Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer
Albay 1st District Engineering Office
Airport Site, Legazpi City

19FA0020 - ASPHALT OVERLAY ALONG DAANG MAHARLIKA JCT-LEGAZPI-STO. DOMINGO-


TABACO-CAMARINES SUR BDRY RD - K0562+357-K0565+243, MALINAO, ALBAY

BILL OF QUANTITIES
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL
Part-A FACILITIES FOR THE ENGINEER
A.1.1 (8) Prov. of Field Office for the Engr (Rental Basis)

per month 1.90 month


A.1.2(4) Provision of 4x2 Pick Up Type Service Vehicle for the Engineer ( Rental Basis)

per month 0.50 month


Part-B OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard

per ea. 3.00 ea


B.7 Occupational Safety and Health Program

per month 1.90 month


B.8(2) Traffic Management

per l.s. 1.00 l.s.


B.9 Mobilization / Demobilization

per l.s. 1.00 l.s.


Part C EARTHWORKS
103(1)a Structure Excavation

per cu.m. 58.00 cu.m.


Part-E SURFACE COURSES
302(2) Bituminous Tack Coat (emulsified asphalt)

per sq.m. 32,985.35 sq.m.


310(1)c Bituminous Concrete Surface Wearing Course (50mm thk)

per sq.m. 32,985.35 sq.m.


Part-H MISCELLANEOUS WORKS
603(3)a1 Metal Guardrails (metal beam) including post

per m. 718.00 m.
603(4)a Metal Beam End Piece

per ea. 12.00 ea.


612(1) Reflectorized Thermoplastic Pavement Markings (white)

per sq.m. 798.00 sq.m.


612(2) Reflectorized Thermoplastic Pavement Markings (yellow)

per sq.m. 38.03 sq.m.


605(6)e2 Hazard Markers (chevron signs), 600mmx 800mm

per ea. 116.00 ea.


TOTAL AMOUNT IN FIGURES TOTAL
Total Amount in Words