Country report of Viet Nam

14th Meeting of the GMS


Sub-regional Transport Forum
2-3 December 2010
Presenter: Nguyen Van Thach
Ministry of Transport

Background information on Existing railway

• Railway operates over 2,600


route-km, comprising seven
main lines and several branch
lines.
• Network is all of single track
with 1,000mm gauge (85.5%),
1,435 mm gauge and dual-
gauge sections.
• VR has two divisions:
Transport and Infrastructure
• VR is an independent SOE
under the government

The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or
policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does
not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their
use. Terminology used may not necessarily be consistent with ADB official terms.

1
Issues
• Lack of market orientation
• Low utilazation of assets
• Huge backlog of
infrastructure maintenance
• Lack of modern business
tools
• Inadequate
financial/performance
agreement between railway
and the government

Master plan up to 2020


1. Development of railway transport:
• Until 2020: Railway transportation should account for 13% in terms of
the demand on passenger transport and 14% in terms of the demand
on goods transport.
2. Infrastructure development
Until 2020: Completing the improvement and upgrading the existing
railway network to gain the standardized national railway Grade 1;
completing the linkage of railways with international ports such as Cai
Lan, Lach Huyen, Van Phong, Cai Mep - Thi Vai, and with industrial
zones, mines and tourism areas; striving for the completion of Lao Cai
- Hanoi - Hai Phong railway route and Hanoi - Dong Dang railway
route; connecting with Singapore – Kunming Rail Link.

• For new construction, railways with the standardized gauge 1,435mm


should be prioritized The Hanoi - Lao Cai route, Hanoi - Hai Phong
route and Hanoi - Dong Dang route are to be constructed with the
standardized gauge 1.435 mm.

2
Ha Noi – Lao Cai Railway Upgrading
Total length: 296 km,
Rehabilitation and
upgrading of the section as
follows:
Replacement of super
structure, rehabilitation of
weak bridges, realignment
of some sections, set up
some new stations...
Financing: Co-financing $
60M from ADB, $ 80M
from the Government of
France and $ 20M from
Vietnamese Government
with the total cost of USD
160 mil. Bidding for
construction work is under
preparation.

Implementation period: 2010-


2013.

Yen Vien – Cai Lan Railway Project


• 130 km long, dual-gauge
track (1000 & 1435mm) r
is under construction,
with the total cost of
USD 400 mil.
(Vietnamese
Government funding)
and is expected to be
complete in 2013

3
Di An – Loc Ninh Project
Length: 129 km including 12
stations, from Hoa Lu to Di
An, its P.F/S has been
completed. Double track,
standard gauge,
electrification.
- Railway connecting point
with Cambodia at Hoa Lu
Border Gate.
- First Phase: construction of
single track with 1.000mm
gauge (embankment
standard gauge) to connect
with North – South Railway
line.
- Estimated cost: USD 740
Million