Project No.
REVAMPING OF WASTE WATER TREATMENT FACILITY IN ETHYLENE PLANT AT
QAPCO
GENERAL COMMENTS
Comment incorporated.
1.1 Full size Piping Key Plan drawing shall be provided. Full Size Piping Key Plan Drawing WWT-P06-00450-101-01
submitted for Review and Approval
Drawing scale shall be assigned generally for the Comment incorporated.
drawing. For special view or detail there may be different Submitted Piping GAs are in 1:50 scale meeting QAPCO
1.2
scale that shall be shown on the view. General scale for requirement. Three sheets are added now to include sections
piping GA shall not be less than 1:60. and details to provide more clarity as required by QAPCO.
This will require major revision on all piping GAs hence
1.3 Please draw line size 8" and larger with double line. deliverables will be delayed. Will revise the drawing to show
double lines for 12” and above as per normal practice.
1.4 Please draw piping lines bolder than accessory lines. Comment incorporated.
Page 1 of 2 438531254.doc
Company: Contractor:
Project No.
REVAMPING OF WASTE WATER TREATMENT FACILITY IN ETHYLENE PLANT AT
QAPCO
Page 2 of 2 438531254.doc