Designing Ventilation For Battery Rooms


Jose Osmin Pineda, P.E.

There is no shortage of codes and guidance to consider when engineering for this
environment, but with a truly explosive worst-case scenario, it’s worth every effort to ensure
safe hydrogen management.

Battery rooms or stationary storage battery systems (SSBS) have code requirements such as
fire-rated enclosure, operation and maintenance safety requirements, and ventilation to
prevent hydrogen gas concentrations from reaching 4% of the lower explosive level (LEL).
Code and regulations require that LEL concentration of hydrogen (H2) be limited to 25% of LEL
or 1% of room volume. The room ventilation method can be either forced or natural and
either air-conditioned or unconditioned. Battery manufacturers require that batteries be
maintained at 77ºF for optimum performance and warranty. This article will look into the
battery room ventilation requirements, enclosure configurations, and the different ways to
accomplish them.

BACKGROUND

Typical applications of SSBS are as backup power in uninterruptible power supply (UPS)
systems for telecommunication rooms, electrical substations controls, and data centers. SSBS
provide temporary power during momentary power failure while the main backup power,
typically diesel or propane generators, synchronize with the power demand.

Typical battery SSBS are composed of batteries of the flooded lead-acid batteries, Valve
Regulated Lead-Acid (VRLA), or nickel- Cadmium (Ni-Cd) batteries, a battery charger, rectifiers,
inverters, converters, and associated electrical equipment. The SSBS are normally housed in a
room as a part of a main building or as a standalone enclosure. During the charging and
discharging of the batteries, H2 gas is released, which can be explosive and catastrophic at
levels between 4% of LEL and 74% of the HEL.

The applicable codes and regulations for designs, safety operation, and maintenance of
battery rooms are the Building Code, Mechanical Code, Fire Code, National Electrical Code
(NEC), Occupational Safety and Health Administration (OSHA), and the Institute of Electrical
and Electronics Engineers (IEEE) Standards.

CODES AND REGULATIONS

The following summarizes codes and requirements for ventilation at the national level. State
and local jurisdictions may have more stringent ventilation requirements. For example, the
digital.bnpmedia.com/publication/?i=494131&article_id=3078794&view=articleBrowser#{"issue_id":494131,"view":"articleBrowser","article_id":"307879… 1/7
8/15/2019 Digital Rendition

California Code of Regulations or CAL-OSHA, requires H2 gas concentration to not exceed 20%
of LEL or 0.8% of the room volume, compared to 25% of LEL or 1% of the room volume in the
national level. Check with your local jurisdiction for specific ventilation requirements.
Mechanical Code

The International Mechanical Code (IMC) specifies similar requirements as NFPA 1 and
International Fire Code. The Uniform Mechanical Code (UMC) does not directly address battery
room ventilation but specifies that if a proposed occupancy is not listed in Table 4-4, the
requirements for the listed occupancy that is most similar to the proposed space in term of
occupant density and occupancy type shall be used. The occupancy that resembles that of a
battery room on Table 4-4 is a science lab classroom where flammable or explosive gases may
be present. The ventilation rate required is 1.0 cfm/sq-ft.

These codes have additional requirements that specify the design, construction, and
installation of the ventilation system.

International Fire Code

The International Fire Code (IFC) requirements are such that when the battery storage system
contains more than 50 gallons of electrolyte for flooded lead-acid, nickel cadmium (Ni-Cd), and
valve regulated lead-acid (VRLA) or more than 1,000 pounds for lithium-ion batteries, the
ventilation requirements are as follows:

1.For flooded lead acid, flooded Ni-Cd, and VRLA batteries, the ventilation system shall be
design to limit the maximum concentration of hydrogen to 1% of the total volume of the
room; or

2.Continuous ventilation shall be provided at a rate of not less than 1 cubic foot per second of
the floor area of the room.

3.Mechanical ventilation system shall be supervised by an approved central, proprietary, or


remote station service, or shall initiate an audible and visual signal at a constant attended on-
site location.

NFPA 1 — Fire Code, has similar ventilation requirements as IFC, with the exception of
electrolyte quantity. NFPA 1 ventilation requirements apply to stationary storage battery
systems having more than 100 gallons of electrolyte in sprinklered buildings and more than 50
gal of electrolyte in unsprinklered.

National Electrical Code (NEC)

Article 480.9(A) of the NEC states that provisions appropriate to the battery technology shall be
made for sufficient diffusion and ventilation of the gases from the battery, if present, to
prevent accumulation of an explosive mixture.

Adequate ventilation is required to prevent classification of a battery location as a hazardous


(classified) location in accordance with Article 500.

Occupational Safety and Health Administration (OSHA)

digital.bnpmedia.com/publication/?i=494131&article_id=3078794&view=articleBrowser#{"issue_id":494131,"view":"articleBrowser","article_id":"307879… 2/7
8/15/2019 Digital Rendition

Title 29 Code of Federal Regulations — Ventilation shall be provided to ensure diffusion of the
gases from battery and to prevent accumulation of an explosive mixture.

The Institute of Electrical and Electronics Engineers (IEEE) Standards 1188, 450, 484, and 485
provide guides that focus on the battery system design, maintenance, and operation. All these
codes and regulations require ventilation or some type of provision to prevent H2 gas
accumulation to LEL level.

DESIGN CONSIDERATIONS

Applying Most Stringent Codes and Regulations

Considering the most stringent requirements from the different codes, the following codes
apply: OSHA, NFPA 1, IFC, and UMC or IMC. Also, it is worth noting that by providing adequate
ventilation at 1 cfm/sq-ft, the NEC Article 480.9(A) requirement is met and the battery room
need not be classified as a Hazardous location, Class I, Division 1, Group B, per NEC Article
500.

The codes allow for natural or mechanical ventilation. However, only mechanical ventilation
systems will be discussed due to the unreliability of natural ventilation. The two code-required
approaches to satisfy the ventilation requirements are to continuously ventilate the space at 1
cfm/sq-ft or intermittently ventilate the enclosure as needed by monitoring and limiting H2
concentration to not exceed 25% of LEL.

Continuous Ventilation

Of the two code requirements, continuous ventilation at 1 cfm/ sq-ft is the easier approach
since no calculation is needed for the H2 evolution rate. However, this option may be
impractical when the space is air conditioned, because exhausting conditioned air is a waste of
energy and the 77ºF room temperature normally required by the battery manufacturer will be
hard to maintain in high ambient temperature applications — a decision the owner must
consider in order maintain to batteries warranty.

The continuous ventilation system must be monitored for airflow and can be done by
installing a f low switch upstream or downstream of the exhaust fan at locations with
minimum air turbulence and stable static pressure readings. Flow switches are available with
Form C relays and can be used to send local or remote signals to notify maintenance
personnel if the exhaust fan is not operating.

The downside of continuous ventilation is that it increases maintenance and energy costs, and
reduces the service life of the fan. An estimated cost of approximately $200/yr of energy
would be wasted at rate of $2/cfm, assuming 100-cfm exhaust fan. Therefore, continuous
ventilation is recommended only when the space is not air conditioned.

An alternative variation of continuous ventilation in air conditioned battery room spaces is to


utilize, as makeup air, the conditioned air from other occupied spaces that would require
ventilation as part of the indoor air quality requirements.

Intermittent Ventilation, Monitoring, and Limiting H2 Concentration


digital.bnpmedia.com/publication/?i=494131&article_id=3078794&view=articleBrowser#{"issue_id":494131,"view":"articleBrowser","article_id":"307879… 3/7
8/15/2019 Digital Rendition

The second of the two code-required ventilating systems is the intermittent ventilation
coupled with H2 monitoring and limiting. This approach requires the design of a gas detection
and ventilation system that will operate only when it is needed. The ventilation system
requires the calculation of H2 evolution rate generated by the battery systems. This H2
evolution rate is crucial to properly sizing the exhaust fan. When calculating the H2 evolution
rate, the following factors need to be considered: types of batteries used (VRLA, flooded lead-
acid, or Ni-Cd), charging mode (float or boost mode), battery system charging current and
voltage, and the quantity of batteries. The H2 evolution rate can be calculated using IEEE
1635/ASHRAE Guideline 21 — Guide for the Ventilation and Thermal Management of Batteries
for Stationary Applications formulas. However, it is best to obtain the H2 evolution rate
directly from the battery manufacturer since the battery chemistry varies between battery
manufacturers.

The gas detection system monitors and limits the H2 concentration from exceeding the 25% of
LEL level in the space, and it interlocks with the exhaust fan to operate when H2 is detected.
The gas detection system is composed of a H2 sensor head, communication wiring, and a H2
controller. The sensor monitors the hydrogen levels and when the predetermined
concentration is reached, sends a signal to the H2 controller to activate the proper alarms. The
H2 controller is recommended to be installed on the outside of the enclosure if possible so H2
concentration levels can be verified before entering the space.

Most H2 controllers come configured with two alarms. Alarm one normally energizes the
exhaust fan and motorized make-up air dampers to open. Alarm two reports normally to a
remote occupied location to notify personnel and can be designed to activate local horns and
strobes. Alarm two satisfies the monitoring requirement since it will notify personnel when the
exhaust fan does not operate.

The battery system layout and ceiling construction will determine the best location for the gas
sensors. Follow manufacturer’s installation guidelines for H2 sensor location and sensor
coverage area. H2 is lighter than air and rises to ceiling areas; therefore, the ceiling must be
smooth to avoid pockets that can trap H2 gas. The detection system requires regular
maintenance and cost can be minimal if scheduled at the same time the battery system is
checked.

BATTERY ROOM CONFIGURATIONS

The suitability of the ventilation approach can be influenced by the configuration of the
battery room. The battery system may be installed in a dedicated enclosure or within a space
that is shared with other office spaces, or in areas much larger than the battery room like in a
warehouse.

Dedicated Enclosure

For battery rooms with a dedicated enclosure that are not air conditioned and are relatively
small, continuous ventilation at 1 cfm/sq-ft is a simple and practical design. The exhaust fan
can be ceiling or wall-mounted. Wall-mounted exhaust fans must be installed as close as
possible to the ceiling, providing enough clearance for service and maintenance between fan

digital.bnpmedia.com/publication/?i=494131&article_id=3078794&view=articleBrowser#{"issue_id":494131,"view":"articleBrowser","article_id":"307879… 4/7
8/15/2019 Digital Rendition

and ceiling. The exhaust fan must discharge to the outdoors per UMC and IMC as described
above. A flow switch can be installed upstream or downstream of the fan to monitor air flow.

For battery rooms that are relatively large, the 1 cfm/sq-ft rate would result in a very large
exhaust fan, which may be impractical and inefficient. In this case, the approach of monitoring
and limiting H2 concentration from exceeding 25% of LEL is a better approach. The hydrogen
detection system must be interlocked with an exhaust system that can provide the minimum
air changes required to replace the air in the enclosure and limit the H2 concentration to no
more than 25% of LEL. Under normal conditions, the exhaust fan is not energized but will get
energized upon detection of H2 in the room.

Shared Space

For battery systems that are installed in a relatively large space like a warehouse which are not
normally air conditioned, a localized ventilation system is ideal. The batteries can be installed
under a hood with an exhaust system to remove H2 gas to the exterior of the building. The
ventilation rate of 1 cfm/sq-ft rate is appropriate for this configuration since the area used for
the ventilation rate calculation is the cabinet or rack area under the hood.

This type of design results in a relatively small ventilation system serving two purposes: to
remove H2 gas and remove heat generated by the batteries. There are packaged hoods and
exhaust systems available for this type of application. Hood design must meet UMC and IMC
construction requirements. Similarly, as mentioned above, to comply with ventilation
monitoring requirements, a flow switch shall be installed upstream or downstream of the
exhaust fan.

DESIGN OF VENTILATION SYSTEM

For the battery room case study, a dedicated air conditioned enclosure will be used as an
example. The enclosure is a sheet metal building with insulated walls and roof and
dimensioned 12 ft by 32 ft by 10 ft high. The building has access doors on both ends and has
no windows.

The battery system consists of the following:

• Lead-calcium batteries, VRLA

• Float voltage of 2.21 V per cell, three cells per unit

• Equalize voltage of 2.33 per cell

• Normal operating temperature of 77ºF

• Two parallel strings (120 cells per string) at nominal 250 amp-hour

• Total electrolyte – 408 gallons

For this case, monitoring and limiting H2 concentration is the best approach since the space is
air conditioned. This approach requires the installation of an exhaust fan interlocked with a

digital.bnpmedia.com/publication/?i=494131&article_id=3078794&view=articleBrowser#{"issue_id":494131,"view":"articleBrowser","article_id":"307879… 5/7
8/15/2019 Digital Rendition

hydrogen detection system. The detection system monitors H2 concentration levels in the
enclosure and activates the ventilation system when 1% of H2 LEL is reached.

The battery system specified has a H2 evolution rate of approximately 0.0031 cfm, while the
formulas provided by IEEE/ASHRAE Guide 21 yielded 13 cfm. The IEEE/ASHRAE formula was
based on a worst-case scenario when batteries are overcharged. The calculated required
ventilation would take approximately three minutes to reach the limiting concentration, using
the more conservative H2 evolution rate, the volume of the enclosure (3,840 cu ft), and 1% of
H2 LEL as the limiting factor. The manufacturer’s H2 evolution rate would take approximately
200 hours or approximately eight days to reach the limiting concentration.

For this project, a 400-cfm fan was selected to provide approximately one air change in 10
minutes. The fan selected was a roofmounted type with high enough static pressure to
overcome the static pressure from make-up air dampers and fan losses. The fan was installed
on the roof to meet UMC and IMC requirements for the exhaust discharge termination
clearances.

The two approaches resulted in a fan of the same size. The advantage with the selected
approach is that the fan will only operate intermittently when needed, resulting in energy
savings and prolonged fan service life. The activation of the exhaust fan is controlled by the
hydrogen detection system. The H2 controller is configured to run the exhaust fan for 10
minutes every time the 1% of H2 LEL concentration is reached, providing one air change every
time it comes on.

Motorized make-up air dampers are installed approximately 12 in from the floor at both ends
of the building to provide cross ventilation and to assure H2 is completely removed. The
enclosure has a smooth ceiling to avoid H2 potential accumulating in pockets. The two battery
strings are laid out along the 32-ft walls. The air conditioning unit is installed at the middle of
the building and to avoid installing hydrogen sensors close to moving air devices, two sensors
are located about 8 ft to 9 ft from both ends of the building. The H2 controller is mounted near
one of the exit doors for easy access. Outdoors strobes are installed at both exit doors to warn
personnel when there’s H2 concentration of greater than 1%. The strobes are color blue
following the standard color code for environmental conditions. The hydrogen controller
alarm one (1% of LEL) energizes the exhaust fan. Alarm two (2% of LEL) sends remote
notification and activates local strobe.

CONCLUSION

The design of battery room ventilation involves compliance with multiple codes and
regulations. Regardless of the size of the battery system, some type of ventilation is required.
Even though codes allow for natural ventilation, mechanical ventilation is more reliable and
effective. There are two approaches to the design of the ventilation system: continuous
ventilation at 1 cfm/sq-ft or intermittent ventilation that monitors and limits H2 gas
concentration from exceeding 25% of H2 LEL. The best approach will depend on the battery
room configuration.

REFERENCES

digital.bnpmedia.com/publication/?i=494131&article_id=3078794&view=articleBrowser#{"issue_id":494131,"view":"articleBrowser","article_id":"307879… 6/7
8/15/2019 Digital Rendition

1 EnerSys US-FL-IOM-001, Safety, Storage, Installation, Operation & Maintenance Manual:


Flooded Lead-acid Batteries C,D, E, F and G. Reading, PA 2007, p. 45?.

2.IEEE/ASHRAE Guide for the Ventilation and Thermal Management of Batteries for Stationary
Applications. New York: IEE

3.NFPA 1, 2011 Edition, Fire Code.

4.NFPA70, National Electric Code Handbook, 2014 Edition.

5.International Fire Code (IFC)

6.International Mechanical Code (UMC)

7.Code of Federal Regulations Title 29 (29CFR Subtitle B), Section 1926.411(2), Occupational
Safety and Health Administration

8.The Institute of Electrical and Electronics Engineers (IEEE)

JOSE OSMIN PINEDA, P.E.

Jose O. Pineda is a licensed professional engineer with the Los Angeles Department of Water
and Power (LADWP), and has over 10 years of mechanical design experience. He is the lead
mechanical engineer for LADWP, power system facilities engineering. His experience includes
HVAC systems, fire protection, and plumbing systems for electrical substations, power
generating stations, and office buildings. He is responsible for mechanical designs from
inception to completion which includes system design, project management, procurement of
equipment and materials, construction support, and commissioning.