TableB (Network and I & D).

Index Index description Source of Base value Bidder‟s Bidder‟s


code index
and date related proposed
currency
weighting11
amount

Nonadjustable - - - 0.15
1.

2. Labour – Pl *-*

3. Cement – Pc *-*

4. Steel – Ps *-*

5. Bitumen – Pb *-*

6. POL – Pf *-*

7. Plant & Machinery *-*


Spares - PP

8 Other materials - *-*


Pm12

Total 1.00

Notes:

1. Source of Index for respective Indices shall be the same as indicated under Para4.2
of ―Schedule 8 - Price Adjustment‖attached to the Contract.

2. The Bidder shall specify a value in the last column of the Table within the range
indicated therein such that the total weighting = 1.00