Sl. No QAPCO Comments Contractor Response QAPCO Reply

GENERAL COMMENTS
Comment incorporated.
1.1 Full size Piping Key Plan drawing shall be provided. Full Size Piping Key Plan Drawing WWT-P06-00450-101-01
submitted for Review and Approval
Drawing scale shall be assigned generally for the Comment incorporated.
drawing. For special view or detail there may be different Submitted Piping GAs are in 1:50 scale meeting QAPCO
1.2
scale that shall be shown on the view. General scale for requirement. Three sheets are added now to include sections
piping GA shall not be less than 1:60. and details to provide more clarity as required by QAPCO.
This will require major revision on all piping GAs hence
1.3 Please draw line size 8" and larger with double line. deliverables will be delayed. Will revise the drawing to show
double lines for 12” and above as per normal practice.
1.4 Please draw piping lines bolder than accessory lines. Comment incorporated.

1.5 Please show all equipment tag no. Comment incorporated.


Show coordinate of equipment on the CL or a reference
Comment incorporated.
1.6 point. Deviation angle from normal co-ordinate lines
shall be shown.
1.7 Line numbers shall be shown on each edge of the line Comment incorporated.
(or at borderline), when any change in direction and
when interfere with other line. Or whenever needed to

Page 1 of 2 438531254.doc
Company: Contractor:

Project No.
REVAMPING OF WASTE WATER TREATMENT FACILITY IN ETHYLENE PLANT AT
QAPCO

COMMENTS RESOLUTION SHEET


show any unclear portion.

Pipe elevation shall be shown. For flat lines, BOP shall


be shown under the line number. For slope lines, WP Comment incorporated.
1.8
elevation shall be shown on every change in direction or
elevation and branches.
Deviation angle between true and Plant North shall be Comment incorporated.
1.9 shown.
Changemark #02
2.1 Please show properly as per piping drawing standard Comment incorporated.
practice.
Changemark #03 Comment incorporated.
3.1 Detail drawing.
Sections & Details added for giving clarity. Additional Sheets
2 of 3 & 3 of 3
Changemark #04 Comment incorporated.
4.1 Please show properly Sections & Details added for giving clarity. Additional Sheets