Name of the Project : Purvanchal Expressway (Package-ll)

Client : UPEIDA
Authority Engineer : Egis Date of Submission: 30-Jun-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 01-Jul-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time
Type Details
Highway :
1 PE/GPL/P-2/HW/07/20/22905 30-06-20 EmB FDD of Embankment (MCW) 28 40300 40450 150 BHS 01-07-20 2:45 PM 22666/15-06-20

2 PE/GPL/P-2/HW/07/20/22907 30-06-20 EmB FDD of Embankment (MCW) 16 43800 43900 100 BHS 01-07-20 4:30 PM 22376/10-06-20

3 PE/GPL/P-2/HW/07/20/22907 30-06-20 EmB FDD of Embankment (MCW) 16 43900 44000 100 BHS 01-07-20 5:00 PM 22376/10-06-20

4 PE/GPL/P-2/HW/07/20/22908 30-06-20 EmB FDD of Embankment (MCW) 28 47300 47400 100 LHS 01-07-20 10:45 AM 22893/30-06-20

5 PE/GPL/P-2/HW/07/20/22909 30-06-20 EmB FDD & Level Checking On Embankment Top Layer (MCW) Top 47300 47400 100 RHS 01-07-20 11:00 AM 22894/30-06-20

6 PE/GPL/P-2/HW/07/20/22910 30-06-20 EmB FDD of Embankment (MCW) 17 47400 47430 30 LHS 01-07-20 10:30 AM 22465/11-0-20

7 PE/GPL/P-2/HW/07/20/22911 30-06-20 Median Drain Shuttering checking & concreting for median drain wall Wall 50290 50340 50 01-07-20 11:00 AM 22833/29-06-20

8 PE/GPL/P-2/HW/07/20/22912 30-06-20 GSB FDD & Level Checking On GSB Top Layer (MCW) Top 57500 57510 10 BHS 01-07-20 11:00 AM 22904/30-06-20

9 PE/GPL/P-2/HW/07/20/22913 30-06-20 SG FDD of Subgrade (MCW) Top-1 65210 65230 20 BHS 01-07-20 4:00 PM 22895/30-06-20

10 PE/GPL/P-2/HW/07/20/22914 30-06-20 Chute Drain Checking & Concreting of Wall for Chute Drain Wall 69370 69490 120 RHS 01-07-20 11:00 AM 22900/30-06-20

11 PE/GPL/P-2/HW/07/20/22915 30-06-20 Side Slope Checking Of Side Slope 69700 69850 150 RHS 01-07-20 12:00 PM 22056/28-05-20

12 PE/GPL/P-2/HW/07/20/22916 30-06-20 Turfing Checking of grass Turfing Grass 69900 70050 150 LHS 01-07-20 11:30 AM 22901/30-06-20

13 PE/GPL/P-2/HW/07/20/22917 30-06-20 Back Filling FDD Checking of Back Filling For Box Culvert A1(Lko) 7 77310 BHS 01-07-20 4:20 PM 22902/30-06-20

14 PE/GPL/P-2/HW/07/20/22918 (Spot) 01-07-20 EmB FDD of Embankment (MCW) 19 45800 45900 100 BHS 01-07-20 3:30 PM 22674/15-06-20

22251/07-06-20
15 PE/GPL/P-2/HW/07/20/22919 (Spot) 01-07-20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 51500 51600 100 RHS 01-07-20 2:00 PM
16505/15-01-20

16 PE/GPL/P-2/HW/07/20/22920 (Spot) 01-07-20 DBM Laying & Level Cheking of DBM ( MCW) Top 51500 51600 100 RHS 01-07-20 2:30 PM 22919/01-07-20

17 PE/GPL/P-2/HW/07/20/22921 (Spot) 01-07-20 Mountable Kerb Laying of Mountable Kerb (MCW) 51600 51610 10 LHS 01-07-20 12:00 AM 21831/28-05-20

18 PE/GPL/P-2/HW/07/20/22922 (Spot) 01-07-20 L Kerb Laying of Kerb Casting (MCW) 51600 51610 10 LHS 01-07-20 12:30 PM 21831/28-05-20

22921/01-07-20
19 PE/GPL/P-2/HW/07/20/22923 (Spot) 01-07-20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 51600 51610 10 LHS 01-07-20 1:30 PM
22922/01-07-20
Service Road :

1 PE/GPL/P-2/SR/07/20/1704 30-06-20 SG FDD of Subgrade (SR) Top-1 49630 49700 70 RHS 01-07-20 11:00 AM 1560/11-06-20

2 PE/GPL/P-2/SR/07/20/1705 30-06-20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 49700 49750 50 RHS 01-07-20 3:00 PM 1629/15-06-20

1616/14-06-20
3 PE/GPL/P-2/SR/07/20/1707 30-06-20 SG FDD of Subgrade (SR) Top-1 49750 50000 250 RHS 01-07-20 5:00 PM
1630/15-06-20

4 PE/GPL/P-2/SR/07/20/1707 30-06-20 EmB FDD of Embankment (SR) 7 76900 77000 100 LHS 01-07-20 5:00 PM 111/03-09-19

5 PE/GPL/P-2/SR/07/20/1708 30-06-20 EmB FDD of Embankment (SR) 7 77000 77100 100 LHS 01-07-20 4:00 PM 111/03-09-19

Lab :
1 PE/GPL/P-2/Lab/07/20/823 30-06-20 BA Sampling Sampling of Borrow Area-307 43700 LHS 01-07-20 12:00 PM

2 PE/GPL/P-2/Lab/07/20/824 30-06-20 BA Sampling Sampling of Borrow Area-308 41400 LHS 01-07-20 10:00 AM

Page 1 of 2
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time
Type Details
Structures :
Gzp Side Haunch reinforcement , shuttring checking & concreting
1 PE/GPL/P-2/STR/07/20/5862 30-06-20 VUP 58369 RHS 01-07-20 2:00 PM
For VUP (MCW)

Lko Side Haunch reinforcement , shuttring checking & concreting For


2 PE/GPL/P-2/STR/07/20/5863 30-06-20 VUP 58369 RHS 01-07-20 10:00 AM
VUP (MCW)

A2 side working pile no. 20 final depth, reinforcement checking &


3 PE/GPL/P-2/STR/07/20/5864 30-06-20 MNB 77963 LHS 01-07-20 9:00 AM
cage lowering with concreting for MNB.

Gzp side Retaining wall raft Reinforcement , shuttring checking &


4 PE/GPL/P-2/STR/07/20/5865 30-06-20 Retaining wall 78667 LHS 01-07-20 9:00 AM
concreting for PUP (MCW)

Lko side Retaining wall raft Reinforcement , shuttring checking &


5 PE/GPL/P-2/STR/07/20/5866 30-06-20 Retaining wall 78667 LHS 01-07-20 10:00 AM
concreting for PUP (MCW)