WORK BREAKDOWN STRUCTURE

UV Light Tunnel
with Disinfecting
Mist Machine

Planning Implementation Finalization

1.1.1 2.1 2.1.1 3.1 3.1.1


Nov.
12
The Project Manager Oct. Personnel The hiring of all Oct. Quality The Electricians does
creates a presentation of 15-18 personnel needed for 23-24 a final checking of the
the project. the implementation of Check plug sockets,
the project commences installment of the
1.1.2 to be done by the units, and machine to
Project Manager. ensure if its works.
The Project Manager Oct. 2.2.1
sources out the all the 15-18
materials to be needed 3.2.1
for the implementation of The Construction Oct.
the project Laborers measures the 25 The Project Manager Nov.
area to determine the trains the internal 13
2.2 size of the Aluminum 3.2 customers pertaining
Tunnel with Glass to to the procedures to
order from the supplier.
1.1.3 Installation Training do in terms of using
the additional safety
1.1 Area measure. They would
Project Manager lists all Oct. 2.2.2 also be assisting the
the needed personnel 15-18
Project for the implementation of
external customers
Proposal The Construction Oct. when they visit the
the project and creates
Laborers cleans the area 25 building
the organizational chart.
and clears the objects at
present.

1.1.4 2.3.1 3.3 3.3.1


The Project finalizes all Oct. The Project Manager Oct. Paying the The personnel will be Nov.
the costs to be incurred 15-18 asks a quotation from 26 compensated after 14
for the project from all LPC GLASS AND personnel the entire project has
the materials needed ALUMINUM SUPPLY. been installed.
and the personnel to be Afterwards, when the
hired. cost fits their budget
then an order is placed.

1.2.1 2.3.2
2.3
1.2 The Project presents the Oct The Project Manager Oct.
project proposal towards 19-22 asks a quotation from 26
the President of Carwill Ace Hardware for the
Construction and once other materials. After the
approved the budget is costs fits the budget
given. then the items are
purchased.

Purchasing
Presentation of the
items

2.3.3

The Project Manager Oct.


orders the UV Lights and 26
Disinfecting Mist
Machine at Lazada.

2.4.1

All the items are Oct. 26-


delivered and the Nov, 8
Construction Laborers
helps in unloading all the
items

2.4.2

2.4 The Construction Nov,


Laborers assembles the 8-9
Customized Aluminum
Construction Tunnel with Glass at the
entrance of the building.

2.4.3

The Electricians installs Nov,


the plug sockets inside 10-12
the Tunnel with the help
of the Construction
Laborers. Afterwards,
they set up the UV
Lights and Disinfecting
Mist Machine