,600.00 156,211.20
75,800.00 60,640.00
35,900.00 28,720.00
58,000.00 46,400.00
367,218.40

49,000.00 1,568,000.00
49,000.00 1,568,000.00
49,000.00 3,038,000.00
30,600.00 3,561,840.00
115,300.00 6,710,460.00
81,700.00 4,754,940.00
21,201,240.00
23,718,458.40

813,600.00 156,211.20
75,800.00 97,024.00
35,900.00 45,952.00
37,000.00 47,360.00
346,547.20

49,000.00 2,548,000.00
49,000.00 2,940,000.00
49,000.00 1,764,000.00
30,600.00 3,366,000.00
81,700.00 4,493,500.00
115,300.00 6,341,500.00
21,453,000.00
21,799,547.20

997,977.71 143,708.79
75,800.00 72,768.00
35,900.00 34,464.00
250,940.79

49,000.00 882,000.00
255,933.33 5,732,906.67
81,700.00 1,830,080.00
107,800.00 2,414,720.00
95,000.00 665,000.00
11,524,706.67
11,775,647.46

997,977.71 359,271.97
75,800.00 181,920.00
35,900.00 86,160.00
627,351.97

49,000.00 4,390,400.00
255,933.33 22,522,133.33
81,700.00 7,189,600.00
107,800.00 9,486,400.00
95,000.00 2,375,000.00
45,963,533.33
46,590,885.31

1,000,000.00 1,000,000.00
86,400.00 2,600,640.00
82,300.00 118,512.00
140,000.00 2,800,000.00
75,000.00 3,000,000.00
39,000.00 1,560,000.00
164,900.00 571,378.50
210,900.00 7,794,864.00
58,000.00 730,800.00
20,176,194.50

58,000.00 4,814,000.00
58,000.00 2,262,000.00
700,000.00 700,000.00
7,776,000.00

131,836,732.86
13,183,673.29
145,020,406.15
145,020,000.00
Analisa
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
No. Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan Jumlah Harga

I. PEKERJAAN TANAH SNI 2835-2008


1.1. MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METER
Upah :
0.750 OH Pekerja Rp 95,000 Rp 71,250
0.025 OH Mandor Rp 145,000 Rp 3,625
Rp 74,875 Rp 74,875
Overhead + Profit ( Max. 15 % ) Rp 7,488
Jumlah Rp 82,363
DIbulatkan Rp 82,300

1.8. MEMBUANG 1 M3 TANAH SEJAUH 30 METER


Upah :
0.330 OH Pekerja Rp 95,000 Rp 31,350
0.010 OH Mandor Rp 145,000 Rp 1,450
Rp 32,800 Rp 32,800
Overhead + Profit ( Max. 15 % ) Rp 3,280
Jumlah Rp 36,080
DIbulatkan Rp 36,000

1.9. MENGURUG KEMBALI 1 M3 GALIAN


Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjan galian
Rp 74,875 Rp 24,958 Rp 24,958
Overhead + Profit ( Max. 15 % ) Rp 2,496
Jumlah Rp 27,454
DIbulatkan Rp 27,400

1.10. MEMADATKAN 1 M3 TANAH (PER 20 CM)


Upah :
0.500 OH Pekerja Rp 95,000 Rp 47,500
0.050 OH Mandor Rp 145,000 Rp 7,250
Rp 54,750 Rp 54,750
Overhead + Profit ( Max. 15 % ) Rp 5,475
Jumlah Rp 60,225
DIbulatkan Rp 60,200

1.11. MENGURUG 1 M3 PASIR URUG


Upah :
0.300 OH Pekerja Rp 95,000 Rp 28,500
0.010 OH Mandor Rp 145,000 Rp 1,450
Bahan :
1.200 m3 Pasir Urug Rp 100,000 Rp 120,000
Rp 29,950 Rp 120,000 Rp 149,950
Overhead + Profit ( Max. 15 % ) Rp 14,995
Jumlah Rp 164,945
DIbulatkan Rp 164,900

1.12. MENGURUG 1 M3 SIRTU


Upah :
0.300 OH Pekerja Rp 95,000 Rp 28,500
0.010 OH Mandor Rp 145,000 Rp 1,450
Bahan :
1.200 m3 Sirtu Rp 150,000 Rp 180,000
Rp 29,950 Rp 180,000 Rp 209,950
Overhead + Profit ( Max. 15 % ) Rp 20,995
Jumlah Rp 230,945

Page 18
Analisa
No. Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan Jumlah Harga

DIbulatkan Rp 230,900

II. PEKERJAAN PONDASI SNI 2836-2008


2.2. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PP
Upah :
1.500 OH Pekerja Rp 95,000 Rp 142,500
0.750 OH Tukang batu Rp 115,000 Rp 86,250
0.075 OH Kepala Tukang Rp 125,000 Rp 9,375
0.075 OH Mandor Rp 145,000 Rp 10,875
Bahan :
1.200 m3 Batu Belah 15 cm/20 cm Rp 170,000 Rp 204,000
163.000 kg PC Rp 1,380 Rp 224,940
0.520 m3 Pasir Pasang Rp 210,000 Rp 109,200
Rp 249,000 Rp 538,140 Rp 787,140
Overhead + Fee ( Max. 10 % ) Rp 78,714
Jumlah Rp 865,854
III. PEKERJAAN BETON SNI 7394-2008
3.4. MEMBUAT 1 M3 LANTAI KERJA BETON MUTU F'C = 7,4 MPa (K 100), SLUMP (3-6) CM, W/C = 0,87
Upah :
1.200 OH Pekerja Rp 95,000 Rp 114,000
0.200 OH Tukang Batu Rp 115,000 Rp 23,000
0.020 OH Kepala Tukang Rp 125,000 Rp 2,500
0.060 OH Mandor Rp 145,000 Rp 8,700
Bahan :
230.000 kg PC Rp 1,380 Rp 317,400
0.638 m3 PB Rp 220,000 Rp 140,329
0.761 m3 KR (Maksimum 30 mm) Rp 175,000 Rp 133,130
0.200 Liter Air Rp 3,000 Rp 600
Rp 148,200 Rp 591,458 Rp 739,658
Overhead + Profit ( Max. 15 % ) Rp 73,966
Jumlah Rp 813,624
DIbulatkan Rp 813,600

Jumlah Rp 134,457

V. PEKERJAAN PLESTERAN SNI 2837-2008


5.4. MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 20 MM
Upah :
0.260 OH Pekerja Rp 95,000 Rp 24,700
0.200 OH Tukang batu Rp 115,000 Rp 23,000
0.020 OH Kepala Tukang Rp 125,000 Rp 2,500
0.013 OH Mandor Rp 145,000 Rp 1,885
Bahan :
6.912 kg PC Rp 1,380 Rp 9,539
0.035 m3 Pasir Pasang Rp 210,000 Rp 7,350
Rp 52,085 Rp 16,889 Rp 68,974
Overhead + Profit ( Max. 15 % ) Rp 6,897
Jumlah Rp 75,871
DIbulatkan Rp 75,800

5.6 MEMASANG 1 M2 ACIAN


Upah :
0.150 OH Pekerja Rp 95,000 Rp 14,250
0.100 OH Tukang batu Rp 115,000 Rp 11,500
0.010 OH Kepala Tukang Rp 125,000 Rp 1,250
0.008 OH Mandor Rp 145,000 Rp 1,160
Bahan :
3.250 kg PC Rp 1,380 Rp 4,485

Page 19
Analisa
No. Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan Jumlah Harga

Rp 28,160 Rp 4,485 Rp 32,645


Overhead + Profit ( Max. 15 % ) Rp 3,265
Jumlah Rp 35,910
DIbulatkan Rp 35,900

VII. PEKERJAAN PENUTUP LANTAI DAN DINDING SNI 7395-2008


1 MEMASANG 1 M1 SALURAN GRAVEL U20cm
Bahan+Upah :
0.250 m3 Galian tanah Rp 82,300 Rp 20,575
0.063 m3 Urugan Kembali Rp 27,400 Rp 1,713
0.188 m3 Buangan tanah sekitar lokasi Rp 36,000 Rp 6,750
0.025 m3 Lantai kerja Rp 813,600 Rp 20,340
1.000 m1 Saluran Gravel U20cm Rp 30,000 Rp 30,000
0.300 m2 Pasangan dinding Bata Rp 140,421 Rp 42,126
0.360 m2 Plesteran dinding Rp 80,100 Rp 28,836
0.360 m2 Acian dinding bata Rp 35,900 Rp 12,924
Jumlah Rp - Rp 163,264 Rp 163,264

2 MEMASANG 1M2 PAVING BLOCK t=6cm


Upah :
0.2500 Oh Pekerja Rp 95,000 Rp 23,750
0.5000 Oh Tukang Rp 115,000 Rp 57,500
0.0250 Oh Kepala tukang Rp 125,000 Rp 3,125
0.0030 Oh Mandor Rp 145,000 Rp 435
Bahan :
1.0000 m2 Paving Block 6 cm Rp 85,000 Rp 85,000
0.1000 m3 Pasir Beton Rp 220,000 Rp 22,000
Rp 107,000 Rp 84,810 Rp 191,810
Overhead + Profit ( Max. 15 % ) Rp 19,181
Jumlah Rp 210,991
DIbulatkan Rp 210,900

3 MEMASANG 1M1 KANSTEIN


0.2500 m3 Galian Tanah Rp 74,875 Rp 18,719
0.2500 m3 Buangan tanah Rp 32,800 Rp 8,200
0.0038 m3 Lantai kerja Rp 739,658 Rp 2,774
1.0000 m1 Kansteen Rp 41,500 Rp 41,500
0.1500 m2 Adukan Speci. 1 : 3 Rp 68,974 Rp 10,346
Rp 81,539 Rp - Rp 81,539
Overhead + Profit ( Max. 15 % ) Rp 8,154
Jumlah Rp 89,692
DIbulatkan Rp 89,600

IX. PEKERJAAN BESI DAN ALUMINIUM SNI 7393-2008


9.1. MEMASANG 1 KG BESI PROFIL
Upah :
0.060 OH Pekerja Rp 95,000 Rp 5,700
0.060 OH Tukang Besi Rp 115,000 Rp 6,900
0.006 OH Kepala Tukang Rp 125,000 Rp 750
0.003 OH Mandor Rp 145,000 Rp 435
Bahan :
1.150 kg Besi Profil Rp 15,000 Rp 17,250
Rp 13,785 Rp 17,250 Rp 31,035
Overhead + Profit ( Max. 15 % ) Rp 3,104
Jumlah Rp 34,139

Page 20
Analisa
No. Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan Jumlah Harga

DIbulatkan Rp 34,100

9.4. MEMBUAT 1 M1 GRILL BESI SIKU L50X50X5+CNP 100


Upah :
1.050 OH Pekerja Rp 95,000 Rp 99,750
1.050 OH Tukang Besi Rp 115,000 Rp 120,750
0.105 OH Kepala Tukang Rp 125,000 Rp 13,125
0.052 OH Mandor Rp 145,000 Rp 7,540
Bahan :
15.000 kg Besi Siku L 30.30.3 Rp 15,000 Rp 225,000
32.800 kg Besi CNP.100 Rp 15,000 Rp 492,000
0.05 kg Kawat Las Rp 35,000 Rp 1,750
Rp 241,165 Rp 718,750 Rp 959,915
Overhead + Fee ( Max. 10 % ) Rp 95,992
Jumlah Rp 1,055,907

9.13. MEMASANG 1 M2 KONTRUKSI BAJARINGAN BENTANG 0 s/d 8M


Upah :
0.100 OH Pekerja Rp 95,000 Rp 9,500
0.200 OH Tukang Besi Rp 115,000 Rp 23,000
0.050 OH Kepala Tukang Rp 125,000 Rp 6,250
0.050 OH Mandor Rp 145,000 Rp 7,250
Bahan :
0.917 btg Rangka Canal C.75.75, @6mtr Rp 85,000 Rp 77,917
0.750 btg Rangka Reng/Gording TR 32.45.@6mtr Rp 45,000 Rp 33,750
15.000 pcs Screw/Dynabolt Rp 5,000 Rp 75,000
Rp 46,000 Rp 186,667 Rp 232,667
Overhead + Fee ( Max. 10 % ) Rp 23,267
Jumlah Rp 255,933

9.14 MEMASANG 1 M1 KONTRUKSI RANGKA BAJARINGAN C.75.75


Upah :
0.050 OH Pekerja Rp 95,000 Rp 4,750
0.025 OH Tukang Besi Rp 115,000 Rp 2,875
0.005 OH Kepala Tukang Rp 125,000 Rp 625
0.010 OH Mandor Rp 145,000 Rp 1,450
Bahan :
0.175 Btg Rangka Canal C.75.75, @6mtr Rp 85,000 Rp 14,875
4.000 pcs Screw/Dynabolt (Baut bajaringan) Rp 5,000 Rp 20,000
Rp 9,700 Rp 34,875 Rp 44,575
Overhead + Profit ( Max. 15 % ) Rp 4,458
Jumlah Rp 49,033
DIbulatkan Rp 49,000

9.15 MEMASANG 1 M1 KONTRUKSI RANG/GORDING BAJARINGAN TR 32.45


Upah :
0.050 OH Pekerja Rp 95,000 Rp 4,750
0.025 OH Tukang Besi Rp 115,000 Rp 2,875
0.005 OH Kepala Tukang Rp 125,000 Rp 625
0.010 OH Mandor Rp 145,000 Rp 1,450

Page 21
Analisa
No. Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan Jumlah Harga

Bahan :
0.175 Btg Rangka Reng/Gording TR 32.45.@6mtr Rp 46,500 Rp 8,138
2.000 pcs Screw/Dynabolt (Baut bajaringan) Rp 5,000 Rp 10,000
Rp 9,700 Rp 18,138 Rp 27,838
Overhead + Profit ( Max. 15 % ) Rp 2,784
Jumlah Rp 30,621
DIbulatkan Rp 30,600

X. PEKERJAAN PERSIAPAN SNI 03-2835-2002


10.9 1 M2 PEMBERSIHAN LAPANGAN DAN PEMERATAAN
Upah :
0.0500 OH Mandor 145,000 7,250
0.1000 OH Pekerja 95,000 9,500
16,750 16,750
Overhead + Profit ( Max. 10 % ) Rp 1,675
Jumlah Rp 18,425
DIbulatkan Rp 18,400

10.5 1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK


Upah :
0.0050 OH Mandor 145,000 725
0.0100 OH Kepala Tukang 125,000 1,250
0.1000 OH Tukang Kayu 115,000 11,500
0.1000 OH Pekerja 95,000 9,500
Bahan :
0.0120 M3 Kayu 5/7 (kayu klas. IV) 3,000,000 36,000
0.0200 Kg Paku Biasa 2"-5" 20,000 400
0.0070 M3 Kayu Papan 3/20 (klas IV) 2,750,000 19,250
22,975 55,650 78,625
Overhead + Profit ( Max. 15 % ) Rp 7,863
Jumlah Rp 86,488
DIbulatkan Rp 86,400

XII. PEKERJAAN PENUTUP (SNI DT-03-3436-2002)


12.28 1 M2 PASANG ATAP GENTENG METAL ZINCALUME t=0.4
Upah :
0.200 OH Pekerja Rp 95,000 Rp 19,000
0.100 OH Tukang Rp 115,000 Rp 11,500
0.010 OH Kepala Tukang Rp 125,000 Rp 1,250
0.001 OH Mandor Rp 145,000 Rp 145
Bahan :
1.020 m2 Metal Zincalume spandek Rp 65,000 Rp 66,300
1.000 ls Assesories Rp 6,630 Rp 6,630
Rp 31,895 Rp 72,930 Rp 104,825
Overhead + Profit ( Max. 15 % ) Rp 10,483
Jumlah Rp 115,308
DIbulatkan Rp 115,300

12.30 1 M' PASANG NOK GENTENG METAL


Upah :
0.150 OH Pekerja Rp 95,000 Rp 14,250
0.050 OH Tukang Rp 115,000 Rp 5,750

Page 22
Analisa
No. Koofisien Satuan Upah/ Bahan Harga Satuan Harga Upah Harga Bahan Jumlah Harga

0.050 OH Kepala Tukang Rp 125,000 Rp 6,250


0.005 OH Mandor Rp 145,000 Rp 725
Bahan :
1.100 lbr Nok metal Rp 95,000 Rp 104,500
0.050 kg paku biasa Rp 6,630 Rp 332
Rp 26,975 Rp 104,832 Rp 131,807
Overhead + Profit ( Max. 15 % ) Rp 13,181
Jumlah Rp 144,987
DIbulatkan Rp 144,900

12.37 1 M2 PASANG ALUMINIUM FOIL/ SISALATION


Upah :
0.150 OH Pekerja Rp 95,000 Rp 14,250
0.050 OH Tukang Kayu Rp 115,000 Rp 5,750
0.005 OH Kepala Tukang Rp 125,000 Rp 625
0.008 OH Mandor Rp 145,000 Rp 1,160
Bahan :
1.050 m2 Sisalation/ aluminium foil Rp 50,000 Rp 52,500
Rp 21,785 Rp 52,500 Rp 74,285
Overhead + Profit ( Max. 15 % ) Rp 7,429
Jumlah Rp 81,714
DIbulatkan Rp 81,700

Page 23
DAFTAR
HARGA SATUAN DASAR BAHAN
HARGA
No. URAIAN SATUAN
SATUAN (Rp)
1 Pasir Urug m3 100,000.00
2 Pasir Pasang m3 210,000.00
3 Pasir Beton m3 220,000.00
4 Kerikil Beton m3 175,000.00
5 Batu Pecah 1/2 ( Split ) m3 235,000.00
6 Sirtu m3 150,000.00
8 Batu Pecah Pondasi m3 170,000.00
9 Batu Bata bh 800.00
10 Paving Blok t=6cm m2 85,000.00
11 Kansteen Paving m1 41,500.00
12 Semen Biasa (50 kg), sek Tiga roda zak 69,000.00
13 Semen Biasa (1 kg), sek Tiga roda Kg 1,380.00
16 Paku Biasa uk. 2-3cm kg 25,000.00
17 Paku Biasa uk. 5-7cm kg 20,000.00
18 Paku Biasa uk. 10-12cm kg 20,000.00
21 Paku Seng Metal kg 22,000.00
26 Screw/Dynabolt (Baut bajaringan) bh 5,000.00
26 Elektroda / Kawat las RB 2,6 mm kg 35,000.00
26 Genteng Metal berpasir t=0,4 m2 80,000.00
27 Zincalume=0,4 m2 70,000.00
27 Nok Genteng Metal berpasir p=0,35m m' 95,000.00
28 Sisalation/ aluminium foil m2 50,000.00
30 Kawat Beton kg 30,000.00
31 Kawat Las kg 35,000.00
32 Besi Beton Polos kg 10,000.00
35 Besi Profil kg 15,000.00
38 Baja Ringan Canal C.75.75, @6mtr btg 85,000.00
39 Baja Ringan Reng/Gording TR 32.45.@6mtr btg 46,500.00
40 Minyak Cat kg 15,000.00
41 Menie Besi kg 25,000.00
43 Amplas m 10,000.00
44 Kuas rata-rata bh 15,000.00
45 Tinner Ltr 25,000.00
46 Minyak cat Ltr 15,000.00
47 Dempul Impra kg 40,000.00
48 Cat besi kg 50,000.00
50 Air m3 3,000.00
51 Lem Putih kg 20,000.00
52 Lem kuning kg 40,000.00
51 Oli Bekas ( Minyak Bekisting ) ltr 3,000.00
53 Bahan bakar solar non subsidi ltr 10,000.00
AHAN

KET.
DAFTAR
HARGA SATUAN UPAH
STANDARD SK.GUB 2014 UNTUK KABUPATEN BANDUNG

HARGA SATUAN
No. JENIS UPAH SATUAN KETERANGAN
Rp.
1 Mandor hari 145,000
2 Kepala Tukang Kayu hari 125,000
3 Kepala Tukang Batu hari 125,000
4 Kepala Tukang Besi hari 125,000
5 Kepala Tukang Pipa hari 125,000
6 Tukang Kayu hari 115,000
7 Tukang Besi hari 115,000
8 Tukang Batu hari 115,000
9 Tukang Pipa hari 115,000
10 Tukang Listrik hari 115,000
11 Pekerja hari 95,000