You are on page 1of 9

SPEED POST/COURIER

Our Ref: MDD-III/RM/IS 7098 16 March 2007

Subject: Review Meeting for the Licensees of XLPE Insulated Cables as per IS 7098

Dear Sir,

This is in continuation to the meeting notice of even number dated 22 February 2007
regarding review meeting of the licensees of XLPE insulated cables under central region. The
date and venue for the meeting is as given below:

Date of Meeting Friday, 23 March 2007

Time 1030 hr

Venue BIS Auditorium


Manak Bhavan
9 Bahadur Shah Zafar Marg
New Delhi - 110002

A copy of the AGENDA for the meeting is enclosed. The copy is also available on BIS website
(http://www.bis.org.in ).

You are once again requested to participate in the above meeting.

Thanking you,

Yours faithfully,

(K.K. Chaudhary)
Director (MDD-III)

Encl: As above.
BUREAU OF INDIAN STANDARDS
Marks Department Delhi III

AGENDA

REVIEW MEETING OF XLPE INSULATED CABLE LICENSEES OF CENTRAL


REGION

Date of Meeting Friday, 23 March 2007

Time 1030 hr

Venue BIS Auditorium


Manak Bhavan
9 Bahadur Shah Zafar Marg
New Delhi - 110002

CHAIRMAN: Shri S.K.Gupta, Deputy Director General (Central Region)

SECRETARY: Dr R.K.Singh, Scientist ‘E’ & Head (MDD-III)

1 INAUGURAL SESSION (1030 hr)

1.1 Welcome Address and Programme Objectives: Dr R.K.Singh, Scientist ‘E’ & Head
(MDD-III)

1.2 Inaugural Address: Shri S.K.Gupta, Deputy Director General (Central Region)

Tea Break (1100 hr to 1130 hr)

2 TECHNICAL SESSION (1130 hr – 1330 hr)

2.1 Presentation on the Operation of licenses under CRO

2.2 Discussion on Comments and Queries

2.2.1 Comments on Indian Standards

Comments received are given at Annexure 1. Comments may please be examined/discussed.

(Note – Recommendations requiring any amendment shall be forwarded to the concerned


Technical department/Sectional committee for their scrutiny/examination towards issue of
amendment, if any)
2.2.2 Comments on the Schemes of Testing and Inspection (STI)

Comments received on STIs are given at Annexure 2

(Note – Recommendations requiring any amendment shall be forwarded to the Central Marks
Department, BIS for changes in STIs, if any)

3 BRIEF ON SIMPLIFIED PROCEDURE FOR GRANT OF BIS PRODUCT


CERTIFICATION LICENSE: Presentation by MDD-III, BIS

4 BRIEF ON BIS HALLMARKING SCHEME FOR GOLD AND SILVER: Presentation by


MDD-III, BIS.

5 BRIEF ON BIS MANAGEMENT SYSTEM CERTIFICATION SCHEME: Presentation


by MDD-III, BIS.

6 BRIEF ON CE MARKING: Presentation by IR & TISD, BIS.

7 ANY OTHER BUSINESS

8 CONCLUDING REMARKS BY THE CHAIRMAN

9 VOTE OF THANKS

Lunch (1330 hr)

(Note – Technical session may be continued post lunch, if required)


ANNEXURE 1
(Ref Item 2.2.1)

COMMENTS ON IS 7098(PT 1), 7098(PT 2) , 7098 (PT 3) AND IS 10810

Commentators:

M/s Havell’s India Ltd (HIL)


M/s R.K.Electrical Industries India (RKEI)
M/s Vikas Cable Company (VCC)
Marks Department Delhi – III (MDD-III)

IS 7098 (Part 1):1988

Clause Commentator Comments Decision


No. of
Standard

6.2, Page HIL For armouring which standard is to be


3 followed, IS 3975 : 1988 or IS 3975 : 1999. In
IS 3975:1999 the value of Tensile Strength &
Elongation are not given for sample taken from
finished cable.

6.2, Page RKEI Clause no.6.2 of IS 7098 (Part-1) clearly states


3 that the galvanized steel Wires/ strips shall
comply with the requirements of IS 3975 :
1979/1988 and BIS Laboratories are issuing
test reports of armour as per IS 3975
:1979/1988 specification. Ref: Test Report No.
(Central Lab) E/40149, 40150, 40151 dated 09-
12-2004. But the manufacturers of ISI marked
armour wires are issuing test certificates as per
IS 3975: 1999 which is a more stringent
specification in quality parameters.

Here, the question is that once we are


manufacturing cables as per IS 7098 (Pt-1),
whether it is justified to test the cable armour as
per IS 3975 : 1999 during third party inspection
who always insist for latest edition.

We want BIS to clear this point.


6.2, Page RKEI The manufacturer of cable armour wires/strips
3 & IS issues test certificates without chemical
3975 composition. The clause A-3.2 Line No. 6 of
IS 3975 : 1999 clearly states that all selected
samples shall be tested for all the chemical
requirements.

Here, we would like BIS to clarify whether


chemical composition of metal is to be
mentioned in the test reports of manufacturer or
not.

During third party inspections, some agencies


are asking for manufacturers test certificates for
chemical analysis as per IS 3975 : 1999.

10.1 c) VCC Core identification of three core cables by


Page -4 numerals has been indicated as 0,1,2,3. This
should have been 0,1,2.

11.2, VCC For 23 cores lay up has been shown as 2-7-13.


Table 4, This should have been 2-8-13.
Page-4
11.2, VCC For 37 cores lay up has been shown as 0-6-12-
Table 4, 18. This should have been 1-6-12-18.
Page-4
11.2, VCC For 62 cores lay up has been shown as 1-6-12-
Table 4, 18-24. This should have been 1-6-12-18-25.
Page-4
13.2, RKEI Note under this clause states : “It may be
Page-5, desirable for single core cables intended for
use in ac system, to be armoured with non-
magnetic material” whereas IS 1554 (Pt-1)
Clause No. 13.2.1 states that : “ In case of
single core cable intended for use in ac
systems, the armouring shall be of non-
magnetic material”.

Since the application of cables is same, we


would like BIS to clarify this point.

15.1 c) HIL Which procedure is to be followed for thermal


vii, Page stability test on outer sheath; as per Annexure
7 –A of IS 5831 or test method of IS 10810 (Pt-
60).
16.2.1, VCC “An ac voltage of 7.2 kV” should be replaced
Page 8 by “ dc voltage of 7.2 kV”.

17.2.1, VCC The sentence “ Cables with heat resisting


Page 9 insulation suitable for 85 degree C conductor
temperature shall be identified by the letters
HR 85” should be deleted as insulation is of
XLPE compound.

IS 7098 (Part 2):1985

Clause Commentator Comments Decision


No. of
Standard

Appendix HIL The sampling plant of IS 7098 (Pt-1) and 7098


A (Pt-2) is different. In IS 7098 (Pt-2) min.
number of sample upto 25 drums should be
three samples as in other IS also.
IS 7098 (Part 3):1993

Clause Commentator Comments Decision


No. of
Standard

8.3, Page VCC Elongation at break before ageing (min) 300%


3 and after ageing Min. 300%. How it is possible
that before and after ageing value is same.

8.3, Page VCC Tensile strength before ageing specified as 12.5


3 N/mm 2 (Min.), however specified value of
tensile strength after ageing not mentioned.

Contrarily, Page 6, Clause 19.1. Sl. No. 3 (II)


mention tensile strength and elongation at break
before and after ageing and refers to clause 8.3.

13.3, VCC Last line mentions more than 0.1 ti it should


Page 3 have been 0.1 mm + 0.1x ti .

Table 6, VCC Calculated diameter under metallic sheath


Page 4 mentioned in line 3 as (45-45) and mentioned
in line 10 and 11 as (80-85) & (85-90).

The above should be corrected to (45-50) in


line 3 and (80-90) in 10 & 11.

19.1, VCC In list of type test Partial discharge test and


Page 6 High Voltage test have not been mentioned.
These two tests should be mentioned in type
test as : -
- Partial discharge test; clause 20.10 and
Ref. : 10810 (Pt-46).
- High Voltage test ; clause 20.17 and
Ref. 10810 (Pt-45).

19.1, HIL PD test should be as type test.


Page 6
IS 10810

Clause of Commentator Comments Decision


Standard
1, Scope, VCC Insulation of electric cables should be replaced
Line 2 of by insulation and sheath of electric cables.
Pt-30
4, Table 1 VCC Apparatus for hot set test should be included
of Pt-30 with conditioning chamber.
4.5, Table VCC Range of thermometer for hot set test
1 of Pt-30 mentioned as 200 degree Celsius. It should
have range of 250 degree Celsius.
6.1 and MDD-III For smaller diameter tubular samples,
15.1. d) preparation of test specimen for carrying out
v) of Part water absorption test as per dimension given in
33 & the specification is not possible and therefore
Table 1, this test is not being carried out by BIS
vi of IS Laboratory. Size of test specimen suitable for
7098 (Pt- smaller diameter tubular samples should be
1) specified in the IS.
ANNEXURE -2
(Ref Item 2.2.2)

Comments on Scheme of Testing and Inspection

Standard Commentator Comments Decision

IS 7098 HIL Please clarify whether we can mark ISI on


(Pt-1) : FRLS outer sheath cable.
1988

You might also like