PROJECT TITLE : AHAD EUPHORIA, BANGALORE

PMC: FOUR DIMENSIONS


DATE :
CHECKLIST FOR AFTER CONCRETING TIME :
Civil / Mech / Elec :
REF .DOCUMENT / DRG : CONTRACTOR/SUB CONTRACTOR
NAME :

SL.NO DESCRIPTION YES NO NA REMARKS

1
Check for suitable CURING arrangements (Min 14 days – cover with Asian cloth)

2 Check if casting date is marked on the structural elements ?

3 Check whether inserts, Embedment which are flush with concrete surface are exposed
properly

4 Check for MARKING OF LOCATION OF SERVICE CONDUITS & FITTINGS, where


applicable.

5 Check for ALIGNMENT OF EXPANSION JOINTS, if any.

6 IS the line / level of concrete surface O.K ?

7 Check for CORRECTIVE ACTION on surface defects on Exposed Concrete. If any


likes.
 Honey combing -----------------------------------------
 Loss of grout ---------------------------------------------
 Segregation --------------------------------------------
 Bulging ---------------------------------------------
 Exposed Reinforcement --------------------------------------------
 Damaged edges of corners-------------------------------------------------
 Air bubbles ----------------------------------------------
 Any others ----------------------------------------------

8 Check for Dimensions of the members as per the relevant drawing (Attach supplement
for the records of dimension check & reference drawing no.)
Are any members exceeding the acceptance dimensional limit
9  Quantity of concrete poured ----------------------------------------
 Starting time of concrete ----------------------------------------
 Completion time of concreting --------------------------------------
 No of concrete cube taken ------------------------------------------
 Slump of concrete noted ----------------------------------------------
 Concrete Dospatch slip no.------------------------------------------------
 Concrete Dospatch slip no.------------------------------------------------

CORRECTIVE ACTIONS PROPOSED

CONTRACTOR CONSULTANT CLIENT