You are on page 1of 5

C C

B B

A A

C OF PROPOSED
STRUCTURE

LEGEND:-

O16038-C-RP A
NATIONAL HIGHWAYS ANIL K
AUTHORITY OF INDIA SRS 70+857 & 88+711
Theme Engineering PBV
SAMARTH INFRAENGG L&T CONSTRUCTION AECOM,
Service Pvt. Ltd., TRANSPORTATION 9/F, Infinity Tower - C, SR
TECHNOCRATS PVT LTD. INFRASTRUCTURE IC DLF Cyber City, DLF Phase-II, - - - M B - N U - 0 1 0 2
Gurgaon, Haryana - 122 002.
1 1

Cad File No: E:\NH-163 YADGIRI TO WARANGAL\MY WORK\FINAL DRAWINGS\NH163-KM 113.000 TO KM 123.050\STRUCTURES\FINAL\SUPER STRUCTURE AT CH. 70+857
SCHEDULE OF REINFORCEMENT
1 2 3 BAR
DESCRIPTIONS SHAPE
NO.
4 4

NOTES:

2 3
1

SECTIONAL ELEVATION OF GIRDER

REFERENCE DRAWINGS:-

SECTIONAL PLAN 4-4

o MESH TYPE A
DETAIL OF 8 T

5 5

SECTION 3-3 SECTIONAL PLAN 5-5


SECTION 1-1 SECTION 2-2

O16038-C-RP
REINFORCEMENT DETAIL OF LONGITUDINAL A
NATIONAL HIGHWAYS ANIL K GIRDER FOR MAJOR BRIDGE
AUTHORITY OF INDIA SRS 70+857 & 88+711
Theme Engineering PBV
SAMARTH INFRAENGG L&T CONSTRUCTION AECOM,
Service Pvt. Ltd., TRANSPORTATION 9/F, Infinity Tower - C, SR
TECHNOCRATS PVT LTD. INFRASTRUCTURE IC DLF Cyber City, DLF Phase-II, - - - M B - N U - 0 1 0 3
Gurgaon, Haryana - 122 002.
1 1

Cad File No: E:\NH-163 YADGIRI TO WARANGAL\MY WORK\FINAL DRAWINGS\NH163-KM 113.000 TO KM 123.050\STRUCTURES\FINAL\SUPER STRUCTURE AT CH. 70+857
1

NOTES:

1 "Y"

SECTIONAL ELEVATION OF END DIAPHRAGM

REFERENCE DRAWINGS:-

SECTIONAL PLAN OF END DIAPHRAGM (TOP REINFORCEMENT)

SCHEDULE OF REINFORCEMENT
BAR DESCRIPTIONS SHAPE REMARKS
NO.

SECTIONAL PLAN OF END DIAPHRAGM (BOTTOM REINFORCEMENT)

DETAILS OF MESH-M1 TYPICAL DETAIL INDICATING


DETAIL - "Y"
SECTION 1-1 ANCHORAGE OF STIRRUP

O16038-C-RP
REINFORCEMENT DETAIL OF END CROSS A
NATIONAL HIGHWAYS ANIL K GIRDER FOR MAJOR BRIDGE
AUTHORITY OF INDIA SRS 70+857 & 88+711
Theme Engineering L&T CONSTRUCTION AECOM, PBV
SAMARTH INFRAENGG 9/F, Infinity Tower - C, SR
Service Pvt. Ltd., TECHNOCRATS PVT LTD.
TRANSPORTATION
- - - M B - N U
INFRASTRUCTURE IC DLF Cyber City, DLF Phase-II, - 0 1 0 4
Gurgaon, Haryana - 122 002.
1 1

Cad File No: E:\NH-163 YADGIRI TO WARANGAL\MY WORK\FINAL DRAWINGS\NH163-KM 113.000 TO KM 123.050\STRUCTURES\FINAL\SUPER STRUCTURE AT CH. 70+857
C C

A A

HALF PLAN SHOWING HALF PLAN SHOWING


TOP REINFORCEMENT BOTTOM REINFORCEMENT
PLAN BAR DESCRIPTIONS
NO. SHAPE

O16038-C-RP A
NATIONAL HIGHWAYS ANIL K
AUTHORITY OF INDIA SRS
70+857 & 88+711
Theme Engineering L&T CONSTRUCTION AECOM, PBV
SAMARTH INFRAENGG 9/F, Infinity Tower - C, SR
Service Pvt. Ltd., TECHNOCRATS PVT LTD.
TRANSPORTATION
INFRASTRUCTURE IC DLF Cyber City, DLF Phase-II, - - - M B - N U - 0 1 0 5
Gurgaon, Haryana - 122 002.
1 1

Cad File No: E:\NH-163 YADGIRI TO WARANGAL\MY WORK\FINAL DRAWINGS\NH163-KM 113.000 TO KM 123.050\STRUCTURES\FINAL\SUPER STRUCTURE AT CH. 70+857
NOTES

1 1
L L

T INSTALLATION INSTRUCTIONS.
PLAN
(SHOWING RCC PEDESTAL AND ELASTOMERIC BEARING

ISOMETRIC VIEW OF ELASTOMERIC BEARING

MAINTENANCE

DETAIL - X
SECTION 1-1

DIMENSION SCHEDULE FOR BEARINGS

O16038-C-RP DETAILS FOR LOAD AND FORCES A


NATIONAL HIGHWAYS ANIL K OF ELASTOMERIC BEARING
AUTHORITY OF INDIA SRS FOR MAJOR BRIDGE 70+857 & 88+711
Theme Engineering PBV
SAMARTH INFRAENGG L&T CONSTRUCTION AECOM,
Service Pvt. Ltd., TRANSPORTATION 9/F, Infinity Tower - C, SR
TECHNOCRATS PVT LTD. INFRASTRUCTURE IC DLF Cyber City, DLF Phase-II, - - - M B - N U - 0 1 0 6
Gurgaon, Haryana - 122 002.
1 1

Cad File No: E:\NH-163 YADGIRI TO WARANGAL\MY WORK\FINAL DRAWINGS\NH163-KM 113.000 TO KM 123.050\STRUCTURES\FINAL\SUPER STRUCTURE AT CH. 70+857

You might also like