You are on page 1of 4

DISTRIBUSI GAYA GESER HORISONTAL TOTAL AKIBAT GEMPA

Tingkat hi(m) Wi(kg) Wi*hi Fix,y total 1/8 Fix 1/4Fiy


ATAP 21.80 466,583.20 10,171,513.76 60,873.18 7,609.15 15,218.30
6 18.00 775,721.60 13,962,988.80 83,563.92 10,445.49 20,890.98
5 14.20 775,721.60 11,015,246.72 65,922.65 8,240.33 16,480.66
4 10.40 775,721.60 8,067,504.64 48,281.38 6,035.17 12,070.34
3 6.60 775,721.60 5,119,762.56 30,640.11 3,830.01 7,660.03
2 2.80 740,349.60 2,072,978.88 12,406.10 1,550.76 3,101.53
Total 4,309,819.20 50,409,995.36

Fi = Wi*hi
*V
Wi*hi (total)
BEBAN GRAVITASI
BEBAN LANTAI 2-6
Beban hidup (qh) = 250.00 kg/m2 L = 4.00 m L= 1.50 m
q ekivalen = 2/3*1/2*L*q = qh_eklv = 333.33 kg/m 125.00 kg/m
Beban mati tambahan (qm) =
Pelat lantai tebal 12 cm 288.00 kg/m2
Keramik 24.00 kg/m2
Plester (2,5cm) 53.00 kg/m2
Beban M/E 25.00 kg/m2
Plafond 18.00 kg/m2
408.00 kg/m2 qm_eklv = 544.00 kg/m 204.00 kg/m
BEBAN LANTAI ATAP
Beban hidup (qh) = 100.00 kg/m2 L = 4.00 m L= 1.50 m
q ekivalen = 2/3*1/2*L*q = qh_eklv = 133.33 kg/m 50.00 kg/m
Beban mati tambahan (qm) =
Pelat lantai tebal 10 cm 240.00 kg/m2
Plester (2,5cm) 53.00 kg/m2
Beban M/E 25.00 kg/m2
Plafond 18.00 kg/m2
Waterproofing 5.00 kg/m2
341.00 kg/m2 qm_eklv = 454.67 kg/m 170.50 kg/m
BEBAN BALOK
Berat dinding = 250.00 kg/m2
h= 2.80 m qm_ddg = 700.00 kg/m
h= 3.80 m qm_ddg = 950.00 kg/m
h= 2.50 m qm_ddg = 625.00 kg/m
TABLE: Groups 3 - Masses and Weights
GroupName SelfMass SelfWeight TotalMassX TotalMassY TotalMassZ
Text Kgf-s2/m Kgf Kgf-s2/m Kgf-s2/m Kgf-s2/m
ALL 17039.75 167,128.65 17039.75 17039.75 17039.75
LT2 5656.44 55,479.26 5656.44 5656.44 5656.44
LT3 5656.44 55,479.26 5656.44 5656.44 5656.44
LT4 5726.88 56,170.13 5726.88 5726.88 5726.88

PERHITUNGAN GAYA GESER DASAR HORISONTAL TOTAL AKIBAT GEMPA


BERAT BANGUNAN TOTAL (Wt)
Berat Lantai 4 (W4) = 56,170.13 kg
Berat Lantai 3 (W3) = 55,479.26 kg
Berat Lantai 2 (W2) = 55,479.26 kg
Wt = W2+W3+W4 = 167,128.65 kg
WAKTU GETAR BANGUNAN

Tinggi bangunan (H) = 12.00 m


Tx = Ty = 0,06*H^(3/4) = 0.387 detik
Dari grafik koef gempa dengan Tx diatas didapat
C1 = 0.50 (ZONA GEMPA 2)
Faktor reduksi gempa (R )= 8.50 (BETON BERTULANG DAKTAIL)
C1/R = 0.059
Faktor keutamaan struktur (I) = 1.00 (RUKO)
Vx = Vy = C1/R*I*Wt = 9,831.097 kg
Tingkat hi(m) Wi(kg) Wi*hi Fix,y total 1/5Fix 1/5Fiy
4 12.00 56,170.13 674,041.56 4,945.97 989.19 989.19
3 8.00 55,479.26 443,834.08 3,256.75 651.35 651.35
2 4.00 55,479.26 221,917.04 1,628.38 325.68 325.68

Total 1,339,792.68

Fi = Wi*hi