Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

Chapter 1
Earth Work

1.1 EARTHWORK - GENERAL contractor shall have no claim to the trees or


1.1.1 Site Clearance : Before work is other material removed during site clearance
started, the whole area between the toes of and the same shall be the property of the
banks or tops of cuttings plus 2m on both Railway.
sides shall be properly and effectively 1.1.2 Demarcation and Profiles : The
cleared by the contractor of all small trees (of contractor, before starting work, is to
girth upto 30 cm), roots, bushes, heavy grass demarcate with a deep furrow, at least 20 cm
etc; The Contractor shall also clear the site wide and 15 cm deep, 1m away from the
of all buildings, abandoned structures etc as toes of slopes of banks and the outside limits
directed by the Engineer, for which extra will of cuttings on both sides of the centre line,
be made unless otherwise stated in the the boundaries of the bottom and the top of
agreement The Contractor shall arrange the slopes of the borrow pits. This is to be
removal of rubbish and other excavated considered as part of the setting out of work,
material excluding earth upto a distance of and preliminary to contractor being allowed
50 the periphery of the area under site to start the work; and this dag belling is to be
clearance. High portions of the ground shall maintained and renewed by contractor as
be cut down and hollow depressions filled and when necessary, or when ordered by the
upto the required level with the excavated Engineer. The cost of this is included in the
earth so as to give an even neat and tidy initial rate for earth-work.
look. The work of this nature will be covered 1.1.2.1 The centre line will be initially set
by the initial rate for earth work, unless out by the Railway. The contractor shall, at
stated to the contrary in the agreement. his own expense, provide all building
1.1.1.1 Trees of girth over 30 cm, materials as cement, stone chips, sand,
measured at a height of 1m above ground bricks, steel plates, nails, markers, stakes,
level, shall be considered as large trees. bamboos, strings, pegs and labour
Cutting down of large trees shall be paid necessary for setting out the centre line and
extra at the rate specified when stumps are profiles required for the correct execution of
grubbed up in addition. Large trees shall not work and for marking out borrow pits and
be cut without specific orders from the slopes and will be responsible to ensure that
Engineer. As few trees shall be cut as is they are maintained in proper order. The
absolutely necessary for the execution of costs of providing and maintaining the above
work. The roots of trees and saplings shall including all materials and labour is included
be removed to a depth of 60 cm below in the initial rate for earth-work.
ground level or 30 cm below formation level 1.1.2.2 The contractor before starting
or 15 cm below subgrade level, whichever is any work, shall take charge of all bench
lower. All holes or hollows formed due to marks, centre line, demarcation and other
removal of roots shall be filled up with earth field stones and reference pegs and be
rammed and levelled. Trees, shrubs, poles, responsible for their subsequent
fences, signs, monuments, pipe lines, cable, preservation, and should they disappear or
etc adjacent to the area which are not be destroyed after he has taken them over,
required to be disturbed during site he shall pay the cost of their replacement or
clearance shall be properly protected by the replace them at his own level in consultation
contractor at his own cost and nothing extra with the department.
shall be payable. In case any damage to the
1.1.3 Maintenance : Banks and cuttings
pipe lines, cables, etc is done due to
are to be correctly dressed and finished in
negligence on part of the contractor the
profile with slopes as specified in each case.
necessary damage charges will be
Where gullies or water-cuts commence to
recovered accordingly.
form on the slopes of embankments or
1.1.1.2 Any trees cut down or building cuttings, the erosion is to be checked as
materials released from dismantling of early as practicable and made good with
structures shall be stacked by the contractor suitable material well rammed into place.
within a distance of 100 metres outside the Where a gully or water-cut has not been
periphery of the area under site clearance as checked at its commencement, it may be
per instructions of the Engineer. The advisable to cut it out or step it before filling it

Page 20 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

in, and to further protect the place by turfing, Earth work can be divided under the
pitching or other means as may be ordered following heads :
by the Engineer. Work, before being finally 1.1.5.1 Soft / Loose Soil : Generally any
paid for, is to be checked by the Engineer as soil which yields to the ordinary application of
having been correctly brought up, or carried pick and shovel, or to phawra, rake or other
down, to the proper level and to be otherwise ordinary digging implements; such as
complete in all respects in accordance with vegetable or organic soil, turf, gravel, sand,
the specifications, and with the proper silt, loam, clay, peat, etc.
allowance for settlement as specified in para
1.1.5.2 Hard/Dense Soil : Generally any
1.2.6.
soil which requires the close application of
1.1.3.1 As soon as the work has been picks or jumpers or scarifiers to loosen; such
satisfactorily completed, the Engineer shall as stiff clay, compact moorum, macadam
issue a certificate of completion in respect of surfaces of any description, (water bound,
the work as specified in Clause 48 of the grouted, tarmac etc), kankar soil, shingle and
General Conditions of Contract. Unless boulder studded soil and soft conglomerate
otherwise specified in the Tender conditions, etc.
the contractor shall maintain the banks /
1.1.5.3 Mud (Soil) : A mixture of soil and
cuttings for a period of six months or as per
water in fluid or weak solid state and where
conditions of contract and handing over of
inflow of sub soil water is not involved.
banks / cuttings to Railway in proper
condition and where necessary, for their 1.1.5.4 Soft/Disintegrated Rock (Not
restoration to such condition, at the end of Requiring Blasting) : Rock or boulders
maintenance period. Until then, contractor is which may be quarried or split with crow
responsible for all losses due to subsidence, bars. This will also include laterite and hard
wastage or guttering due to rain, wind, wear, conglomerate.
wash or from any other cause whatsoever 1.1.5.5 Hard Rock (Requiring Blasting) :
and he shall have no claim for any extra Any rock for the excavation of which blasting
work or payment on this account. is required.
1.1.4 Spoil from cutting to bank : Up to 1.1.5.6 Hard Rock (Blasting Prohibited) :
the normal lead of 50 metres, material from Hard rock requiring blasting as described
each end of every cutting shall be led under sub para 1.1.5.5, but where blasting is
forward into the adjoining bank as a matter of prohibited for any reason and excavation has
course, and the rate to be paid for such to be carried out by chiselling, wedging or
material shall be the rate for cutting only. any other agreed method.
Both bank and cutting will not be paid for. 1.1.6 Measurements : Cutting and banks
The Engineer shall specify in each case from are to be excavated and made up neatly to
what point in each cutting to what point in the the lines shown in the cross section as per
adjoining bank, spoil shall be led out, approved construction drawing. No payment
payment being made only for the excess will be made for excess work done outside
lead over and above the initial lead included these lines except when such work is so
in the rate for cutting. The Engineer can ordered in writing by the Engineer. However,
modify these limits at any stage of the work if any bulges are left in the slopes of cuttings
and all such changes shall be binding on the due to practical difficulties and are permitted,
contractor without any claim for any extra deduction as per actual measurements will
payment on this account. Dressing and be made. Similar action will be taken in case
compaction of the bank will, however, be of concave surfaces in the slopes of
paid for in addition. embankments, if permitted.
1.1.5 Classification of Soils : The 1.1.6.1 Should the Engineer so desire, he
classification of soils met with in executing may, at any stage of the work, order the
the work shall be made by the Engineer/ Contractor to increase or reduce the slopes
Engineers‘ representative authorized by the of any cutting or bank or alter the formation
Engineer for this purpose subject to the level, in which case the amount of work
approval and final decision of the Engineer, if actually done will be paid for in accordance
not made by him. The rates to be paid to the with the specifications and the Schedule of
contractor in his bills shall be based on these Rates.
classifications.
1.1.6.2 Unless otherwise specified the
initial rate for Earth work is inclusive of an
initial lead upto 50 metres and lift of 1.5
metres.

Page 21 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.1.6.3 Additional lead for the purpose finished side slope of the cutting, by straight
of payment will be measured from the centre lines to the zero point. Figure No.1.2 is
of gravity of excavation to the centre of illustrative of the manner in which the
gravity of the bank or spoil heap, and shall payment for the cutting will be made
be measured along the shortest practicable (c) For widening of existing cuttings for
route and not necessarily the route actually one or more lines where the existing
taken. cutting slope disappears and a fresh
1.1.6.4 Additional lift for the purpose of slope stands : Before undertaking widening
payment will be estimated by dividing the of the cutting, pre-classification of the
cross section of the bank or cutting into existing cutting slope (which will disappear)
successive stages of 1.5m high or deep should be done after clearing and cleaning
respectively from the natural ground level the surface and the strata met marked on the
and only the quantity contained in each strip cross-section sheets. After completion of the
shall be paid for at the rate pertaining to its work various strata as stand exposed on the
height or depth above or below the natural new finished slope of the cutting shall again
ground level, respectively. Lift from the be marked on the cross-sections. Then the
borrow-pit to the ground level or from ground demarcation points of adjacent strata as
level to the spoil bank shall not be taken into determined by classification of the existing
account in any payment for lift unless the slope and the final slope should be joined as
depth of the borrow- pit or the height of the shown in Figure No. 1.3.
spoil bank has been made in excess of 1.5m The cross-sectional areas for different strata
under instructions from the Engineer, and in may be worked out and quantities payable
such cases, only the portion of the borrow-pit classification-wise assessed accordingly.
below 1.5m depth or of the spoil bank above
(d) For extension to the existing cutting
1.5m height as measured from the natural
where no fresh cutting slope is available
ground level, shall be, measured separately
after work : Before execution of the work
for payment of lift on the same basis as for
pre-classification of the existing cutting slope
cuttings or banks respectively. No extra
which will not be finally available, should be
payment will be made for descent, ascents,
done and recorded in the initial cross-
crossing of nallahs and ridges.
section. Figure No. 1.4 is illustrative of the
1.1.6.5 For purpose of payment, cuttings manner in which the payment for the cutting
shall be assumed to be composed of such is to be made for soil of different
soil / soils only, as stand exposed on both or classifications.
one side of the finished cuttings, depending
1.1.6.6 Classification in the above
upon whether the cutting is box type or one
manner shall be made only at such points
sided on a transversely sloping ground. The
where the cross sections giving the ground
content of each type of soil thus assigned to
profile have been recorded. The
any cross section shall be determined as
classification as recorded in the above
indicated below. It is to be noted that no
manner in case of cuttings shall be signed by
portion of cutting will be payable for any such
the contractor in token of his acceptance.
type of soil as is not exhibited on the finished
The classification as recorded by the
side slope, where the side slope exists.
Authorized representative of the Engineer in
(a) For box type cutting : The centre line of the above cases for cuttings is subject to
the alignment will be marked vertically on the confirmation by the Engineer, whose
cross section and the content of each type of decision shall be final and binding on the
soil will be determined by computing the area contractor. Where there is disagreement
of the strip, formed by joining the points, between the Contractor and the Authorized
which form the extremity of occurrence of the representative of the Engineer on
particular soil on the finished side slope of classification of soil, payment shall be
cutting, by straight horizontal lines effected ―on account‖ as per lower
terminating on the centre line. Figure No.1.1 classification as made by the Authorised
is illustrative of the manner in which payment representative of the Engineer. Payment for
is to be made. extra at the rate for higher classification shall
(b) For one sided cutting on a be made after final decision by the Engineer
transversely sloping ground : Content of on the admissibility of the Contractor‘s claim
each type of soil will be determined by for higher classification.
computing the area of the strip, formed by 1.1.6.7 In computing the quantity of earth
joining the points, which form the extremity of work in cuttings and side drains, no
occurrence of the particular soil on the cognizance will be taken of the additional

Page 22 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

excavation, which may be necessitated be provided are for the guidance of the
during the progress of the work due to the contractor and not for the purpose of
presence of boulders or other material, and measurements).
payment will only be made for the quantity as The profiles of the finished and plotted bank/
per cross sections required to be provided. cutting shall like-wise be taken in the
1.1.6.8 Where cutting spoil is utilised for presence of the contractor or his authorised
making the bank, stones over 15 cm size, agent and super-imposed on the original
which are not to be used in the bank, shall ground profile. These profiles are to be taken
be stacked separately at a site to be at locations as directed by the Engineer,
indicated by the Engineer. To determine the atleast at 25m intervals on straight and at
quantity of cutting spoil led out for making least at every 15m on Curves with radii
the bank, the sectional quantity of the cutting sharper than 600m and at extra locations in
shall be reduced by the volume of stones special cases such as irregular or side long
and boulders stacked outside, which will be ground etc. The gross volume of earth work
arrived at by deducting 50% for voids from shall be calculated from the original and
the stack measurements of these stones and finished profile of the bank/ cutting. For the
boulders. The stacking of these stones and purpose of payment the gross quantity thus
boulders including lead upto 50 metres and calculated shall be reduced by 10% towards
lift upto 1.5 metres is covered by the initial shrinkage allowance for earth work in
rate of Earth work. embankments only, but no such deductions
1.1.6.9 Stones and boulders over 15 cm shall be made for earth work in cuttings.
size shall not be used in making Where the embankment has been
embankments. In embankments where compacted by heavy machinery as stipulated
payment is made on the basis of cross in subsequent Para 1.9 or in accordance
section measurements, the stones and with any other special specifications, on the
boulders over 15 cm size shall be stacked specific instructions of the Engineer in
separately, and their volume, after deducting writing, shrinkage allowance shall be
50% for voids from the stack measurements deducted at the rate of 5% of the gross
of these stones and boulders, shall be quantity of earth work. Irrespective of the
included as extra, for payment for earthwork type of soil, number of monsoons passed
in excavation from borrow pits. over the embankment, shrinkage /
compaction which may be caused due to
1.1.6.10 Payment : It must be clearly
base settlement, wash out, mode of working,
understood that the Contract rates are
i.e. use of trucks, camel carts, donkeys etc,
intended to cover the full cost of finished
and other reasons, whatsoever and the
work. Banks and cuttings are to be carefully
actual shrinkage allowance provided in
dressed to formation with such slopes as
setting out the profiles in different sections.
may be specified in each case. The
payment for the quantity of earth work in As it may, at times, be difficult to measure by
cutting / bank shall normally be made on means of cross sections the quantity of rock
cross sectional measurements. The existing excavated by blasting or chiselling, owing to
ground / bank profile shall be taken and its irregular configuration or intermixture with
plotted by the Authorised representative of other materials, the quantity of rock may be
the Engineer in the presence of contractor or measured after stacking the excavated rock
his authorized agent before commencement spoil. The same procedure also applies to
of the work. The profile of the bank or the any other type of soil, which requires to be
cutting required to be provided including measured separately from the material
allowance of settlement in case of constituting the bulk of the spoil. In all such
embankment, shall also be plotted on the cases, the payable quantity of the stacked
same sheets. The levels and cross sections material is to be arrived at by making
shall be signed by both the Authorised suitable deductions for voids from the
representative of the Engineer and the measured cubical contents of the stacks as
contractor / his authorized agent. (The specified below :
profiles of the bank or cutting as required to

Type Of Soil Stacked Deduction


(a) Rock spoil of different sizes 30 per cent
(b) Sandy materials 7 ½ per cent
(c) Black cotton soil 20 per cent

Page 23 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

(d) Other soils, including coal ashes 15 per cent

To facilitate measurement, all stacks to be 1.1.6.12 Where, for any reason at the
measured shall be made rectangular in plan discretion of the Engineer, borrow-pit
and of uniform height, on level ground or measurements are resorted to, all matams
ground levelled for this purpose. The and roads and excess earth work, such as
stacking of spoil shall be done in a compact bulges in the slopes of the banks / cuttings,
manner to the satisfaction of the Engineer. shall be excluded from the measurements.
The rates provided shall include all charges 1.1.6.13 Nothing extra shall be paid for :
on account of such stacking as well as any
(i) Excavation for insertion of planking
lead or lift, as also the re-stacking of stacks
and strutting.
or portions of stacks which the Engineer
considers, in his sole discretion, as not (ii) Removing slips or falls in excavations
properly stacked. (iii) Bailing out water in excavations from
As far as possible spoils from cuttings fit for rains, ordinary springs not requiring pumping
embankment shall be used to make up the etc.
bank. If however, this is found to be (Note : Pumping out water caused by
uneconomical due to excessive lead or lift, powerful springs, tidal or river seepage,
the earth if available from the borrow pits in broken water mains or drains and the like,
Railway land it may be used if permitted. If shall be paid separately if provided for in the
sufficient quantity of good earth fit for Agreement)
embankment is not available from the source (iv) Unauthorised battering or benching of
of cut spoils and the source of borrow pits, excavations.
Contractor‘s earth shall be utilised. As far as
(v) Forming steps in sides of deep
possible each stretch of bank should be
excavations and their removal after
made of earth from only one source so as to
avoid mix up. If however, this is not possible measurements.
due to exigencies of work, earth from one (vi) Protective measures for protection
source should be utilised first and against risk of accidents to the public due to
compaction done before earth from the next open excavation.
source is allowed to be dumped. Initial cross (vii) Protective measures / precautions
section of bank and cross section after taken to avoid damage to existing Signal /
compaction of earth from each of the Electrical / Telecom / other Miscellaneous
sources should be taken. Based on the cross Cables, Pipes, installations etc.
sectional areas, the gross quantity of earth 1.1.7 Dressing Surface :
work embankment executed by utilising the
earth from different sources shall be 1.1.7.1 This specification is applicable to
determined. The net quantity shall be Surface dressing executed as a separate
assessed after deduction of shrinkage work for purposes other than Earthwork for
allowance at the rate of 10%/5% as the case Embankment or Cutting. In case of
may be, depending upon the type of Earthwork for Embankment or cutting,
compaction done. provisions of Para 1.1.1 will apply and the
surface dressing will be covered by the initial
Final measurements shall be taken only after rate of earthwork unless stated to the
the bank/ cutting has been completed to the contrary in the Agreement. This specification
required profile as directed by the Engineer shall also be applicable only to work
irrespective of the period of completion and involving Soft / Loose soil and Hard / Dense
number of monsoons that may pass during soil.
execution. Shrinkage allowance shall be
applied on these final measurements for 1.1.7.2 The terms ―Dressing Surface‖ shall
banks. be taken to mean the cutting down of high
portion of a specified area of ground and
1.1.6.11 At the end of final using the excavated earth to fill up the
measurements, following certificate shall be hollows and the depressions. The maximum
recorded in the Measurement Book by depth of excavation or filling shall be
Authorised representative of the Engineer. restricted to 15 cms.
―Certified that necessary allowance for 1.1.7.3 The levels to which the ground is
shrinkage as prescribed was made while to be dressed shall be such that the quantity
giving profiles to the contractor for doing filled is nearly equal to the quantity cut and
earth work and the same has been provided the finished surface is even and tidy with
by the Contractor‖.

Page 24 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

such slopes as may be necessary for proper 1.2.4 Side Slopes : The side slopes will
drainage. Before the work is commenced ordinarily be 2:1, but the Engineer or his
the proposed levels shall be set up at regular Authorised representative may, by order in
intervals both for the cuts and for the fills, by writing, vary this slope to suit local
suitable means as directed by the Engineer conditions. The side slopes shall be carried
and these shall be got checked and up simultaneously with the rest of the work
approved by him. and not filled in afterwards. This can only be
1.1.7.4 Unless otherwise provided for in ensured by insisting on the whole width of
the Contract, the rates shall be inclusive of embankment from the toes of the slope
removal of rubbish upto a distance of 50m coming up simultaneously. The slopes of
outside the periphery of the area cleared. banks composed of sand shall, if directed by
the Engineer be covered by a layer of not
less than 30 cm thickness of Moorum or
1.2 EARTH WORK IN EMBANKMENTS other good soil to facilitate turfing and extra
1.2.1 Embankment in Water-logged payment will be made for the same.
ground etc. : When embankments are to be 1.2.5 Profiles : Profiles for banks shall be
carried across water-logged or swampy set out where-ever cross section has been
ground or to be made in soil which requires taken. These profiles shall be set up atleast
special protective measures, it rests with the every 25m on the straight and every 15m on
Contractor in all such cases to bring these curves with radii shorter than 600m. Profiles
facts to the notice of the Engineer concerned shall also be set up at any additional places
who will direct on the methods to be adopted if ordered by the Engineer.
and the rates to be paid, and will arrange for
1.2.6 Allowance for settlement : In width
a special agreement for the same if
of formation 50mm extra should be provided
necessary.
for each 30 cm of the height of the bank as
1.2.2 Selection of Earth : If due to non shown on the section upto a maximum of
availability of adequate quantity of earth from 0.60m. This does not affect the width at the
Railway land, the contract provides for toes of the slopes, which will be set out from
contractor‘s earth the contractor shall get the the height given on the section. In setting up
prior approval of the Engineer for the quality profiles for bank, due allowance for
of earth and where Contract Conditions settlement must be made and added to the
provide for lead based on the distance from height of the profile over and above the
the sources of supply to site, the lead to be height of formation as shown in the approved
paid. The disturbed / undisturbed soil drawing. As a guide the following shrinkage
samples along with the test results as per allowances per metre height are suggested
specifications will be submitted by the for adoption with different classes of soil:-
contractor for approval of the source from The additional earth has to be removed after
where the earth is proposed to be borrowed final dressing and it can be used elsewhere
before the Earth work in embankment is after a stretch of the work is completed,
started or in case of change in location of the dressed to final profile and taken over by the
source. railways.
1.2.3 Formation Width : The formation
widths are to be as shown in the drawings.

Shrinkage allowance for work done manually per metre height :


Bank made of rocky fills 0 to 2 cm
Bank made of moorum and sandy soils 8 to 12 cm
Bank made of fills with considerable clay content 16 to 20 cm

The Engineer will decide the scale of 1.2.6.1 The above shrinkage allowances
allowance for settlement for each section are only for the purpose of setting out of the
and shall be at liberty to vary the same work. For payment, the deduction for
during the progress of the work to suit the shrinkage shall be as specified in para
nature of soil met with, the method adopted 1.1.6.10.
for executing the earth work, the 1.2.7 Borrow Pits : The Engineer
consolidation achieved during the progress concerned will direct from where material is
of the work and any other factors affecting to be obtained and has powers to refuse to
the earth work. allow any unsuitable material to be put into a

Page 25 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

bank. As far as possible, Bank should be kept, when digging fresh borrow-pits in the
made of homogeneous material with no mix old ones, as a precautionary measure for
of rubble or boulders with soil. No correct assessment of the work. Diagonal
excavation for borrow pits shall be made bunds are also to be kept in borrow-pits for
within 2m of the limits of the acquired land. new works where payments are to be made
Borrow pits shall not be dug close to level on borrow-pit measurements. When doing
crossings, bridges or culverts, telegraph earthwork repairs, Authorised representative
poles, electric poles, or close to inhabited of the Engineer should bear this point in
areas, unless they can be properly drained to mind and refuse to measure up any pit in
prevent water stagnating. Borrow pits within which a diagonal bund has not been kept.
station limits shall be avoided as far as For repair works it would save a large
possible. The earth is to be excavated and amount of unnecessary detailed
thrown to such width, depth and height and measurements if all pits were excavated to a
in such places as may be from time to time uniform size as far as practicable.
decided. 1.2.8 Bank executed manually : All
1.2.7.1 During excavation, the contractor banks, if executed manually shall be made in
shall take particular care to avoid damage to successive layers, not more than 30 cm in
drains, water mains, cables or other depth, over the whole width and slightly
underground work. Should any damage be concave in section so as to retain water for
caused, the Engineer shall be notified subsidence. The subsequent top layer shall
immediately and the damage shall be made be started only when the previous layer has
good at the contractor‘s expense. been completed for a length not less than
1.2.7.2 Borrow pits shall be excavated within 30m along the embankment.
the limits of railway land as directed by the 1.2.9 Clods:- All large clods ( larger the 15
Engineer. The pits must be rectangular or cm ) shall be broken up in the borrow pits or
conform to the land boundaries. The sides bank by labour specially deputed for this
of the pits next to the toe of the bank are to work. This shall be strictly ensured.
be sloped down at 2:1, and elsewhere at a 1.2.10 Bunding of Bank Top : In
slope of 1:1 unless otherwise directed by the banks executed manually/mechanically,
Engineer. Any pits wrongly excavated shall before the commencement of monsoon,
be refilled by the contractor at his own cost, continuous longitudinal earth bunds, 25 cm
and in such a manner as the Engineer high and 30 cm wide on the top with side
directs. slopes of 2:1, are to be made on the outer
1.2.7.3 Borrow pits are not to be made of edges of the top of embankments, together
uneven depth but the whole area of each pit with cross bunds of the same dimensions at
is to be neatly excavated to the same level. every 15m, so as to impound rain water to
The outer or the most distant half of the expedite consolidation. This work shall be
borrow-pits is to be excavated first, so that in paid for separately at the rate for soft/loose
the event of the pits being flooded by rain, soil and may be left uncompacted.
there will still be ground available for work. 1.2.11 Benching : In widening an existing
1.2.7.4 A berm 15m wide is to be left bank, steps 30cm in height and
untouched initially at every 85m between approximately 60 cm wide, shall be cut in the
edges of borrow-pits, and is not to be existing bank before any new earth is placed,
encroached upon for any excavation except to form a bond between the new and old
under the instructions of the Engineer. If it is earth work. Similar benching is to be
necessary for drainage purposes to cut provided in side-long ground of which the
through the berm, the channel will be made slope at right angles to the alignment of the
on the side remote from the Bank. banks is 3 Horizontal to 1 vertical or steeper
1.2.7.5 In side long ground, the borrow or if ordered by the Engineer. The benching
pits are to be dug on the upper side of the in side long ground will not be separately
bank, and are to be continuous to serve as measured or paid for, but is deemed to be
catch water drains; and, if so ordered, the covered by the initial rate for earth work.
contractor shall get the earth for the bank 1.2.12 Stream diversions : When it has
exclusively from such pits till the catch water been decided to divert a stream adjoining the
drain is complete to the required length, bank, the excavation for this work is to be
section and level as prescribed by the undertaken and completed before any
Engineer. borrow pit work is done at site and all earth
1.2.7.6 When doing repair work to banks it is from such diversion is to be put into the main
absolutely essential that diagonal bunds be bank, if so ordered. If earth excavated from

Page 26 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

the drain is led into the bank, payment will decided by the Engineer. Where the slope is
only be made for the quantity excavated already consolidated, it should be loosened
including lead and lift if any and not for both for a depth of about 4 cms before the sods
cut and fill. In excavating for diversion of are laid.
stream, care must be exercised by the 1.2.15.2 Turfing shall consist of sods, not
Engineer that such diversion does not start a less than 10 cm thick and 20 cm square well
land slip. beaten into the bank till they get a proper
1.2.13 Backing to bridges : In carrying hold and form a level and compact mat. The
embankments over a bridge or a culvert contractor shall be responsible for watering
intended to be covered by the work, the where necessary to ensure that the turf
earth work shall be brought up evenly on grows properly; and in the event of it not
both sides of the structure so that the doing so, he will returf such parts as have
pressure may be equalised. In filling in the not grown, at his own cost. The turfing shall
approaches of a bridge, or the spandrels be measured and taken over only after the
between small arches, the earth filling shall grass has rooted well and has formed a
be raised simultaneously with the wing walls sufficiently dense growth over the earth
in the former case and with the face walls in slopes. Turing with sarkanda or other
the latter, in order that the filling may be well varieties of locally available grass may also
trodden down under the feet of the labourers; be permitted by the Engineer incharge
and in filling in foundations and backing to depending upon the local conditions.
revetments, the earth work shall similarly be 1.2.15.3 Turfing of side slopes of cuttings
brought up level as the masonry proceeds. if ordered by the Engineer shall be carried
Filling for the backing of bridges or culverts out in a manner similar to Turfing of bank.
will conform to specifications under Para 1.6,
1.2.16 Sarkanda or similar type of
and subsequent sub paras, or as ordered by
planting on bank slopes : Where Sarkanda
the Engineer. Cast iron rammers should be
is planted on bank slopes, the minimum
used to consolidate the earthwork where
distance centre to centre in rows shall be 40
mechanical compaction can not be done due
cm in either direction. The plantation in
to practical constraints.
adjacent rows will be staggered for proper
1.2.14 Dressing : After completion of earth coverage of the area. For other types of
work the slopes shall be neatly dressed to plantation, the local practice shall be
the correct profiles, and shall be made up followed as directed by the Engineer. Where
where required during the maintenance directed to be done, this item will be paid for
period. The top should be neatly dressed off extra.
sloping at an inclination of 1 in 30 either side
from the centre line unless otherwise
specified in the drawings. 1.3 EARTH WORK IN CUTTINGS
1.2.15 Turfing : Turfing of banks shall be 1.3.1 Formation width : The formation
done during the monsoon season, preferably widths, exclusive of side drains, are to be as
after a heavy shower, when it can be shown in the drawings :
ensured that the bank slopes will remain wet The top width of each side drain will
for a long time after planting the grass. ordinarily be 120 cm at formation level and
Turfing shall be paid for separately. Turfing depth 30 cm, unless shown otherwise in the
shall not be commenced without the prior drawing. For longer drains specially
written permission of the Engineer. The designed sections will be adopted depending
stretch of embankment where turfing is to be upon the catchment area, length and slope
done should be completed in all respects of the drain which should be finalized before
and should be so recorded in the level books completion of the cuttings.
and profiles. Contractor should be given 1.3.2 Side Slopes : The side slopes will
permission in writing to this effect before ordinarily be 1:1 unless otherwise ordered
starting the Turfing. by the Engineer.
1.2.15.1 Before turfing is commenced, 1.3.3 Excavation :
the side slopes are to be dressed to the
1.3.3.1 When so ordered, the centre portion
specified section. This dressing is included
of gullet of the cutting shall be first taken out
in the initial rate for earth work, and should a
contractor stop work before dressing the to the full width of formation to enable the
bank, he shall be debited with the estimated Engineer to determine the slopes suitable to
the full length of the particular cutting or to
cost of the dressing to be done by another
different lengths of it. When the gullet is cut
contractor or departmental labour, as
out to its full depth in shallow cuttings, or to

Page 27 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

the depth of the first cut in deep cuttings, the slope for drainage, and will be excavated to
side portions or triangular sections up to the such depth not exceeding 3m as may be
slopes may be excavated. In deep cuttings, ordered, with perpendicular sides leaving
the, second cut will not be started until the pathways for workmen along the sides of the
top portion is thus completed. cut parallel to the central line about every 15
The necessity of excavating cuttings in this m. In shallow cuttings, not exceeding 2m in
manner is evident as, in the event of heavy the deepest part, the gullet may be cut out at
rain occurring with work partly completed, once to formation level.
and the bottom of the excavation uneven and 1.3.4.2 Side drains according to the cross
incapable of drainage, excessive delay might section shown in the drawing shall be
occur or excessive pumping might become provided at the toe of the slope in all cuttings
necessary. The contractor is solely to ensure proper drainage. Excavation to the
responsible for any such contingency and required cross section and longitudinal slope
the railway will not be liable for any to form the side drain will be paid for at the
compensation. same rates for cutting.
1.3.3.2 All cuttings shall be taken down 1.3.5 Catch-water drains : Where
carefully to the precise level and section as required, catch water drains cut to the
delineated in the drawings or as ordered by section and profile prescribed, shall be
the Engineer. In case the bottom of the constructed on the up hill side leaving a
cutting is taken down deeper than is berm of one metre from the boundary of the
necessary by over sight or neglect of the railway land or as decided to suit the local
contractor or due to blasting operations, the conditions and shall be paid for at the same
hollow must be filled up to true depth with rates as for cutting. The cross sectional area
selected material and rammed, at of the catch water drain shall normally not
contractor‘s expense. Cuttings with the exceed 0.75 sqm.
formation in rock will be excavated upto 15 The spoil from the catch water drain will be
cm (Max.) below the true formation and filled deposited to make a uniform slope from the
up to true level with cutting spoil to ensure edge of the cutting towards the drain. The
that no lumps of solid rock project above material derived from the catch water drain
formation level. The bottom sloping from will be used to the extent required to provide
centre towards side drains shall be as given the slope and the surplus earth should be
in Sub Para 1.3.3.3 below. Payment will, deposited in the spoil bank of the cuttings.
however be made for earth work in cutting up Unless ordered to the contrary by the
to the true formation level only. Engineer, the Catch water drain must be
1.3.3.3 In soft soil the excavation of excavated before the cutting is started.
cuttings shall, in the first instances be carried 1.3.6 Berms and spoil banks : No spoil
to about 15 cms short of the full depth, so shall be deposited within a distance of 10 m
much being left for dressing the bottom true from the top edge of the slope of any cutting
to the formation. The side slopes shall be duly taking into account the location of the
dressed true and straight and the bottom catch water drain, if any. While doing so, the
shall then be completed by sloping if from Engineer may bear in mind the side on which
the centre line towards the side drains to a the doubling may eventually be done and
slope of 1 in 30 or any other slope as shown may be suitably increased.
in the drawing.
1.3.6.1 The spoil heap shall be roughly but
1.3.4 Drainage of cuttings : neatly dressed off to a slope of 1 ½: 1, and
1.3.4.1 In excavating cuttings, special shall form a continuous bund along the top of
precautions are to be taken to ensure that the cutting. In country where there is any
the excavations drain themselves cross fall, sufficient spoil shall be thrown on
automatically. To ensure this, the central the up hill side of the cutting to supplement
block of earth or gullet is to be excavated the catch water drain and assist in keeping
first. This will be done in such a manner that drainage out. This work must be done first.
the bottom of the excavation shall, where 1.3.6.2 (a) All material excavated from
possible, slope downwards from the centre cuttings suitable for pitching, ballast,
of the cutting towards the ends. It will be masonry or any other purpose whatever,
made in such cuts or steps as may from time shall be the property of the Railway, and
to time, be directed. Generally, in deep shall be stacked, as also disposed off, as
cuttings the first cut or step will directed by the Engineer, within the limits of
approximately follow the surface of the lead specified for stacking of spoil. This is
ground, where this will secure the necessary included in the rate for cutting.

Page 28 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

(b) Any finds of archaeological interest such Note : In ordinary rock, not requiring
as relics of antiquity, coins, fossils or other blasting, blasting operations shall not be
articles of value shall be delivered to the generally adopted. However, the contractor
Engineer and shall be the property of the may resort to blasting with the permission of
Railways. the Engineer, but nothing extra shall be paid
1.3.7 Springs or Inflow : Should springs for such blasting operations.
or inflow of water appear in cuttings, or The contractor shall obtain licence from the
should they be flooded, the contractor must competent authority for undertaking blasting
arrange for bailing, pumping or drainage of work as well as for containing and storing the
water, without obstruction to adjacent works. explosive as per the Explosive Act, 1884 as
Payment for the same shall not be made amended upto date and the Explosive Rules,
unless otherwise provided for in the 1983. The contractor shall purchase the
Agreement with the Contractor. explosives fuses, detonators etc. only from a
1.3.8 Protections : Excavation, where licenced dealer. Transportation and storage
directed by the Engineer, shall be securely of explosive at site shall conform to the
fenced and provided with proper caution aforesaid Explosive Act and Explosive Rules.
signs, conspicuously displayed during the The contractor shall be responsible for the
day and properly illuminated with red lights safe custody and proper accounting of the
during the night, to avoid accidents. The explosive materials. Fuses and detonators
Contractor shall take adequate protective shall be stored separately and away from the
measures to see that the excavation explosives. The Engineer or his authorised
operations do not damage the adjoining representative shall have the right to check
structures or dislocate the services. Water the contractor‘s store and account of
supply pipes, sluice valve chambers, explosives. The contractor shall provide
sewerage pipes, manholes, drainage pipes & necessary facilities for this.
chambers, communication cables, power The contractor shall be responsible for any
supply cables etc. met within the course of damage arising out of accident to workmen
excavation shall be properly supported and public or property due to storage,
adequately protected, so that these services transportation and use of explosive during
remain functional. No extra payment will be blasting operation.
made for taking such measures unless 1.3.9.2 Blasting operations shall be carried
otherwise specifically provided for in the out under the supervision of a responsible
Contract. authorized agent of the contractor (referred
Excavation shall not be carried out below the subsequently as agent on duty), during
foundation level of adjacent buildings untill specified hours as approved in writing by the
underpinning; shoring etc. is done as per the Engineer. The agent shall be a licensed
directions of the Engineer for which payment blaster. In case of blasting with dynamite or
shall be made separately. The temporary any other high explosive, the position of all
arrangement drawings should be submitted the bore holes to be drilled shall be marked
by the contractor and got approved before in circles with white paint. These shall be
undertaking such excavation. inspected by the Contractor‘s agent. Bore
1.3.9 Blasting : If any blasting operations holes shall be of a size that the cartridge can
are necessary, they shall be carried out in easily pass down. After the drilling operation,
accordance with the Explosives Act and the the agent shall inspect the holes to ensure
Rules as amended upto date. Extracts from that drilling has been done only at the
the Explosives Rules 1983 are kept at marked locations and no extra hole has been
Annexure 1.1 for strict adherence by the drilled. The agent shall then prepare the
Contractor‘s staff as well as Railway necessary charge separately for each bore
employees engaged in blasting operations. hole. The bore holes shall be thoroughly
For general guidance, the instructions cleaned before a cartridge is inserted. Only
contained in Chapter X of Indian Railways cylindrical wooden tamping rods shall be
Works Manual may be referred to. The used for tamping. Metal rods or rods having
following specifications are supplementary to pointed ends shall never be used for
the above. tamping. One cartridge shall be placed in the
bore hole and gently pressed but not
1.3.9.1 Where hard rock is met with and
rammed down. Other cartridges shall then be
blasting operations are considered
added as may be required to makeup the
necessary, the contractor shall obtain the
necessary charge for the bore hole. The top
approval of the Engineer in writing for
most cartridge shall be connected to the
resorting to blasting operation.

Page 29 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

detonator which shall in turn be connected to ignite the fuse, shall withdraw to a safe
the safety fuses of required length. All fuses distance of atleast 150 metres from the
shall be cut to the length required before blasting site. Audio warning by blowing
being inserted into the holes. Joints in fuses whistle shall be given before igniting the
shall be avoided. Where joints are fuse.
unavoidable, a semi-circular nitch shall be Blasting work shall be done under careful
cut in one piece of fuse about 2 cm deep supervision of a licensed blaster and trained
from the end and the end of other piece personnel shall be employed. Blasting shall
inserted into the nitch. The two pieces shall not be done within 100 metres of an existing
then be wrapped together with string. All structure, unless specifically permitted by the
joints exposed to dampness shall be Engineer in writing. In such cases, the
wrapped with rubber tape. Authorised representative of the Engineer
The charges shall be fired successively and must be present to ensure that special
not simultaneously. Immediately before precautions as may be prescribed by the
firing, warning shall be given and the agent Engineer and those stipulated by the
shall see that all persons have retired to a licensing authority are taken and that
place of safety. The safety fuses of the necessary warning is given to the
charged holes shall be ignited in the inhabitants.
presence of the agent, who shall see that all All procedures and safety precautions for the
the fuses are properly ignited. use of explosives drilling and loading of
Careful count shall be kept by the agent and explosives before and after shot firing and
others of each blast as it explodes. In case disposal of explosives shall be taken by the
all the charged bore holes have exploded, contractor as detailed in IS 4081, Safety
the agent shall inspect the site soon after the code for blasting and related drilling
blast but in case of misfire, the agent shall operation.
inspect the site after half an hour and mark 1.3.9.4 Precautions against misfire : The
red crosses (X) over the holes which have safety fuse shall be cut in an oblique
not exploded. During this interval of half an direction with a knife. All saw dust shall be
hour, nobody shall approach the misfired cleared from inside of the detonator. This
holes. No driller shall work near such bore can be done by blowing down the detonator
until either of the following operations have and tapping the open end. No tools shall be
been done by the agent for the misfired inserted into the detonator for this purpose.
boreholes.
If there is water present or if the bore hole is
(a) The contractor‘s agent shall very damp, the junction of the fuse and detonator
carefully (when the tamping is of damp clay) shall be made water tight by means of tough
extract the tamping with a wooden scraper grease or any other suitable material.
and withdraw the fuse, primer and detonator.
The detonator shall be inserted into the
(b) The holes shall be cleaned for 30 cm cartridge so that about one-third of the
of tamping and its direction ascertained by copper tube is left exposed outside the
placing a stick in the hole. Another hole shall explosive. The safety fuse just above the
then be drilled 15cm away and parallel to it. detonator shall be securely tied in position in
This hole shall be charged and fired. The the cartridge. Water proof fuse only shall be
misfired holes shall also explode along with used in the damp bore hole or when water is
the new one. present in the bore hole.
Before leaving the site of work, the agent of If a misfire has been found to be due to
one shift shall inform the agent relieving him defective fuse, detonator or dynamite, the
for the next shift, of any case of misfire and entire consignment from which the fuse,
each such location shall be jointly inspected detonator or dynamite was taken shall be got
and the action to be taken in the matter shall inspected by the Engineer or his authorised
be explained to the relieving agent. representative before resuming the blasting
The Engineer shall also be informed by the or returning the consignment.
agent of all cases of misfires, their causes
and steps taken in that connection.
1.4 EARTH WORK BY DEPARTMENTAL
1.3.9.3 General Precautions : For safety of MATERIAL TRAINS ;
persons, red flags shall be prominently
Normally earthwork is not done by DMT
displayed around the area where blasting
these days.
operations are to be carried out. All the
workers at site, except those who actually

Page 30 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.5 EXCAVATION OF FOUNDATIONS measures as may be necessary or as


FOR BUILDINGS / TRENCHES FOR directed by the Engineer for protection
PIPELINES ETC. against risk of accidents to the public due to
1.5.1 Clearance of Site : The contractor open excavation shall be provided by the
will, at his own expense, clear the site of all Contractor. These may include temporary
obstructions to enable the setting out to be fencing, lighting of site etc.
done, and will also provide all necessary 1.5.5 Trenches for Sewers, Pipe lines or
labour, pegs, string ,building materials drains : The excavation of the trench shall
including cement etc. required for the proper be carried out accurately to the depths,
setting out of the work. If any huts or other gradients, lengths and directions shown in
structures, trees (girth 30 cm and above) etc. the drawing. All trenches which are to be
are to be removed they will be paid for with gradients, must be excavated
separately. commencing from the lowest point and
1.5.2 Setting out : The centre longitudinal advancing towards the highest point, the
or face line and atleast one main cross line excavation of man-holes, chambers, etc. at
shall be marked by means of small masonry the different points being completed before
pillars built clear of the point to which the the excavation of the trench advances
slopes of the excavation will extend. On each beyond those points. Trenches for laying of
pillar there shall be an accurate mark to pipes shall be excavated wide enough to
enable a theodolite being set up over it for allow a space of 22.5cm unless otherwise
setting out purposes. These pillars shall be directed by the Engineer, on either side of
adequately protected from any possibility of the collars, sockets or flanges of the pipes
damage during the course of the work. The when laid, so as to provide walking space for
provision and protection of the pillars shall be workmen. No extra payment shall be made
at the expense of the contractor, for which for making a trench to any special shape as
nothing extra shall be paid. may be specified in the case of drains, pipes
bedded on earth etc.
1.5.3 Size and Form of Excavation: The
excavation for the foundations of bridges, 1.5.6 Sight rails etc. : The Contractor
culverts, columns and buildings and all other shall supply and erect proper sight rails and
structures as well as trenches for sewers, supply boning rods, as necessary for the
drains and pipes, shall be executed to the proper execution of the excavation work.
depths shown on the drawings, or to such Boning shall be done at intervals not
greater or lesser depth as the character of exceeding 1.8m along the length of the
the ground necessitates to ensure a stable trench. In the case of trenches for pipes and
and solid foundation, and as directed by the drains, where the boning rod is devised to
Engineer. Should the trenches be excavated show the invert level, a block of wood of
by the contractor by negligence or mistake to height equal to the difference in level
greater dimensions than are necessary, no between the invert and the bottom of
payment shall be made for this extra foundation should be used in boning the
excavation and the contractor will bear the excavated trench.
cost of the concrete of the mix proportion 1.5.7 Wet Excavation : All excavations in
stipulated for bed concrete and for levelling foundations shall be paid for as ―dry”, except
the concrete required to fill up the excess such as is actually below sub-soil water level
excavation. and requiring continuous bailing or pumping.
1.5.4 Sides and Shoring : Excavations The contractor will be responsible that no
for foundations and trenches shall be work in excavation at the increased rate for
executed with sloping sides, or shall be ―wet‖ excavation is commenced, until the
properly timbered with vertical sides as may work has been inspected by the Engineer or
be necessary and as directed by the the Authorised representative of the
Engineer. Whatever be the method adopted Engineer, and approval obtained stating the
for the excavation, it shall be efficiently point from which the ―wet‖ excavation
carried out to ensure its stability and safety commences.
of adjoining lands, railway line, pipes and 1.5.7.1 In all pumping and other operations,
other structures, as also the safety of the special care shall be taken to prevent
labourers employed on excavation work. No “blowing‖ and to ensure that sand or other
excavation shall be carried out below the material is not withdrawn from the bottom or
foundation level of adjacent structures until sides of the trenches and the adjoining
adequate safety measures, as directed by ground. The contractor shall take adequate
the Engineer, have been taken. Any measures for bailing and / or pumping out

Page 31 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

water from excavations and construct Engineer. Nothing extra shall be paid for the
diversion channels, bunds, sumps, coffer neat spreading of the spoil.
dams etc. as may be required. Pumping 1.5.10.1 No excavated earth is to be
shall be done directly from the foundation heaped within 2 m of the edge of the trench
trenches or from a sump outside the or half the depth of the trench, whichever is
excavation in such a manner as to preclude more.
the possibility of movement of water through
1.5.11 Inspection : Foundation trenches
any fresh concrete or masonry and washing
shall be passed by the Engineer or the
away parts of concrete or mortar. During
Authorised representative of the Engineer
laying of concrete or masonry and for a
before laying the concrete. The bottom of the
period of atleast 24 hours thereafter,
excavation shall be carefully examined for
pumping shall be done from a suitable sump
any soft spots. Should any such places be
separated from concrete or masonry by
found, all the soft earth must be removed
effective means. Capacity and number of
and the hollow space filled with concrete with
pumps, locations at which the pumps are to
the same mix as the foundation concrete or
be installed, pumping hours etc. shall be
as directed by the Engineer. If differences of
decided from time to time in consultation with
level have to be provided for, it shall be done
the Engineer.
by means of vertical steps.
Pumping shall be done in such a way as not
1.5.12 Measurements : The quantity of
to cause damage to the work or adjoining
excavation to be paid for is to be the product
property by subsidence etc. Disposal of
of the area of the foundation trench as
water shall not cause inconvenience or
shown in the plan and the depth to which the
nuisance in the area or cause damage to the
trench has been carried, and is not to include
property and structures nearby.
slopes and slips due to the falling in of the
1.5.7.2 The rate for dry excavation sides or due to undermining, or any other
includes seepage water standing up to a cause whatsoever. Where shoring is
maximum of 15 cm in depth in 3 hours when considered necessary and approved by the
work is not in progress. The rate for wet Engineer, it shall be paid for at the rate as
excavation includes the cost of pumping or provided for in the Contract.
bailing out water with the contractor‘s tools,
However, in case where excavations with
plants, fuel and labour.
sloping sides or with varying widths at
1.5.7.3 Should it be necessary to do different depths has been specifically
―Shoring‖ as approved by the Engineer the permitted by the Engineer, the quantity of
same will be paid for. earth work in excavation will be paid for as
1.5.8 Bottom of foundations : The actually executed.
bottom of all foundations and trenches shall
be accurately excavated to the form of the
1.6 EARTH FILLING IN FOUNDATION
permanent work, and carefully levelled and
TRENCHES AND PLINTH, UNDER
cleaned, and if dry, shall be well watered and
FLOORS AND BEHIND ABUTMENTS ETC.
thoroughly rammed, and all loose or soft
material of every kind shall be entirely 1.6.1 Foundation Trenches : The space
removed before building work is started. between the sides of the foundation trenches
Where the excavation is in rock, the sides of and the masonry is to be filled with sound
the trenches shall be properly sheared and impervious material such as moorum, chips,
cut, and the bottom shall be dressed and spawls, gravel or other sandy material well
stepped for proper bearing as per plans or as rammed in layers not exceeding 15 cm, each
directed by the Engineer, all without any layer being watered, rammed and
extra payment beyond the contract rates. consolidated before the succeeding one is
laid. Earth shall be rammed with iron
1.5.9 Special measures : When a safe
rammers where feasible, and with the butt
and solid foundation cannot be obtained at
ends of crow bars / wooden ballies where
the depth shown in the plans, special
rammers cannot be used. Earth used for
measures (to be determined in all cases by
filling shall be free from salts, organic or
the Engineer) may be necessary, and the
other foreign matter. All clods of earth shall
carrying out of these must be made the
be broken or removed.
matter of a special agreement before hand.
1.6.1.1 Where there is likelihood of rain, the
1.5.10 Disposal of soil : All spoil from
earth filling may closely follow the masonry
excavation of foundations shall be neatly
until ground level is reached, but the
spread to make up the adjacent ground, or
otherwise disposed of as directed by the

Page 32 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

contractor shall only do this after obtaining be ―Backed‖ or filled by hand packed graded
the written permission of the Engineer. coarse material such as boulders and
1.6.1.2 Where concrete foundations are cobbles, quarry rubbish, chips, spawls, hand
brought up in reducing off-sets, it will be packed dry rubble or other hard and
necessary to bring the earth filling up with drainable materials for a thickness of at least
the form walls but in such cases special care 60 cm. or to such thickness as may be
shall be taken that no earth is allowed to fall shown in the drawings, or as directed by the
on the concrete surface, on which further Engineer with the smaller size material
concrete is to be laid. towards the back.
1.6.2 Plinth filling or filling under floors 1.6.3.1 The space at the back of this
: After allowing 7 days / 14 days setting time packing is to be filled with granular material
respectively for Cement / Lime masonry, such as moorum, sand or sandy oil, well
filling in plinth or under floors shall be watered and rammed in layers 15 cm or less
similarly done with earth in layers not thick. Under no circumstances is black
exceeding 15 cm, watered and consolidated cotton soil or any clayey or silty soil to be
by ramming with iron rammers and with butt used for backing. Each layer shall have a
o
ends of crow bars / wooden ballies. Only slope of about 45 towards the ground level,
sandy soil, free from salts, organic or other toe slope to commence from immediately
foreign matter and white ants shall be used behind the abutments. Compactions of the
for such filling. Where there is black cotton layers shall be done by vibratory plate
soil, this shall be removed to a depth of 60 compactors or as directed by the Engineer.
cm as it is liable to absorb moisture and 1.6.4 Dressing of surrounding ground :
expand and thus ruin a floor. The top 30 cm On the completion of a building, the ground
immediately below or as shown in the all round up to a distance of 15m is to be
drawings the floor shall be filled with sand or carefully dressed, and when practicable,
cinder. If earth of good quality fit for this given a gentle slope outwards. This dressing
filling is not available from earth generated will be paid for separately.
by excavation for foundation etc, or from 1.6.5 Use of earth from excavation: If
borrow pits from within the Railway land, the excavated earth from the foundations of
good contractor‘s earth should be used. a bridge is thrown up to form part of the
1.6.2.1 To prevent future sinkage, and guide bund, embankment or backing of a
damage to the floor it is necessary, when bridge, it is to be understood that the only
convenient to do so, that the plinth area be items (over and above the rate for the
flooded with water for minimum 3 days so as excavation) to be paid for are any extra ―Lift‖,
to enable the earth filling to consolidate ―Lead‖ ―Dressing‖ and ―Compaction‖ which
thoroughly. In this case, however, the earth may be thus necessitated.
filling shall be allowed to dry and then 1.6.6 Filling of Trenches for Pipes etc. :
rammed and consolidated, before the pucca The filling back of pipe-line trenches shall not
flooring is laid. be commenced until any testing as required
1.6.2.2 In all fillings sufficient allowance to be done has been carried out and the
shall be made for settlement of all materials pipe-line passed. The filling shall generally
and restoration of the surface to the required be done using the material excavated from
level. the same trench. But any excavated rock
1.6.2.3 The filling shall not be used for filling back shall be mixed with finer
commenced until the recording of levels, material so as to fill up all the voids. In
measurements etc as maybe necessary in refilling, care shall be exercised to avoid
respect of the existing ground or of any work damaging or disturbing the pipe line or other
to be filled over or likely to be hidden by the work being covered up. The manner in which
filling has been completed and permission in filling and consolidation are to be done shall,
writing has been given to the contractor by in other respects, be the same as laid down
the Engineer to start the filling. for foundation trenches. Where the trench
carries a pipe-line or an arch barrel, sand or
1.6.2.4 The finished level of the filling shall
other stable soil approved by the Engineer
be kept to slope intended to be given to the
shall be used upto a height of 15 cm above
floor.
the top of the pipe or barrel. This height shall
1.6.3 Filling behind abutments etc. : be increased to 30 cm in the case of
Unless otherwise specified, the space next trenches cut in rock. In case of sand filling as
to the masonry at the back of all bridge per drawing additional payment as per
abutments, wing walls and return walls is to relevant item will be made.

Page 33 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.6.7 Measurement : The measurement supported by vertical walings, which shall be


shall in all cases be of the space filled and all strutted to similar timber pieces on the
the hidden details required for the same shall opposite fact of the trench. The lowest
be measured up before being filled over and boards supporting the sides shall be taken
deductions made accordingly. No deduction into the ground. No portion of the vertical
shall be made for shrinkage or subsidence, side of the trench shall remain exposed, so
provided the Engineer is satisfied that the that earth is not liable to slip out.
consolidation has been done properly, as 1.7.2.2 The withdrawal of the timber shall be
specified in each case. In the filling for done very carefully to prevent the collapse of
foundations and other trenches, any extra the trench. It shall be started at one end and
work done on account of over cuts, slips, etc. proceed systematically to the other end.
shall not be paid for. Concrete or masonry shall not be damaged
1.6.8 Rates : The rate for each type of in the removal of timber. Where planking
filling shall include the cost of all the and strutting are required to be left
operations as described above for each, permanently in position as directed by the
except that in cases where the excavated Engineer, extra payment will be made under
earth available within the initial lead and lift is the relevant schedule item. In cases where
not adequate for the filling, the procurement there is no such specific directive of the
of the extra earth required will be a matter of Engineer no claim shall be entertained for
special agreement. any timber, which cannot be withdrawn and
is lost, damaged or buried.
1.7 SHORING OR TIMBERING FOR 1.7.3 Open Timbering : In case of open
TRENCHES timbering, the entire side of the trench is not
required to be covered. The vertical boards
1.7.1 General : In case of deep trenches,
of 25 cm width shall be spaced sufficiently
exceeding 2 metres or where the soil is soft
apart to leave unsupported strips of 50 cm
or slushy, the sides of trenches shall be
average width. The detailed arrangement,
prevented from collapsing by stepping,
sizes of the timber and the distances apart
sloping and / or shoring or timbering as may
shall be subject to the approval of the
be decided by the Engineer or the
Engineer. In all other respects, specifications
Authorized representative of the Engineer.
for close timbering shall apply to open
Timbering shall be “Close” or “Open”
timbering. A typical sketch of open timbering
depending on the nature of soil and the
is given in Figures 1.5A & 1.5B.
depth of the trench and the type of timbering
shall be determined by the Authorised 1.7.4 Measurements : The area of
representative of the Engineer or the longitudinal section of the timbered trench
Engineer. It shall be the responsibility of the shall be measured for the purpose of
contractor to take all necessary steps to payment. This shall be the area of one side
prevent the sides of trenches from of the trench timbered on both sides. In case
collapsing. Guidance may be taken from IS of basements, where the opposite sides, are
3764 for designing the shoring and strutting not connected by struts but, each side is
arrangements. supported by slanting struts and toe
supports, the measurements for timbering
1.7.2 Close Timbering : Close timbering
shall be taken for the area of all the walls
shall be done by completely covering the
supported by timbering. The dimensions
sides of the trench generally with short,
shall be measured correct to a cm.
upright members called ‗polling boards‘.
These shall be 25 cm x 4cm section or as
directed by the Engineer. The boards shall 1.8 PUDDLE
generally be placed in position vertically in 1.8.1 Composition : Puddle shall consist
pairs, one board on each side of cutting, and of good adhesive and stiff clay containing
shall be kept apart by horizontal walings of nearly 20% sand by weight. So called
strong wood at 1.0 to 1.2m spacings, cross ‗Sodium Clays‘, containing sodium carbonate
strutted with ballies or as directed by the shall generally be preferred. If adequate
Engineer. The length of the ballies shall quantity of sand is not present in the clay,
depend upon the width of the trench. Typical suitable amount of sand may be mixed with
sketch of close timbering is given in Figures the clay after it has been weathered and
1.5A & 1.5B. pulverised. The clay shall be free from roots,
1.7.2.1 In case the soil is very soft and turf, shale and other injurious materials, and
loose, the boards shall be placed horizontally should be approved by the Engineer.
against the sides of the excavation and

Page 34 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.8.2 Preparation : The clay should be 1.9.2.1 Compaction is the process of


dry and exposed to the sun and pulverised increasing the density of soil by mechanical
with rammers. Additional sand if necessary means by packing the soil particles closer
shall be uniformly mixed with the powdered together with reduction of air voids and to
clay two days previous to that on which the obtain a homogeneous soil mass having
clay is required for use. The clay and sand improved soil properties. Compaction brings
mixture shall be wetted and thoroughly many desirable changes in the soil
worked up into a plastic homogeneous mass properties as follows:
of the toughest consistency, in a pug mill or a) Helps soils to acquire increase in
under men‘s feet. strength in both bearing resistance and
1.8.3 Laying As soon as possible after it shear strength.
has been worked up into puddle it shall be b) Reduces compressibility, thus
deposited in place, spread in even layers 15 minimising uneven settlement during
cm thick, each layer laid out to its full extent, services.
rammed, trodden and if necessary, cross cut
c) Increased density and reduces
and made perfectly water-tight.
permeability, thereby reducing susceptibility
1.8.3.1 The puddle shall be carried in to change in moisture content.
baskets or wheel-borrow as convenient.
d) Reduction in erodibility
Each batch shall be well consolidated with
rammers or trodden under feet until it is e) Results in homogeneous uniform soil
thoroughly integrated with the batch already mass of known properties.
in place. Stones, bricks, roots, grass, etc. f) Reduction in frost susceptibility in cold
shall not be allowed to remain in the puddle. regions.
1.8.3.2 If at any time the puddle surface 1.9.3 Factors affecting Compaction
should become dry/hard or soft, it shall be in the filed :
excavated and removed from the work Compaction of a particular soil is affected by
before another layer is laid. Puddle walls moisture content, compacting effort, type of
must be supported on each side by selected roller etc as explained below:
material.
(a) Compacting Effort : In modern
1.8.4 Protection : All puddle after placing construction projects, heavy compaction
shall be protected from the strong rays of the machinery is deployed to provide
sun by covering with wet gunny bags or compaction energy. Types of machinery
mats. required are decided based on type of soil to
1.8.4.1 Contractor’s liability and be compacted. The method of compaction is
maintenance : The contractor shall make primarily of four types viz kneading
good at his own expense any defect that compaction, static compaction, dynamic or
may occur either in the puddle or in its impact compaction and vibratory
junction with the ground or walls whether compaction. Different type of action is
during the construction stage or during the effective in different type of soils such as for
period of maintenance. cohesive soils, Sheep‘s foot rollers or
pneumatic rollers provide the kneading
action. Silty soil can be effectively
1.9 MECHANICAL COMPACTION OF
compacted by Sheep‘s-foot roller /
EARTHWORK
pneumatic roller or smooth wheel roller. For
Note : Based on RDSO‘s ―Guidelines for compacting sandy and gravelly soil, vibratory
Earthwork in Railway Projects‖ (July 2003 – rollers are most effective. If granular soil has
Guideline No.GE:G-1 to which reference some fines both smooth wheeled and
may be made for further details.) pneumatic rollers can be used.
1.9.1 Orders for compaction : (b) Moisture Control : Proper control of
Depending upon the height of the moisture content in soil is necessary for
embankment the type of the soil, time achieving desired density. Maximum density
available for completing the embankment, with minimum compacting effort can be
the importance of the line and other relevant achieved by compaction of soil near its OMC
factors such as axle load, permitting higher (Optimum Moisture Content). If natural
speeds within a limited time etc, the moisture content of the soil is less than the
Engineer shall decide whether Mechanical OMC, calculated amount of water should be
compaction is to be done for the full or part added with sprinkler attached to water tanker
height of the embankment. and mixed with soil by motor grader for
1.9.2 Advantages of Compaction : uniform moisture content. When soil is too

Page 35 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

wet it is required to be dried by aeration to compacted. Top layer of sand and gravel
reach upto OMC. remains loose in vibratory compaction.
(c) Soil Type : Type of soil has a great Therefore, in final pass the roller should
influence on its compaction characteristics. move smoothly without vibration. Dry
Normally, heavy clays, clays and silts offer densities attained in field trials normally
higher resistance to compaction, whereas, should be around MDD/ specified Relative
sandy soils and coarse grained or gravelly Density as obtained from laboratory tests
soils are amenable for easy compaction. and should form the basis for specification
Coarse-grained soils yield higher densities in and quality control.
comparison to clay. A well-graded soil can ii) Poorly graded sand and gravel with
be compacted to higher density. Cu<2.0, should not be used in earthwork for
(d) Thickness of Layer : Suitable the banks to safeguard against liquefaction
thickness of soil of each layer is necessary to under moving loads or especially due to
achieve uniform compaction. Layer earthquake tremor. Generally, fine sand is
thickness depends upon type of soil involved prone to liquefaction. This aspect should be
and type of roller, its weight and contact specifically examined to prevent possibility of
pressure of its drums. Normally, 200-300mm any liquefaction.
layer thickness is optimum in the field for 1.9.4.2 Compaction of Silty - Clayey Soils
achieving homogeneous compaction. Silty soil is a fine-grained soil. These can be
(e) Number of Passes : Density of soil plastic or non-plastic depending upon the
will increase with the number of passes of clay content in it. Silts and fine sands with
roller but after optimum number of passes, high water content have a tendency to
further increase in density is insignificant for undergo liquefaction under vibrating rolling
additional number of passes. For due to the pore water pressure generated by
determination of optimum number of passes mechanical work. Silty soils can be
for given type or roller and optimum compacted satisfactorily near about OMC
thickness of layer at a predetermined either with smooth rollers or vibratory rollers.
moisture content, a field trial for compaction Vibratory roller will give high degree of
is necessary which will be arranged by the compaction and higher lift. Compaction of
Engineer for which the Contractor shall make silty clays will have to be handled in a
all arrangements and bear the cost of test / manner similar to clays.
tests as required. 1.9.4.3 Compaction of Clays
1.9.4 Compaction procedure for i) Water content plays very important
Different soils role in compaction of clays. Main objective
The embankments are constructed with of compacting predominantly clays is to
locally available soil provided it fulfils the achieve uniform mass of soil with no voids
specified requirements. Procedure of between the lumps of clays. If moisture
compaction to be adopted will depend on the content is too high, roller tends to sink into
type of soil being used in construction. the soil and if too low the chunks would not
General guidelines to deal with compaction yield to rolling by rollers. Appropriate water
of various types of soils for attaining optimum content i.e. OMC of the soil is in the range of
dry density/ relative density at minimum about plastic limit plus two percent. Sheep-
effort, have been briefly given as under. The foot rollers are most effective in breaking the
procedure to be adopted will be decided by clods and filling large spaces.
the Engineer for strict adherence by the ii) Thickness of layer should not be more
Contractor. than depth of feet of roller plus 50mm. Pad
1.9.4.1 Compaction of Cohesion foot vibratory roller with drum module weight
less gravely and Sandy soil of 7 tonne (total static weight of 11 tons) for a
i) Sandy & gravely soils should be lift thickness of 30 cm is found quite effective
compacted with vibratory rollers. If fines are for compaction of clays. For better results,
less in these types of soils, it can be initial rolling with static pad foot roller
compacted with minimum number of passes followed by 15 tons vibratory roller can be
of vibratory rollers without strict control of tried.
moisture to achieve desired Relative Density. iii) In case of such soils, the MDD and
With higher percentage of fines, sandy and OMC as determined in the Laboratory may
gravely soils need to be brought to OMC not be very relevant and therefore
level to get effective compaction. Uniformly achievable MDD and practicable moisture
graded sand and gravel are difficult to be content at which such soils can be

Page 36 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

compacted should be determined by surface without vibration so that top surface


conducting field trials for which the is properly finished.
Contractor shall make all arrangements and f) Extra bank width of 500mm on either
bear the cost of field trials as required. side shall be rolled to ensure proper
1.9.5 Selection of Compacting compaction at the edges. The extra soil
Equipment : would be cut and dressed to avoid any loose
The performance of roller is dependent earth at the slopes. This should preferably
mainly on type of soil used in construction. be done with help of grade cutter. The earth
Guidelines on selection of compacting so cut in final stages will not be paid but can
equipment are given in Annexure 1.2. be used at other places by the contractor.
Vibratory rollers which can be used in static g) At the end of the working day, fill
as well as dynamic mode with plain and pad material should not be left uncompacted.
drum, are now being manufactured by Care should be taken during rolling to
reputed Indian Companies also. Salient provide suitable slope on toe of the bank to
features of some of models are given in facilitate quick shedding of water and avoid
Annexure 1.3. The Contractor should get ponding on formation.
the Engineer‘s approval for the type of h) During construction of formation, there
equipment to be deployed for compaction. may be rainfall to the extent that rain cuts
1.9.6 General aspects of Mechanical may develop on the surface of formation due
Compaction to erosion of soil. Care should be taken that
a) The spreading of material in layers of these rain cuts are not allowed to develop
desired thickness over the entire width of wide and deep otherwise these locations will
embankment should be done by mechanical remain weak spots.
means and finished by a motor grader. The i) Top of the formation should be finished
motor grader blade shall have hydraulic to cross slope of 1 in 30 from one end to
control suitable for initial adjustment and other towards cess / drain in multiple lines
maintain the same so as to achieve the slope and from center of formation to both sides in
and grade. single line.
b) Thickness of layer is decided based on j) Once the top surface of the formation
field compaction trials. However, as a good has been finished to proper slope and level,
practice thickness of layer should be movement of material vehicle for
generally kept as 300mm for fill material and transportation of ballast, sleepers etc. should
250mm for blanket material in loose state be avoided since these movements will
before compaction. cause development of unevenness, ruts on
c) If natural moisture content (NMC) of the surface which will accumulate water and
the soil is less than the OMC, calculated weaken the formation.
amount of water based on the difference k) In conversion / doubling / rehabilitation
between OMC and NMC and quantity of projects, suitable benching of existing slope
earthwork being done at a time, should be shall be done as provided for in the contract
added with sprinkler attached to water tanker before new earthwork is taken up to provide
and mixed with soil by motor grader or by proper bonding between old and new
other means for obtaining uniform moisture earthworks. It should be ensured that there
content. When soil is too wet, it is required is no humus material left on the benched
to be dried by aeration to reduce moisture slope. Care needs to be taken to avoid entry
content near to OMC. Efforts should be of rainwater into the formation from this weak
made to keep moisture content level of the junction; otherwise this would result in
soil in the range of OMC + 2% at the time of development of weak formation, slope
compaction. failure, maintenance problem due to uneven
d) Fill shall be placed and compacted in settlement etc.
layers of specified thickness. The rate of l) At locations where the water table is
progress should be, as far as possible, high and the fill soil is fine-grained, it may be
uniform so that the work is completed to final desirable to provide a granular layer of about
level almost at the same time. 30 cm thickness at the base, above subsoil
e) The rolling for compaction of fill across the full width of formation. This work
material should commence from edges will be carried out if directed by the Engineer
towards center with minimum overlap of for which extra rate will be paid.
200mm between each run of the roller. In 1.9.7 Quality Control of Compacted
final pass, roller should simply move over the Earth / Blanket layer

Page 37 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.9.7.1 Compacted Earth : Degree of sampling does not fall vertically on the earlier
compaction of each layer of compacted soil sampling points of the layer immediately
should be ascertained by measurement of below. Additional sampling points can be
dry density / Relative Density of soil at taken, as considered necessary.
locations selected in specified pattern. The ii) In case of bank widening, sampling
method of sampling, frequency of tests, should be done at an interval of minimum 25
method of tests to be conducted and metres on widened side(s) of embankment.
acceptance criteria to be adopted are as
b) Frequency of Tests :
under.
Density check would be done for every
a) Method of Sampling :
layer of compacted fill / blanket material as
i) Various methods of selection of per following minimum frequency:
sample points for check of in-situ dry density
i) At least one density check for every
are in vogue. The sampling adopted has to
200 sqm. for blanket layers and top one
be such that effectiveness of proper
metre of sub-grade.
compaction having been done for the entire
area under consideration can be judged. For ii) Atleast one density check for every
this, the Engineer will lay down in detail the 100 sqm. for other than blanket and one
method to be adopted in detail depending on metre of sub-grade.
site conditions and accordingly records of In case of bridge approaches or
checks done are to be properly maintained. special locations closer frequency may be
However, in absence of such procedure laid adopted.
down, following method should be adopted. c) Method of In-situ Dry Density
Suggested Method of Sampling : For each Measurements
layer, a minimum of one sample at a Any of the following methods could be
predetermined interval (in compliance with adopted as per the requirements at site.
the requirement stated in next para) along RDSO‘s guidance may be taken for adoption
the centre line of the alignment, would be of other methods such as by use of Nuclear
taken in a staggered pattern so as to attain a Moisture Density gauge and Compact Meter
minimum frequency of tests as given in sub fitted on rollers.
para ―b‖ below. For subsequent layer, the
stagger should be such that the point of

Method Of Procedure Of Test Parameters To Be Remarks


Measurement Measured
i) Sand As per IS-2720 (Part a) In-situ Dry May be adopted for all type of soils
Replace-ment 28) 1974 Density
Method b) Moisture
content
ii) Core As per IS-2720 (Part a) In-situ Dry In some of the coarse grained soils
Cutter Method 29) 1975 Density (with little fines) taking core cutter
b) Moisture samples is difficult. In such cases,
content sand replacement method may be
used for density measurement.

d) Acceptance Criteria : obtained by Heavy Compaction Test (IS


i) Coarse grained soils which contains 2720 (part 8) – 1983) in the laboratory.
fines passing 75 micron IS Sieve, upto 5 In case, there are difficulties in achieving
percent should have the Density Index 98% of the MDD values as obtained by
(Relative Density) a minimum of 70% as Laboratory test, in the field trials, the same
obtained in accordance with IS:2720 (Part- may be relaxed upto 95% of MDD with the
14)-1983. specific approval of the Engineer, recording
ii) For other soils, field dry density should reasons of such relaxation.
not be less than maximum attainable dry iii) During widening of bank in case of
density obtained in field compaction trial. gauge conversion and rehabilitation of
However, in field compaction trial, the unstable formation, compaction of earthwork
maximum attainable dry density should not should be minimum 95% of MDD as
be less than 98% of MDD values as obtained by Laboratory test as per Heavy

Page 38 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

Compaction Test (IS:2720 (part 8) – 1983) approval by the Engineer samples of the
or 70% Relative Density for cohesion less Blanketing material in three wide mouth
soil (IS:2720 (Part 14) –1983). sealed glass jars of a quantity of 0.035 Cum.
1.9.7.2 Formation Level : Finished top of each. The material to be used by the
sub-grade level may have variation from contractor for blanketing should strictly
design level by + 25 mm and finished top of adhere to the quality of material as approved
blanket layer may also be permitted to have by the Engineer.
variation from design level by plus 25mm. 1.10.3 Specifications of Blanket Material
The ballast should be placed only on level Blanket material produced in a plant should
formation without ruts or low pockets. generally conform to following specifications
1.9.7.3 Cross Slope : Cross slope should :
be within 1 in 28 to 1 in 30. a) It should be coarse, granular and well
1.9.7.4 Side Slopes : Side slope should in graded.
no case be steeper than designed side b) Skip graded material is not permitted.
slope. Provision of berm width should not
c) Non -plastic fines (particles of size
be less than the designed width.
less than 75 micron) are limited maximum to
1.9.7.5 Formation Width : Formation width 12%, whereas plastic fines are limited
should not be less than the specified width. maximum to 5%.
d) The blanket material should have
1.10 BLANKETING particle size distribution curve within one of
Note : Based on RDSO‘s Specification no. the bands of enveloping curves shown in
GE.IRS.2 (Final) dated July 2005 on Figure 1.6 or the percent passing of the
―Mechanically produced Blanketing Material material through each IS sieves should lie
for Railway formation including Guidelines between the upper and lower limit of blanket
for Laying‖ to which reference may be made material as given in the Table 1.1
for further details. e) The material should be well graded
1.10.1 Scope : Where the drawings with Cu & Cc as under :
provide for a Blanket of coarse and granular
material of thickness as shown therein over Uniformity coefficient, Cu = D 60/D10 >
the full width of formation, the contractor 7
shall arrange for the supply of the materials
Coefficient of curvature,
at site, spreading over the formation 2
earthwork and for consolidation as detailed D30
below. The thickness of blanketing layer
CC  between 1 and 3
D60 xD10
shall be fixed in light of the Guidelines dated
July 2005 of RDSO referred to in the Note f) Particle size distribution must follow
above. one of the gradation ranges tabulated below
1.10.2 Sample for Material : The :
successful contractor should submit for

Table 1.1 : Particle size distribution ranges for different grades of blanket material
Headings Headings Headings Headings
1. 40 mm 100 95-100 95-100
2. 20 mm 100 93-100 80-100
3. 10 mm 95-100 85-95 65-85
4. 4.75 mm 92-99 70-92 43-70
5. 2 mm 65-90 46-65 22-46
6. 600 micron 33-50 22-33 08-22
7. 425 micron 28-40 18-28 05-18
8. 212 micron 16-27 10-16 00-10
9. 75 micron 00-12 00-10 00-08

Page 39 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.10.4 Selection of Blanket Material 1.10.6.2 It is desirable to have a check


Depending on the source of material, the on quality of material at
blanket material can be categorized in the source/manufacturing point so that major
following categories: deviation in quality of the material being sent
to site does not exist. It would be in the
 Natural material interest of the supplier to have such tests
 Machine manufactured material conducted on his own to avoid any
 Crushed material complication at a later stage.
 Blended material 1.10.6.3 The frequency of such test
1.10.4.1 Proper survey of area close to could be laid down by the engineer in-
projects needs to be carried out to identify charge, if need be. In the absence of any
suitable sources of blanket material required other instructions, at least one test may be
for the project. Aim of such source performed per day to check the particle size
identification survey is to use naturally gradation at the point of loading into the
available material, or select alternatives of trucks. However, the final acceptance of the
machine manufactured blanket material blanket material should be at the site where
through crushing, blending or a combination, it is laid, as per para 1.10.6.6.
which is cheap and conforms to the 1.10.6.4 The supplier/ Engineer may also
specifications laid down. lay down proforma for 'Incoming Material
1.10.4.2 The parent material of the Register ' to be maintained at manufacturing
blanket material so chosen should be point for having a control on utilization of
chemically inactive and sturdy in normal different grades of material, especially
working environment. Brickbats, factory where blending is done using crushed as
slag, weak dissolvable stones like lime, well as local material.
shale, laterite etc. need not be selected as 1.10.6.5 Test for Quality : Blanket
blanket material. material should be tested as per IS: 2720
1.10.4.3 The choice of gradation as (Part 4) of a minimum of one test per 500
provided in 1.10.3 (f), above, may be cum. or part thereof to plot particle size
exercised judiciously, based on the distribution curve, so as to assess its
availability of material. It may be advisable suitability. It would be necessary to carry out
to choose the grade A for finest subgrade wet analysis to assess actual percentage of
soils (requiring 1.0m thick layer of blanket), fines. To expedite testing work, dry sieve
and grade B or C for coarser subgrades analysis may be carried out if variation
(requiring less thickness of blanket). between results of dry and wet analysis is
not significant and adequate margin exists
1.10.5 Mechanical Production : with respect to acceptance criteria.
The Blanket can be produced by adopting However, in such cases also, wet analysis
either crushing methodology or Blending has to be carried out at frequent interval to
Methodology as described in Paras 6.1 and verify the extent of variation. In any
6.2 respectively of RDSO‘s Specification situation, acceptance of blanket material
No.GE.IRS.2 (Final) dated July 2005 and to would be based on wet analysis only. The
which reference can be made for any sample for wet analysis should be prepared
details. Crushing Methodology is resorted to as per para 4.3 of IS: 2720 (Part 4).
in the event of non availability of natural 1.10.6.6 Acceptance Criteria :
source of blanket materials and involves
crushing the rock / boulder to produce The material should generally conform to
crushed blanket material. Blending specification as given at para 1.10.3.
methodology involves proper blending of two 1.10.7 Transportation:
or more soils or in combination with soils The blanket material should be transported
crushed material like stone chips or quarry wet after mixing water in order to achieve
dust. OMC, in tippers for direct unloading on
1.10.6 Quality Control on Blanket formation.
Material at Production site 1.10.8 Laying, Spreading and
1.10.6.1 The source of blanket material, Compacting
detailed in para 1.10.4, needs to be 1.10.8.1 The blanket material must be
identified based on tests & studies spread with a tractor mounted grader or a
conducted and conformity of the material to paver-finisher in layers of uniform thickness,
the Specification as laid down in para before allowing compaction.
1.10.3.

Page 40 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.10.8.2 Compaction to specified levels selected in specified pattern. The method of


of RD or percentage of MDD (para sampling, frequency of tests, method of
1.10.10.3) will be carried out through a tests to be conducted and acceptance
number of passes of vibratory rollers of 100- criteria to be adopted are as under.
120 kN static weight or equivalent capacity. 1.10.9.2 Method of Sampling :
A combination of vibrating rolling initially and
(a) The sampling adopted has to be such
static finishing rolling may be established
that effectiveness of proper compaction
through trials. Speed of roller shall not
having been done for the entire area under
exceed 5 km/hr.
consideration can be judged. For this, the
1.10.8.3 Proper control of moisture is Engineer in-charge should lay down the
required to optimize the compaction effort. method adopted in detail depending on site
Optimum moisture content may be conditions and accordingly records of
established through Modified Proctor checks done are properly maintained.
Apparatus (IS: 2720, part 8) and moisture However, in absence of such procedure laid
may be added by sprinkling at the plant or at down, following method should be adopted:
site as per the requirement.
(b) Suggested method of sampling :
1.10.8.4 Rolling is to be carried out in For each layer, a minimum of one sample at
layers of not more than 300 mm each, a predetermined interval (in compliance with
following the same camber profile as the requirement stated in next para) along
provided in the subgrade layer and to be the centre line of the alignment would be
maintained upto the top layer. taken. The checking points may be
1.10.8.5 No provision for uncompacted staggered to the extent possible.
portion may be made on the edges of (c) Frequency of Tests : Density check
embankment. The sides may be hand would be done for every layer of blanket
rammed with a suitable rammer. material as per following min. frequency :
Note : The engineer should generally expect At least one density check for every 200
to get MDD above 2.1 gm/cc, and OMC in sqm of blanket layer. (say, every 18 to 30 m
the range of 5-9%, as matter of guidance. for single line, or doubling work and every
1.10.9 Quality Control Checks on 12 to 16 m for a double line construction.)
Finished blanket work : 1.10.9.3 Method of in-situ dry density
1.10.9.1 Degree of compaction of each measurements :
layer of compacted blanket should be Any of the following methods could be
ascertained by measurement of dry adopted as per the requirements at site –
density/Relative Density of soil at locations

Procedure Parameters to be
Method of measurement Remarks
of test measured
i) Sand Replacement As per IS- a) In-situ Dry Density May be adopted for all type of
Method 2720 (Part b) Moisture content material
28) 1974

ii) Core Cutter Method As per IS- c) In-situ Dry Density In some of the coarse-grained
2720 (Part d) Moisture content soils (with little fines) taking core
29) 1975 cutter samples is difficult. In
such cases, sand replacement
method may be used for density
measurement.
iii) Nuclear Moisture As issued a) Bulk density May be used in consultation with
Density Gauge by RDSO b) Moisture content RDSO
c) Dry density
d) Degree of
compaction

iv) Compaction meters fitted As issued As issued by RDSO May be used in consultation with
on roller (On roller by RDSO RDSO
continuous compaction
control)

Page 41 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.10.10 Acceptance Criteria : for in the tender documents duly approved


1.10.10.1 1.10.1 to 1.10.4 above. by competent authority.
1.10.10.2 The blanket material, which 1.10.11.3 Method of measurement in case
contains fines passing 75 micron IS Sieve, of stack measurement may be the same as
upto 5 percent should have the Density in case of ballast incorporated in
Index (Relative Density) a minimum of 70% "Specification for track ballast-1999".
as obtained in accordance with IS: 2720 ( 1.10.11.4 It is advisable to tally the
Part 14) – 1983. quantity and quality measured at site with
1.10.10.3 For other materials, field dry the 'Incoming Materials Register' maintained
density should not be less than maximum at plant (para 1.10.6.4) as a means of
attainable dry density obtained in field double check.
compaction trial. However, in field
compaction trial, the maximum attainable 1.11 SPECIFICATIONS OF BIAXIAL
dry density should not be less than 98% of GEOGRIDS FOR TRACKBED
MDD values as obtained by Heavy STABILIZATION
Compaction Test (IS: 2720 (part 8) – 1983)
Biaxial Geogrids of Punched & oriented type
in the laboratory. In case, there are
with large aperture with below mentioned
difficulties in achieving 98% of the MDD
specifications are to be used for trackbed
values as obtained by Laboratory test, in the
stabilization application.
field trials, the same may be relaxed upto
95% of MDD with the specific approval of Biaxial Geogrids shall be manufactured from
Chief Engineer, recording reasons of such carefully selected polypropylene (PP).
relaxation. Grade of PP used shall in manufacturing of
Geogrids shall combine optimum values of
1.10.10.4 During widening of bank in case
strength, stiffness, toughness and durability.
of gauge conversion and rehabilitation of
Biaxial Geogrids shall be made by extruding
unstable formation, compaction of blanket
a sheet of PP to very precise tolerances,
layer should be minimum 95% of MDD as
punching an accurate pattern of holes, then
obtained by Laboratory test as per Heavy
stretching the sheet under controlled
Compaction Test (IS: 2720 (part 8) – 1983)
temperature, firstly in longitudinal direction,
or 70% Relative Density for cohesionless
then in transverse direction. Process shall
soil (IS: 2720 ( Part 14) – 1983).
create a geogrid with square or almost
1.10.11 Measurement : square apertures by stretching in two
1.10.11.1 Measurement of blanket orthogonal directions.
material should be done on the basis of The polymers long chain molecules shall be
finished cross section after the material and orientated in the direction of stretching
workmanship have been accepted as per resulting in a dramatic increase in both
the above criteria. No deduction is to be strength and stiffness. This orientation shall
made towards voids. pass through both the narrower ribs and the
1.10.11.2 In very rare cases, where it is thicker nodes. The resulting product shall be
not possible to take blanket material on monolithic grid with square edged ribs and
finished subgrade, measurement may be integral junctions which possesses both
done on the basis of stack measurement geometrical and molecular symmetry; critical
with the permission of Chief Engineer in- for consistency in manufacture and efficient
charge. It may be necessary to frame load transfer in service.
different schedule items for different The geogrid shall be supplied in standard
methods of measurement. There should be width of 3.8m and roll length of minimum
no occasion to change the method of 40m.
measurement unless specifically provided

SL Property Test Method Values Testing Facilities At


General Properties :
1. Polymer Polypropylene / HDPE or similar polymer IIT-Chennai, IIT-Delhi, IIT-
Bombay, BTRA-Mumbai,
BICS-Hyderabad, BTTG-
BS 2782 Part-4 Method Ahmedabad, SASMIRA-
2. Carbon Black 2% (min.)
452B:1993 Mumbai, CBRI-Roorkee,
CIPET-Chennai
2
3. Mass Per Unit Area IS:14716 / ASTM 320 g/m (min.) IIT-Chennai, IIT-Delhi, IIT-

Page 42 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

D : 3776 Bombay, BTRA-Mumbai,


Square opening of suitable size with BICS-Hyderabad, BTTG-
tolerance of ±10% : Size of 60mm to 70mm Ahmedabad, SASMIRA-
at the interface of ballast & blanket, i.e. for Mumbai, CBRI-Roorkee
4. Aperture Size
ballast reinforcement application, such that
effective interlocking takes place with
existing ballast particles.
Rib Profile &
5. Rectangular with 1.5mm rib depth (min.)
Thickness
3.8m to 4.0m, as per site requirement and
6. Roll Width Not Applicable
width attachment to BCM
40m to 50m (However, it has to be ensured
that final roll dia does not exceed 350mm or
7. Roll Length else geo-grids may get struck underneath Not Applicable
the sleepers during installation on existing
tracks)
Mechanical Properties :
Ultimate Tensile
8. 30 kN/m (min.)
Strength (CD & MD) IS:13162 Part-5 & IIT-Chennai, IIT-Delhi, IIT-
Strain at Ultimate IS:13325 Bombay, BTRA-Mumbai,
9. Tensile Strength (CD And 8% To 12% BICS-Hyderabad, BTTG-
& MD) ASTM D 6637/ BS EN Ahmedabad, SASMIRA-
Load at 5% Strain ISO 10319:1996 21.0 kN/m Mumbai, CBRI-Roorkee
10.
(CD & MD) (min.)
IIT-Chennai, IIT-Delhi, IIT-
Junction Efficiency GRI-GG2-87 and Bombay, BTRA-Mumbai,
11. 95 %
(CD & MD) GRI-GG1-87 BICS-Hyderabad, BTTG-
Ahmedabad, CBRI-Roorkee
IIT-Chennai, IIT-Delhi, IIT-
Radial Stiffness at Bombay, BTRA-Mumbai,
350 kN/m
12. low strain, (@ 0.5% ISO 10319:1996 BICS-Hyderabad, BTTG-
(min.)
strain) Ahmedabad, SASMIRA-
Mumbai, CBRI-Roorkee
U.S. Army Corps of
Engineers Methodology 3.5 Kg-cm/deg BICS-Hyderabad, BTTG-
13. Aperture Stability
for measurement of (min.) Ahmedabad, Tensar – UK
Torsional Rigidity
IIT-Chennai, IIT-Delhi, IIT-
Resistance to BS 8006:1995 & Bombay, BICS-Hyderabad,
14. > 90 %
Installation Damage ISO 10319:1996 BTTG-Ahmedabad, CBRI-
Roorkee
Resistance to IIT-Chennai, IIT-Delhi, IIT-
15. Chemical EPA 9090 100 % Bombay, BTRA-Mumbai,
Degradation BICS-Hyderabad, BTTG-
Ahmedabad, SASMIRA-
Resistance to UV Mumbai, CBRI-Roorkee,
16. ASTM D4355 100 %
Light Weathering CIPET-Chennai

1.11.1 Installation Methodology The formation shall be prepared as per


Indian Railway standards. It shall be free

Page 43 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

from stumps, stones or other large 1.12 WOVEN GEOTEXTILE AS


protrusions which could cause damage to SEPERATOR TO SUBGRADE AND
the grids. BLANKET LAYER
Biaxial Geogrids shall be placed over the The geotextile shall be made from
formation just below the ballast. polypropylene multifilament yarns, woven
Adjacent rolls are secured along both the together into a stable fabric structure with a
longitudinal and transverse edges by superior combination of mechanical and
forming 300mm overlaps. Ballast must be hydraulic properties. Finished product shall
placed over Geogrid so that it is able to fully have excellent resistance to biological and
interlock with the grid to ensure continuity of chemical environments normally found in
strength between adjacent rolls. soils and shall be stable against short-term
exposure to ultraviolet radiation.
The woven geotextile shall conform to
property values listed below :

Specifications of Multifilament Woven Geotextile

SL Property Test Method Value (MARV)

I Polymer Composition, Structure and Physical Properties


1 Polymer Polypropylene
Woven with multifilament yarn in both
2 Structure
warp and weft directions
2
3 Mass per unit area ASTM D 5261 240 g/m
II Mechanical Properties
Warp 55 kN/m
1 Tensile strength
Weft 40 kN/m
IS 1969
Elongation at specified Tensile Warp 25 %
2
Strength Weft 25 %
Warp 1100 N
3 Trapezoid tearing strength ASTM D 4533
Weft 750 N
4 Puncture strength ASTM D 4833 600 N
III Hydraulic Properties
1 Apparent opening size ASTM D 4751 150 microns
Water flow rate normal to the 2
2 ASTM D 4491 32 l/m /s
plane
Standard roll length : 100m, Standard roll width :
Roll Dimensions
5m

1. Values listed are minimum average tensile strength measured over a gauge
roll values except for II-2 and III-1, which are length of 100mm marked at the center of
maximum average roll values. specimen.
2. The elongations reported are the 3. Roll length and Roll width may vary as
actual fabric elongations at the specified per requirement.

Page 44 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

1.12.1 Installation of Woven Geotextile The guidelines for application of jute


as Separator geotextile for Rain water erosion control in
The woven geotextile shall be laid directly Road & Railway embankment and hill slopes
on the site, having removed major have also been issued by Bureau of Indian
protrusions such as rocks and bush stumps Standard (BIS) vide (IS-14986-2001) and
and also having filled local hollows and woven geotextile Specifications (IS-14715:
depressions with the approved fill. 2000 under revision), these may be referred
to for further guidance and application.
The geotextile rolls of specified width shall
be laid in the longitudinal direction (parallel Tests
to the track) on the prepared subgrade. A The sample of jute geotextile may be got
300mm overlap shall be provided between tested at Institute of Jute Technology (IJT)
any joint of two geotextile rolls (transversely Kolkata or Indian Jute Industries Research
or longitudinally). Association (IJIRA) or any authorized jute
After laying the geotextile, first layer of testing laboratory.
PREVENTION OF RAILWAY TRACK SUBSI
PREVENTION
blanket layer as per drawing is to be OF RAILWAY TRACK SUBSIDENCE
constructed and compacted.
Jute Geo-Textiles
Jute Geo-Textiles

1.13 Jute Geotextile


Jute Geotextile improves performance of
soil. It imparts strength to soil by not
allowing soil particles to migrate on one
hand and by easing out water through its
pores on the other. Jute Geotextile is
capable of performing functions of
separating drainage and initial
reinforcement.
The application of Jute Geotextile in slopes
of Railway embankment is to be done in
accordance with Process of laying for
RDSO‘s guidelines JGT Process of laying JGT
under Railway Track
application of jute geotextile in Railway under Railway Track
embankments and hill slopes vide RDSO‘s
report no. RDSO/2007/GE:G-0008 or its
subsequent versions including earth work
and fixing arrangement.

Page 45 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

ANNEXURE 1.1
EXTRACTS FROM THE EXPLOSIVES RULES, 1983

4. Safety distance categories of acting under a licence granted under these


explosives rules shall, whenever explosives are loaded,
(1) Explosives are divided into tour unloaded or handled, depute a competent
categories according to the risks which they person experienced in the handling of
present when initiated, namely- explosives to be present at and to conduct
the operations in accordance with these
(i) Category X — those explosives which
rules.
have a fire or a slight explosion risk or both
but the effect of which will be local. 12. Precautions to be observed in
handling explosives —
(ii) Category Y — Those explosives which
have a mass fire risk or a moderate (1) The floor of any place or any carriage
explosion risk, but not the risk of mass or vessel in which any explosive is or is to
explosion. be laid and the ground gangway, decks and
other places over which the explosive is to
(iii) Category Z — Those explosives which
be conveyed during loading or unloading
have a mass explosion risk and major
shall be —
missile effect.
(i) Carefully examined to ensure that
(iv) Category ZZ. — Those explosives
there is nothing thereon in contravention of
which have a mass explosion risk and minor
these rules or likely to endanger the safety
missile effect.
of the consignment;
(2) If any question arises as to whether
(ii) Thoroughly cleaned and swept before
any explosive belongs to Category X,
and after use,
Category Y, Category Z or Category 22, the
matter shall be referred to the Chief (2) The packages containing the
Controller whose decision shall be final. explosives shall not be thrown or dropped
down or rolled or pulled along the ground or
floor but shall be passed from hand to hand
General Provisions and carefully deposited and stored.
7. Restriction on delivery and (3) Where a package is to be slung, due
dispatch of explosives — precaution shall be taken to slung it in such
(1) No person shall deliver or dispatch any a manner as effectively to prevent the
explosive to any one other than a person possibility of a fall.
who — (4) After the handling of explosives has
(a) is the holder of a licence, to possess commenced, the operations shall proceed
the explosives or the agent of a holder of with due diligence and without unnecessary
such a licence duly authorised by him in stoppage.
writing in this behalf; or 13. Restriction on handling of
(b) is entitled under these rules to explosives after sunset — No person shall
possess the explosives without a licence. handle or cause to be handled any explosive
(2) The explosives so delivered or between the hours of sunset and sunrise:
dispatched shall in no case exceed the Provided that nothing in this rule shall apply
quantity which the person to whom they are to handling of explosives during the dark
delivered or dispatched is authorised to hours if proper illumination is provided in the
possess with or without a licence under area and the place is guarded,
these rules. 14. Prohibition of smoking, fires,
(3) (i) No person shall receive explosives lights and dangerous substances — No
from any person other than the holder of a person shall smoke, and no fires, lights or
licence granted under these rules. articles or substances of a flammable nature
(ii) No person shall receive from or or liable to spontaneous ignition, or to cause
transfer explosives to any person for a or communicate fire or explosion such as
temporary storage or safe custody in a acids, petroleum, carbide of calcium,
licensed premises, unless prior approval is compressed gases or such other hazardous
obtained from the Chief Controller. substances, shall be allowed-
11. Competent person to be Incharge (a) at any time within 15 metres from a
of operations — Every person holding or place where an explosive is stored; or

Page 46 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

(b) at any place where an explosive is (5) All doors, hatches and coverings of
handled, during transport, one hour before every compartments or hold containing
and during such handling: explosives in or on any carriage or vessel
Provided that nothing in this rule shall apply shall be kept closed and secured except
to the use on a ship of — when explosives are being loaded or
unloaded into, onto or from it.
(i) an engine room fire, if such fire has
been previously carefully banked up or (6) When explosives are being carried in
or on a carriage or aircraft or vessel, they
(ii) any artificial light or ship's signal lights
shall be kept away from anything whether in
or of a type approved in writing by the Chief
the carriage or vessel or elsewhere that
Controller in areas outside port limits and by
would be liable to cause them to ignite or
the Conservator of the Port within port limits.
explode.
15. Prohibition of matches etc. — No
42. Delay in transit to be avoided — If
person on, in, or near any place where
the quantity of explosives transported in
explosives are stored or handled or on any
any carriage or vessel exceeds 2.5 kg, the
carriage conveying explosives shall —
person or persons incharge of such carriage
(a) have in his possession any matches, of vessel shall not stop or delay at any place
fuses or other appliances for producing for a longer time than may be reasonably
ignition or explosion or any knives or other necessary, nor stop unnecessarily at any
articles made of iron or steel; or place where such stopping would be
(b) wear boots or shoes with iron nails or attended with danger to public.
shod or strengthened with iron, unless such 44. Small quantities of fireworks
boots or shoes are covered with leather, exempted — Nothing contained in Rules 35,
rubber, felt or other material, in the form 40 and 41 shall apply to the transport of
overshoes or other. manufactured fireworks in the custody of a
41. Protection from fire or explosion person entitled to possess them without a
— licence under Rule 14 provided that not
(1) No carriage or aircraft or vessel shall more than 2.5 kg of manufactured fireworks,
be used for transporting explosives unless securely packed, shall be so transported in
all iron or steel therein with which a package any motor vehicle licensed for conveyance
containing any explosive is likely to come in of more than six passengers.
contact is effectually covered with lead, 113. Licence for possession, sale and
leather, wood, cloth or other suitable use —
material. (1) No person shall possess, sell or use
(2) Where the weight of the explosives any explosive except under and in
transported in any carriage exceeds 1000 accordance with a licence granted under
kg, they shall be placed in the interior of the these rules.
carriage which shall be enclosed on all (2) The licensee shall be responsible for
sides with wood or metal so as effectually to all operations in connection with the
protect the explosives from communication possession, sale or use of explosives which
of fire and the carriage shall be locked. may be conducted in the premises covered
(3) Where the weight of explosives by the licence.
transported in any vessel exceeds 1000 kg, 114. No licence needed for possession
they shall be placed in the hold of the vessel and sale in certain cases -
which shall have a closed deck and closely
(l) notwithstanding anything contained in
fitting hatches and double water-tight bulk
Rule 113, no licence shall be necessary for
heads shall be provided at each end of the
the possession.
hold where the explosives are stowed and
the hatches shall be locked. (a) of any explosive by a carrier or other
person for the purpose of ( transport, when
(4) Where the explosives carried in
the same is being kept or transported in
carriage or vessel do not exceed 1000 kg in
accordance with the provisions of Chapter
weight, the explosives shall, unless they are
IV regulating transport of such explosives: or
conveyed in the manner specified in sub-
rule (2) or sub-rule (3), as the case may be, (b) by any person of manufactured
be completely covered with fireproof cloth fireworks in any quantity not exceeding 25
tarpaulin or any other suitable material as kg Provided that the fireworks -
effectually to protect the explosives from (i) are obtained and intended by such
communication of fire. person for immediate use and not for sale

Page 47 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

and are possessed by him for a period not in Indian Standard Specification No. 2309 as
exceeding 14 days; and amended from time to time.
(ii) are kept in substantial receptacle (2) The connections to various parts of
which is exclusively appropriated to the earth resistance of the lightning conductor
keeping of explosives and is closed and terminal on the building to the earth shall be
secured so as to prevent unauthorised tested at least once in every year by a
person from having access to the qualified electrical engineer or any other
explosives; or competent person holding a certificate of
(c) by any person for his own private use competency in this behalf from the State
and not for sale of gunpowder not exceeding Electricity Department. A certificate showing
5 kg and 50 metres of safety fuse for the results of such test and the date of the
blasting in any State, other than Bihar, last test shall be hung up in conspicuous
Kerala, Tamil Nadu and West Bengal, and of place in the building -
small arm nitre-compound not exceeding 5 117. Precautions during thunderstorm
kg except in the State of Kerala and Tamil - Whenever a thunderstorm appears to be
Nadu; imminent in the vicinity of a magazine or
(d) by Railway Administration for flare store house every person engaged In or
lights or other explosives for its own use and about such magazine or store house shall
not for sale to any other person by transfer be withdrawn to a safe distance from such
or otherwise for maintaining railways, tracks, magazine and store house and the
tunnels, provided that the provisions of the magazine and the store house shall be kept
Act and these rules or otherwise complied closed and locked until the thunderstorm
with; has ceased or the threat of it has passed.
(e) of any explosive, which is not for sale 119. Maintenance of records — Every
and is required solely for the navigation of person holding a licence granted under
aircraft, when kept in an aircraft for use | these rules for possession, sale or use of
therein, or for distribution to other aircraft or explosives shall maintain records in the
to aerodromes or at an aerodrome for use prescribed Forms and shall produce such
there or for distribution to aircraft or to other records on demand to an inspecting officer.
aerodromes, provided that the maximum 120. Repairing of licensed magazine or
quantity so possessed shall not exceed 25 store house — Before repairs are done to
kg when carried in an aircraft and 50 kg, any magazine or store house or part thereof
when kept at an aerodrome; used for storage of explosives, that
(f) and sale from a shop of amorces (an magazine or Store house shall be cleaned
explosive of Class 7 and division 2) in by removal of all explosives and by thorough
quantity not exceeding 12.5 kg Provided that washing.
in respect of clauses (b) and (c) the Central 122. Premises to be kept locked —
Government may prohibit the possession of (1) Any licensed magazine or store house
any explosive or prescribe any conditions shall be kept securely closed or locked at all
under which the explosives can be times except when goods, are being placed
possessed without a licence when in or taken from it or when it must be kept
considered necessary for the security of open for some other purpose in connection
public peace. with the management of such premises.
(2) Notwithstanding anything contained in (2) The keys of the licensed magazine
Rule 113, no licence shall be necessary for shall, at all times be kept secured in
the sale of such explosives manufactured by license's, own custody or of his authorised
the Armed Forces of the Union and agent and shall be produced for opening the
Ordnance Factories or other establishment magazine or store house whenever so
of such Forces as are sold or delivered to required by an inspecting officer. The name
any person who is in possession of a valid and address of the person with whom the
licence issued under these rules for the keys will be kept shall be intimated to the
class and quantity of the explosives so sold licensing authority and the controller of
or delivered. Explosives having Jurisdiction.
116. Protection from lightning — 123. Guards to be provided —
(1) Every magazine shall have attached (1) The licensee shall at his own
thereto one or more efficient lightning, expenses provide for round the clock safe
conductors designed and erected in custody of the magazine or store house a
accordance with the specification laid down guard which shall be of such strength as the

Page 48 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

District Authority may consider it to be granted if the specified distances on the


sufficient. licence around the magazine or store house
(2) The licensee, shall provide a shelter or the floor space in the specified rooms for
for the watchman on duty near the magazine storage of each kind of explosives is not
or store house, adequate for keeping of the total quantity of
explosives, including the excess quantity
124. Repacking or opening of
applied for.
packages —
(iii) The licensing authority may refuse to
(1) No packages containing explosives
grant a permit for excess storage of
shall be opened in magazine or store house.
explosives if such excess storage is of a
(2) Repacking of explosives shall be repeated nature.
done, where the necessary in an approved
(iv) No explosive in excess of the licensed
open sided shed having smoothly finished
quantity shall be stored in the magazine or
cemented floor at a distance as approved by
store house unless a permit in this behalf is
licensing authority.
obtained from the licensing authority by a
125. Explosives not to be kept in letter or telegram.
damaged boxes — The licensee of every
129. Storage in a magazine — An
magazine or store house shall ensure that
explosive if stored in a magazine shall be
the explosives are always kept in their
stored either in Mode 'A' or Mode 'B'
original outer package. In case the outer
magazine as specified in Schedule VII.
package gets damaged so that the
explosives contained therein cannot be 130. Restriction, on use of Mode 'B'
stored or transported, such explosives shall magazine — Mode 'B' magazine shall be
be repacked only after the same are used for storage of explosive required (or
examined by a Cont use for a temporary period for a specific
purpose and such magazine shall not be
126. Storage of explosives In excess of
used for sale of explosives.
licensed quantity —
131. Mound of magazines — A
(1) The quantity of any kind of explosives
substantial mound shall be provided near a
kept in any licensed magazine or store
magazine, if so required by the licensing
house shall not exceed the quantity entered
authority. Such mound shall be of a type
in the licence against such kind of
approved by the licensing authority and shall
explosives,
always be maintained in good condition to
(2) Notwithstanding anything contained in provide effective protection.
sub-rule (1), the Chief Controller may issue
135. Construction of premises :
a permit, on payment of the prescribed fee
to a holder of licence in Form 22 and such (1) All explosives on the premises shall
holders of licence in Form 21 who also have be kept in a brick, stone or concrete building
licence in Form 20 (for the class of which is closed and secured so as to
explosives) for keeping of explosives in prevent unauthorized person from having
excess of the licensed quantity entered in access thereto.
the licence when he is satisfied that such (2) The premises shall have a floor area
excess storage is essential and unavoidable of minimum nine square metres.
due to circumstances beyond the control of (3) The premises shall have independent
the licensee. The validity of such permit entry and exit.
shall not exceed 30 days
(4) If the premises are situated in a
(i) the licensing authority shall not issue building used for other purposes also, such
any permit for excess storage of explosives premises shall not be situated under a
if the magazine or store house cannot staircase and shall be so located as not to
observe the requisite safety distances for obstruct any passage in from or to the
the total quantity entered in the licence plus building in case of fire or accident.
the additional quantity of the explosives so
(5) The premises shall be situated at
permitted.
ground level.
(ii) no permit for storage of explosives in
excess of the licensed capacity shall be

Page 49 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

ANNEXURE 1.2

Typical Compaction Characteristics for natural soils, rocks and artificial materials
(Ref: BS: 6031-1981, Table 4)
Material Major Subgroups Suitable type of Maximum Maximum Remarks
Divisions compaction number of thickness
plant passes for of
satisfactory compacted
compaction layer (mm)
(1) (2) (3) (4) (5) (6) (7)
Rock- Natural All rock fill Heavy 4 to 12 500 to If well graded or
like rocks (except chalk) vibratory roller 1500 easily broken
materials not less than depending down then this
180 kg per on plant can be classified
100mm of roll used as a coarse-
Grid roller not grained soil for
less 180 kg per the purpose of
100mm of roll compaction.
The maximum
diameter of the
rock fragment
should not
exceed two third
of the later
thickness.
Chalk See remarks 3 500 This material
can be very
sensitive to
weight and
opearation of
compacting
effort and
spreading plant.
Less compactive
effort is needed
than with other
rocks

Artificial Waste Burnt and Vibratory roller 4 to 12 300


material unburnt Smooth depending
colliery shale wheeled roller on weight
Self-propelled of plant
tamping roller
Pulverized Vibratory roller Includes lagoon
fuel ash Self - propelled and furnace
tamping roller bottom ash
Smooth
wheeled roller
Pneumatic
tired roller
Broken Heavy Non-processed
concrete, vibratory roller sulphide brick
bricks, steel Self- propelled slag should be
works, slag, tamping roller use with caution

Page 50 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

etc. Smooth
wheeled roller
Coarse- Gravel Well graded Grid roller over 3 to 12 75 to 275
grained sand, gravel and 540 kg per depending depending
soils gravelly gravel/ sand 100mm of roll. on type of on type of
soils mixture: little Pneumatic plant plant
or no fines tired over 2000
Well graded kg per wheel
gravel / sand Vibratory plate
mixtures with compactor over
excellent clay 1100 kg /Sq.m.
binder of base plate
Uniform Smooth wheel
gravel: little or roller Vibratory
no fines roller Vibro
Poorly graded rammer Self-
grave and propelled
gravel / sand temping roller
mixtures: little
or no fines.
Gravel with
excess fines,
silty gravel,
clayey gravel,
poorly graded
gravel / sand
/ clay
mixtures
Sand and Well graded
sandy gravel and
soils gravel/ sand
mixture: little
or no fines
Well graded
gravel / sand
mixtures with
excellent clay
binder
Uniform
gravel: little or
no fines
Poorly graded
grave and
gravel / sand
mixtures: little
or no fines.
Gravel with
excess fines
Unifrom Uniform Smooth 3 to 16 75 to 300
sands and gravels; little wheeled roller depending depending
gravels or no fines. below 500 kg on type of on type of
Uniform per 100mm of plant plant
sands; little or roll. Grid roller
no fines. below 540
Poorly graded kgper 100mm
sands; little or of rolling.
no fines. Pneumatic
Sands with tired roller

Page 51 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

fines, silty below 1500 kg


sands, clayey per wheel.
sands, poorly Vibratory roller.
graded sand / Vibrating plate
clay mixtures compactor
Vibro-tamper
Fines Soils Silts Sheepsfoot 4 to 8 100 to 450 If water content
soils having low (inorganic) roller Smooth depending depending is low, it may be
plasticity and very fine wheeled roller on type of on type of preferable to use
sands, rock Pneumatic plant plant vibratory roller.
flour, silty or tired roller Sheeps foot
clayey fine Vibratory roller rollers are best
sands with over 70 kg per suited to soils at
slight 100 mm of roll water contents
plasticity Vibratory plate below their
Clayey silts compactor over plastic limit.
(inorganic) 1400 kgs./sqm.
Organic silts of base plate
of low Vibro tamper
plasticity Power rammer
Soils Silty and
having sandy clays
medium (inorganic) of
plasticity medium
plasticity
Clays
(inorganic) of
medium
plasticity
Organic clays Generally
of medium unsuitable for
plasticity Earthworks
Soils Micaceous or Should only be
having diatomaceous used when
high fine sandy circumstances
plasticity and silty soils, are favourable
plastic silts
Clay
(inorganic) of
high
plasticity, fat
clays
Organic clays Should not be
of high used for
plasticity earthworks

Note: The information in this table should be taken only as a general guide. Field trials for compaction
should be conducted for working out optimum layer thickness and number of roller passes for the type
of compaction equipment being used. Compaction of mixed soils should be based on that subgrade
requiring most compactive effort.

Page 52 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

ANNEXURE 1.3

SALIENT FEATURES OF VIBRATORY ROLLERS MANUFACTURED IN INDIA

Drum Detail Vibrati


Operati
Normal ng
MODEL ng DRUM AXLE LOAD (T)
MAKE Amplitu Freque REMARKS
No. Weight WIDTH de (Mm) ncy
(Kg.) (Mm) Front Rear (Hz)
EC 5250
ESCORTS 9350 2130 5.050 4.300 1.72 30
STD
It is used for better
9550 2130 5.250 4.300 1.72 30
gradeability
It is used for better
10500 2130 6.650 4.300 1.53 30 gradeability &
breaking clods
1.27/0.7 0-
9300 1680 4.650 4.300
5 30/42
GREAVES BW 212- It is used for better
10424 2100 6.463 3.961 1.67 40/31
BOMAG D-2 (2A) gradeability
It is used for better
BW 212-
10879 2100 6.201 4.678 1.5 30 gradeability &
PD-2
breaking clods
1104
L&T 11150 2330 5.770 5.380 1.6/0.6 28/36
STD
It is used for better
1104 D 11150 2330 5.900 5.535 1.6/0.6 28/36
gradeability
It is used for better
1104 PD 11835 2330 6.300 5.535 1.6 28 gradeability &
breaking clods
INGERSOL ISD-100
10740 2135 6.210 4.535 1.7 0-30
LRAND STD
ISD-100 It is used for better
10830 2135 6.295 4.535 1.7 0-30
D gradeability
ISD-100F 11740 2135 7.205 4.535 1.41 0-30

NOTE : The rollers indicated above can also be used in Static mode. The list includes rollers manufactured by reputed
firms only.

LEGEND : STD- Standard Type, D- Drum Type & PD - Pads + Drum Type

Page 53 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

SKETCHES SHOWING MANNER OF COMPUTATION OF QUANTITIES OF


VARIOUS CLASSIFICATIONS OF SOIL
(FIG. NOS.1.1 TO1.4)

SOFT/LOOSE SOIL CL FINAL EXPOSED


SLOPE OF CUTTING
FINAL EXPOSED SOFT/LOOSE SOIL
SLOPE OF CUTTING
HARD/DENSE SOIL SOFT/DISINTEGRATED
ROCK
HARD ROCK
HARD ROCK

BOX TYPE CUTTING (Figure No.1.1)


FINAL EXPOSED
SLOPE OF CUTTING

SOFT/LOOSE SOIL

SOFT/DISINTEGRATED FINAL BASE OF CUTTING


ROCK

HAED ROCK

ONE SIDED CUTTING IN A TRANSVERSE SLOPING GROUND (Figure No.1.2)

SOFT/LOOSE SOIL
ORIGINAL SLOPE OF CUTTING
FINAL EXPOSED SOFT/LOOSE
ORIGINAL
SLOPE OF SLOPE OF CUTTING SOIL
CUTTING HARD/DENSE FINAL EXPOSED
SLOPE OF
SOFT/ CUTTING
DISINTEGRATED
ROCK
HARD ROCK HARD ROCK

WIDENING OF CUTTING WHERE THE EXISTING


CUTTING SLOPE DISAPPEARS AND A FRESH SLOPE ARISES (Figure No.1.3)

SOFT/LOOSE SOIL
HARD/DENSE SOIL
ORIGINAL SLOPE ORIGINAL EXPOSED
OF CUTTING
HARD ROCK SURFACE

EXTENSION OF EXISTING CUTTING WHERE NO


FRESH CUTTING SLOPE IS AVAILABLE AFTER THE WORK. (Figure No.1.4)

Page 54 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

DETAILS OF CLOSE AND OPEN TIMBERING


(SECTIONAL ELEVATION & CROSS SECTION) NOT TO SCALE

DETAILS OF CLOSE & OPEN TIMBERING


CLOSE TIMBERING (With vertical poling boards)
Figure No.1.5A REQUIRED
WIDTH
POLING BOARD
1.5m X25 cm X 4 cm

60cm 60cm

23 TO30 cm
3 m
25cm

1.8m c/c 60 cm 60 cm
STRUT 12.7cm DIA

WALLING
10cm X 10cm

SECTIONAL ELEVATION X -- SECTION


D)
CLOSE TIMBERING (WITH LONGITUDINAL POLING BOAR
60 cm REQUIRED
60 cm 1.8 m WIDTH
POLING
BOARD
3mX25cm X4cm

VERTICAL 1.5 m
WALLING
10cmX10cm

STRUT 12.7cm DIA.

SECTIONAL ELE VATION X- SECTION

OPEN TIMBERING
REQUIRED
WIDTH
POLING 23 TO 30cm
BOARD
1.5cm X25cm
50cm X 4cm
50cm
25cm 1.5m
60cm
1.8m C/C 60cm WALLING
10cm x 10cm

75cm 75cm STRUT 12.7cm DIA.


75cm

SECTIONAL ELE VATION X -SECTION

Page 55 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

DETAILS OF CLOSE AND OPEN TIMBERING


(ISOMETRIC VIEW)
Figure No.1.5B

CLOSE PLANKING & STRUTTING PLANKING & STRUTTING FOR SHALLOW


WITH VERTICAL POLING BOARD WIDE EXCAVATION
Waling
100x100
600 Poling Board
600 Poling Board
800
250x30 250x38
1
x.
Ma
Rake
2000
Struts

2000
Max.
1200
Max. Blocking
300

CLOSE PLANKING & STRUTTING OPEN PLANKING AND STRUTTING


WITH LONGITUDINAL POLING BOARD
Waling 100x100
00 600
x.1800 6 500
250 Poling Board
M a 250 250x30

2000 2000 0
180
Max
Poling Board 600
250x30
Struts

Page 56 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 1 : Earth Work

Page 57 : Chapter 1
Unified Standard Specifications For Works & Materials Chapter 2 : Carriage Of Materials

Chapter 2
Carriage Of Materials

1 SUPPLY OF QUARRY PRODUCTS TO When calling for tenders for supply of


RAILWAYS materials, samples of the materials should
The Contractor shall arrange at his own cost be called for along with each tender. No
all labour, explosives, tools, baskets, carts, materials should be accepted which are
lorries and other conveyance required for inferior to the approved samples under any
excavation, quarrying, leading, stacking, circumstances. In all cases of dispute about
loading etc. When blasting is necessary, it the quality of the materials whether
shall be carried out in accordance with the conforming to accepted sample or not, the
statutory rules in force. The rate payable to decision of the Engineer shall be final and
the contractor is inclusive of all charges, binding.
royalty, compensation to land owners for SUPPLY OF MISCELLANEOUS
right of passage, sales tax, octroi etc. MATERIALS TO RAILWAYS
2.1.1 Site for stacking 2.5.1 BAMBOOS
Sites for stacking materials shall be located 2.5.1.1General : The bamboos to be
within the railway boundaries and close to supplied or to be used on works shall be
the place of use and as directed by the sound and shall be free from attacks of
Engineer. The sites for stacking of materials weevills or other boring insects. They shall
should be got approved before collection is be sufficiently seasoned.
commenced. The collection of materials 2.5.1.2Size : The bamboos shall be of the
made on stacking grounds not approved by specified girth, the measurement of girth
the Engineer will be liable for rejection. The being taken at the centre of the length of
stacking grounds shall be levelled. The each bamboo. The Engineer’s representative
Engineer shall direct the contractor to level may, at his discretion, exclude from the
the ground where required and for this length of the bamboos any tapered end
purpose no payment will be made. which is too thin to be of use.
2.1.2 Deductions 2.5.2 CASUARINA POSTS
Payment shall be made for the materials on 2.5.2.1Quality : The posts shall be
the actual measurements of the stacks with reasonably straight and sound, and free from
such deductions as are laid down in the projecting knots, remnants of branches,
relevant chapter of the specifications for splits, hollows, rot or any other defect which
each type of material. may affect their strength or usefulness to any
2.1.3 Opening out appreciable extent, in the opinion of the
Engineer’s representative.
At any time required by the Engineer or his
2.5.2.2Size : The provisions of Para 2.4.1.2
authorised representative while stacking is in
will apply, substituting the word “casuarinas
progress and at the time measurement is
posts” in place of “bamboos”.
taken, the contractor shall supply at his own
cost, labour, tools and other facilities to open 2.5.3BAMBOO MATTING
out all or any of the stacks for the purpose of 2.5.3.1Mats : The bamboo mats shall be of
inspection or measurement. the specified type, viz. “Ordinary” or
Nonconforming materials “double”, the latter meaning the thicker
variety, with the outer skin of bamboos
Materials not conforming to the detailed
covering one face of the mat. The quality of
specifications shall be removed from the
mats to be supplied or used on works shall
Railway’s premises by the Contractor within
invariably be got approved by the Engineer
the time specified by the Engineer. Failing
in advance. All edges shall be properly
such removal after issue of notice, the
bound, in weaving, to prevent fraying. The
Railway shall be at liberty to dispose of the
bamboo strips used shall be reasonably
materials at the risk and cost of Contractor.
uniform in width and thickness and shall be
No compensation shall be payable to the
closely woven.
Contractor for the materials so disposed of
2.5.3.2 Size : When using bamboo matting in
by the Administration.
claddings, partitions, etc, side and end laps
Samples of atleast 15 cm shall be provided between
individual mats. The matting shall be fixed to

Page 58 : Chapter 2
Unified Standard Specifications For Works & Materials Chapter 2 : Carriage Of Materials

the supports in an approved manner. When secured to the floor and prevented from
fillets of wood or bamboo are used for flapping in the lowered position. In addition,
securing the matting, the fixing shall be done slip rings and wooden plugs shall be
with nails driven through the fillets. Any cut provided for holding the chick when rolled up
edges shall be properly bound to prevent to any desired height. For chicks of height
fraying. exceeding 3m and in other cases where
2.2.4CHICKS specified, two wooden / steel pulleys of
approved quality shall also be supplied,
2.2.4.2Bamboo Chicks : The chick shall be along with an adequate extra length of 12
formed out of bamboo laths of width 6 to mm cotton rope to enable the chick being
10mm, thickness not less than 3mm and raised or lowered.
length equal to the full width of the chick,
split out of good mature bamboo. The laths 2.2.4.5 Rate : Unless otherwise stipulated,
shall be planed smooth with knife to be of the rate for supply of chicks shall be all
fairly uniform size and free from projecting inclusive and nothing extra shall be payable
knots and fibres. They shall then be for pulleys, ropes, rings etc.
arranged on the ground and closely bound 2.2.5 POLYETHYLENE CANE – Should
together by country twine, with the spacing be as per IS:-2828:1964
between laths kept to a minimum and the 2.2.5.1 TYPES
spacing between consecutive twines not a) Type 1 – Produced from high
exceeding 20 cm. The binding shall be such density polyethylene; and
that the laths are held fast, while at the same
time there is freedom for rolling. Two straight b) Type 2 – Produced from blends of
solid bamboos of diameter not less than 5 high and low density polyethylene.
cm shall be tied to the top and bottom edges 2.2.5.2 High Density Polyethylene
of the chick so formed, High density polyethylene used for
2.2.4.2 manufacturing cane shall be of grade
2.2.4.2Cane Chicks : Where cane chicks are designation. PE TGN A 50 T 022 or PE TGN
prescribed, the chicks shall be formed out of A 57 T 022 as per IS 7328 : 1992. But
mature cane of diameter from 6 to 10mm density, in any case, shall not be less than
instead of bamboo laths. In other respects, 0.950 g/ml and melt flow index (is) shall not
the constructional details shall be the same exceed 2.0 g/10 Min.
as given in para 2.4.4.1. 2.2.5.3 Low Density Polyethylene
2.2.4.3 Binding : Blue dungry cloth of the Low density polyethylene used for
best quality, formed to the required size, manufacturing cane shall be of grade
shall be spread over the chick so as to cover designation LDPE 23 Y 00 or LDPE 33 Y 00
the whole of the chick and folded back at as per IS 3395 : 1984. But density, in any
the edges for a width of 4 cm on both sides case shall not be less than 0.92 g/ml and
and 7.5cm at the top and bottom, and well melt flow index (is) shall not exceed 3.0
stitched on. Best white tape, 8 cm wide, shall g/10/Min.
then be stitched securely along both the 2.2.5.4 The material shall be smooth and
sides, covering approximately 4 cm on either glossy and its edges shall be free from sharp
face of the chick. Additional tapes 4 cm wide cuts. It shall not split while weaving.
shall also be stitched on, either diagonally, or
2.2.5.5 Tolerance on Width and Thickness
in vertical bands of spacing not exceeding
1.2m as may be directed by the Engineer, to The polyethylene cane shall be supplied in
prevent flapping of the cloth. two sizes, one for seat and back and the
other for border. The permissible tolerance
2.2.4.4 All chicks shall be provided with 2
on width and thickness for the two sizes shall
nos. of endless cotton ropes 12mm dia for
be as follows :
the full depth so as to enable their being
Width Thickness
For the seat and back ± 0.10 mm ± 0.02 mm
For border ± 0.15 mm ± 0.03 mm
Notes :
1. Following sizes of polyethylene cane are most suitable and are used in furniture trade :
Width Thickness
For the seat and back 2.00 mm 0.02 mm
For border 3.50 mm 0.03 mm
2. The thickness may be determined by a micro meter in mm.

Page 59 : Chapter 2
Unified Standard Specifications For Works & Materials Chapter 2 : Carriage Of Materials

CARRIAGE OF MATERIALS 2.3.4.2 Cement bags, steel bars, structural


General steel sections, bricks and timber and other
similar materials shall be stacked in regular
The carriage and stacking of materials shall tiers.
be done as directed by the Engineer. Any
tools and plants required for the work shall 2.3.4.3 Pipes of RCC, SW, GI, CI etc. shall
be arranged by the Contractor. The carriage be stacked in rows.
of materials includes loading within a lead of 2.3.5.5 Lime, stone, metal, sand and such
50 metres, unloading and stacking within a similar materials shall be stacked as directed
lead of 50 metres. by the Engineer.
Responsibility for Loss or Damage 2.3.5 Measurements
Loading, carriage, unloading and stacking Length, breadth and height of stacks shall be
shall be done carefully to avoid loss or measured correct to a cm. The quantity shall
damage to the materials. In case of any loss be worked out in cubic metre correct to two
or damage, recovery shall be affected from places of decimal. The volume of stacks,
the contractor at twice the Departmental shall be reduced by percentages as shown
issue rates of the materials. If the against each for looseness in stacking to
departmental issue rates of the materials are arrive at the net quantity for payment. No
not available, then the recovery shall be reduction shall be made in respect of articles
affected at twice the prevailing market rates or materials for which mode of payment is by
as determined by the Engineer. length or weight or number.
Mode of Carriage 2.3.5.1 Earth
Depending upon the feasibility and economy, i) In loose stacks such as cart loads,
the Engineer shall determine the mode of lorry loads etc- 20%
carriage viz. whether by mechanical or ii) In fills consolidated by light
animal transport or manual labour. mechanical machinery or manually – 10%
Lead (Refer Para 1.1.6.11)
2.3.3.1 All distances shall be measured over iii) In fills consolidated by heavy
the shortest practical route and not mechanical machinery at or near OMC – 5%
necessarily the route actually taken. (Refer Para 1.1.6.11)
2.3.3.2 Carriage by manual labour shall be iv) Consolidated fills in confined
reckoned in units of 50 metres. situation such as under floors etc. Nil
2.3.4.3 Carriage by animal and mechanical Manure or sludge – 8% (Refer Para
transport shall be reckoned in one km unit. 16.2.1.1 & 16.2.4.2)
Distances of 0.5km or more shall be taken Moorum, building rubbish, Lime –
as 1 km and distance of less than 0.5 km 7.5 %
shall be ignored. However, when the total Sand / Sandy Material – 7.5% (Refer
lead is less than 0.5 km., it will not be Para 1.1.6.11)
ignored but paid for separately in successive
Stone material, 40mm nominal size
stages of 50 metres subject to the condition
and above 10.0%
that the rate worked on this basis does not
exceed the rate for initial lead of 1 km. by Coarse aggregate / stone metal
mechanical / animal transport. below 40mm nominal size – 7.5 %
2.3.4 Stacking - IS 4082:1996 may be 2.3.5.7 Soling Stone / Boulder 100mm
seen for further details and above – 15%
2..4.0 Material shall be stacked in such a Excavated rocks – 30%
manner as to ensure the preservation of their 2.3.6 Rate : The rate for carriage of
quality and fitness for the work. Different materials is inclusive of all the operations
types of materials shall be stacked described above.
separately and in such a way that counting STORAGE OF MATERIALS
and measurements can be done without Para 17.9 of Chapter 17 may be referred to.
disturbing the stacks.
FLOOR AND LEVELS
2.3.4.1 Earth, dismantled materials, malba
and other similar materials shall be stacked Buildings :
as directed by the Engineer. 2.5.1.1 Floor 1 is the lowest floor above the
ground level in the building unless otherwise

Page 60 : Chapter 2
Unified Standard Specifications For Works & Materials Chapter 2 : Carriage Of Materials

specified in a particular case. The floors IS Safety Codes and the direction of the
above floor 1 shall be numbered in sequence Engineer.
as floor 2, floor 3 and so on. The number
shall increase upwards.
2.5.1.2 Floor level : For floor 1 top level of
finished floor shall be the floor level and for
all other floors above floor 1, top level of the
structural slabs shall be the floor level.
2.5.1.3 Plinth level : Floor 1 level or 1.2m
above the ground level whichever is lower
shall be the plinth level.
2.5.1.4 Plinth level - For abutments piers &
return walls of culverts and bridges, walls of
water reservoirs and basements - Floor level
2.5.1.5 Plinth level - For retaining walls
where floor level is not determinate 1.2
metres above average ground level or bed
level whichever is lower.
2.5.1.6 Plinth level - For breast walls
Formation level
2.5.1.7 Plinth level - For platform walls
Formation level of track
2.5.5 Special Structures
For all other structures like chimneys, over
head reservoirs/ tanks and other elevated
structures, where elevations/ height above a
defined datum level have not been specified
and identification of floors cannot be done
1.2m above the ground level shall be the
plinth level.
2.6 MEASUREMENTS
2..1 In booking dimensions, the order
shall be consistent and in the sequence of
length, width and height or depth or
thickness.
2.6.2 Rounding Off
Rounding off where required shall be done in
accordance with IS : 2. The number of
significant places rounded in the rounded off
value should be as specified.
2.72.7 SAFETY IN CONSTRUCTION
2.7.1 The Contractor shall employ only
such methods of construction, tools and
plant as are appropriate for the type of work
or as approved by Engineer in writing.
2.7.2 The Contractor shall take all
precautions and measures to ensure safety
of works and workman and shall be fully
responsible for the same. Safety pertaining
to construction works such as excavation,
centring and shuttering, trenching, blasting
demolition, electric connections, scaffolds,
ladders, working platforms gangway, mixing
of bituminous materials, electric and gas
welding, use of hoisting and construction
machinery shall be governed by the relevant

Page 61 : Chapter 2
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

Chapter 3
Plain Concrete

3.1 MATERIALS fully borne by the Contractor except where


3.1.1 General : Water, cement, lime and fine otherwise stipulated in the Contract.
aggregate shall be as specified in Chapter (b) Gravel : It shall consist of naturally
26 ‘Mortar’. Fine aggregates are divided into occurring (uncrushed, crushed or broken)
four Zones as described in Table 26.1 of river bed shingle or pit gravel. It shall be
Chapter 26. Most of the natural sand found sound, hard and clean. It shall be free from
in the country has grading corresponding to flat particles of shale or similar laminated
one or other of these zones. Typical good material, powdered clay, silt, loam, adherent
sand falls in Zone II Grading. However Finer coatings, alkali, vegetable matter and other
Sand (Zones III and IV) and Coarse sand deleterious substances. Pit gravel shall be
(Zone I) may be used with suitable washed if it contains soil materials adhering
adjustments in the ratio of quantities of Fine to it. These shall conform to IS:383 unless
to Coarse aggregates as indicated in Table otherwise specified. Where required by the
3.15 for Nominal Mix Concrete. fine sand Engineer, Tests shall be done in accordance
coming under Zone IV grading should not be with IS 2386 (Parts I to VIII) with the cost
used except where the concrete is closely fully borne by the Contractor except where
controlled by the use of Design Mix. With otherwise stipulated in the Contract.
nominal mix concrete, it is not advisable to (c) Brick Aggregate : Brick aggregate
use Zone IV Sand under any circumstances which can be used for Plain Cement/ Lime
and Zone I sand should be avoided if a lean Concrete shall be obtained by breaking well
concrete mix is desired. burnt or over burnt dense bricks / brick bats.
3.1.2 Coarse Aggregate They shall be homogeneous in texture,
3.1.2.1 General : Aggregate, most of roughly cubical in shape and clean. They
which is retained on 4.75mm IS Sieve and shall be free from unburnt clay particles,
contains only as much fine material as is soluble salt, silt, adherent coating of soil,
permitted in IS:383 for various sizes and vegetable matter and other deleterious
grading is known as Coarse aggregate. substances. Such aggregate should not
Coarse aggregate shall be stone aggregate, contain more than one percent of sulphates
gravel or brick aggregate as described below and should not absorb more than 20% of
and it shall be obtained from approved / their own mass of water.
authorized sources. (d) Light weight aggregates such as
On Stone aggregate, Gravel and Brick bloated clay aggregate and sintered fly ash
aggregates the following should be kept note aggregate may also be used provided the
of: Engineer is satisfied with the data on the
properties of concrete made with them.
(a) Stone Aggregate : It shall consist of
naturally occurring (uncrushed, crushed or 3.1.2.2 Marine Aggregates (Concrete
broken) stones. It shall be hard, strong, Bridge Code – C.S. no.1 dated 26.04.2000)
dense, durable and clean. It shall be free In general, marine aggregate shall not be
from veins, adherent coatings, injurious used for reinforced concrete and prestressed
amounts of disintegrated pieces, alkali, concrete bridges. However, in special cases,
vegetable matter and other deleterious use of marine aggregates may be permitted
substances. It shall be roughly cubical in by the Engineer subject to the following :
shape; Flaky and elongated pieces shall be The marine aggregates shall be thoroughly
avoided. It shall conform to IS:383 unless washed.
otherwise specified. Where required by the
Generally, the limits for chloride content and
Engineer, test shall be done in accordance
sulphate content in aggregates after washing
with IS 2386 (Parts I to VIII) with the cost
will be as under :

Page 62 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

Fine Aggregates Coarse Aggregates


Chloride content 0.04% by wt. acid 0.02% by wt. acid
(Cl.) max. soluble soluble
Sulphates (SO3) 0.4% by wt. acid 0.4% by wt. Acid
max. soluble soluble

After washing and drying, the aggregates material shall not be more than five per cent
should conform to IS:383. The designer of the weight of coarse aggregate when
should take into account grading of determined in accordance with IS:2386 (I).
aggregates after washing. 3.1.2.4. Size and Grading
3.1.2.3 Deleterious Material : Coarse (i) Stone aggregate and gravel
aggregate shall not contain any deleterious
It shall be either graded or single sized as
material, such as pyrites, coal, lignite, mica,
specified. Nominal size and grading shall be
shale or similar laminated material, clay,
as under :
alkali, soft fragments, sea shells and organic
impurities in such quantity as to affect the (a) Nominal sizes of graded stone
strength or durability of the concrete. Coarse aggregate or gravel shall be 40, 20, 16, or
aggregate to be used for reinforced cement 12.5 mm as specified. For any one of the
concrete shall not contain any material liable nominal sizes, the proportion of other sizes
to attack the steel reinforcement. as determined by the method prescribed in
Annexure 3.1 shall be in accordance with
Aggregates which are chemically reactive
Table.3.1.
with alkalies of cement shall not be used.
The maximum quantity of deleterious

TABLE 3.1
GRADED STONE AGGREEGATE OR GRAVEL
IS Sieve Percentage passing (by weight) for nominal size of
Designation 40 mm 20 mm 16 mm 12.5 mm
80 mm 100 - - -
40 mm 95 to 100 100 - -
20 mm 30 to 70 95 to 100 100 100
16 mm - - 90 to 100 --
12.5 mm - - - 90 to 100
10 mm 10 to 35 25 to 55 30 to 70 40 to 85
4.75 mm 0 to 5 0 to 10 0 to 10 0 to 10

(b) Nominal sizes of single sized stone as determined by the method prescribed in
aggregate or gravel shall be 63, 40, 20, 16, Annexure 3.1 shall be in accordance with
12.5 or 10 mm as specified. For any of the Table.3.2.
nominal size, the proportion of other sizes

TABLE 3.2
SINGLE SIZED (UNGRADED) STONE AGGREGATE OR GRAVEL
IS Sieve Percentage passing (by weight) for nominal size of
Designation
63 mm 40 mm 20 mm 16 mm 2.5 mm 10 mm
80 mm 100 -- -- -- -- --
63 mm 85-100 100 - - - -

Page 63 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

40 mm 0-30 85-100 100 - - -


20 mm 0-5 0-20 85-100 100 - -
16 mm -- - - 85-100 100 --
12.5 mm -- - - - 85-100 100
10 mm 0-5 0-5 0-20 0-30 0-45 85-100
4.75 mm -- - 0-5 0-5 0-10 0-20
2.36 mm -- - - - - 0-5

(c) When stone aggregate or gravel determined by the method prescribed in


brought to site is single sized (ungraded), it Annexure 3.1 shall be in accordance with
shall be mixed with single size aggregates of Table 3.1 Recommended proportions by
different sizes in the proportion to be volume for mixing of different sizes of single
determined by field tests to obtain graded size aggregate to obtain the required
aggregate of specified nominal size. For the nominal size of graded aggregate are given
required nominal size, the proportions of in Table 3.3.
other sizes in mixed aggregate as

TABLE 3.3
MIXING SINGLE SIZED (UNGRADED) STONE AGGREGATE OR GRAVEL TO PRODUCE
GRADED AGGREGATE (BY VOLUME)
Nominal Parts of single size aggregate of size to be mixed to get
size of graded aggregate (By volume)
graded
Cement 50 mm 40 mm 20mm 12.5 mm 10mm
aggregate
concrete
required
1:6:12 63 9 - 3 - -
1:6:12 40 - 9 3 - -
1:5:10 63 7½ - 2½ - -
1:5:10 40 - 7½ 2½ - -
1:4:8 63 6 - 2 - -
1:4:8 40 - 6 2 - -
1:3:6 63 4½ - 1½ - -
1:3:6 40 - 4½ 1½ - -
1:3:6 20 - - 4½ - 1½
1:2:4 40 - 2½ 1 - ½
1:2:4 20 - - 3 - 1
1:2:4 12.5 - - - 3 1
1:1½:3 20 - - 2 - 1

Note : for obtaining required graded aggregate. No


(i) The proportions indicated in Table 3.3 adjustments in rate for item of cement
above are by volume. When considered concrete shall be made for any variation in
necessary, these proportions may be varied the proportions so ordered by the Engineer.
marginally by the Engineer after making If single size coarse aggregates are not
sieve analysis of aggregates brought to site premixed at site, to obtain the graded coarse

Page 64 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

aggregate required for the mix, the volume of (ii) Brick Aggregate : Nominal size of
single size aggregates required to be brick aggregate shall be 40 mm and its
arranged from the source of supply for grading shall be as specified in Table 3.4
making the mix shall be suitably increased to when tested for sieve analysis by the method
account for reduction in total volume at the prescribed in Annexure 3.1.
site of mixing.
TABLE 3.4
BRICK AGGREGATE
IS Sieve designation Percentage passing (by weight)
80 mm 100
37.5 mm 95-100
20.0 mm 45-100
4.75 mm 0-5

3.1.2.5 Size of Coarse aggregate between the main bars or 5mm less than the
a) The nominal maximum size of coarse minimum cover to reinforcement whichever
aggregate should be as large as possible is smaller.
within limits specified but in no case greater Where reinforcement is widely spaced as in
than one fourth of the minimum thickness of solid slabs, limitations on the size of the
the members, provided that the concrete can aggregate may not be so important and the
be placed without difficulty to fill all corners of nominal maximum size may sometimes be
the form and to surround all reinforcement. as great or even greater than the minimum
For reinforced concrete work and pre- cover.
stressed concrete work, aggregates having a c) Coarse and fine aggregates shall
nominal size of 20mm are generally preferably be batched separately, specially
considered satisfactory. In special cases for design mix concrete.
larger size may be specifically permitted by
d) The largest possible size, properly
the Engineer but in no case the nominal
graded, should be used in order to reduce
maximum size in such RC/ PSC structures
the water demand. For high compressive
shall be more than 40mm.
strengths of concrete, this is usually
Plums above 160mm and upto any economical.
reasonable size may be used in plain
3.1.2.6 All-in-Aggregate grading
concrete work upto a maximum limit of 20
percent by volume of concrete when In cases where specifically provided for in
specifically permitted by the Engineer. The the contract, if supply is taken for premixed
plums shall be distributed evenly and shall aggregate consisting of a mix of coarse and
not be closer than 160mm from the surface. fine aggregates, also called All-in-Aggregate
Necessary payment for providing plums and they should conform to requirements in
deduction in the rate of CC will however be Table 3.5. If such combined Aggregate
done accordingly in individual cases. supply is taken, there is no need to separate
them into Fine and Coarse aggregates, but
b) For heavily reinforced concrete
necessary adjustment may be made in
members, as in the case of ribs of main
grading by addition of single size aggregate
beams, the nominal maximum size of
as found necessary.
aggregate should usually be restricted to
5mm less than the minimum clear distance

TABLE 3.5
ALL IN AGGREGATE GRADING
IS Sieve designation Percentage passing for All-in-Aggregate of
40mm nominal size 20mm nominal size
80mm 100 --
40mm 95-100 95-100
20mm 45-75 95-100

Page 65 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

4.75mm 25-45 30-50


600 micron 8-30 10-35
150 micron 0-6 0-6

3.1.2.7. Stacking: Aggregates shall be 3.1.3.4. Dosage of these admixtures may


stacked on a hard, dry and level patch of vary according to manufacturer‟s
ground. When stockpiling, the aggregate specification.
shall not form pyramids resulting in 3.1.3.5. Two or more admixtures may not be
segregation of different sized materials. It compatible in the same solution. It is
shall be stacked separately according to therefore mandatory that when two
nominal size of coarse aggregates. Stacking admixtures manufactured by the same
shall be done in regular stacks of height not manufacturer are to be used simultaneously,
exceeding 100 cm. Coarse aggregates the manufacturer shall certify their
supplied in different sizes and stacked in compatibility. In case the two or more
separate stockpiles shall be mixed only admixtures are produced by different
after the quantity required for each size has manufacturers, then, before their use in
been separately measured. concrete, test shall be got performed by the
3.1.2.8. Testing: Coarse aggregate shall be manufacturers to establish their compatibility
tested for the following (as per IS: 2386): and all such test reports shall be furnished
a) Determination of particle size and by the Contractor to the Engineer for his
shape (Annexure 3.1). The aggregate approval before their use in concrete.
failing in the test should be got removed from 3.1.3.6 Some admixtures may be in the form
the site. of powder particle or high concentration
b) Estimation of organic impurities (As liquids which may require mixing with water
per IS: 2386 Part II): prior to dosing. Under these conditions
water in solution shall be considered as part
c) Surface moisture (Annexure 3.2)
of total water content in the batch in order to
d) Determination of 10% fine value maintain the stipulated water – cement ratio.
(Annexure 3.3)
3.1.3.7 Manufacturer‟s recommendation
3.1.3. Chemical Admixtures shall be carefully followed so as to ensure
3.1.3.1 General:- When required, admixtures complete solution of the product or to
of approved quality shall be mixed with prepare a standard solution of uniform
concrete, as specified. The admixtures shall strength for easier use.
conform to IS : 9103. 3.1.3.8 Certain admixtures may contain
3.1.3.2. Admixtures may be any one of the significant amounts of finely divided insoluble
following classes for use in concrete:- materials or active ingredients which may or
(a) Water reducing Admixtures may not be readily soluble. It is essential for
such admixtures that precautions be taken to
(b) Retarding Admixtures ensure that these constituents be kept in a
(c) Accelerating Admixtures state of uniform suspension before actual
(d) Water reducing and retarding batching. When relatively small amounts of
Admixtures powdered admixtures are to be used directly,
(e) Water reducing and accelerating these shall be pre-blended with cement.
Admixtures 3.1.3.9 Admixtures are sold under various
(f) Permeability reducing (water proofing) trade names and may be in the form of
Admixtures liquids or powders. The proprietary name
and the net quantity of content shall be
3.1.3.3. Liquid admixtures : Admixtures clearly indicated in each package or
introduced into the concrete as liquids container of admixtures. The admixtures
generally fall into the following categories. shall be uniform within each batch and
(a) Air entraining uniform between all batches.
(b) Water reducing 3.1.3.10 No admixtures shall be accepted for
(c) Water reducing retarders use in concrete unless these are tested in
(d) Retarders accordance with IS: 9103 and the test results
are approved by the Engineer.
(e) Water reducing accelerators
3.1.3.11 Functions of Admixtures
(f) Accelerators

Page 66 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

a) Accelerating admixtures The relative density of liquid admixtures shall


These are added to hasten the rate of early be checked for each drum containing
strength development, which would facilitate admixtures and compared with the specified
early removal of form work; or reduce the value before acceptance.
required period of curing or concreting in The chloride content of admixtures shall be
cold weather or in emergency repairs. independently tested for each batch before
Common accelerators are calcium chloride, acceptance.
flourosilicates and triethanolamine; but If two or more admixtures are used
chloride content in concrete shall be carefully simultaneously in the same concrete mix,
checked before permitting its use. data should be obtained to asses their
b) Retarding admixtures interaction and to ensure their compatibility.
These admixtures tend to slow down the rate 3.1.3.13 As stipulated in Paras 4.4.2 and
of setting of cement. They are useful in hot 4.4.3 of Indian Railways Concrete Bridge
weather concreting; for avoiding cold joints in Code (Revised 1997), the following should
mass concrete works and for special be strictly adhered to
treatment of concrete surfaces. Common i) Calcium chloride or admixtures
retarders are starches, cellulose products, containing calcium chloride shall not be used
sugars and hydroxyl - carboxylic acids and in structural concrete containing
their salts. reinforcement, pre-stressing tendon or other
c) Water reducing or plasticizing embedded metal.
admixtures ii) The admixture containing Cl & SO3
These admixtures allow greater workability to ions shall not be used. Admixtures
be achieved for a given water cement ratio; containing nitrates shall also not be used.
or for the same workability reduces water Admixtures based on Thicyanate may
content. When used in sufficient quantities, promote corrosion and therefore shall be
these admixtures function as set-retarders. prohibited.
The basic ingredients of water reducing 3.2 CEMENT CONCRETE
admixture are either ligno-sulphonate or poly 3.2.1 Designation of Concrete :
hydroxy compounds. 3.2.1.1 Designation by Grade : IS 456,
d) Air entraining admixtures Code of Practice for Plain and Reinforced
These are used to intentionally entrain a Concrete, designates concrete only by
controlled quantity of air in the concrete, Grade e.g. M15, M20 etc – the number
without altering the setting or hardening of denoting its 28 day characteristic
2
concrete significantly. Their use improves compressive strength in N/mm .
durability, water tightness and workability. 3.2.1.2 Designation by Volume
Commonly used air-entraining agents are Proportion (Ordinary Concrete) :
animal and vegetable oils and fats; natural Traditionally concrete was being designated
wood resins and their sodium salts; and by volumetric proportion of its constituents
alkali salts of sulphated and sulphonated e.g. 1:1½:3, 1:2:4, 1:3:6 etc. Such concrete
organic compounds. is generally referred to as ordinary concrete.
IS 456, since its 1978 version, has stopped
3.1.3.12 Special Precautions in use of
designating concrete by such volumetric
Admixtures
proportion as it is not considered correct
Previous experience with and data on such engineering practice. However in most
materials should be considered in relation to government departments, including railways,
the likely standards of supervision and in CPWD, particularly on old standard and
workmanship to the work being specified. type drawings and schedule of rates,
Admixtures should not impair durability of concrete by volumetric proportion is still
concrete nor combine with the consistment specified and therefore is used. Although use
to form harmful compounds nor increase the of such concrete is not a recommended
risk of corrosion of reinforcement. practice and should be discouraged, in this
The workability, compressive strength and Specification it has been included and has
the slump loss of concrete with and without been referred to as Ordinary Concrete. It is
the use of admixtures shall be established to be noted that Ordinary Concrete is not
during the trial mixes before use of Volumetric Mix of Grade Concrete permitted
admixtures. in special circumstances described in Para
3.2.6.4 below.
3.2.2 Classification of Concrete :

Page 67 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

3.2.2.1 Grades of Concrete : The given in Table 3.6.


concrete shall be in grades designated as

TABLE 3.6
GRADES OF CONCRETE
(Based on IS 456-2000; Table-2 of Concrete Bridge Code 1997 CS No.8 dated 15.02.06)

Group Grade Designation Specified Characteristic*


Compressive Strength of 150
mm Cube at 28 Days in
2
N/mm
Ordinary M10 10
Concrete M15 15
M20 20
Standard M25 25
Concrete M30 30
M35 35
M40 40
M45 45
M50 50
M55 55
High M60 60
Strength M65 65
Concrete M70 70
M75 75
M80 80

* The characteristic strength is defined 3. Concrete of grade lower than M-10


as the strength of material below which not may be used for Plain Concrete
more than 5 per cent of the test results are Constructions, lean concrete, simple
expected to fall foundations, foundations for masonry walls
Notes : and other simple or temporary reinforced
concrete constructions.
1. In the designation of concrete mix M
refers to the mix and the number to the 3.2.2.2 Mix of Ordinary Concrete :
specified compressive strength of 150 mm Ordinary concrete is classified according to
2
size cube at 28 days, expressed in N/mm the mix proportion by volume of its
2. For concrete of compressive strength ingredients viz. cement: fine aggregate:
greater than M55, mix designs may be coarse aggregate. The Ordinary Concrete of
obtained from specialized literatures and different mixes to be used for different types
experimental results. of structures are given in Table 3.7 below for
guidance. The list is only indicative.

TABLE 3.7
MIXES OF ORDINARY CONCRETE
DIFFERENT MIXES OF ORDINARY CONCRETE AND THEIR APPLICATION
SL Type of works Mix of Maximum Water in Consistency
Ordinary size of Litres
Concrete coarse per Bag
aggregate of
cement
1 Concrete deposited under water, 1:1 ½ :3 12mm to 30 Medium
RCC water retaining structures, well 20mm

Page 68 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

kerbs, platforms, important RC


structures, piles, arches etc.
2 Beams, slabs, columns, retaining 1:2:4 12mm to 32 to 36 Stiff to
walls, roads, pavements, drive ways, 40mm medium
bunkers, foundation of bridges, bed
blocks, drain linings etc.
3 Mass concrete work for retaining 1:3:6 12mm to 37 to 40 Stiff to
walls, compound walls, part of flooring 40mm medium
of water tanks resting on ground,
machine bases, foundation of bridges
etc.
4 Foundations under column footings, 1:4:8 20mm to 45 Medium
wall foundations, mass concrete for 40mm
heavy wall, Plain Concrete, Hearting
of abutments & pipes, retaining walls
with stone facing in hilly area etc
5 Foundations of ordinary buildings 1:5:10 20mm to 60 Medium
encasing pipes etc / of light structures 40mm

The anticipated compressive strength of different mixes of Ordinary Concrete is as under :

2
Concrete Mix Compressive Strength (kg/cm )
7 days 28 days
1: 1 ½ : 3 175 265
1:2:4 140 210

3.2.3 Durability of Concrete


3.2.3.1 General 3.2.3.2 Requirements for Durability
A durable concrete is one that performs 3.2.3.2.1 General environment The
satisfactorily in the working environment durability of concrete depends on its
during its anticipated exposure conditions resistance to deterioration and the
during service. The materials and mix environment in which it is placed. The
proportions shall be such as to maintain its resistance of concrete to weathering,
integrity and, if applicable, to protect chemical attack, abrasion, frost and fire
reinforcement from corrosion. depends largely upon its quality and
The factors influencing durability include : constituents materials. Susceptibility to
corrosion of the steel is governed by the
(a) the environment;
cover provided and the permeability of
(b) the cover to embedded steel; concrete. The cube crushing strength alone
(c) the type and quality of constituent is not a reliable guide to the quality and
materials; durability of concrete; it must also have an
(d) the cement content and water/cement adequate cement content and water-cement
ratio of the concrete; ratio. The general environment to which the
concrete will be exposed during its working
(e) workmanship, to obtain full
life is classified in five levels of severity that
compaction and efficient curing; and
is mild, moderate, severe, very severe and
(f) the shape and size of the member. extreme, as described below in Table 3.8.

Page 69 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

TABLE 3.8
ENVIRONMENTAL EXPOSURE CONDITIONS
(Based on Table 3 of IS 456:2000 and Table in Para 5.4.1 of Concrete Bridge Code, 1997
C.S.No.1 dated 26.04.2000)

SL Environment Exposure Conditions


i) Mild Concrete surfaces protected against weather or aggressive
conditions, except those situated in coastal area.
ii) Moderate Concrete surface sheltered from severe rain or freezing whilst wet;
Concrete exposed to condensation and rain; Concrete continuously
underwater.
Concrete in contact or buried under non-aggressive soil/ ground
water.
Concrete surfaces sheltered from saturated salt air in coastal area.
iii) Severe Concrete surfaces exposed to severe rain, alternate wetting and
drying or occasional freezing whilst wet or severe condensation;
Concrete completely immersed in sea water; Concrete exposed to
coastal environment.
iv) Very severe Concrete surfaces exposed to sea water spray, corrosive fumes or
severe freezing conditions whilst wet.
Concrete in contact with or buried under aggressive sub-soil/ ground
water.
v) Extreme Concrete surface exposed to abrasive action/ Surface of members in
tidal zone. Members in direct contact with liquid / solid aggressive
chemicals.

Note : For the purpose of determining obtained by the use of suitable air entraining
exposure conditions, all places within a admixtures. When concrete lower than
distance of 10 km of coastal line, sea front grade M50 is used under these conditions,
would be treated as coastal area. the mean total air content by volume of the
3.2.3.2.2 Freezing and Thawing: Where fresh concrete at the time of delivery into the
freezing and thawing actions under wet construction site should be as under.
conditions exist, enhanced durability can be

Nominal Maximum Size Aggregate (mm) Entrained Air Percentage


20 5+1
40 4+1

3.2.3.2.3 Exposure to sulphate attack : sheet; or surface coating based on asphalt,


For the very high sulphate concentration in chlorinated rubber, epoxy, or polyurethane
Class 5 conditions given in Table 3.9 below; materials should also be used to prevent
some form of lining such as polychloroprene access by the sulphate solution.

Page 70 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

TABLE 3.9
REQUIREMENTS FOR CONCRETE EXPOSED TO SULPHATE ATTACK
(Based on IS 456-2000 Table 4)
SL Class Concentration of Sulphates Dense, fully compacted made
Expressed as SO3 Concrete with 20 mm Nominal Maximum
in Soil Size Aggregates Complying
Type of Cement with IS: 383
In soil In
Ground
SO3 in Minimum Maximum Free
2:1 Water Cement Water Cement
Total
SO3 Water: Content Ratio
3
Soil gms/ kg/m
Extract litre
Percent
gms/ litre
(i) 1 Traces Less Less Ordinary Portland cement or 280 0.55
(<0.2) than than Portland slag cement or
1-0 0.3 Portland Pozzolana cement

(ii) 2 0,2 to 1.0 to 0.3 to Ordinary Portland cement or 330 0.50


0,5 1.9 1.2 Portland slag cement or
Portland Pozzolana cement

Super sulphated cement or


sulphate resisting Portland 310 0.50
cement
(iii) 3 0.5 to 1.9 to 1.2 to Super sulphated cement or 330 0.50
1.0 3.1 2.5 sulphate resisting Portland
cement
Portland Pozzolana cement or
Portland slag cement 350 0.45

(iv) 4 1.0 to 3.1 to 2.5 to Super sulphated cement or 370 0.45


2.0 5.0 5.0 sulphate resisting Portland
cement
(v) 5 More More More Sulphate resisting cement or 400 0.40
than 2.0 than 5.0 than Super sulphated cement with
5.0 protective coatings.

Notes : class, cement contents above these


1. Cement content given in this table is minimum are advised.
irrespective of grades of cement. 5. For severe conditions, such as thin
2. Use of super sulphated cement is sections under hydrostatic pressure on one
generally restricted where the prevailing side only and sections partly immersed,
temperature is above 40 C.
0 considerations should be given to a further
reduction of water-cement ratio.
3. Super sulphated cement gives an
acceptable life provided that the concrete is 6. Portland slag cement conforming to IS :
dense and prepared with a water-cement 455 with slag cement more than 50 percent
ratio of 0.4 or less, in mineral acids, down to exhibits better sulphate resisting properties.
pH 3.5. 7. Where chloride is encountered with
4. The cement contents as given in col.7 of sulphate in soil or ground water, ordinary
this table are the minimum recommended. Portland cement with C3 A content from 5 to
For SO3 contents near the upper limit of any 8 percent shall be desirable to be used in
concrete, instead of sulphate resisting

Page 71 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

cement. Alternatively, Portland slag cement performance of such blended cements in


conforming to IS:455 having more than 50 these conditions.
percent slag or a blend of ordinary Portland 3.2.3.2.4 Chlorides in Concrete : The total
cement and slag may be used provided amount of chlorides content (as C1) in the
sufficient information is available on concrete at the time of placing shall be as
given in Table 3.10 below.

TABLE 3.10
MAX. CHLORIDE CONTENT VIS-À-VIS TYPE OF USE
(BASED ON IS 456-2000 TABLE 7)
Maximum Total Acid
Type of Use of Concrete Soluble – Chloride
SL
Content Expressed as
3
kg/m of Concrete
(1) (2) (3)
Concrete containing metal and steam cured at elevated
(i) 0.4
temperature and pre-stressed concrete.
Reinforced concrete or plain concrete containing embedded
(ii) 0.6
metal.
Concrete not containing embedded metal or any material
(iii) 3.0
requiring protection from chloride.

3.2.3.2.5 Sulphates in Concrete : The total One of the main characteristics influencing
water-soluble sulphate content of the the durability of any concrete is its
concrete mix, expressed as SO3, should not permeability. With strong, dense
exceed 4 percent by mass of the cement in aggregates, a suitably low permeability is
the mix. The sulphate content should be achieved by having a sufficiently low water-
calculated as the total from the various cement ratio, by ensuring as thorough
constituents of the mix. compaction of the concrete as possible and
The 4 percent limit does not apply to by ensuring sufficient hydration of cement
concrete made with super-sulphated cement through proper curing methods. Therefore,
complying with IS: 6909. for given aggregates, the cement content
should be sufficient to provide adequate
3.2.3.2.6 Minimum Grade of Concrete
workability with a low water-cement ratio so
From durability consideration, depending that concrete can be completely compacted
upon the environment to which the structure by vibration.
is likely to be exposed during its service life,
The limits for maximum water cement ratio
minimum grade of concrete shall be as
for design mix shall be based on
given as per Table 5 of IS-456-2000.
environmental conditions as defined in Para
However in case of bridges , it shall be as
3.2.3.2.1. The limits for maximum water-
per Table 4 (b) of IRS Concrete Bridge
cement ratio for different environmental
Code 1997.
conditions shall be as given in Table
3.2.3.2.7 Maximum Water Cement Ratio No.3.12 below.
for different Environmental Conditions

Table 3.12 MAXIMUM WATER CEMENT RATIO


(Based on Table 4(a) C.Slip No.8 dated 15.02.2006 of Concrete Bridge Code 1997)

Environment Plain Concrete Reinforced Concrete Pre-stressed


(PCC) (RCC) Concrete (PSC)
Mild 0.55 0.50 0.45
Moderate 0.50 0.50 0.40
Severe 0.50 0.45 0.40

Page 72 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

Very Severe 0.50 0.45 0.35


Extreme 0.45 0.40 0.35

3.2.3.2.8 Cementitious Material Content:- Table 3.13. Maximum cementitious material


3.
(Refer Correction Slip No.8 dated content shall be limited to 500 kg/ m
15.02.2006 to Concrete Bridge Code, 1997) Cementitious material means cement or
Depending upon the environment to which cement mixed with mineral admixtures like
the structure is likely to be exposed during its Pozzolanic Fly Ash (PFA) / Grounded
service life, minimum cementitious material granulated Blast furnace slag (GGBFS),
content in concrete shall be as given in Microsilica, etc.

Table 3.13 MINIMUM CEMENTITIOUS MATERIAL CONTENT


(Based on Table 4(c) C. Slip No.8 dated 15.02.2006 of Concrete Bridge Code 1997)

3
Environment Minimum cementitious material content in Kg/m
Plain Concrete Reinforced Pre-stressed
(PCC) Concrete (RCC) Concrete (PSC)
Mild 210 300 350
Moderate 250 300 400
Severe 250 350 430
Very Severe 300 400 440
Extreme 300 400 440

Note : For underwater Concrete 10% extra than 20mm, the workability / slump will be
Cement should be added over and above the lower whether it is Design Mix Concrete,
normal cement content of the Concrete mix Nominal Mix Concrete or Ordinary Concrete.
specified above. The Designer should clearly indicate the
3.2.4 Workability of Concrete Water Cement ratio and slump for the mix
based on strength and workability criteria.
3.2.4.1 The concrete mix proportion chosen
The field Engineer can then do field check to
should be such that the concrete is of
see if the workability is satisfactory with the
adequate workability for the placing
water cement ratio stipulated, taking into
conditions of the concrete and can properly
account the site conditions. Even if there is
be compacted with the means available.
any difficulty in workability, the water cement
Suggested ranges of workability of concrete
ratio should be maintained and the
measured in accordance with IS : 1199 are
workability improved by use of Plasticiser /
given in Table 3.14A. Slump is to be
admixture with the approval of the Engineer
measured by Slump Test (See Annexure
or alternatively by adding more water with
3.4). Where required suitable type of
corresponding extra quantity of cement. At
plasticiser/ Admixture may be used to
the time of making the mix at site, the total
achieve the desired workability. Degree of
quantity of free water to be added to the mix
workability and slump are for concreting with
based on Water Cement ratio should be
vibration. Where concreting is done without
reduced to the extent of surface water in the
vibration, higher degree of workability /
wet aggregates. This aspect has been dealt
greater slump will be required. For
with in detail in subsequent para 3.2.6.7.
concreting with aggregate of smaller size

Page 73 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

TABLE 3.14A
WORKABILITY VIS-À-VIS PLACING CONDITIONS
(Based on IS 456-2000; Para 7.1)
Placing Conditions Degree of Slump (mm)
Workability
Blinding concrete; Shallow sections; Pavements using pavers Very low See Note 2
Mass concrete; Lightly reinforced sections in slabs, beams, walls, Low 25-75
columns, Floors, Hand placed pavements; Canal lining; Strip footings
Heavily reinforced sections in slabs, beams, walls, columns Medium 50-100
Slip form work; Pumped concrete Medium 75-100
Trench fill; In-Situ piling High 100-150
Tremie concrete Very high See Note 3

Note : 1) For most of the placing than slump (see IS : 1199) and a value of
conditions, internal vibrators (needle compacting factor of 0.75 to 0.80 is
vibrators) are suitable. The diameter of the suggested.
needle shall be determined based on the 3) In the „very high‟ category of
density and spacing of reinforcement bars workability, measurement of workability by
and thickness of sections. For tremie determination of flow will be appropriate (see
concrete, vibrators are not required to be IS : 9103).
used (see also Para 3.2.11.5)
2) In the „very low‟ category of workability
3.2.4.2 Para 5.3.1 of Concrete Bridge Code
where strict control is necessary, for
1997 has laid down the following on
example, pavement quality concrete,
workability as given in Table 3.14B.
measurement of workability by determination
of compacting factor will be more appropriate

TABLE 3.14B
WORKABILITY VIS-À-VIS PLACING CONDITIONS
(Based on Para 5.3.1 of Concrete Bridge Code 1997)

Placing conditions Degree of workability Values of workability


(1) (2) (3)
Concreting of shallow sections Very low 20-10 seconds vee-bee time or
with vibration 0.75-0.80 compacting factor
Concreting of lightly reinforced Low 10-5 seconds vee-bee time or
sections with vibration 0.80-0.85 Compacting factor
Placing conditions Degree of workability Values of workability
Concreting of lightly reinforced Medium 5-2 seconds vee-bee time or
sections without vibration or 0.85-0.92 compacting factor or
heavily reinforced section with 25-75 mm slump for 20mm
vibration aggregate (see Note 1)
Concreting of heavily reinforced High Above 0.92 compacting factor or
sections without vibration 75-125mm slump for 20mm
aggregate. (See Note 1)

Note : 1) For smaller aggregates the slump conform to Clause 4.4 of Concrete Bridge
values will be lower. Code, extracts given in Para 3.1.3.13 above.
2) Suitable plasticiszer/ admixture may be 3.2.5 Concrete Mix Proportioning :
used to achieve workability of the order of 3.2.5.1 Mix Proportion
160/200mm. Plasticizer/admixture should

Page 74 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

The mix proportion shall be selected to Since 1978 IS 456 does not include
ensure the workability of the fresh concrete volumetric mix method of mix proportioning
and when concrete is hardened, it shall have and therefore its use is to be discouraged. In
the required strength, durability and surface exceptional circumstances, when even
finish. nominal mix Grade concrete can not be
Information required:- In specifying a used, volumetric mix may be used for
particular grade of concrete, the following concrete of grade M20 and below with the
information shall be included:- permission of the Engineer. The volumetric
mixes equivalent to various grades is
i) Type of mix i.e. design mix concrete or
indicated in Para 3.2.5.6 below.
nominal mix concrete;
Similarly in some of the existing Type
ii) Grade designation;
drawings etc, ordinary Concrete with the
iii) Type of cement; volumetric proportions like 1:2:4, 1:3:6 etc
iv) Maximum nominal size of aggregate; are specified and the same shall be used for
v) Minimum cement content (for design mix mix proportioning.
concrete); 3.2.5.4 Design Mix Concrete: (Grade
vi) Maximum water cement ratio; Concrete)
vii) Workability; (a) General :-This is the recommended
method for all concrete designated by Grade.
viii) Mix proportion (for nominal mix
Design Mix is mandatory for grades higher
concrete);
than M20. For concrete of compressive
ix) Exposure conditions; strength greater than M55 specialised
x) Maximum Temperature of concrete at literature should be consulted.
the time of placing; (b) Mix design and proportioning:
xi) Method of placing; Recommended Guidelines for Concrete Mix
xii) Degree of supervision; Design are given in IS 10262 which may be
xiii) Type of aggregate; referred to for details. As mentioned therein
in order that not more than the specified
xiv) Maximum cement content; and proportion of test results are likely to fall
xv) Whether an admixture shall or shall not below the characteristic strength, the
be used and the type of admixture and concrete mix has to be designed for a
the conditions of use; and somewhat higher target average
3.2.5.2. Proportioning for Grade Concrete: compressive strength. In terms of Clause
The determination of the proportion of 9.2.2 of IS 456 the Target Mean Strength of
cement, aggregate and water to attain the Concrete mix should be equal to the
required strengths shall be made as follows:- characteristic strength plus 1.65 times the
Standard Deviation. Mix proportions shall be
(a) Design Mix: By designing the concrete designed to ensure that the workability of
mix; such concrete shall be called “Design fresh concrete is suitable for conditions of
mix concrete”. handling and placing, so that after
(b) Nominal Mix: By adopting nominal compaction it surrounds all reinforcements
concrete mix such concrete shall be called and completely fills the form work. When
„Nominal mix concrete‟. concrete is hardened, it shall have the
Design mix concrete is preferred to nominal stipulated strength, durability and
mix. If design mix concrete cannot be used impermeability.
on a work for any reason such as non Determination of the proportions by weight of
availability of a competent Engineer who can cement, aggregate and water shall be based
do the design, small quantity of Concrete on design of the mix.
involved in the work etc., for grades of M20 As a trial the manufacturer of concrete may
or lower, nominal mixes, as indicated in Para prepare a preliminary mix according to
3.2.5.5 below, may be used with the provisions of SP:23-1982. (Special
permission of the Engineer. Publication 23-1982 of Bureau of Indian
It should be noted that in Nominal Mix Standards).
Concrete the proportion of ingredients is by Mix design shall be tried and the mix
weight and not by volume. proportions checked on the basis of tests
3.2.5.3 Proportioning for Ordinary conducted at a recognized laboratory
Concrete: approved by the Engineer.

Page 75 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

All concrete proportions for various grades of each grade of concrete designed for
of concrete shall be designed separately and various workability conditions to the Engineer
the mix proportions established keeping in for his comments and approval. Concrete or
view the workability for various structural any particular design mix and grade shall be
elements, methods of placing and produced/manufactured for works only on
compacting. obtaining written approval of the Engineer.
(c) Standard Deviation For any change in quality/quantity in the
Standard deviation calculations of test ingredients of a particular concrete, for which
results based on tests conducted on the mix has been designed earlier and approved
same mix design for a particular grade by the Engineer the mix has to be
destination shall be done in accordance with redesigned and approval obtained again.
Clause 9.2.4 of IS 456. Table 8 of IS 456 3.2.5.5 Nominal Mix Concrete :
gives the standard deviation that can be (Grade Concrete)
assumed for design of mix in the first (a) With the approval of the Engineer,
instance. The final standard deviation figures Nominal Mix Concrete (proportions by
may be determined based on test results for mass/weight) may be used for concrete of
the particular grade of concrete when Grade M15 or lower. The proportions of
available. materials for nominal mix concrete shall be in
(d) Approval of Design Mix accordance with Table.3.15 below.
The producer/manufacturer/contractor of
concrete shall submit details of each trial mix

TABLE 3.15
(a) PROPORTIONS FOR NOMINAL MIX CONCRETE M5 TO M 15
(On other than Bridge works Based on IS 456-2000: Table 9)
Grade of Total Quantity of Dry Aggregates by Mass Proportion of Fine Quantity of
Concrete per 50 Kg of Cement, to be taken as the Sum Aggregate to Coarse Water per 50
of the Individual Masses of Fine and Coarse Aggregate (by Mass) kg. Of
Aggregates, Kg. Max. Cement, Max.
M5 800 Generally 1:2 but 60
subject to an upper
M 7.5 625 limit of 1:1 ½ and a 45
M 10 480 lower limit of 1:2 ½. 34
M 15 330 32

Note : by weight) on the proportions given in Table


1) The proportion of the fine to coarse 3.15
aggregates should be adjusted from upper 3) The cement content of the mix
limit to lower limit progressively as the specified above shall be proportionately
grading of fine aggregates becomes finer increased if the quantity of water in a mix has
and the maximum size of coarse aggregate to be increased to overcome the difficulties
becomes larger. Graded coarse aggregate of placement and compaction, so that the
shall be used. Example : For an average water-cement ratio as specified is not
grading of fine aggregate falling under Zone exceeded.
II of Table 4 of IS : 383-The proportions shall 4) In case of vibrated concrete the limit
be 1:1 ½ , 1 : 2 and 1 : 2 ½ for maximum specified for water may be suitably reduced
size of aggregates in the ascending order 10 to avoid segregation.
mm, 20 mm and 40 mm respectively.
5) The quantity of water used in the
2) The proportion of Fine to Coarse concrete mix for reinforced concrete work
Aggregate should be fixed keeping in mind should be sufficient, but not more than
the above guidelines and Cubes of mix cast sufficient to produce a dense concrete of
and tested at 28 days to confirm that the adequate workability for its purpose, which
minimum characteristic strength stipulated will surround and properly grip all the
has been attained with Cement, fine reinforcement. Workability of the concrete
aggregate, Coarse aggregate and water (all should be controlled by maintaining a water
content that is found to give a concrete,

Page 76 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

which is just sufficiently wet to be placed and properly constructed gauge boxes on a clean
compacted without difficulty by means platform. If the sand is moist necessary
available. allowance shall be made for bulking. The
6) If nominal mix concrete made in contents of the gauge boxes shall not be
accordance with the proportions given for a consolidated by ramming but it will be
particular grade does not yield the specified desirable to shake them lightly in order to
strength, such concrete shall be specified as remove the excessive looseness.
belonging to the appropriate lower grade. Notes :
Nominal mix concrete proportioned for a 1) All aggregates to be used should be
given grade in accordance with Table 3.15 graded aggregates.
above shall not however be classified in
2) Sand should be coarse sand only. Stone
higher grade on the ground that the test
dust should not be used for any RCC
strengths are higher than the minimum
work or important mass concrete.
specified.
3) Fine sand can be used only for 1:3:6
7) It is recommended that fine aggregate
concrete with 40mm coarse aggregate
conforming to grading Zone IV should not be
and other leaner mixes.
used in reinforced concrete unless tests
have been made to ascertain the suitability 4) Cement shall be measured by weight
of proposed mixed proportions. only. A standard bag of Cement can be
partaken as weighing 50 kg. or 0.50
3.2.5.6 Ordinary Mix Concrete:
quintal equivalent volume of 0.035 cum.
a) (i) For concrete of Grades M 20 and lower
3.2.6 Batching
when volumetric mix is used the following
volumetric mixes can be assumed to 3.2.6.1 (a) To avoid confusion and error in
correspond to the Grade of concrete shown batching, consideration should be given to
against them. These figures were included in using the smallest practical number of
IS 456-1964 for general guidance on different concrete mixes on any site or in any
approximate correspondence between one plant. In batching concrete, the quantity
Grade concrete and Ordinary Concrete. In of both cement and aggregate shall be
subsequent revisions of IS 456 these determined by mass except where
equalising mix proportions have not been volumetric batching is permitted by the
included. Engineer; admixture, if solid, by mass;
liquid admixture may however be measured
M-10 -- 1:3:6
in volume or mass as recommended by
With 40mm Coarse Aggregate
manufacturer; water shall be weighed or
M-15 -- 1:2:4 measured by volume in a calibrated tank
M-20 -- 1:1 ½:3 (see also IS : 4925). Batching plant, if used,
Though not mentioned in any earlier IS, should conform to IS:4925.
based on field experience M-5 can be taken (b) Ready-mixed concrete supplied by
as equivalent to 1:5:10/ 1:6:12 and M-7.5 ready-mixed concrete plant shall be
equivalent to 1:4:8. Volumetric mix will also preferred. For large and medium project
become applicable in cases of works to be sites the concrete shall be sourced from
carried out as per older type plans of ready-mixed concrete plants or from on site
buildings etc wherein concrete mix has been or off site batching and mixing plants. (see IS
shown as 1:3:6, 1:2:4, 1: 1 ½ :3 etc. : 4926). Annexure 3.5 may be seen for
These volumetric proportions are to be taken details.
with the aggregates in a surface dry 3.2.6.2 Except where it can be shown to the
condition. Accordingly allowance should be satisfaction of the Engineer that supply of
made for the bulking in volume of fine properly graded aggregate of uniform quality
aggregate to be used in the mix. Also the can be maintained over a period of work, the
quantity of free water to be added to the mix grading of aggregate should be controlled by
should take into account the surface obtaining the coarse aggregates in different
moisture already present in the wet sizes (single size upgraded) and blending
aggregates. Similarly the water required for them in the right proportions when required,
bone dry aggregates to become surface dry the different sizes being stocked in separate
should also be kept in mind. Detailed stock – piles. The materials should be stock-
explanation on this issue has been given in piled for several hours preferably a day
subsequent Para 3.2.6.7. before use. The grading of coarse and fine
b) Proportioning : All ingredients shall be aggregate should be checked as frequently
measured separately and accurately in as possible, the frequency for a given job

Page 77 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

being determined by the Engineer to ensure batching is adopted, allowance shall be


that the specified grading is maintained. The made for bulking in accordance with IS:2386
grading of coarse aggregates shall be as per (Part III).
IS 383 (see Table 3.1). The combined 3.2.6.5 It is important to maintain the water-
aggregate shall also conform to “All in cement ratio constant at its correct value. To
aggregate” of the grading under IS 383 (See this end, determination of moisture contents
Table 3.5). in both fine and coarse aggregates shall be
3.2.6.3 The accuracy of the measuring made as frequently as possible, the
equipment shall be within +2 percent of the frequency for a given job being determined
quantity of cement being measured and + 3 by the Engineer according to weather
percent of the quantity of aggregate, conditions. The amount of the added water
admixtures and water being measured. shall be adjusted to compensate for any
3.2.6.4 In terms of Para 5.6.2.2 of Concrete observed variations in the moisture contents.
Bridge Code, in case uniformity in the For determination of moisture content in the
materials used for concrete making has been aggregates. IS : 2386 (Part 3) may be
established over a period of time, the referred to. To allow for the variation in mass
proportioning may be done by volume of aggregate due to variation in their
batching for M 20 grade and below Grade moisture content, suitable adjustments in the
concrete with the approval of the engineer, masses of aggregates shall also be made. In
provided the materials and aggregates the absence of exact data, only in the case
conform to the grading as per IS:383. Where of nominal mixes, the amount of surface
weigh batching is not practicable, the water may be estimated from the values
quantities of fine and coarse aggregate (not given in Table 3.17 below. Field Test for
cement) may be determined by volume determination of Surface Moisture is at
batching for concrete of grade upto M 20. If Annexure 3.2.
the fine aggregate is moist and volume

TABLE 3.17
SURFACE WATER CARRIED BY AGGREGATE
(Based on IS:456-2000, Table 10/ Concrete Bridge Code 1997 Table 6)

SL Aggregate Approximate Quantity of Surface Water


3
Percent by Mass Litre /m of aggregate
(i) Very wet sand 7.5 120
(ii) Moderately wet sand 5.0 80
(iii) Moist sand 2.5 40
(iv) Moist gravel or crushed rock 1.25-2.5 20-40

Note : Coarser the aggregate, less the sand have almost the same volume. But
surface water it will carry for the same damp sand increases in volume depending
Volume of aggregate. upon moisture content. The allowance for
3.2.6.6 No substitutions in materials used on bulking for any sample of sand shall be
the work or alteration in the established determined as per IS 2386 (Part III).
proportions, except as permitted in 3.2.6.4. Reference may be made Table 26.4 of
and 3.2.6.5. shall be made without additional Chapter 26 on “Mortar” giving relation
tests to show that the quality and strength of between the moisture content and
concrete are satisfactory. percentage of bulking of average sand.
3.2.6.7 Implication of existence of Surface b) Absorption of water by Bone dry
Water or absence of it in coarse and fine aggregate : In hot summer the sand and
aggregates coarse aggregate will be bone dry and will
actually absorb some water from the
a) Bulking of aggregates : This
concrete mix to become “surface dry”. This
phenomenon is prominent in fine aggregate
absorption will reduce the effective quantity
and is not taken into account for the coarse
of water in the mix. In the absence of a
aggregate. Surface Dry and fully saturated
regular test to determine the absorption

Page 78 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

capacity of the aggregates, absorption may above. Thus from the quantity of water
be assumed as 1.00% by weight for average stipulated as per water cement ratio, the
sand and 0.50% by weight for coarse surface water available in Fine and coarse
aggregates such as Trap rock and granite. aggregates should be deducted before
c) Surface water in aggregates : For adding free water to the mix.
the determination of actual moisture content If the aggregates are bone dry, they will
in the aggregates, Annexure 3.2 and IS absorb some water to become surface dry as
2386 (Part III) may be referred to. In the explained in (d) above. Thus, for the quantity
absence of exact data, only in the case of of water stipulated as per water cement ratio,
mixes other than design mix, the amount of extra quantity of free water should be added
surface water may be estimated from the to maintain the water cement ratio as
values given on Table 10 of IS 456 given as stipulated.
Table 3.17. In all cases, if there is any difficulty in
d) Mix Proportion on volumetric Basis placement and compaction due to non
– Fine aggregate to be used : In this case workability with the water cement ratio as
the volume of sand is stipulated on the stipulated for the mix, extra water as required
assumption that the sand is surface dry. If it may be added but simultaneously adding
is wet or has surface water, there will be extra cement so that the stipulated water
bulking. The actual bulking % should be cement ratio is not exceeded. Alternatively
determined as per IS 2386 (Pt. III). In with the approval of the Engineer, suitable
absence of test result, the figures given in plasticizer / admixtures may be used to
sub para (c) above may be assumed. Thus, improve workability.
if the volume of surface dry sand (average 3.2.7 Mixing
grade) in the mix is specified as 100 litres,
3.2.7.1 General : To avoid confusion and
the actual wet sand volume to be used will
error in batching, consideration should be
be 122 litres, if the moisture content % by
given to using the smallest practical number
weight is 3%.
of different concrete mixes on any site or in
e) Mix Proportion on weight basis – any one plant. A competent person shall
Coarse and Fine aggregates to be added : supervise all stages of production of
In this case also, the weights of coarse and concrete. Competent person is one who
fine aggregates are stipulated on the has been authorized by the Engineer for
assumption that they are surface dry. If they executing and supervising relevant aspect of
are wet, their unit weight will be more due to concreting. Preparation of test specimens
weight of surface water. This should be and site tests shall be properly supervised.
correctly assessed by tests as per IS 2386 The Engineer shall be afforded all
(part III). In absence of exact data, the % by reasonable opportunity and facility to inspect
mass for fine and coarse aggregates may be the materials and the manufacture of
taken as shown in (e) above. Thus if 100 gm concrete and to take any samples or to make
of surface dry sand is to be used and at site any tests.
it is very wet sand, the weight of wet sand to
Concrete shall be mixed in mechanical batch
be used will be 107.50 gm; Similarly if 100
type concrete mixers conforming to IS : 1791
gm of coarse aggregate is to be used and it
having two blades and fitted with power
is moist; the weight of moist coarse
loader (lifting hopper type). Half bag mixers
aggregate to be used will be 101.25 gm to
and mixers without lifting hoppers shall not
102.50 gms depending on the coarseness.
be used for mixing concrete.
f) Mix proportions whether on
In exceptional circumstances, such as
Volumetric basis or weight basis –
mechanical break down of mixer, work in
quantity of free water to be added : The
remote areas or power breakdown and when
water cement ratio is specified for the mix
the quantity of concrete work is very small,
and the weight and corresponding volume of
hand mixing may be done with the specific
water to be used for the mix per bag of
prior permission of the Engineer in writing
cement can be determined based on the
subject to adding 10% extra cement. When
same
hand mixing is permitted, it shall be carried
If the aggregates are wet with surface water, out on a water tight platform and care shall
they will contribute to this requirement of be taken to ensure that mixing is continued
water as indicated in (e) above. While the until the concrete is uniform in colour and
actual volume of surface water has to be consistency. In case Brick aggregate is used,
determined by IS 2386 (Part III), the before mixing, the brick aggregate shall be
approximate figures may be seen in (e) well soaked with water for a minimum period

Page 79 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

of two hours and stone aggregate or gravel (a) The hopper shall be of adequate
shall be washed with water to remove, dirt, capacity to receive and discharge the
dust and other foreign materials. For maximum nominal batch of unmixed
guidance, the mixing time may be 1 ½ to 2 materials without spillage under normal
minutes for normal mixer and 45 to 60 operating conditions on a level site.
seconds for high rated Batching Plant. For Note : In such a case the volume of the
hydrophobic cement it may be taken as 2 ½ maximum nominal batch of mixed material
to 3 minutes. will be 50% greater than the nominal mixed
3.2.7.2 Power Loader: Mixer will be fitted batch capacity.
with a power loader complying with the (b) The minimum inside width of the
following requirements:- feeding edge of the hopper shall be as
specified below.

Nominal size of mixer (T, NT or R) litre Minimum inside width of hopper


feeding edge (metre)
140 1.0
200 1.1
280 1.2
375 1.4
500 1.5
1000 2.0
T – tilting NT – non-tilting R – Reverse

c) The design of the loader shall be such (f) The clutch and brake control
that it allows the loading hopper to be arrangements also be so designed that the
elevated to such a height that the centre line operator can control the falling speed of the
of the chute plate of the hopper when in loader.
discharge position, is at an angle of not less (g) Safety device shall be provided to
o
than 50 to the horizontal. A mechanical secure the hopper in raised position when
device to aid discharge of the contents as not in use.
quickly as possible from the hopper to the
3.2.7.3 Mixing Efficiency : (a) The mixer
drum may also be provided. Even when a
shall be tested under normal working
mechanical device is provided, it is
conditions in accordance with the method
recommended that the angle of centre line of
specified in IS: 4643 with a view to check its
the chute plate of the hopper when in
ability to mix the ingredients to obtain
discharge position, should be as large as
0 concrete having uniformity within the
practicable, preferably not less than 40 to
prescribed limits.
horizontal.
3.2.7.4. Procedure for Machine Mixing:
(d) When the means of raising and
The mixer shall be flushed clean with water.
lowering the loading hopper includes flexible
Measured quantity of coarse aggregate shall
wire ropes winding on to a drum or drums,
be placed first in the hopper. This shall be
the method of fastening the wire to rope to
followed with measured quantity of fine
the drums shall be such as to avoid, as far
aggregate and then cement. In case fine
as possible any tendency to cut the strands
aggregate is damp, half the required quantity
of the ropes and the fastening should
of coarse aggregate shall be placed in the
preferably be positioned clear of the barrel of
hopper, followed by fine aggregate and
the drum as for example, outside the drums
cement. Finally the balance quantity of
flange. When the loading hopper is lowered
coarse aggregate shall be fed in the hopper.
to its normal loading position, there should
Then the dry materials are slipped into the
be at least one and a half drums of rope on
drum by raising the hopper and the dry
the drum.
materials mixed for at least four turns of the
(e) Clutch brake and hydraulic control drum. While the drum is rotating, water shall
lever shall be designed so as to prevent be added gradually to achieve the water
displacement due to liberation by accidental cement ratio as specified or as directed by
contact with any person.

Page 80 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

the Engineer. After adding water, the mixing free fall of concrete that can be permitted
shall be continued until concrete of uniform may be taken as 1.5 metre.
colour, uniformly distributed material and 3.2.8.2 To place concrete on heights, the
consistency is obtained. Mixing shall be most economical and convenient method is
done for at least two minutes after adding concrete lift. For large works cranes are
water. If there is segregation after unloading used. Concrete is also conveyed by means
from the mixer, the concrete should be of pumps in very large work. The concrete
remixed. The drum shall be emptied before should be placed in horizontal layers of
recharging. When the mixer is closed down uniform thickness. Unless the previous layer
for any time exceeding 20 minutes, the drum is properly compacted the second layer
shall be flushed clean with water. should not be started. The concrete should
3.2.7.5 Procedure for Hand Mixing : When be laid fast as otherwise before the second
hand mixing has been specifically permitted layer is started the first layer may get set
in exceptional circumstances by the thus forming a cold joint. The thickness of
Engineer subject to adding 10% extra layer in an RCC work can be 150mm to
cement, it shall be carried out on a smooth, 200mm and for plain concrete the same can
clean and water tight platform of suitable be 375mm to 500mm. While concreting
size. Measured quantity of sand shall be members like walls, beams, and girders, the
spread evenly on the platform and the first batch should be placed at the ends and
cement shall be dumped on the sand and the subsequent pouring continued towards
distributed evenly. Sand and cement shall the centre. When the concrete has to be
be mixed intimately with spade until mixture placed at a lower level, chutes are generally
is of even colour throughout. Measured used. However, an open chute should not
quantity of coarse aggregate shall be spread be permitted under any circumstance. A
on top of cement sand mixture. Three totally covered chute should be used. The
quarters of the total quantity of water slope of chute should be between 1:2 to 1:3
required shall be added in a hollow made in and must be adequately supported on all
the middle of the mixed pile and the material sides. To prevent any segregation, the height
is turned towards the middle of pile with of drop of concrete from chute to the point of
spade. The whole mixture is turned slowly placing should be properly adjusted.
over again and again and the remaining Sometimes it is noticed that while speedily
quantity of water is added gradually. The concreting the tall forms, water gathers on
mixing shall be continued until concrete of the top surface of concrete. This should not
uniform colour and consistency is obtained. be allowed. In such a case the concreting
The mixing platform shall be washed and should be stopped for about half an hour
cleaned at the end of the day. when the top 300mm high concrete is to be
3.2.7.6. Transportation and Handling: laid. The concreting can be restarted
Concrete shall be transported from the mixer immediately thereafter. At the same time,
to the place of laying as rapidly as possible one should carefully note that no initial set
by methods which will prevent the takes place as it will result in forming a cold
segregation or loss of any of the ingredients joint. In arch work, the arch must be sub-
duly maintaining the required workability. divided in the direction of the axis of the
barrel into such widths that a complete ring
During hot or cold weather, concrete shall be
can be laid continuously without stopping.
transported in deep containers. Other
These rings should be laid alternately and
suitable methods to reduce the loss of water
the gaps between laid afterwards. The
by evaporation in hot weather and heat loss
Engineer or his authorized representative
in cold weather may also be adopted.
must always supervise all concrete laid in
3.2.8 Placing arches. If, from any unforeseen occurrence,
3.2.8.1 The concrete shall be deposited as it is found not possible to complete by
nearly as practicable in its final position to continuous laying any ring of an arch, the
avoid re-handling. It shall be laid gently (not cement concrete must be stopped with a
thrown) and shall be thoroughly vibrated and slope that is radial to the soffits of the arch.
compacted before setting commences and Before the arch ring is completed oiled paper
should not be subsequently disturbed. must be placed over the surface of the
Method of placing shall be such as to already deposited concrete so as to form a
preclude segregation. Care shall be taken to joint.
avoid displacement of reinforcement or 3.2.9 Compaction
movement of form work and damage due to
rains. As a general guidance, the maximum

Page 81 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

3.2.9.1 General : Concrete shall be iii) With perfect vibration higher density
thoroughly compacted and fully worked concrete with good homogeneity and
around embedded fixtures and into corners higher strength can be obtained.
of the form work. Compaction shall be done iv) Concrete with greater durability can be
by mechanical vibrator of appropriate type till achieved.
a dense concrete is obtained. The
Different types of vibrators in use are as
mechanical vibrators shall conform to IS:
follows :
2505, IS:2506, IS.2514 and IS.4856. To
prevent segregation, over vibration shall be 1) Internal pin vibrators
avoided. 2) External form vibrators
Compaction shall be completed before the 3) Table vibrators
initial setting starts. For the items where 4) Plate vibrators
mechanical vibrators are not to be used, the
5) Screed vibrators
contractor shall take permission of the
Engineer in writing before the start of the (b) Vibration Functions
work. After compaction the top surface if External or internal vibration is commonly
exposed but not subject to wear shall be used on construction works, for compacting
finished even and smooth with wooden concrete. When concrete is vibrated, the
trowel before the concrete begins to set. vibration produces a series of rapid
Any excess water or cream on the surface compressive impulses which greatly reduces
shall be removed. Dry cement or a dry the friction, or internal cohesion between
mixture of cement and sand shall not be various size particles of the mix. Thus, the
sprinkled on the surface to absorb such concrete just behaves like liquid and easily
excess moisture. settles under the action of gravity in the
3.2.9.2 Hand Compaction : This, where forms, and during the process the unwanted
permitted by the Engineer, is the most entrapped air rises to the top surface. As
suitable method for small jobs and in very soon as the vibration is stopped the internal
thin sections where a mechanical vibrator of friction gets re-established and the concrete
any type cannot be used. starts setting.
The hand tapping is done by a tamping rod (c) Internal Pin Vibrators
of suitable length and thapis. The rod should These vibrators are called immersion
be long enough to reach the bottom and thin vibrators or needle vibrators or poker
enough to pass through the reinforcements vibrators. They are operated on petrol, diesel
to reach the bottom. or even on electricity. The vibrating heads
Another method of hand tapping is spading. called needles range from 20mm to 175mm
In this case the trowel (Thapi) or spade like diameter connected to the flexible shaft. The
tool is inserted between side of form work vibrating head is immersed in concrete
and concrete, thus forcing the larger imparting vibratory motion in the concrete.
aggregate of concrete deeper into the mass (d) External Form Vibrators
of concrete. This way, the air entrapped These vibrators are attached to the form
during transporting and placing is able to work. The forms must be strong enough to
escape. withstand the effect of vibration. Form
In case of paving work or a heavy flooring vibrators are either electrically or
work, a heavy timber beam with proper pneumatically operated. They should be so
camber is placed on the top of concrete and placed that the intensity of vibration is
the same is rammed. This gives proper uniformly spread over the form. The time
compaction. required for proper vibration by a form
3.2.9.3 Compaction by Machines vibrator is considerably longer than by
(a) The following advantages accrue by internal vibration.
compacting the concrete by machines and is When the form vibrators are being used, the
to be adopted in circumstances other than in top 750mm portion should not be covered by
Para 3.2.9.2 above. the action of the form vibrators. The above
gap can be vibrated by internal vibrator.
i) Mix with low water cement ratio can be
used. The form vibrators are most suitable when
the reinforced section is very heavy and the
ii) A section with heavy and congested
reinforcements can be successfully internal vibrator cannot be used at all. Form
compacted. vibrator can be attached to the exposed face
of the reinforcement bars to vibrate them.

Page 82 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

This will help remove the air trapped under scrubbing the wet surface with wire or bristle
the bars. This type of vibration will increase brushes, care being taken to avoid
the bond between the concrete and dislodgement of particles of coarse
reinforcement bars. aggregate. The surface shall be thoroughly
(e) Table Vibrators wetted and all free water removed. The
surface shall then be coated with neat
These vibrators are mainly used for pre-cast
cement slurry @ 2 kg. of cement per sqm.
items. These are attached to the tables
On this surface, a layer of concrete not
where the precasting moulds are kept and
exceeding 150 mm in thickness shall first be
the unit vibrates along with the table top.
placed and shall be well rammed against
(f) Plate/ Surface Vibrators corners and close spots of work. Thereafter,
These are best suited for pavement and work shall proceed in the normal way.
similar type works. They apply vibration 3.2.10.4 On construction joints in plain and
through a flat plate at bottom direct to the reinforced concrete in General Bridge
concrete surface. These vibrators save a Constructions reference may be made to
great deal of labour in levelling and finishing Para 8.5 and Appendix “A” of Concrete
of concrete. These vibrators should not be Bridge Code, 1997.
used for concrete with a slump greater than
3.2.11 Concreting under Special
75mm.
Conditions
Also the surface vibrators should not be used
3.2.11.1 Mass Concrete
on a surface which is already adequately
compacted since the additional vibration will (a) Mass Concrete is to be deposited in
result in accumulation of mortar and fine layers not exceeding 40 cm thickness and
material in excess quantity on the surface complete layers of concrete should be laid in
which in turn will reduce wear resistance. a day.
(g) Screed Vibrators (b) Care shall be exercised to avoid
disturbing the setting action of the concrete,
These are mostly used for road works. The
and unless sufficient time has elapsed for the
vibrator is attached to the timber section
setting to take place, no imposed load, such
having handles on both ends. The unit is
as that caused by walking over it, laying
thus called screed vibrator. All the
planks or other timber upon it or other loads,
conditions mentioned for surface vibrators
however light, shall be allowed. Earth must
apply to screed vibrators as well.
never be rammed in the vicinity of reinforced
3.2.10. Construction Joints concrete less than one month old.
3.2.10.1 : Concreting shall be carried out (c) Use of Stone plums : Stone plums upto
continuously up to construction joints. The a maximum limit of 20 percent of the volume
position and arrangement of construction of concrete may be used in mass concrete,
joints shall be as shown in the structural where so specified or permitted by the
drawings or as directed by the Engineer. Engineer, with a view to economy. The
Number of such joints shall be kept plums shall be of granite or other approved
minimum. Joints shall be kept as straight as hard stone, and of maximum dimension from
possible. Construction joints should comply 150 to 220mm but not greater than one-third
with IS:11817. the least dimension of the concrete mass.
3.2.10.2 When the work has to be resumed The plums shall be located only in zones not
on a surface which has hardened, such subject to tensile stresses, which may
surface shall be roughened. It shall then be generally be taken as the middle half of the
swept clean and thoroughly wetted. For cross section on the case of piers and the
vertical joints, neat cement slurry of workable front three-fourth in the case of abutments.
consistency by using 2 Kg of cement per The plums shall be free from sharp corners
sqm shall be applied on the surface before it and shall be staggered laterally and spaced
is dry. For horizontal joints, the surface shall suitably apart to permit proper filling and
be covered with a layer of mortar about 10- consolidation of the inter-space with
15 mm thick composed of cement and sand concrete.
in the same ratio as the cement and sand in 3.2.11.2 Concreting in Cold weather
concrete mix. This layer of cement slurry or
During cold weather, precautions shall be
mortar shall be freshly mixed and applied
taken, to the satisfaction of the Engineer to
immediately before placing of the concrete.
ensure that the concrete shall have a
3.2.10.3 Where the concrete has not fully temperature of atleast 4.5 deg. C and that
hardened, all laitance shall be removed by the temperature of the concrete shall be

Page 83 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

o
maintained above 2 C until it has thoroughly case to reduce the flow of water to less than
hardened. If necessary, aggregates and / or 3m per minute through the space into which
water used on mix shall be heated before concrete is to be deposited. Cofferdams or
mixing. No frozen materials or material forms in still water shall be sufficiently tight to
containing ice shall be used. The concrete prevent loss of mortar through the walls.
placed shall be protected against frost by Dewatering by Pumping shall not be done
suitable covering. Dependence should not while concrete is being placed, or until 24
be placed on salt or other chemicals for the hours thereafter.
prevention of freezing. (f) Concrete shall be deposited
3.2.11.3 Concreting in hot weather continuously until it is brought to the required
During hot weather, precautions shall be height. While depositing, the top surface
taken to see that the temperature of wet shall be kept as nearly level as possible and
concrete does not exceed 38 deg. C. For the formation of seams avoided. The
this, concreting may be avoided during the methods to be used for depositing concrete
hottest part of the day and may be done under water shall be one of the following:-
during the morning and evening hours. Tremie : The concrete should be coherent
3.2.11.4 Concreting in Rainy Weather and slump shall be more than 150mm but
should not exceed 180mm. When concreting
During rainy weather, sufficient supply of
is carried out under water, a temporary
tarpaulins or other water proof cloth shall be
casing should be installed to the full depth of
provided by the contractor at the site of work.
bore hole or 2 m into non-collapsible stratum,
Any time when it rains, all freshly laid
so that fragments of ground cannot drop
concrete which has not been covered for
from the sides of the hole into the concrete
curing purposes, shall be adequately
as it is placed. The temporary casing may
protected by means of such tarpaulins or
not be required except near the top when
other waterproof cloth. Any concrete injured
concreting under drilling mud. The top
by rain shall be removed and replaced at the
section of the tremie shall be a hopper large
expense of the contractor.
enough to hold one entire batch of mix or the
3.2.11.5 Concreting under water entire contents of the transporting bucket
(a) When it is necessary to deposit when one is used. The tremie pipe shall be
concrete under water, the methods, not less than 200mm in diameter and shall
equipment, materials and proportions of the be large enough to allow free flow of
mix to be used shall be submitted to, and concrete and strong enough to withstand the
approved by the Engineer before the work is external pressure of the water in which it is
started. suspended, even if a partial vacuum
(b) Concrete shall not be placed in water develops inside the pipe. Preferably flanged
having a temperature below 4.5 .C. The
o steel pipe of adequate strength to sustain the
temperature of the concrete, when greatest length and weight required for the
deposited, shall be not less than 16 deg. C job should be used. A separate lifting device
nor more than 38 deg. C. shall be provided for each tremie pipe with its
hopper at the upper end. Unless the lower
(c) The concrete shall contain atleast 10
end of the pipe is equipped with an approved
percent more cement than that required for
automatic check valve, the upper end of the
the same mix placed in the dry, the quantity pipe shall be plugged with a wadding of
of extra cement varying with conditions of gunny sacking or other approved material
placing. The volume or weight of the coarse
before delivering the concrete to the tremie
aggregate shall be not less than one and a
pipe through the hopper, which plug will be
half times, nor more than twice, that of the
forced out of the bottom end of the pipe by
fine aggregate. The concrete shall be so
filling the pipe with concrete. It will be
proportioned as to produce a concrete necessary to raise slowly the tremie by 25
having a slump of not less than 10 cm and cm to 30 cm in order to cause a uniform flow
not more than 18 cm.
of the concrete, but the tremie shall not be
(d) The water under which the concrete is emptied so that water enters above the
laid shall be quite still and any movement in concrete in the pipe. At all times after the
the water shall be stopped by sheeting so as placing of concrete is started and until all the
to divide into compartments the place where concrete is placed, the lower end of the
the concrete is being deposited. tremie pipe shall be atleast 600mm below
(e) In case cofferdams or forms are being the top surface of the plastic concrete as
provided, the same shall be sufficiently tight ascertained by sounding.. This will cause
to ensure still water if practicable, and in any the concrete to build up from below instead

Page 84 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

of flowing out over the surface, to avoid (iv) In reinforced concrete structures, care
formation of laitance layers. If the charge in shall be taken to protect the reinforcement
the tremie is lost while depositing, the tremie from exposure to saline atmosphere during
shall be raised above the concrete surface, storage, fabrication and use. It may be
and unless sealed by a check valve, it shall achieved by treating the surface of
be re-plugged at the top end, as at the reinforcement with cement wash or by other
beginning, before refilling for depositing suitable methods as provided for in the
concrete. Contract.
Drop Bottom Bucket : The concrete shall 3.2.11.7 Concrete in Aggressive Soils
be gently laid in position by means of and Water
approved skips or buckets with flaps or doors The destructive action of aggressive waters
automatically opening at the bottom. The top on concrete is progressive. The rate of
of the bucket shall be open. The bottom deterioration which varies with the alkali
doors shall open freely downward and resisting property of the cement used
outward when tripped. The bucket shall be decreases as the concrete is made stronger
filled completely and lowered slowly to avoid and more impermeable, and increases as
backwash. It shall not be dumped until it the salt content of the water increases.
rests on the surface upon which the concrete Where structures are only partially immersed
is to be deposited and when discharged shall or are in contact with aggressive soils or
be withdrawn slowly until well above the water on one side only, evaporation may
concrete. cause serious concentrations of salts with
(g) To minimise the formation of laitance, subsequent deterioration even where the
great care shall be exercised to disturb the original salt content of the soil or water is not
concrete as little as possible while it is being high. The selection of type of cement,
deposited. No tamping or ramming shall be therefore, should be made after thorough
done until the concrete surface rises above investigation. For particular problems the
water level, and even then, the surface shall Engineer should decide upon the method.
be tamped gently so as not to squeeze the No concrete shall be allowed to come in
water. Care must be taken that tamping is contact with sea water within 72 hours of
not done in a manner as to permit any casting.
disturbance of mortar or leakage or suction 3.2.12 Curing
of the same from the concrete.
3.2.12.1 General : Curing is the process of
3.2.11.6 Concrete in Sea Water: preventing loss of moisture from the
Concrete in sea-water or exposed directly concrete. The importance of curing can be
along the sea-coast shall be at least M20 appreciated from the details given at
Grade in the case of plain concrete and M30 Annexure 3.6. The following methods shall
in case of reinforced concrete. The use of be employed for effecting curing.
slag or Pozzolana cement is advantageous
3.2.12.2. Moist curing : Exposed surfaces of
under such conditions.
concrete shall be kept continuously in a
(i) Special attention shall be given to the damp or wet condition by ponding or by
design of the mix to obtain the densest covering with a layer of sacking, canvas,
possible concrete. Slag, broken brick, soft Hessian or similar materials and kept
lime stone, soft sandstone, or other porous constantly wet for at least 7 days from the
or weak aggregates shall not be used. date of placing concrete in case of ordinary
(ii) As far as possible, preference shall be Portland cement and at least 10 days where
given to use of pre cast members un- mineral admixtures or blended cements are
reinforced, well-cured and hardened, without used. The period of curing shall not be less
sharp corners, and having trowel-smooth than 10 days for concrete exposed to dry
finished surfaces free from crazing, cracks or and hot weather conditions. In the case of
other defects. Plastering should be avoided. concrete where mineral admixtures or
(iii) No construction joint shall be allowed blended cements are used, it is
within 60 mm below low water-level or within recommended that above minimum period
60 mm of the upper and lower planes of may be extended to 14 days.
wave action. Where unusually severe 3.2.12.3 Membrane Curing: Approved
conditions or abrasion are anticipated, such curing compounds may be used in lieu of
parts of the work shall be protected by moist curing with the permission of the
bituminous or silico-fluoride coatings or stone Engineer. Such compound shall be applied
facing bedded with bitumen. to all exposed surfaces of the concrete as
soon as possible after the concrete has set.

Page 85 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

Impermeable membrane such as polythene 3.2.13 Testing of concrete :


sheet covering the concrete surface may This will be done as described in Chapter 4
also be used to provide effective barrier on R.C.C.
against the evaporation.
3.2.14 Form work
3.2.12.4 Freshly laid concrete shall be
Form work shall be as described in Chapter
protected from rain by suitable covering.
4 on R.C.C. and shall be paid for separately
3.2.12.5 Over the foundation concrete, the unless otherwise specified.
masonry work may be started after 48 hours
3.2.15 Finishes
of its completion, but the curing of exposed
surfaces of cement concrete shall be Plastering and special finishes other than
continued along with the masonry work for at those obtained through form work shall be
least 7 days. And where the cement specified and paid for separately unless
concrete is used as base concrete for otherwise provided for in the Contract.
flooring, the flooring may be commenced 3.2.16 Application of Load
before the curing period of base concrete is The following minimum periods shall be
over but the curing of base concrete shall be allowed to elapse after the concreting is
continued along with top layer of flooring for completed before the load is imposed on it.
a minimum period of 7 days.

50 percent of 75 percent of Full designed


designed load designed load load
Ordinary Cement concrete 7 days 14 days 28 days
Rapid - hardening Cement 5 days 10 days 14 days
Concrete

Note : 1. The expression “Load” means the 3.2.17.4 No deduction shall be made for the
total calculated load with the appropriate following:-
impact allowance specified for the speed at (a) Ends of dissimilar materials for
which the load is permitted. example beams, posts, girders, rafters,
2. The above periods shall be suitably purlins, trusses, corbels and steps up to 500
increased where the mean air temperature is sq.cm in cross sections.
less than 5˚.C (b) Opening upto 0.1 sq.metre (1000
3.2.17. Measurements sq.cm.)
3.2.17.1. Dimensions of length, breadth and (c) Volume occupied by pipes, conduits,
thickness shall be measured correct to sheathing etc., not exceeding 100 sq.cm.
nearest cm. except for the thickness of slab each in cross sectional areas.
and partition which shall be measured to (d) Small voids when these do not exceed
nearest 5 mm. Areas shall be worked out to 40 sq.cm. each in cross section.
nearest 0.01 sqm and the cubic contents of
Note : In calculating area of opening, the
consolidated concrete shall be worked out to
thickness of any separate lintel or sill shall be
nearest 0.001 cum. Any work done in excess
included in the height. Nothing extra shall be
over the specified dimensions or sections
payable for forming such openings or voids.
shown in the drawing shall be ignored.
3.2.17.5 Cast-in-situ and precast concrete
3.2.17.2. Concrete work executed in the
work shall be measured separately.
following conditions shall be measured
separately, unless otherwise specified in the 3.2.17.6 Cast-in-situ concrete shall be
contract. classified and measured as follows, unless
otherwise stipulated in the Schedule of
a. Work in or under water
Rates.
b. Work in liquid mud
1. Foundation, footings, bases for columns.
c. Work in or under foul positions
2. Walls (any thickness) including attached
3.2.17.3. Cast-in-situ concrete and /or pre- pilasters, buttresses, plinth and string
cast concrete work shall be measured in courses, fillets etc.,
stages described in the Schedule of item of
3. Shelves
work:
4. Slabs

Page 86 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

5. Chajjas including portions bearing on the 17. Kerbs, steps and the like
wall 18. String or lacing courses, parapets,
6. Lintels, beams and bressummers copings, bed block, anchor blocks, plain
7. Columns, piers, abutments, pillars, post window sills and the like
and struts 19. Cornices and moulded windows sills.
8. Staircase including stringer beams but 20. Louvres, fins, fascia
excluding landings 3.2.17.7 Precast cement concrete solid
9. Balustrades, Newels and sailing articles shall be measured separately and
10. Spiral staircase (including landings) shall include use of moulds, finishing the top
surfaces even and smooth with wooden
11. Arches
trowel, before setting in position in cement
12. Domes, vaults mortar 1:2 (1 cement:2 coarse sand) Plain
13. Shell roof, arch ribs and folded plates and moulded work shall be measured
14. Chimneys and shaft separately and the work shall be classified
and measured as under :
15. Breast walls, retaining, walls return walls
16. Concrete filling to precast components

Classifications Method of measurement


(a) Wall panels In square meters stating the thickness.
(b) String or lacing courses, copings bed plats, plain In cubic meters.
windows sills, shelves, louvers, steps etc.
(c) Kerbs, edgings etc., In cubic meters.
(d) Solid block work In square meters stating the thickness or in
cubic meters.
(e) Hollow block work In square meters stating the thickness or in
cubic meters.
(f) Light weight Partitions In square meters stating the partition‟s
thickness.

3.2.18 Rate 3.3.1.1 Fly Ash Concrete shall be prepared


The rate is inclusive of the cost of labour and by mixing graded coarse aggregate of
materials involved in all the operations nominal size as specified with fine
described above, unless otherwise provided aggregate, ordinary Portland cement and fly
for in the Contract. ash in specified proportions with required
quantity of water. The recommended
3.3. CEMENT FLY ASH CONCRETE
composition of cement-fly ash concrete is
3.3.1. General:- given in Table 3.18 below for Ordinary Mix
Concrete.

TABLE 3.18
FLY ASH CONCRETE MIXES
Composition (Dry volume) Compressive strength at 7 days
Lean Concrete (1:5:10) 2.8 kg. /cm2
Cement (Ordinary Port land) 1.0
Fly Ash 2.5
Sand 4.0
Stone Aggregate 11.0
Lean Concrete (1:4:8) 3.7 kg/cm2
Cement (Ordinary Port land0 1.0

Page 87 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

Fly ash 2.0


Sand 3.5
Stone aggregate 9.0

Note : No fly ash is to be added to Damp proof course shall be cured for at
Pozzolana cement. least seven days, after which it shall be
3.3.1.2 In terms of Correction Slip No. 9 allowed to dry.
dated 27.03.2006 to Concrete Bridge Code,
when Portland Pozzolana Cement is used in 3.4.3 Application of Hot Bitumen
Plain and Reinforced Concrete, it is to be
Where so directed, hot bitumen in specified
ensured that proper damp curing of concrete
quantity shall be applied over the dried up
is done atleast for 14 days and supporting
surface of cement concrete properly cleaned
form work is not removed till concrete attains
with brushes and finally with a piece of cloth
atleast 75% of Design strength.
soaked in kerosene oil. Bitumen of
3.3.2. Proportioning : This shall be as penetration A 90 or equivalent where used
specified in 3.2.5. shall be heated to a temperature of 160 +5
o
o
3.3.3. Mixing : This shall be as specified in C. The hot bitumen shall be applied
3.2.7 except that the fly ash shall be placed uniformly all over, so that no blank spaces
in the hopper before cement in case of are left anywhere. It will be paid for
machine mixing. separately.
3.3.4 Placing and compaction : This 3.4.4 Water proofing Materials
shall be as specified in 3.2.8 and 3.2.9.3 Where so specified, water proofing material
3.3.5 Curing:- This shall be as specified of approved quality shall be added to the
in 3.2.12 concrete mixture in accordance with the
3.3.6 Form work : This shall be as manufacturer‟s specifications stating the
specified in 3.2.14. quantity of water proofing material in litres or
kg per 50 kg of cement and this will be paid
3.3.7 Measurements : This shall be as
for separately. A layer of 400 micron thick
specified in 3.2.17.
polyethylene sheet may be laid over the
3.3.8 Rate : This shall be as specified in bitumen layer which will be paid extra.
3.2.18.
3.4.5 Measurements
3.4 DAMP PROOF COURSE WITH
The length and breadth shall be measured
CEMENT CONCRETE
correct to a cm and its area shall be
3.4.1 Cement Concrete layer calculated in square metres correct to two
This shall consist of cement concrete of places of decimal. The depth shall not be
specified proportions and thickness. The less than the specified thickness at any
surface of brick or stone masonry work shall section.
be levelled and prepared before laying the 3.4.6 Rate
cement concrete. Edge of damp proof
The rate is inclusive of the cost of materials
course shall be straight, even and vertical.
and labour involved in all the operations
Side shuttering shall consist of steel forms
described above except for the applications
and shall be strong and properly fixed so
of a coat of hot bitumen and addition of
that it does not get disturbed during
water proofing materials which shall be paid
compaction and the mortar does not leak
for separately, unless otherwise specified.
through. The concrete mix shall be of
workable consistency and shall be tamped
thoroughly to make a dense mass. When 3.5 Specifications for Bisphenol and
the sides are removed, the surface should Butyl Based Products :
come out smooth without honey-combing.
Continuity shall be maintained while laying
3.5.1 Bisphenol and Butyl Based Epoxy
the cement concrete layer and laying shall
Coating
be terminated only at the predetermined
location where damp proof course is to be The coating should adhere to following
discontinued. There shall be no construction Standards :
joint in the Damp Proof Course. 1. ISO Standards as per ISO / TS / 16949-
3.4.2 Curing 2002 / 069734 TS2

Page 88 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

2. EN Standards – EN ISO 14001 – 2004 /


069734 UM Product Characteristics :
3. OHSAS 18001 : 1999 / 069734 OH 1. Fast Curing – 1 hours.
4. CFIA standards. 2. Compressive Strength as per ASTM
Product Characteristics : C109 13000 psi
1. Curing – 24 hours. 3. High Temperature Resistant : -29°C to
2. Working life @ 25 °C : 40 to 60 minutes +1090°C
(Easy application ) 4. Coefficient of Thermal Expansion as per
3. Compressive Strength as per ASTM ASTM C 531:10 power -6 in/in/F
D695 : 15000 psi Pre Tg - 5.95
4. High Temperature Resistant : -29°C to Post Tg – 6.11
+107°C 5. Resistant to Chemicals and Ultra Violet
5. Non Shrinking after 100% curing light.
6. Resistant to Chemicals and Ultra Violet
light. 3.5.3 Gun Grade, Poly Urethane Based
Crack Sealer :
3.5.2 Magnesium Poly Phosphate Based The coating should adhere to the following
Concrete Fast Repair Epoxy : Standards :
The coating should adhere to following 1. ISO Standards as per ISO / TS / 16949-
Standards : 2002 / 069734 TS2
1. ISO Standards as per ISO / TS / 16949- 2. EN Standards – EN ISO 14001 – 2004 /
2002 / 069734 TS2 069734 UM
2. EN Standards – EN ISO 14001 – 2004 / 3. OHSAS 18001 : 1999 / 069734 OH
069734 UM 4. CFIA standards.
3. OHSAS 18001 : 1999 / 069734 OH 5. USDA Approved.
4. CFIA standards. Product Characteristic :
Concrete Fast Repair (Beam Repair – 1. Tensile Strength as per ASTM D 412 -
Before) 200 psi
2. Shear Strength as per ASTM D 1002 -
170 psi
3. Elongation at Break as per ASTM D 412
– 1000 %
4. Hardness in Shore A – 33.
5. Can be used for indoor and outdoor
applications.
6. Paintable.
7. Resistant to chemicals and ultra Violet
light.

3.5.4 Bisphenol Polyurethane Coating of


Concrete Fast Repair (Beam Repair – After) 100% Solid Epoxy :
The coating should adhere to the following
Standards :
1. ISO Standards as per ISO / TS / 16949-
2002 / 069734 TS2
2. EN Standards – EN ISO 14001 – 2004 /
069734 UM
3. OHSAS 18001 : 1999 / 069734 OH
4. CFIA standards.
5. Salt water spray resistant with min. 1000
hrs. spray.
6. Compatible to potable water.

Page 89 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

Product Characteristic :
1. Viscosity – 40000 – 60000 cps.
2. Coefficient of Thermal Expansion as per
ASTM C 531 K-1
Pre Tg - 5.95
Post Tg – 6.11
3. Compressive Strength as per ASTM
D695 – 9840 psi
4. Shear Strength as per ISO 4587 – 2190
psi.
5. Abrasion Resistant as per ASTM D 4060 Product Characteristic :
– 49 mg. 1. Curing – Light pedestrian traffic: 12
6. Water Vapour Transmission rate as per hours.Heavy pedestrian traffic: 72 Hours
ASTM E 96 – 4 * 10 power 11 2. Working life @ 25 º Cel – 04 Hours (
7. Thermal Conductivity as per ASTM F – Easy application)
433 watt / mk – 0.42. 3. Coefficient of friction, ASTM F609, 1.05
4. High Temperature Resistant: - 29º C to
3.5.5 Special Anti-Slip Coating : 60º C.
Supplying and applying of two components 5. Resistant to acids, alkalis, solvents,
anti-slip coating, which should withstand grease, oil, salt water, detergents,
heavy vehicular and pedestrian traffic. It alcohol, gasoline, jet fuels & hydraulic
should also adhere to metal, wood and oils.
concrete surfaces. Coating must be Scope of Work :
chemical and corrosion resistant. Job 1. The surface to be repaired has to be
includes cleaning and priming of the surface cleaned thoroughly using water based
with suitable metal or concrete primer, cleaner to remove all visible and in-
abrasive cleaning of surface followed by
visible contaminants.
cleaning with suitable solvents.
2. Area has to be roughened using sander,
The coating should adhere to following chipping or other tools as will be
Standards :
required.
1. ISO Standards as per ISO /TS / 16949- 3. Re-cleaning of area with brush or dry
2002 / 069734 TS2 compressed air.
2. EN Standards - EN ISO 14001 -2004 /
4. Application of the product on the
069734 UM prepared surface using primer as per
3. OHSAS 18001 : 1999 / 069734 OH substrate concrete / metal.
4. CFIA standards. 5. Finish it off with roller or brush.

Page 90 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

ANNEXURE 3.1

DETERMINATION OF PARTICLE SIZE In order that the sieves shall not be


overloaded, care must be taken to ensure
that the maximum sieve loads shown in table
The apparatus, sample size and test
below are not exceeded at the completion of
procedure shall be same as specified in
sieving.
Annexure 26.4 in Chapter 26 on “Mortar”.

Maximum weight
I.S. Sieve for
45 cm dia sieve 30 cm dia sieve
(kg) (kg)
45 mm 10 4.5
40 mm 8 3.5
31.5 mm or 22.1 mm 6 2.5
20 mm 4 2
16 mm or 12.5 mm 3 1.5
10 mm 2 1.0
5.6 mm 1.5 0.75
4.75 mm 1.0 0.50
3.35 mm -- 0.30

The sample weights taken will thus normally placing is permitted. A light brush should be
require several operations on each sieve. used with fine sieves. The cumulative
Each sieve should be shaken separately weight passing each sieve should be
over a clean tray or receiver until no more calculated as a percentage of the total
than a trace passes, but in any case for not sample weight to the nearest whole number.
less than two minutes. Material should not
be forced through the apertures but hand

ANNEXURE 3.2 heating thereafter until the moisture is


evaporated and weigh the dry sample
(C).The surface moisture is then calculated
TEST FOR SURFACE MOISTURE
as follows:-
Surface moisture = 100 A – B
Take a sample of wet aggregate and weigh it
-------
(A). Then place it in a frying pan and gently
apply heat, meanwhile stirring with a glass C
rod until the surface moisture disappears. It is expressed as a percentage of dry
This is apparent when the aggregate loses aggregate.
its shining wet appearance and becomes
dull, or when it just attains a free running
condition. The saturated surface-dry
material is then weighed (B). Continue the

Page 91 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

ANNEXURE 3.3 retained on 10 mm I.S. Sieve. Each layer is


subjected to 25 strokes from the tamping rod
(16 mm dia and 45 to 60 cm long) rounded
DETERMINATION OF TEN PERCENT FINE
at one end, care being taken in case of weak
VALUE
materials not to break the particles. The
Apparatus : The apparatus for the standard surface of the aggregate shall be carefully
test shall consist of the following: levelled and the plunger inserted so that it
(a) A 15 cm diameter open-ended steel rests horizontally on this surface.
cylinder, with plunger and base plate. The Test procedure : The apparatus, with the
surfaces in contact with the aggregate shall test sample and plunger in position, shall
be machined and case hardened or then be placed in the compression testing
otherwise treated so as to have a diamond machine. The load shall be applied at a
(VH) pyramid hardness number of not less uniform rate so as to cause a total
than 650 VH. penetration of a plunger in 10 minutes of
(b) A straight metal tamping rod of circular about 15.0 mm for rounded or partially
cross-section 16 mm in diameter and 45 to rounded aggregates (for example, expanded
60 cm long. Rounded at one end. shales and slags). These figures may be
(c) A balance of capacity 3 kg. readable varied according to the extent of the
and accurate to one gram. rounding or honey combing.
(d) I.S. Sieve of 12.5, 10 and 2.36 mm. After reaching the required maximum
penetration, the load shall be released and
(e) A compression testing machine the whole of the material removed from the
capable of applying a load of 50 tonnes and cylinder and sieved on a 2.36 mm I.S. Sieve.
which can be operated to give a uniform rate
The fines passing the sieve shall be
of loading so that the maximum load in any
weighed, and this weight expressed as a
test is reached in 10 minutes. This load may
percentage of the weight of the test sample.
vary from 0.5 to 50 tonnes. Normally, this percentage will fall within the
(f) For measuring the sample, a range 7.5 to 12.5 but if it does not, a further
cylindrical metal measure of sufficient rigidity test shall be made at a load adjusted
to retain its form under rough usage and of appropriately, to bring the percentage fines
the following internal dimensions:- within the range of 7.5 to 12.5.
Diameter 11.5 cm A repeat test shall be made at the load that
Height 18.0 cm gives as percentage fines within the range
(g) Means of measuring the reduction in 7.5 to 12.5.
the distance between the plates of the Calculations : The mean percentage fines
testing machine to the nearest one millimetre from the two tests at this load shall be used
during the test (for example, dial gauge). in the following formula to calculate the load
Test Sample : Material for the test shall required to give 10 percentage fines.
consist of aggregate passing a 12.5 mm I.S. Load required for 10 percent fines = 14 X
Sieve and retained on a 10 mm I.S.Sieve. -------
The aggregate shall be tested in a surface
Y+4
dry condition. If dried by heating, the period
of drying shall not exceed four hours, the Where X = Load in Tonnes and
0 0
temperature shall be 100 C to 110 C and Y = Mean percentage of fines from
the aggregate shall be cooled to room two tests at X Tonnes load.
temperature before testing. Reporting of results : The load required to
The quantity of aggregate shall be such that produce 10 percent fines shall be reported to
the depth of material in the cylinder, after the nearest whole number for loads of 10
tamping as described below, shall be 10 cm. tonnes or more and the nearest 0.5 tonne for
The weight of material comprising the test loads of less than 10 tonnes. The value
sample shall be determined (weight A) and expressed to the nearest 0.5 tonne should
the same weight of sample shall be taken for be as follows:-
the repeat test. (a) For normal concrete, not less than 5
Note : About 6.5 kg. of natural aggregate is tonnes.
required to provide the two test samples. (b) For wearing surfaces, not less than 10
The measuring cylinder is filled in three tonnes.
layers of approximately equal depth with (c) For granolithic concrete not less than
aggregate passing a 12.5 mm I.S. Sieve and 15 tonnes.

Page 92 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

ANNEXURE 3.4 second and subsequent layers shall


penetrate into the underlying layer. The
bottom Layer shall be tamped through out its
SLUMP TEST
depth. After the top layer has been rodded,
the concrete shall be struck off level with
Apparatus : Mould shall consist of a metal trowel or the tamping rod, so that the mould
frustum of cone having the following internal is exactly filled. Any mortar which shall leak
dimensions: out between the mould and the base plate
Bottom diameter 20 cm shall be cleaned away. The mould shall be
removed from the concrete immediately after
Top diameter 10 cm filling by raising it slowly and carefully in a
Height 30 cm vertical direction. The moulded concrete
The mould shall be of a metal other than shall then be allowed to subside and the
brass and aluminium of at least 1.6 mm (or slump shall be measured immediately by
16 BG) thickness. The top and bottom shall determining the difference between the
be open and at right angles to the axis of the height of the mould and that of the highest
cone. The mould shall have a smooth point of specimen.
internal surface. It shall be provided with The above operations shall be carried out at
suitable foot pieces and handles to facilitate a place free from vibration or shock, and
lifting it from the moulded concrete test within a period of two minutes after
specimen in a vertical direction as required sampling.
by the test. A mould provided with a suitable Result : The sump shall be recorded in
guide attachment may be used. terms of millimetres of subsidence of the
Tamping rod shall be of steel or other specimen during the test. Any slump
suitable material 16 mm in diameter 60 mm specimen which collapses or shears off
long and rounded at one end. laterally gives incorrect result. If this occurs,
Procedure : The internal surface of the the test shall be repeated with another
mould shall be thoroughly cleaned and free sample.
from superfluous moisture and any set The slump test shall not be used for dry
concrete before commencing the test. The mixes as the results obtained are not
mould shall be placed on a smooth accurate.
horizontal, rigid and non absorbent surface
viz. levelled metal plate. The operator shall
hold the mould firmly in place while it is
being filled with test specimen of concrete.
The mould shall be filled in four layers, each
approximately one quarter of height of
mould. Each layer shall be tamped with
twenty five strokes of the rounded end of the
tamping rod. The strokes shall be
distributed in a uniform manner over the
cross-section of the mould and for the
1. “Ready Mixed Concrete (RMC) : RMC
means concrete produced by completely
mixing cement, aggregates, admixtures, if
any, and water at a Central Batching and
Mixing Plant and delivered in fresh condition
at site of construction.
ANNEXURE 3.5 2. Use of Ready Mixed Concrete : Ready
Mixed Concrete may be used, wherever
required. It shall conform to the
READY MIX CONCRETE
specifications of concrete, as laid down in
Concrete Bridge Code. For other aspects,
Indian Railway Standard Code of Practice which are not covered in Concrete Bridge
for Plain, Reinforced and Pre-stressed Code IS: 4926 (Specification for Ready
concrete for General Bridge Construction Mixed Concrete) may be referred.
(Concrete Bridge Code) 3. Effect of transit (transportation) time
Note : Based on Correction Slip No. 3 dated on Ready Mixed Concrete : As Ready
01.08.2000 to Concrete Bridge Code 1997. Mixed Concrete is available for placement

Page 93 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

after lapse of transit time, reduction in and aggregate or adding the cement to the
workability occurs, which may lead to aggregate, whichever is earlier. In case,
difficulty in placement of concrete. In location of site of construction is such that
addition, in case of longer transit time, initial this time period is considered inadequate,
setting of concrete may also takes place, increased time period may be specified
which may render it unusable. Thus, while provided that properties of concrete have
planning for using of Ready Mixed Concrete, been tested after lapse of the proposed
these aspects should be kept in view. delivery period at the time of finalizing mix
4. Checking suitability of Admixtures : design.
Generally admixtures, like water reducing 7. Transportation of Ready Mixed
agent, retarder etc., are used in Ready Concrete : The Ready Mixed Concrete
Mixed Concrete for retention of desired shall be transported in concrete transit
workability and to avoid setting of concrete. agitators conforming to IS: 5892
In such cases, admixtures should be tested (Specification for concrete transit mixers and
for their suitability as per IS: 9103 at the time agitators). Agitating speed of the agitators
of finalizing mix design. Regarding during transit shall not be less than 2
specification of admixtures, clause 4.4 of revolutions per minute nor more than 6
Concrete Bridge Code may be referred. revolutions per minute.
5. Re-tempering with Concrete : Under
any circumstances, re-tempering i.e. addition
of water after initial mixing, shall not be
allowed, as it may affect the strength and
other properties of concrete.
6. Time period for delivery of concrete :
The concrete shall be delivered completely
to the site of work within 1½ hours (when the
o
atmospheric temperature is above 20 C) and
within 2 hours (when the atmospheric
o
temperature is at or below 20 C) of adding
the mixing water to the dry mix of cement
The loss of water due to evaporation from
ANNEXURE 3.6 the freshly laid concrete depends mainly
upon the temperature and relative humidity
of the surrounding air. The velocity of wind
IMPORTANCE OF CURING over the surface of newly laid concrete also
Curing : adds to quick evaporation. Thus, if the
The most important aspect in concrete is temperature is hot with low relative humidity
curing. A concrete which is cured properly and hot winds blowing one must be very
will be stronger, durable, impermeable and careful about curing.
will be in a position to take up stress. It has to be understood that if hydration is
Chemical Action During Curing halted as a result of the loss of water due to
evaporation, the concrete in question
When water is mixed in concrete a chemical
shrinks, thus creating tensile stresses within
reaction called hydration takes place. This
the concrete, and if these stresses develop
hydration continues rapidly for first few days, before the concrete reaches its tensile
after the concrete is placed, but, for this strength the surface starts cracking
hydration to take place without interruption,
endangering the stability of the structure
favourable temperature and moisture
itself. Therefore to protect the quality of
conditions are to be maintained. The act of
concrete adequate curing arrangement
protection of hydration in concrete is in
should be made and this is applicable
broad terms called curing. whether the work is big or small.
Thus, it can be concluded that to facilitate The strength of concrete directly depends
the hydration in cement, the water that is
upon the period of curing a concrete
added in concrete during construction should
member is subjected to as may be seen
be prevented from evaporation. In other
from the Table below.
words, it is prevention or replenishment of
the loss of moisture from freshly placed
concrete, which is termed as curing.

Page 94 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete

EFFECT OF CURING IN ACHIEVING THE STRENGTH IN CONCRETE

SL Curing Days Compressive Strength percent of 28 day moist


cured concrete
1 No curing after laying 50% to 55%
2 Just 3 days curing 75% to 80%
3 7 days curing 95% to 100%
4 Full 28 days curing 120% to 125%

RECOMMENDED LIST OF TESTS ON MATERIALS AND WORKS

Material Para Test Field / Test Minimum Frequency of


Laboratory Procedure quantity of testing
Material for
carrying out test
Stone 3.1.2.1 Percentage of soft General IS 2386 One test for One test for each
aggregate or deleterious visual Part I each source source
material Inspection /
Laboratory
Test where
required by
the
Engineer
3.1.2.4 Particle size Field / Lab Annexure 10 cum Every 40 cum or
distribution 3.1 part thereof
3.1.2.8 (a) Estimation of Field / Lab IS 2386 10 cum -do-
organic Part II
impurities
(b) Surface Field / Lab IS 2386 10 cum -do-
moisture
(c) Determination Field / Lab IS 2386 10 cum -do-
of 10% fine
value
(d) Specific Field / Lab IS 2386 10 cum -do-
gravity
(e) Bulk density Field/ Lab IS 2386 10 cum -do-
(f) Aggregate Field /Lab IS 2386 10 cum -do-
crushing
strength
(g) Aggregate Field/Lab IS 2386 10 cum -do-
impact value
Concrete 3.2.4.1 Slump test Field ANNEXU 10 cum 15 cum or part
RE 3.4 thereof

Page 95 : Chapter 3
Unified Standard Specifications For Works & Materials Chapter 3 : Plain Concrete