Detailed Technical report:

Date: 01/10/2019

Issue: Around 12 Cassette type AC units in the SBC facility; Comprising of the units in NH-1 Housing; NH-2 Offices and OASIS center in Equipment out of order
list. This due to non-availability of the spare PCB of the kind for Mnfr: Samsung with the drain pump in the local market. As a remedy to this long pending issue
the existing units (Mnfr : Samsung ) were replaced with Zamil Air conditioner Cassette type units ( 2 tons).

Action taken: Installation of the Cassette unit 2 ton (Mnfr: Zamil Air conditioners) as a remediation to faulty corridor units at Building NH-1; NH-2 and Oasis
Centre.

List of equipment’s replaced with location details:


S.No Scheduled Day Bldg Floor Unit number Issues Remarks
Date of
installation
1 9-9-2019 Mon NH-1 Third floor 3-D-3 Near room A-332 No power as of now; PCB issue. Installed new AC unit
2 10-9-2019 Tue NH-1 Third floor 3-E-2 Near room A-320 No power as of now; PCB issue. Installed new Ac unit
3 11-9-2019 Wed NH-1 Third floor 3-F-3 Near room A-303 No power as of now; PCB issue. Installed new AC unit
4 15-9-2019 Sun NH-1 Second floor 2-D-3 Near room A-238 Unit to be replaced; Motor / PCB / Fan Installed new AC unit
issue
5 16-9-2019 Mon NH-1 Second floor AS-213-B Lounge No power as of now; PCB issue. Installed new AC unit
6 17-9-2019 Tue NH-1 Second floor 2-E-2 Near room A-220 Unit Running (Recurring breakdown) Working now
7 18-9-2019 Wed NH-1 Second floor 2-F-1 Near room A-215 PCB error ; Motor jam ( Need to Fan motor replaced
replace)
8 19-9-2019 Thu NH-1 First floor Janitor room, near room PCB issue ; Fan not working Replaced the spare from existing
A-114 removed unit.
9 21-9-2019 Sat NH-1 First floor Laundry room Unit recurring breakdown; PCB issue Installed new AC unit
10 22-9-2019 Sun NH-1 First floor 1-A-2 Near meeting PCB issue ; fan motor jam; Installed new AC unit
room A-2
11 24-9-2019 Tue NH-2 First floor Corridor A/C Near room PCB issue ; Fan not working Transferred spare from BS108 unit
B-116
12 25-9-2019 Wed NH-2 First floor 1-A-1 PCB issue ; Fan not working Transferred spare from BS208 unit
13 17-9-2019 NH-2 First floor I.T room No power as of now; PCB issue. Installed new AC unit

14 17-9-2019 NH-2 Second floor I.T room No power as of now; PCB issue. Installed new AC unit

15 28-9-2019 Sat OASIS Third floor Lobby neat lift PCB Issue; Installed new AC unit