Technical Compliance Statement

Internal Combustion Engine Test Rig:


Make Dinesh Model DS 141
Manufactured at the works of TECH-ED EQUIPMENT COMPANY, BENGALURU

Sl. Item Description Offered Make, Model & Deviations


No. (As per your enquiry) Technical Specifications (If any)
01. Computerized Variable Compression Ratio Multi- Computerized Variable Compression Ratio
fuel Engine Test Rig with manifold gas injection kit Multi-fuel Engine Test Rig with manifold gas
injection kit
Technical specifications:
Technical specifications:
1.Engine Capacity:552cc
2.Compression ratio: 1.Engine Capacity:552cc, Kirloskar Model AV1
4 stroke, Water Cooled
 Variable 5:1 to 20:1 2.Compression ratio:
 Changeover of S.I to C.I Mode to be done,
without changing the engine head  Variable 5:1 to 20:1
 Direct reading of compression ratio, the  Changeover of S.I to C.I Mode can be done
compression ratio graduation marking should without changing the engine head
be spirally engraved on a 170mm Diameter  Direct reading of compression ratio, the
plate. compression ratio graduation marking will
 To change the compression ratio, the engine be spirally engraved on a 170mm Diameter
head along with the bore block should be lifted plate.
vertically in 90 degrees without changing the  To change the compression ratio, the engine
compression geometry and valve timing(tilting head along with the bore block can be lifted
of the engine head and bore block should not vertically in 90 degrees without changing
be done, which may cause change in valve the compression geometry and valve
timing) timing(tilting of the engine head and bore
block need not be done)
3.Engine speed:1500 rpm
4.Number of cylinder: one 3.Engine speed:1500 rpm
5.Fuel Type: Diesel mechanical injection 4.Number of cylinder: one
6.Petrol: Multi point fuel injection with 5.Fuel Type: Diesel mechanical injection
programmable map. 6.Petrol: Electronic Fuel Injection with Multi Point Fuel Injection
7.Gas: Manifold gas injection with programmable programmable map is for Multi cylinder
map. 7.Gas: Manifold gas injection with programmable Engines & not applicable
8.power:3-5HP map. for this engine
9.Spark Timing: the spark timing of the engine 8.power:3-5HP
should be variable from 0-360 degree crank angle and 9.Spark Timing: the spark timing of the engine is No other deviation
should be easily controlled from computer variable from 0-360 degree crank angle and can be
10.starting:Electric start easily controlled from computer
11.Dynamometer:the engine should be coupled with 10.starting:Electric start
5 HP eddy current dynamometer air cooled 11.Dynamometer:the engine is coupled with 5 HP
12.Sensors: eddy current dynamometer air cooled
12.Sensors:
 Engine combustion pressure sensor: piezeo-  Engine combustion pressure sensor: piezeo-
electric 0-100 bar. electric 0-350 bar ( with same resolution as
 Crank angle: Rotary 360 PPR 100bar)
 Air measurement :DP Sensor  Crank angle: Rotary 360 PPR
 Fuel Measurement: optical constant volume,  Air measurement :DP Sensor
fully automatic  Fuel Measurement: optical constant volume,
 Speed: Encoder fully automatic
 Dynamometer load: strain Gauge Load cell  Speed: Encoder
 Temperature:”k” type with inline signal  Dynamometer load: strain Gauge Load cell
conditioner.  Temperature:”k” type with inline signal
 Gas consumption measurement: Load cell(loss conditioner.
in weight)  Gas consumption measurement: Load
cell(loss in weight)
13.Data Acquisition System: High speed DAC with
1 mega samples/sec 13.Data Acquisition System: High speed DAC
14.controls:Fuel injection system with controls with 1 mega samples/sec
Software: Engine combustion analysis and 14.controls:Fuel injection system with controls
performance software, fuel injection and control (through software for petrol)
software. Software: Engine combustion analysis and
15.Computer(all in one):core i3,4 GB Ram,500 Gb performance software, fuel injection and control
hard disk software.
16. Printer: Laser jet with in one. 15.Computer (all in one):core i3,4 GB Ram,500
17.3-Year onsite warranty: and it will be started Gb hard disk
from the date of the satisfactory supply and 16. Printer: Laser jet all in one.
installation of Equipment/Hardware/Software and 17.3-Year onsite warranty: and it will start from
other item in all the thermal Engineering Laboratory. the date of the satisfactory supply and installation of
18. Training for the operation and maintenance of the Equipment/Hardware/Software and other items of
equipment/hardware/software in each engine and this equipment.
thermal engineering laboratory should be provided 18. Training for the operation and maintenance of
separately. this equipment & computer hardware/software will
19. Successful bidder should provide service be provided for one or two days at site to the
maintains and training for one year at no cost. concerned faculty member.
20.50 meter electric cable. 19. We will provide service maintenance for one
year at no cost.
General Requirements 20. Control Panel will be provided with 2 mtr long 50mtr electric cable not
5/15 amps, sph mains card required . Control Panel of
 Each of the equipment is to have permanently the test rig works on single
attached to it rating plate of non-corrosive phase power provided in the
lab
material in a conspicuous position. Upon General Requirements
which the total specification along with the
manufacturer’s name, address, etc are to be  Each of the equipment will have
engraved. permanently attached to it rating plate of
 All the equipment are to be suitably protected, non-corrosive material in a conspicuous
covered in water proof packing and created to position. Upon which the total specification
prevent damage or deterioration during transits along with the manufacturer’s name,
and storage till the time of installation. The address, etc will be engraved.
supplier shall be responsible for any loss or  All the equipment will be suitably protected,
damage caused during transportation handling covered in water proof packing and created
or storage till their successful installation. to prevent damage or deterioration during
 All material/equipment shall be inspected and transits and storage till the time of
tested for completeness, proper assembly, installation..
operation, cleanliness and state of physical  All material/equipment may be inspected
condition and performance as per quoted and tested for completeness, proper
specification at the site of installation. assembly, operation, cleanliness and state of
 The tenderer shall provide all test and physical condition and performance as per
measuring equipment/tools required for quoted specification at the site of
inspection/testing. installation.
 We will provide all test and measuring
Installation and commissioning equipment/tools required for
inspection/testing.
Installation and commissioning shall include the
following: Installation and commissioning
Installation and commissioning will include the
 Installation and Testing of the equipment, following:
Machineries etc. Should be supplied by the
tenderer.  Installation and Testing of the equipment
 It will be the responsibility of the tenderer to will be arranged by us.
provide all necessary spares and consumables  We will provide necessary spares and
which may be required during installation and consumables required during installation
commissioning at no extra cost to the and commissioning at no extra cost.
purchaser. However, supply of Diesel & Petrol for the
 The tenderer is to bring their own testing and purpose of demonstration is limited to
measuring instruments required for 10 ltrs each
installation, testing, commissioning which can  No special testing & measuring instruments
be taken back after completion. are required. We will bring our own testing
 Installation must complete within 30 days after instruments like multimeter.
delivery on site.  Installation will be completed within 30
days after delivery on site.

Documentation: Detailed instruction &


operating manual will be supplied with the
equipment. Warranty certificate will be
provided. Factory test results will also be
provided.

Wiring in the laboratory: Not in our scope Wiring & protection


details given in the specs
sheet do not pertain to
Foundation: Test Rig will be supplied with a set this Test Rig. Our
of Vibromounts (Anti vibration pads) & hence equipment requires only
foundation not necessary. However, if you wish a 5/15 A single phase
to have a foundation bed you can construct the supply available in the
same at your cost. The bed should be ready at lab.
site before supply of test rig.

Water supply: To be made available upto the


test rig by the purchaser at his cost.

Exhaust Gas Arrangement: To be made by the


purchaser at his cost.