Hari Builders

Thuraiyur
S. Rate in Per
NO Description of Work Rupees Unit
1 Earthwork for excavation for Foundations, Footings, etc.
A) Ordinary Soil
i) 0.00 to 1.50m dept 8 Cft
ii) From 1.50m to 3.00m depth 10 Cft
B) D0- in Hard gravel/Soft rock
i) 0.00 to 1.50m depth 12 Cft
ii) From 1.50m to 3.00m depth 15 Cft
2 Earth filling in plinth and back filling the foundations with approved materials
including spreading in 150mm layers. Watering , ramming, compacting etc,
complete.(Measurements for net volume of space occupied by filling)
a) Earth filling with excavated earth 4 Cft
b) Do-With imported earth within 5Km lead 6 Cft
3 Supplying and filling Sukka Soil 8 Cft
4 Providing and laying of plain cement concrete in foundations and floring with
40mm nominal size graded stone metal including leveling, compacting, curing and
form work if any, complete.
b) Mix 1:4:8 3200 Cum
c) Mix 1:5:10 3000 Cum
5 Reinforcement concrete in 1:2:4 mix using 20mm blue metal jelly including
centring, scaffolding, concreting and curing etc., complete but excluding the cost
reinforcement
For Ground Floor
a) Footing Concrete 6000 Cum
b) Plinth Beams, Column, Lintel Beams, Roof Beams, Roof Slabs 8000 Cum
6 Reinforcement concrete in 1:1:5:3 mix using 20 mm blue granite jelly including
centring, scaffolding, concreting and curing etc., complete but excluding the cost
reinforcement
For Ground Floor
a) Footing Concrete 6500 cum
b) Plinth Beams, Column, Lintel Beams, Roof Beams, Roof Slabs 8500 cum
7 Providing, Fabricating, Laying and Fixing in Position R.T.S, M.S reinforcement for
RCC works including cutting, bending and binding with 20 guage M.S wire, Spacer
blocks of CM 1:2 embedded with binding wire etc., complete
a) Ground Floor 62000 M.T
8 Brick work 230mm thick with locally available chamber brick in CM 1:6 in
Superstructure including scaffolding, curing etc., complete
a) Ground Floor 5500 cum
9 SuperStructure with AAC Building Block & Binding material in
Superstructure including scaffolding, curing etc., complete
a) Ground Floor 4800 cum

10 Providing & Fixing UPVC Windows with 62mm profile, 304 grade hardwares & 5mm
pinned glass (Excludes of window grills) 575 sft
11 Providing and fixing Pannelled door of using 4"X3" second quality teak wood in
outer frame 30mm thick solid core door with necessary MS oxided hinges, 800 sft
Aluminium aldrop,MS tower bolt, Ms hold fast etc., complete
12 Supplying and fixing of PVC Doors for bath and toilet rooms etc., complete 3000 sqm
13 Supplying and fixing steel Doors in double shuters with frame 40 mm x 40mm x 6mm
'L' angle used as side vertical and top and shutters shall be consists of 35mmx35x5mm
angles and 16kg C.R sheet used with lock arrangements and fixing in position 4500 sqm

14 Supplying and fixing Steel handrails using M.S Pipes upto height of 3' - 00" for
staircase 400 Rft
15 Supplying & fixing grill works using Mild Steel 85 kgs
15 Providing and laying Granolithic flooring in CC 1:1:5:3 50 mm thick using 6mm and
down graded chips, top finishing with floor trawel including curing etc., complete
all floors. 400 Sqm
16 Providing and laying 6mm thick plain, color Ceramic tile flooring with CM 1:m,
20mm thick close joined and pointed with matching cement slurry and finished to
line, level and slope as required including curing, cleaning etc., complete. 750 Sqm
17 Labour charges for laying 6mm thick plain, colour ceramic tile flooring with CM 1:3,
20mm thik close joined and pointed with matching cement slurry and finished to
to line, level and slope as required including curing, cleaning etc., complete. 350 Sqm
18 Providing and laying 20mm thick CM 1; 4 For floor finish and top finished smoothyly 350 Sqm
19 Supplying and fixing both side polished cuddapa slabs 750 sqm
20 Weathering coures of brick jelly and lime 3:1 mix laying to required slope and 2400 sqm
level cost including laying and beeting etc., complete
21 Providing and laying decorative clay tiles of size 9" X 9" on CM 1:3, 20mm thick 600 sqm
mixed with crude oil @5% weight of cement including all materials pointing,
curing etc., complete
22 Plastering in CM 1:5 , 12mm thick at all heights to internal surfaces of walls, RCC 250 sqm
works etc., including scaffolding, curing etc., complete
23 Plastering in CM 1:5, 12mm thickat all heights to external surfaces of walls, RCC 280 sqm
works etc., including scaffolding, curing etc., complete
24 Plastering in CM 1:3,12mm thick for ceilimg including scaffolding, curing etc., 280 sqm
complete
25 providing and applying two coats of white wash with Super white including 20 sqm
cleaning the surfaces, sacffolding etc., complete
26 Providing and applying two coats of distempler over coat ofcement primer 55 sqm
including cleaning the surfaces, sacffolding etc., complete
27 Providing and applying two coats of distemper over coat of cement primer 95 sqm
including cleaning surface, scaffolding etc. complete.(excluding putty finish)
28 Plroviding and applying two coats of distemper over coat of cement primer 185 sqm
including cleaning the surfaces, scaffold etc, complete. (incl. putty finish)
29 Providing and painting for steel works with two coats of enamel paint of 120 sqm
approved make includiung cost ofmaterial, brushes & labour charges.

LIST OF MATERIALS TO BE USED


1 Cement : Client Choice
2 Steel :Client Choice
3 Sand :Msand & Psand
4 Building Block or
AAC Block
5 Flush door shutter :Any Brand
6 Ceramic tiles :Somany/
7 Glazzed Tiles :Somany/
9 Paint :Asian
10 Door/Window Fittings :ISI Make MS