MMT-CHK-LST-INT

Rev. R1/Dt.010406
Measurement checklist

Measure all dimensions in MM only


SL NO In Plan Y / N / Remarks In Section / Elevation Y / N / NA Remarks
NA

A General Points
1 mark location of north point Measure the clear floor height atleast at
three different locations
2 Take all measurements including offsets Give clear heights at sunken slabs, beam
dimensions, angular & curved surfaces soffits etc. or where ever the floor height is
getting changed.
3 Take perpendicular dimensions of angular Measure clear floor heights for areas in
surfaces different wings or floors

B Double Heights / Skylights Double Heights / Skylights


1 Check and mark any Double Height area measure clear height in double height area

2 Are there any skylights, mark details

C RCC Superstructure RCC Superstructure


1 check for evidence of any structural failure measure heights at all points where ever
(cracks in columns, beams, slabs & brickwork) the height is changing

2 check for evidence of any leakage, seepage from measure thickness of loft slab
external walls / roof slabs.
3 Is Structural Drawing available measure clear height between loft slab top
and ceiling slab bottom
4 if yes, check the structural drg w r t actual site

5 record descrepancies in case the site is not


matching with structural drg
6 mark locations & sizes of RCC columns
7 mark clear dimensions between RCC columns

8 mark location and width of RCC beams in dotted measure clear height from floor to slab (or
lines false ceiling if existing)
9 Identify beams near AHU rooms at each floor measure clear height upto beam bottom
level (from existing slab finish level) give
minimum 2 sections
10 Identify and mark deep beams / structural mark depths of all RCC beams
elements which will affect AC design at each floor
level
11 Check for beams jutting into shafts reducing the measure floor drop from finished lobby
clear dimension of the shaft at each floor level level (to ascertain thickness of screeding
reqd / or to ascertain the feasebility for
trunking raceways)
12 Check for lintels on external walls which will
affect glazing or AC system
13 Check and mark details of sunken slabs at each mark depth of drop slab / sunken slabs
floor level

Edifice Architects Pvt Ltd


site-analysis.xls Page 1 of 5 FM / DN / 02
MMT-CHK-LST-INT
SL NO In Plan Y / N / Remarks In Section / Elevation Y / N / NA Remarks
NA
D Shafts
1 Check the termination details of shafts on the
roof
2 Check and identify the shafts which are for
Airconditioning only
Electrical purposes only
Fire fighting only
Plumbing only
3 Check all Shafts for clear internal dimensions at
each floor level
4 Specify the pipe diameters

E Basements Basements
1 mark location & access of basement
2 check & mark ventilation & natural light openings

3 check damp proofing


4 mark locations of ramps , if any measure & mention gradiant slope of the
ramp
5 mark the locations of sump if any measure the depth & invert level

F Staircases Staircases
1 mark location of main staircase mark clear heights & head-rooms available
for main stairs
2 mark location of fire escape staircase mark clear heights & head-rooms available
for fire escape stairs
3 mark no of treads in each flight mark no of risers in each flight
4 mark all intermediate landings

G Lifts & Elevators


1 mark location of passenger lifts
2 mark location of service lifts
3 mark location of dumb waiter
4 location of machine rooms
5 Check the internal dimensions of the lift /
elevator shaft for confirmation
H Wall Surfaces
1 measure niche depths (if any)
2 measure wall thickness
3 In case wall thickness are not measurable then
give overall dimension & clear dimensions

I Curved Surfaces
1 measure offsets of curved surfaces (Refer Sketch)

2 measure running lengths of curved surfaces


3 Diagonal checks, especially for angular and
curved surfaces.

Edifice Architects Pvt Ltd


site-analysis.xls Page 2 of 5 FM / DN / 02
MMT-CHK-LST-INT
SL NO In Plan Y / N / Remarks In Section / Elevation Y / N / NA Remarks
NA
J Structural Glazing / Windows / Doors Structural Glazing / Windows / Doors

1 mark locations of all mullions sill height for windows / curtain glazing
2 give detail of one mullion lintel height for windows / curtain glazing

3 Indicate type of windows


conventional windows
casement windows
curtain wall glazing
4 mark window openings
5 mention direction of opening for normal windows

6 mention direction of opening for sliding / hinged


windows
7 mention size of door openings door height
8 indicate direction of opening

K Canopies & Awnings Canopies & Awnings


1 mark locations of the same mention height at which canopies or
awnings appear
2 mark structural supports for the same, if any

L Cars & other vehicle parkings


1 open parkings inside plot / land limits
2 completely covered parkings
3 mark locations of dedicated ramps for parkings

4 mark the locations of sumps if any


M Landscapings
1 mark plumbing & drainage services for
landscaping

N Plumbing Services
1 mark location of all water supply pipes
2 mark locations of borings (hand-pumps / jet
pumps)
3 mark location of water lifting pumps & motors
4 location of Under Ground Water Storage Tanks

5 location of Over Head Water Storage Tanks


6 mark location of all horizontal drain pipes
7 mark location of all vertical drain pipes
8 mark locations of inspection chambers
9 mark inter-connection of inspection chambers
with the municipal drain lines
10 mark location of all storm water pipes
11 mark locations of sumps

O DG & Electricals
1 mark location of existing DG
2 mark location of Transformer
3 mar the location of the meter room / supply
company .room
4 mark location of stabiliser
5 mark location of main elec panels
6 mark location of shunt capacitors
7 does a platform on which DG is going to be
placed exists
8 if yes measure its size
9 do the earthing pits for DG exists at site
10 if yes count how many numbers
11 mark position of main electrical panel
12 mark the location of HT Switchgear
13 mark routing of HT Cabling
14 mark the location of supply co room

Edifice Architects Pvt Ltd


site-analysis.xls Page 3 of 5 FM / DN / 02
MMT-CHK-LST-INT
SL NO In Plan Y / N / Remarks In Section / Elevation Y / N / NA Remarks
NA
P UPS / Server Room
1 mark location of UPS rooms
2 mark location of Server Room

Q HVAC
1 mark location of chiller plants
2 mark location of condensing units
3 mark location of outdoor units
4 mark location of indoor units
5 mark drain pipe routings
6
7 Check & mark for ledges / balconies which can be
used for locating Outdoor equipment at each
floor level
8 Check & mark lintels which will limit wall
openings required for duct passage at each floor
level
9 Check & mark any special architectural or
structural feature which will affect AC design at
each floor level
10 Check if floor above and floor below are AC
11 If chiller based system is to be suggested as an
option - is the roof designed to take chiller
weight
12 If chiller based system is to be suggested as an
option - is there space available for parking a
Crane for lifting up the unit
13 whether insulation exists or not
14 if yes what type of insulation is it
15 underdeck insulation
16 overdeck insulation
17 Whether site is located on the top floor of bldg to
ascertain under deck insulation requiremenrt

R Data Networking & Satellite links


1 mark location of satellite link towers
2 mark location of dish antenna

S Fire Fighting & Suppression


1 check whether sprinkler system exists at site , if
yes then
2 mark location of Under Ground Water Tank for
fire fighting
3 mark location of Fire Pump room
4 mark routing of main headers
5 mark location of distribution headers
6 mark location of wet risers / hose pipes
7 mark locations of fire rated doors
8 mark location of Gas Suppression Cylinders'
room, if any

Edifice Architects Pvt Ltd


site-analysis.xls Page 4 of 5 FM / DN / 02
MMT-CHK-LST-INT
SL NO In Plan Y / N / Remarks In Section / Elevation Y / N / NA Remarks
NA

T Security Package
1 mark location of CCTV cameras
2 mark the location of DVR / HDD for CCTV sytem

2 mark location of Access Control Readers


3 mark location of Access Control Panels
4 mark the location Door controller units
5 Mark the location of HDD for Acess Control sytem

6 mark the location of security control room

U Building Management Services


1 mark location of BMS panels ( DDC panels) &
their conduiting route
2 mark the location of the Control Room - for BMS/
Secutiry systems monitoring
2 mark location of security guards / check points

3 mark location of water softening plant, in case it


exists
4 location of hot water generators

V Fire Alarm & Detection


1 Mark the location of Main Fire Alarm Control
Panel
2 Mark the location of Repeater Fire Alarm Control
Panel
3 Mark locations for hooters, panic bar
4