1.0 Objective 3

2.0 Definitions and Abbreviations 3

3.0 Scope 5

4.0 Procedure 5

5.0 Related Documents 8

6.0 Attachments: 9
Attachment-A : Submission category code 001- Product pipe corridor 10
Attachment-B : Submission category code 002- Wet Utility Corridor 13
Attachment-C: Submission category code 003- Underground Power Corridor 16
Attachment-D: Submission category code 004- High Pressure Gas Corridor 19
Attachment-E: Submission category code 005- Common Cooling Water Corridor 21
Attachment-F: Submission category code 006- Telecom Corridor 23
Attachment-G: Submission category code 007- LNG Corridor 25
Attachment-H: Submission category code 008- Lay down area 28
Attachment-I: Submission category code 009- Permanent Access Road 31
Attachment-J: Submission category code 010- Lee breakwater& Liquid Product 34
Berth
Attachment-K: Submission category code 011- Camps 36
Attachment-L: Submission category code 012- Other categories 37
Attachment-M: “Covering Sheet” Format 38
Attachment- N: Crossing matrix- Typical example 39
Attachment- O: Drawing # SK-RLC- 02725 Rev.0 40
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 3

1. OBJECTIVE

To establish and maintain a documented Guideline to all End- Users & Contractors for
making various technical submissions to RLC.

2. DEFINITIONS / ABBREVIATIONS

Approve To accept as satisfactory, permit or officially agree

END USER A Company or firm that uses services, facilities and


occupies RLC land for the purpose of manufacturing a
product or providing a service to RLC or other tenants
within RLC.

Contractor A party engaged by End User to perform works / or


services under a contract

Guideline Similar to a procedure but less prescriptive in nature.


Contains general instructions/guidance to carry out a
series of actions.

Shall A mandatory action

Should A preferred course of action or activity

QP Qatar Petroleum.
RLC QP Directorate -Ras Laffan Industrial City.

RLIC Ras Laffan Industrial City.

CPW Consolidated Permit to Work.


RLP Manager, Industrial Planning & Development/ Ras
Laffan Industrial Planning & Development

RIS Head of Project Services/ Ras Laffan Infrastructure


Project Services.

HSE Health, Safety and Environment.

RHE RLC- HSE-Environmental Affairs/


Head of Environment.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 4

RHT RLC- HSE- Safety / Head of Safety

RHS Ras Laffan Security

RHF RLC- HSE-Fire/ Chief Fire Officer

QHDM Qatar Highway Design Manual

QTM Qatar Traffic Manual

QCS Qatar Construction Specification

FGL Finished Grade Level

NGL Natural Ground Level

TLLA Temporary Land Lease Agreement

Common Corridor A Corridor as per RLC drawing # SK-RLC-170 (Latest


revision)

Sub- Corridor A Corridor that is allocated to the specific End-User


within the Common Corridor.

m meter

QNHD Qatar National Height Datum

CGIS-QNG95 Centre for Geographic Information System- Qatar


National Grid 95
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 5

3. SCOPE

This guideline covers the general requirements for making Technical Submissions by End-
Users/ Contractors to RLC. All End Users before installing any permanent/temporary facility in
any of the RLIC common areas, are required to submit all the technical details of the proposed
installation to RLC for Review and Approval. In this context the ‘common area’ is defined as
any area that is outside the battery limits of End-User’s plant.

4. PROCEDURE

The End-Users/Contractors shall submit the technical document detailing the proposed item of
work with necessary drawings & documents. The details submitted shall be conclusive and
comprehensive with regard to the relevant information to enable easy and quick review. The
submission shall be done in accordance with the following procedure.

4.1. Covering Sheet:

All the submissions shall contain a ‘Covering sheet’ as per the Format attached. (See
Attachment: M) The covering sheet must contain the following information:

4.1.1. A unique Submission number with date.

4.1.2. Total number of pages included in the Submission.

4.1.3. All the submissions shall be addressed to :

The Manager
Industrial Planning & Development
Post Box: 22247
Ras Laffan Industrial City
Fax: 474-8489, Tel: 474 8471

4.1.4. Information regarding the originator:

ƒ Name and Designation of the person to whom RLC’s response


to be sent.
ƒ Name of the Company or End User.

4.1.5. FAX Number to which RLC response to be sent.

4.1.6. ‘Name of the Project’ and ‘Subject”

4.1.7. ‘Brief Description’ of the request/ content of the submission.


QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 6

4.1.8. Contact details (Phone number, Mobile number, email ID) of a person with
whom clarifications on the subject matter are to be sought

4.1.9. SUBMISSION CATEGORY CODE

Submissions are categorised under the following headings based on the nature
of work/ location of installation. Indicate the appropriate submission category
Code in the relevant box provided in the covering sheet. Submissions under
each category shall be made in accordance with the relevant attachment. The
Attachment-A to L describes the details that are to be submitted.

CATEGORY DESCRIPTION ATTACHMENT


CODE
001 Product Pipe Corridors A
002 Wet Utility Corridor B
003 Underground Power Corridor C
004 High Pressure Gas Corridor D
005 Common Cooling Water Corridor E
006 Telecom Corridor F
007 LNG Corridor G
008 Lay down Area H
009 Permanent Access Road I
010 Lee Breakwater & Liquid Product J
Berth
011 Camps K
012 Other categories L

4.1.10. PURPOSE OF SUBMISSION:

The purpose of submission shall be indicated in the appropriate box in the


covering sheet by inserting a tick mark. For this purpose the following types are
identified:

4.1.10.1. For Approval:

The documents that are submitted to RLC for review and issuance of
necessary ‘Approval Letter‘, resorts under this type. The approval letter is
necessary for End-User/ Contractor to initiate the Consolidated Permit to
Work within RLIC.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 7

4.1.10.2. Supplementary submissions:

A submission made subsequent to an earlier submission, supplementing the


details that are required for RLC’s review. This may be the result of a
clarification meeting between RLC & the End-User/Contractor or a voluntary
additional submission of details by the originator

4.1.10.3. Revised submissions:

A subsequent submission made after an original submission totally revising


the drawings & documents. This must supersede the original submission.
This submission may be the result of a discussion/s with RLC or any other
authority involved in the approval/concurring process or a voluntary
submission due to an Engineering change.

4.1.10.4. Response to RLC letters:

This type is applicable when revised /supplementary submission is made by


the End-User taking into consideration various comments/query
communicated to the End-User on an earlier submission in writing. This shall
essentially reference the earlier communications from RLC.

4.1.10.5. Information & records:

The submissions that are made to RLC wherein no action from RLC is
solicited will come under this type. This will be applicable in the case of
reports, as-built details, etc.

4.1.11. The submission must indicate previous reference(s)/ correspondence(s), if any.

4.2. Content of the submission :

Ras Laffan Industrial City is divided into several Lots & Corridors, based on the
Industrial Land Use Plan, earmarked for specific purposes. RLC controls the use of
the land within RLIC boundaries in order to ensure efficiencies and to promote
sustainable developments. RLC’s Review & Approval process mainly focuses on
details which are pertinent to ensure that the proposals are inline with RLC’s Master
Plan. This is to achieve possible synergies with, to evade conflicts between and to
avoid interferences with existing/future assets of other End-Users. Thus, RLC’s
Review/Approval does not absolve the End-User from checking and ensuring the
technical content of the document with regard to its conformity with applicable
Codes/Standards & process requirements. Hence all End-Users must refrain from
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 8

submitting details such as Fabrication Drawings, Piping Isometrics, Stress


Calculations, Design documents etc. unless otherwise requested by RLC.

4.2.1. Drawings & Documents :

4.2.1.1. All the documents shall be in A4 size.

4.2.1.2. All drawings shall be in the standard sheet size (A0/A1/A2 or A3)
prepared as per standard engineering practice. Sketches are not
acceptable.

4.2.1.3. All Drawings must be numbered with revision.

4.2.1.4. At least 3 sets of Drawings & Documents must be submitted.

4.2.1.5. Soft Copies :

Submission of soft copies are encouraged. However hard copies are


essential as stated above. Also, soft copies of drawings must be in
AutoCAD compatible with RLC system.

4.2.2. Coordinates :

The submitted drawings shall be in the CGIS-QNG 95 coordinate


system. No other coordinate system will be entertained.

4.3 Acknowledgement of Submissions:

If End-User/ Contractor requires acknowledgement, the documents shall be


submitted in person and RLC will acknowledge the receipt of the submission from
the Office of RLP on the duplicate of the covering sheet. Submissions made through
Post, Courier etc. will not be acknowledged.

5. RELATED DOCUMENTS:

QPR-RLP-010 Regulation for planning and construction of camps at RLIC


QPR-RLP-009 Guidelines for corridors and corridor crossings.
QPR-RLP-007 Regulation for protection of pipe bridges.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 9

6. ATTACHMENTS:

Attachment-A :
Submission category code 001- Product pipe corridor
Attachment-B:
Submission category code 002- Wet Utility Corridor
Attachment-C:
Submission category code 003- Underground Power Corridor
Attachment-D:
Submission category code 004- High Pressure Gas Corridor
Attachment-E:
Submission category code 005- Common Cooling Water Corridor
Attachment-F:
Submission category code 006- Telecom Corridor
Attachment-G:
Submission category code 007- LNG Corridor
Attachment-H:
Submission category code 008- Lay down area
Attachment-I:
Submission category code 009- Access Road
Attachment-J:
Submission category code 010- Lee Breakwater & Liquid Product Berth
Attachment-K:
Submission category code 011- Camps
Attachment-L:
Submission category code 012- Other categories
Attachment- M:
“Covering Sheet” Format
Attachment- N:
“Crossing matrix”- Typical example
Attachment- O:
Drawing # SK-RLC- 02725 Rev. 0
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 10

ATTACHEMENT- A

Submission Category Code -001: PRODUCT PIPE CORRIDOR

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to PRODUCT PIPE CORRIDOR.

PRODUCT PIPE CORRIDOR

Product Pipe Corridors provide space for pipelines to distribute feedstock to processing plants,
from plants via rundown pipelines to tank farms or the Port for storage and export of products,
and for pipelines between End-Users. Pipelines in these corridors carry liquid products and are
normally above ground.

A. PRODUCT PIPE CORRIDOR SUBMISSIONS:

1. Conceptual pipeline routings must be finalised in consultation with RLC. This will be
done with reference to the latest revision of the RLC Common Corridor Drawing #
SK-RLC-00170, and inline with the RLIC development plans. After finalisation,
submit the conceptual routing for RLC’s review and approval.

2. After the routing is agreed in-principle the End-User will arrive at the requirements
of the sub-corridor based on the process parameters. Once the width requirement
is optimized, the exact location of the sub-corridor within the Common Corridor will
be advised by RLC.

3. Once the sub-corridor is allocated, the End-User will develop an overall routing
layout clearly indicating the sub-corridor width and location within the common
corridor, with all crossings identified and numbered. In this regard a drawing in Plan
View is required, clearly identifying all crossings with coordinates in CGIS QNG95
and accompanied with an applicable Crossing Matrix. The Crossing Matrix shall be
in accordance with the example attached in Attachment N. RLC can assist in
identifying the respective asset owners, if required.

In this context ‘crossings’ mean a location where the allocated sub-corridor


intersects in plan (underground or overhead) with another corridor (Occupied ,
Partially occupied or Unoccupied), as defined in the RLC Common Corridor Drawing
# SK-RLC-00170. This overall layout shall be submitted to RLC for review and
Approval.

4. Expansion loops shall be vertical.


QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 11

5. After obtaining the approval for the above overall layout, the End-User shall submit
the following details for RLC’s review and Approval.

a. Non-Crossing locations: Proposed pipe support installation (Excavation details/


Sleeper Details etc) excluding the crossings. The drawing must contain the
details as given below, as a minimum.

i. Piping Plan with proposed pipe dimensions with all relevant cross
sectional details.

ii. RLC Corridor edges & the allocated sub-corridor edges with relevant
coordinates in CGIS-QNG95 system. Relevant dimensions shall be
clearly given.

iii. Clearance from the sub-corridor edges shall be indicated. Please see
drawing # SK-RLC-02725 Rev.0, ‘Sketch-A1’ in the ‘attachment O’.

iv. Existing facilities in the same corridor & known planned facilities.

v. Any other information if deemed necessary.

vi. Key Plan

b. Crossing Details:

i. Each crossing must be separately submitted.

ii. The crossing details must conform to RLC’s Guidelines. (Reference:


“Guidelines for corridors and corridor crossings“- Document # QPR-RLP-
009).

iii. While crossing existing and planned assets of other 3rd Parties,
necessary concurrence shall be obtained from the relevant asset
owners.

6. Separate approval for hydro-testing/ pneumatic testing required for the installed
pipelines shall be obtained.

7. The details of the Telltale system to protect the pipe bridges from possible damages
due to movement of heavy vehicles shall be submitted according to the
“Regulation for protection of overhead pipe bridges” # QPR-RLP-007.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 12

8. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two
sets of hard copies and a soft copy prepared in AUTO-CAD format compatible with
RLC system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 13

ATTACHEMENT- B

Submission Category Code -002: WET UTILITY CORRIDOR

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to WET UTILITY CORRIDOR.

WET UTLITY CORRIDOR

Wet Utility Corridor provides space for ‘wet’ utilities such as desalinated water, potable water,
and irrigation water. Seawater for back-up firewater could be included in the same corridor in
areas where Cooling Water Corridors do not exist. These pipelines are normally laid
underground, except Phase I back-up firewater which is aboveground.

B. WET UTILITY CORRIDOR SUBMISSIONS:

1. Conceptual pipeline routings must be finalised in consultation with RLC. This will be
done with reference to the latest revision of the RLC Common Corridor Drawing #
SK-RLC-00170, and inline with the RLIC development plans. After finalisation,
submit the conceptual routing for RLC’s review and approval.

2. After the routing is agreed in-principle, the End-User/ QP-EPC Contractor will
arrive at the requirements of the sub-corridor based on the process parameters.
Once the width requirement is optimized, the exact location of the sub-corridor
within the Common Corridor will be advised by RLC.

3. Once the sub-corridor is allocated, the End-User/ QP-EPC Contractor will develop
an overall routing layout clearly indicating the sub-corridor width, and location within
the common corridor, with all crossings identified and numbered. In this regard a
drawing in Plan View is required clearly identifying all crossings with coordinates in
CGIS QNG95 and accompanied with an applicable Crossing Matrix. The Crossing
Matrix shall be in accordance with the example attached in Attachment N. RLC can
assist in identifying the respective crossing owner, if required.

In this context ‘crossings’ mean a location where the allocated sub-corridor


intersects in plan (underground or overhead) with another corridor (Occupied ,
Partially occupied or Unoccupied), as defined in the RLC Common Corridor
Drawing # SK-RLC-00170. This overall layout shall be submitted to RLC for review
and Approval.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 14

4. After obtaining the approval for the above overall layout, the End-User/ QP-EPC
Contractor shall submit the following details for RLC review & Approval.

a. Non-Crossing locations: The Proposed pipeline routing except in the crossing


locations clearly indicating the excavation plan shall be submitted for RLC
review and Approval. This must contain the following details, as a minimum.

i. Piping Plan with proposed pipe dimensions with all relevant cross
sectional details.

ii. RLC Corridor edges & the allocated sub-corridor edges with relevant
coordinates CGIS-QNG95; Relevant dimensions shall be clearly
given.

iii. Existing facilities in the same corridor & known planned facilities.

iv. Normally, the pipelines in the wet utility corridor shall be underground.
The Profile plan (longitudinal) showing the proposed pipeline
elevation must be submitted. There must be a minimum cover of 1.00
m with respect to the Finished Grade Level (FGL) or Natural Ground
Level (NGL), whichever is lower, or as required by RLC.

v. Clearance from the sub-corridor edges shall be indicated. Please see


drawing # SK-RLC-02725 Rev.0, ‘Sketch-B1’ in the ‘attachment –O’.

vi. Any other information if deemed necessary.

vii. Key Plan

b. Crossing Details:

i. Each crossing must be separately submitted.

ii. The crossing details must conform to RLC’s Guidelines. (Reference:


“Guidelines for corridors and corridor crossings“- Document # QPR-
RLP-009).

iii. While crossing existing and planned assets of other 3rd Parties,
necessary concurrence shall be obtained from the relevant asset
owners.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 15

5. Separate approval for hydro-testing/ pneumatic testing required for the installed
pipelines shall be obtained.

6. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two
sets of hard copies and a soft copy prepared in AUTO-CAD format compatible with
RLC system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 16

ATTACHEMENT- C

Submission Category Code -003: UNDERGROUND POWER CORRIDOR

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to Underground Power Corridor.

UNDERGROUND POWER CORRIDOR

Underground power corridor provides space for routing underground power cables at the
following rated voltages: 0.415kV, 3.3kV, 6.6 kV, 11kV, 33kV, 132kV, 220kV, and 400kV.

C. UNDERGROUND POWER CORRIDOR SUBMISSIONS:

1. Conceptual pipeline routings must be finalised in consultation with RLC. This


will be done with reference to the latest revision of the RLC Common Corridor
Drawing # SK-RLC-00170, and inline with the RLIC development plans. After
finalisation, submit the conceptual routing for RLC’s review and approval.

2. After the routing is agreed in-principle the End-User will arrive at the
requirements of the sub-corridor based on the cable design parameters. Once
the width requirement is optimized, the exact location of the sub-corridor within
the Common Corridor will be advised by RLC.

3. Once the sub-corridor is allocated, the End-User will develop an overall routing
layout clearly indicating the sub-corridor width, and location within the common
corridor, with all crossings identified and numbered. In this regard a drawing in
Plan View is required clearly identifying all crossings with coordinates in CGIS
QNG95 and accompanied with an applicable Crossing Matrix. The Crossing
Matrix shall be in accordance with the example attached in Attachment N. RLC
can assist in identifying the respective crossing owner, if required.

In this context ‘crossings’ mean a location where the allocated sub-corridor


intersects in plan (underground or overhead) with another corridor
(Occupied , Partially occupied or Unoccupied), as defined in the RLC Common
Corridor Drawing # SK-RLC-00170. This overall layout shall be submitted to
RLC for review and Approval.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 17

4. After obtaining the approval for the above overall layout, the End-User shall
submit the following details, for RLC review and Approval.

a. Non-Crossing locations: The Proposed cable routing except in the


crossing locations clearly indicating the excavation plan shall be submitted
for RLC review and Approval. This must contain the following details, as a
minimum.

i. Cable routing Plan with proposed corridor width.

ii. Cross section showing the cable arrangement/configuration and


spacing.

iii. The clearance between centre line of the outer cables and the edge
of the trench bottom shall be 200 mm minimum and shall be 500 mm
minimum from the edge of the corridor. This will give a minimum
clearance of 1000 mm between centre line of the outer cables and
the centre line of future outer cables in the adjacent corridors.

iv. Clearance from the sub-corridor edges shall be indicated. This


Clearance shall be decided based on the power ratings in
consultation with RLC. End-Users shall take into consideration in
their cable design the effects of future cables which will be installed
1000 mm apart. Please see drawing # SK-RLC-02725 Rev.0,
‘Sketch-C1’ in the ‘attachment-O’. Should this condition cause a
substantial de-rating of the cable capacity, then a wider corridor is
required, and shall be included in the Land Lease Agreement.

v. RLC Corridor edges & the allocated sub-corridor edges with relevant
coordinates CGIS-QNG95. Relevant dimensions shall be clearly
given.

vi. Existing facilities in the same corridor & known planned facilities.

vii. The Profile plan (longitudinal) showing the proposed cable elevation
must be submitted. There must be a minimum cover of 1.10 m with
respect to the Finished Grade Level (FGL) or Natural Ground Level
(NGL) whichever is lower.

viii. Joint bays and cable snacking shall be located within the approved
corridor limits.

ix. Any other information if deemed necessary.


QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 18

x. Key Plan.

b. Crossing Details:

i. Each crossing must be separately submitted.

ii. The crossing details must conform to RLC’s Guidelines. (Reference:


“Guidelines for corridors and corridor crossings“- Document # QPR-
RLP-009).

iii. Joint bays shall not be located at the crossings.

iv. While crossing existing and planned assets of other 3rd Parties,
necessary concurrence shall be obtained from the relevant asset
owners.

5. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two
sets of hard copies and a soft copy prepared in AUTO-CAD format compatible
with RLC system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 19

ATTACHEMENT- D

Submission Category Code -004: High Pressure Gas Corridor.

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to High Pressure Gas Corridor.

HIGH PRESSURE GAS CORRIDOR

The pipelines containing gaseous and mixed phase feed stocks and products are categorised
under High Pressure Gas Corridor. The High Pressure Gas pipelines are buried in most of the
cases. The buried Gas pipelines may be bunded (Soil Blanket) if required.

D. HIGH PRESSURE GAS CORRIDOR SUBMISSIONS:

1. Conceptual pipeline routings must be finalised in consultation with RLC. This will be
done with reference to the latest revision of the RLC Common Corridor Drawing # SK-
RLC-00170, and inline with the RLIC development plans. After finalisation, submit the
conceptual routing for RLC’s review and approval.

2. After the routing is agreed in-principle, the End-User will arrive at the requirements of
the sub-corridor based on process parameters. Once the width requirement is
optimized, the exact location of the sub-corridor within the Common Corridor will be
advised by RLC.

3. Once the sub-corridor is allocated, the End-User will develop an overall routing layout
clearly indicating the sub-corridor width, and location within the common corridor, with
all crossings identified and numbered. In this regard a drawing in Plan View is required
clearly identifying all crossings with coordinates in CGIS QNG95 and accompanied with
an applicable Crossing Matrix. The Crossing Matrix shall be in accordance with the
example attached in Attachment N. RLC can assist in identifying the respective
crossing owner, if required.

In this context ‘crossings’ mean a location where the allocated sub-corridor intersects
in plan (underground or overhead) with another corridor (Occupied , Partially occupied
or Unoccupied), as defined in the RLC Common Corridor Drawing # SK-RLC-00170.
This overall layout shall be submitted to RLC for review and Approval.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 20

4. After obtaining the approval for the above overall layout, the End-User shall submit the
following details for RLC review & Approval.
a. Non-Crossing locations: The Proposed pipe routing, except at the crossing
locations, clearly indicating the excavation plan shall be submitted for RLC’s
review and Approval. This must contain the following details, as a minimum.

i. The routing Plan with proposed pipe dimensions with relevant cross
sectional details.

ii. RLC Corridor edges & the allocated sub-corridor edges with relevant
coordinates CGIS-QNG95. Relevant dimensions shall be clearly
given.

iii. Existing facilities in the same corridor & Known planned facilities.

iv. The Profile plan (longitudinal) showing the proposed pipeline


elevation, NGL, FGL, etc. must be submitted. There must be a
minimum cover of 1.50 m with respect to the Finished Grade Level
(FGL) or Natural Ground Level (NGL) whichever is lower.

v. Clearance from the sub-corridor edges shall be indicated. Please


see drawing # SK-RLC-02725 Rev.0, ‘Sketch-C1’ in the ‘attachment-
O’.

vi. Any other information if deemed necessary.

vii. Key Plan

b. Crossing Details:

i. Each crossing must be separately submitted.

ii. The crossing details must conform to RLC’s Guidelines. (Reference:


“Guidelines for corridors and corridor crossings“- Document # QPR-
RLP-009).

iii. While crossing existing and planned assets of other 3rd Parties,
necessary concurrence shall be obtained from the relevant asset
owners.

5. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two sets of
hard copies and a soft copy prepared in AUTO-CAD format compatible with RLC
system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 21

ATTACHEMENT- E

Submission Category Code -005: Common Cooling Water Corridor

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to Cooling Water Corridor.

COMMON COOLING WATER CORRIDOR

This corridor provides space for the following services;

ƒ Cooling Seawater headers for supply of seawater to End-Users.


ƒ Cooling Seawater headers for return of seawater from End-Users to Receiving
Basin/ Outfall Channel.
ƒ Piping headers for distribution of seawater as Back-up Firewater System.

The pipelines can be installed underground or aboveground.

E. COMMON COOLING WATER CORRIDOR SUBMISSIONS:

1. Conceptual pipeline routings must be finalised in consultation with RLC. This will be
done with reference to the latest revision of the RLC Common Corridor Drawing #
SK-RLC-00170, and inline with the latest RLIC development plans. After finalisation,
the conceptual routing shall be submitted to RLC for review and approval.

2. Once the corridor is allocated, the QP/ EPC Contractor will develop an overall routing
layout clearly indicating the corridor width, with all crossings identified and
numbered. In this regard a drawing in Plan View is required clearly identifying all
crossings with coordinates in CGIS QNG95 and accompanied with an applicable
Crossing Matrix. The Crossing Matrix shall be in accordance with the example
attached in Attachment N. RLC can assist in identifying the respective crossing
owner, if required.

In this context ‘crossings’ mean a location where the allocated corridor intersects
in plan (underground or overhead) with another corridor (Occupied , Partially
occupied or Unoccupied), as defined in the RLC Common Corridor Drawing # SK-
RLC-00170. This overall layout shall be submitted to RLC for review and Approval.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 22

3. After obtaining the approval for the above overall layout, the QP/ EPC Contractor
shall submit the following details for RLC’s review & Approval.

a. Non-Crossing locations: The Proposed pipe routing except in the crossing


locations clearly indicating the excavation plan shall be submitted for RLC
review and Approval. This must contain the following details, as a minimum.

i. The proposed piping routing Plan, including pipe dimensions and relevant
cross section details.

ii. RLC Corridor edges with relevant coordinates CGIS-QNG95. Relevant


dimensions shall be clearly given.

iii. Existing facilities in the same corridor & Known planned facilities.

iv. For underground installations, the Profile plan (longitudinal) showing the
proposed pipe elevation must be submitted. There must be a minimum
earth cover of 1.00 m with respect to the Finished Grade Level (FGL) or
Natural Ground Level (NGL) whichever is lower.

v. Any other information if deemed necessary.

vi. Key Plan

b. Crossing Details:

i. Each crossing must be separately submitted.

ii. The crossing details must conform to RLC’s Guidelines. (Reference:


“Guidelines for corridors and corridor crossings“- Document # QPR-RLP-
009).

iii. While crossing existing and planned assets of other 3rd Parties, necessary
concurrence shall be obtained from the relevant asset owners.

iv. Anchor blocks shall be located at least 10 m away from the crossing
locations.

4. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two sets
of hard copies and a soft copy prepared in AUTO-CAD format compatible with RLC
system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 23

ATTACHEMENT- F

Submission Category Code -006: Telecom Corridor

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to Telecom Corridor. The Telecom cables are normally laid underground.

TELECOM CORRIDOR

This corridor provides space for installing telecom cables for End Users, QP or Utility related
Telecom cables.

F. TELECOM CORRIDOR SUBMISSIONS:

1. Conceptual pipeline routings must be finalised in consultation with RLC. This will be
done with reference to the latest revision of the RLC Common Corridor Drawing # SK-
RLC-00170, and inline with the RLIC development plans. After finalisation, submit the
conceptual routing for RLC’s review and approval.

2. After the routing is agreed in-principle and the requirements are known, the exact
location of the telecom duct within the Common Corridor will be advised by RLC.

3. The End-User will develop an overall routing layout clearly indicating the location within
the common corridor, with all crossings identified and numbered. In this regard a
drawing in Plan View is required clearly identifying all crossings with coordinates in
CGIS QNG95 and accompanied with an applicable Crossing Matrix. The Crossing
Matrix shall be in accordance with the example attached in Attachment N. RLC can
assist in identifying the respective crossing owners, if required.

In this context ‘crossings’ mean a location where the allocated telecom duct
intersects in plan (underground or overhead) with another corridor (Occupied ,
Partially occupied or Unoccupied), as defined in the RLC Common Corridor Drawing #
SK-RLC-00170. This overall layout shall be submitted to RLC for review and Approval.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 24

4. After obtaining the approval for the above overall layout, the End-User shall submit
the following details for RLC’S review & Approval.

a. Non-Crossing locations: The proposed cable routing except in the crossing


locations clearly indicating the excavation plan shall be submitted for RLC review
and Approval. This must contain the following details, as a minimum.

i. The routing Plan with proposed duct dimensions & spacing.

ii. RLC Corridor edges & the allocated telecom ducts with relevant coordinates
in CGIS-QNG95 system. Relevant dimensions shall be clearly given.

iii. Existing facilities in the same corridor & known planned facilities.

iv. The Profile plan (longitudinal) showing the proposed duct elevation, must be
submitted. There must be a minimum cover of 0.60 m with respect to the
Finished Grade Level (FGL) or Natural Ground Level (NGL) whichever is
lower.

v. Any other information if deemed necessary.

vi. Key Plan

b. Crossing Details:

i. Each crossing must be separately submitted.

ii. The crossing details must conform to RLC’s Guidelines. (Reference:


“Guidelines for corridors and corridor crossings“- Document # QPR-RLP-
009).

iii. While crossing existing and planned assets of other 3rd Parties, necessary
concurrence shall be obtained from the relevant asset owners.

iv. The bottom elevation of the proposed pull boxes shall be clearly indicated in
the longitudinal section. This shall not be installed in a crossing location.

5. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two sets of
hard copies and a soft copy prepared in AUTO-CAD format compatible with RLC
system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 25

ATTACHEMENT- G

Submission Category Code -007: LNG CORRIDOR

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to LNG Corridor Pipeline Routing.

LNG CORRIDOR:

This corridor provides space for installing End Users’ LNG Run Down pipelines to storage and/
or vessel loading facilities including the routing through the main Breakwater/ New main
breakwater.

G. LNG CORRIDOR SUBMISSIONS:

1. Conceptual pipeline routings must be finalised in consultation with RLC. This will
be done with reference to the latest revision of the RLC Common Corridor Drawing
# SK-RLC-00170, and inline with the RLIC development plans. After finalisation,
submit the conceptual routing for RLC’s review and approval.

2. After the routing is agreed in-principle the End-User will arrive at the requirements
of the sub-corridor based on the process parameters. Once the width requirement
is optimized, the exact location of the sub-corridor within the Common Corridor will
be advised by RLC.

3. Once the sub-corridor is allocated, the End-User will develop an overall routing
layout clearly indicating the sub-corridor width, and location within the common
corridor, with all crossings identified and numbered. In this regard a drawing in
Plan View is required clearly identifying all crossings with coordinates in CGIS
QNG95 and accompanied with an applicable Crossing Matrix. The Crossing Matrix
shall be in accordance with the example attached in Attachment N. RLC can assist
in identifying the respective crossing owner, if required.

In this context ‘crossings’ mean a location where the allocated sub-corridor


intersects in plan (underground or overhead) with another corridor (Occupied ,
Partially occupied or Unoccupied), as defined in the RLC Common Corridor
Drawing # SK-RLC-00170. This overall layout shall be submitted to RLC’s for
review and Approval.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 26

4. After obtaining the approval for the above overall layout, the End-User shall submit
the following details for RLC’s review & Approval.

a. Non-Crossing locations: The Proposed pipeline routing except in the crossing


locations shall be submitted for RLC’s review and approval. This must contain
the following details as a minimum.

i. The routing Plan with proposed pipe dimensions with relevant cross
sectional details.

ii. For LNG pipelines considering the process constraints, horizontal


expansion loops are permitted. However to the extent possible this shall
be nested.

iii. RLC Corridor edges and the allocated sub-corridor edges with relevant
coordinates CGIS-QNG95. Relevant dimensions shall be clearly given.

iv. Existing facilities in the same corridor & known planned facilities.

v. Piping Plan with proposed pipe dimensions & spacing.

vi. Clearance from the sub-corridor edges shall be indicated. Please see
drawing # SK-RLC-02725 Rev.0, ‘Sketch-A1’ in the ‘attachment-O’.

vii. Any other information if deemed necessary.

viii. Key Plan

b. Crossing Details:

i. Each crossing must be separately submitted.

ii. Loops shall not be located at crossings.

iii. The crossing details must conform to RLC’s Guidelines. (Reference:


“Guidelines for corridors and corridor crossings“- Document # QPR-RLP-
009).

iv. While crossing existing and planned assets of other 3rd Parties,
necessary concurrence shall be obtained from the relevant asset
owners.

5. Separate approval for hydro-testing/ pneumatic testing required for the installed
pipelines shall be obtained.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 27

6. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two
sets of hard copies and a soft copy prepared in AUTO-CAD format compatible with
RLC system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 28

ATTACHEMENT- H

Submission Category Code -008: LAYDOWN AREA

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to lay down areas.

LAYDOWN AREA

Temporary Site Facilities, Storage yards etc. that are planned in the allocated tract to the End-
user/Contractor by RLC under Temporary Land Lease Agreement for facilitating the
installation/construction activities, are known as Lay Down areas.

H. LAY DOWN AREA SUBMISSIONS:

The End-User/Contractor shall submit the following details for RLC’s review. The review of
the details by RLC mainly focuses on the Health, Fire & Life Safety and Environmental
aspects.

1. Environmental Baseline Assessment (EBA):

Environmental Base line Assessment Study of the tract shall be done by the
contractor in coordination with RLC-RHE section prior to commencement of any
activity. Necessary request shall be made for this purpose by the End-User
/Contractor.

2. Site Levelling:

The Site levelling of the allocated tract shall be done only after getting necessary
approval from RLC taking into consideration the EBA recommendations also. If
good top soil exists and inspected by RHE section, the same has to be removed &
deposited in the location approved by RLP. The submission for site levelling must
contain the following:

a. The boundary coordinates as per the TLLA

b. NGL and the proposed FGL of the site in QNHD.

c. The drainage and soak way details (All storm water generated inside the area
shall be managed within the area. In no case this could be let out into RLC
drains).

d. Key plan showing the location.


QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 29

3. Fencing Details:

All temporary lay down areas must be properly fenced. All non-fenced areas will be
treated as common areas as defined earlier and RLC CPW procedure will be
applicable for all work in non-fenced area. The submission for the Fencing must
contain the following:

a. The Layout of Fencing with Coordinates in CGIS-QNG95 as per TLLA

b. Details of Fence and Gates. There shall be minimum two exits (gates with
minimum wide of 6 m) from each enclosed area.

c. Fencing shall be covered with a cloth mesh, so as to avoid litter blowing from
the site due to wind.

d. Key Plan

4. Temporary Site Facilities:

These include the buildings, storage yards, work shops, fabrication shops etc. that
are built in lay down areas to facilitate construction. The submission for temporary
site facilities must contain the following;

a. The Layout showing the internal land use plan & building layouts.

b. Facilities like sand blasting & painting areas, concrete batching plant, chemical
storage, workshop- servicing area, fuel storage, sewage storage, location of DG
(Diesel Generator) sets etc. shall be explicitly shown in the layout drawings and
shall meet Environmental requirements as advised by RLC-RHE & RHF.

c. There shall be minimum 6 m clearance between the buildings & 4 m clearance


from the fence line.

d. Details of Fire Alarm System, Emergency lighting, Fire extinguishers & Fire
water.

e. The Fire & Life Safety Report in consultation with RLC-RHF.

f. The internal road layout including the details of tie-in to the RLC road network.

g. Details of proposed traffic control system at the tie-in location.


QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 30

h. Details of waste segregation / Storage areas.

i. Details of sewage quantities that requires treatment in RLC wastewater


treatment facilities.

j. Key Plan.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 31

ATTACHEMENT- I

Submission Category Code -009: Permanent Access Roads

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to main Access roads.

PERMANENT ACCESS ROADS:

Permanent access roads are the roads that interconnect the main Plant/Tank Farm/Camps/
similar permanent installations of an End-User with RLC road. This submission must have the
following details.

I. PERMANENT ACCESS ROAD SUBMISSIONS:

1. Conceptual Road Layout must be finalised in consultation with RLC based on the
relevant Traffic study reports. This layout will be done with reference to the latest
revision of the RLC Common Corridor Drawing # SK-RLC-00170 and inline with
the RLIC development plans.

2. After the conceptual layout is agreed, the End User /Contractor must develop the
detailed road drawings with all required details including the longitudinal profile
based on the agreed conceptual layout. Typical layout shall contain the following:
a. Alignment of road & Longitudinal Profile.
b. Existing facilities
c. Known planned facilities
d. Coordinates of Right Of Way (ROW) and at crossing locations in
CGIS-QNG95
e. Road markings & Traffic signage details as per QTM
f. Key Plan

3. In the layout, all crossings must be identified and numbered. In this regard a
drawing in Plan View is required clearly identifying all crossings with coordinates
in CGIS QNG95 system and accompanied with an applicable Crossing Matrix.
The Crossing Matrix shall be in accordance with the example attached in
Attachment N. RLC can assist in identifying the respective crossing owner, if
required.

In this context, ‘crossings’ mean a location where the allocated road intersects
in plan (underground or overhead) with another corridor ( Occupied ,
Partially occupied or Unoccupied) defined in the RLC Common Corridor Drawing
# SK-RLC-00170. This overall road layout shall be submitted to RLC for review
and Approval.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 32

4. Depending upon the terrain if natural waterways /existing drains/future drains are
interrupted by the proposed road, necessary culverts shall be provided. This shall
be done in consultation with RLC.

5. After obtaining the approval for the above layout drawings, the End-User shall
submit the crossing details for RLC’S review & Approval.

a. Crossing Details:

If the proposed access road crosses an existing utility or a proposed corridor


the details of the crossing shall be submitted to RLC separately.

The following crossing methodology must be followed while preparing the


details:

Category CROSSING METHODOGLY TO BE ADOPTED.

Existing Future

No provision required.
Pipes on existing sleepers: Provide (Necessary culvert will be
Culvert provided by other End-Users
Product Pipe Corridor as & when required by open
cut method.

Provide necessary protection as Provide Duct Bank (Type # 9


Wet Utility Corridor per the requirement of the asset as per drawing No. SK-RLC-
owner. 00163) to cover the entire
width.
Provide necessary protection as Provide Duct Bank (Type # 8
Power Corridor per the requirement of the asset as per drawing No. SK-RLC-
owner. 00163) to cover the entire
width.
Provide necessary protection as No provision required.
HP Corridor per the requirement of the asset
owner
Common Cooling Water Provide necessary protection as No provision required
per the requirement of the asset
owner
Provide necessary protection as No provision required
Telecom per the requirement of the asset
owner
No Provision required.
Provide Culvert (Necessary culvert will be
LNG Corridor provided by other End-Users
as & when required by open
cut method with permission.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 33

6. While crossing existing and planned assets of other 3rd Parties, necessary
concurrence shall be obtained from the relevant asset owners.

7. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two
sets of hard copies and a soft copy prepared in AUTO-CAD format compatible
with RLC system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 34

ATTACHEMENT- J

Submission Category Code -010: LEE BREAKWATER & LIQUID PRODUCT BERTH

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to pipeline /cable routing through the existing Lee Breakwater Pipe
Racks & Liquid Product Berths (also known as Jetties).

LEEBREAK WATER & LIQUID PRODUCT BERTH:

In the Lee Breakwater & Liquid Product Berths of RLC, the End-User has to route the pipes
through the pipe-racks/bridges previously constructed by RLC for the common use of the Liquid
Product Berth Occupiers. The following details are required for submissions related to Lee
Breakwater and Liquid Product Berth.

J. LEE BREAKWATER & LIQUID PRODUCT BERTH SUBMISSIONS:

1. The conceptual pipeline routings along the existing pipe rack must be finalised in
consultation with RLC. This routing will be done based on the available space
and inline with the RLIC development plans.

2. After the routing is agreed in-principle, the End-User will arrive at the exact
location of pipelines based on the process parameters and the same shall be
approved by RLC.

3. After obtaining the approval for the above overall routing, the End-User shall
submit the following details for RLC’s review & Approval.

a. Piping Plan with proposed pipe dimensions, spacing and details of the
existing/planned assets in the same pipe-rack. There shall be cross-
sectional details showings different elevations of the pipe racks/bridges.

b. Details of modification required to the existing pipe-rack, if required.

c. Crossing details must be submitted separately, with necessary


concurrences from other relevant asset owners.

d. Existing facilities in the same pipe rack and known planned facilities.

e. Jetty Layout showing the allocation of loading arms, allocation of space


behind the loading arms, equipment layout in the allocated jetty area, etc,
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 35

f. 3D model output from PDS/ PDMS shall be presented to RLC. On


acceptance of the 3D model, a hard copy shall be submitted for detailed
review and approval by RLC.

g. Model review of the End Users designs shall be carried out in three
phases (viz. 30%, 60% and 90%).3D Model shall include all the existing,
known planned facilities/ utilities.

h. Any other information if deemed necessary.


.
4. Structural Design :

Since the pipes are routed through a pipe rack/bridge previously built by RLC, it
is mandatory for the End User to carry out necessary structural analysis & design
verifications, based on the piping stress analysis out put & other loads as per
applicable design codes and standards.

a. Load Verification table

The Load Verification Table shall be updated and submitted to RLC for
review. This is to ensure that the existing pipe-rack is structurally adequate
to resist the loads from the proposed assets. The permission for hydro
testing will be given only after the satisfactory submission of the Load
Verification Table.

b. Surge Analysis:

End Users must carry out necessary surge analysis to ensure that the
forces transferred to the existing pipe-racks/ bridges are within the values
considered in the original design. In case, if it exceeds the same, separate
arrangement has to be proposed in consultation with RLC so that
excessive forces/stresses are not transferred to the existing members.

5. Separate approval shall be obtained for hydro-testing/ pneumatic testing required


for the installed pipelines.

6. As-built drawings shall be submitted to RLC for records within 6 months after
completion of the construction activities. The As-built drawings shall include two
sets of hard copies and a soft copy prepared in AUTO-CAD format compatible
with RLC system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 36

ATTACHEMENT- K

Submission Category Code -011: CAMPS

This attachment briefly describes the requirements/details that are to be included in a


submission pertaining to Camps in RLIC.

K. CAMP SUBMISSIONS:

1. As per circular # 24/2006 dated 28th May, 2006 & # 31/2007 dated 5th April, 2007,
all labourers who are performing work at RLIC must be accommodated inside the
boundaries of RLIC. For this purpose the End-Users can utilise the existing RLC
camps if vacancies are available or build their own Camps, if not.

2. In lieu of building a new camp, if vacant camps built by other End-Users or


Contractors are available, they can take over the camp with prior permission from
RLC subject to conditions stipulated by RLC.

3. For building a new camp in the land allotted to the End-User/ Contractor for that
purpose, it is mandatory to submit all relevant information regarding proposed
camps to RLC for review and Approval. This shall be as follows:

a. Camps are to be constructed strictly as per the latest revision of the


‘’REGULATION FOR PLANNING AND CONSTRUCTION OF CAMPS AT
RLIC’, document # QPR-RLP-010.

b. All submissions related to camps shall be as per the relevant clause for
Technical Detail submission in the above Regulation.

4. As-built drawings shall be submitted as per above Camp Regulation. The As-built
drawings shall include two sets of hard copies and a soft copy prepared in
AUTO-CAD format compatible with RLC system.
QPR - RLP – 011
GUIDELINES FOR END USER TECHNICAL
SUBMISSIONS TO RLC Rev: 0
Date 8th January 09
Page No. 37

ATTACHEMENT- L

Submission Category Code -012: OTHER CATEGORIES

L. OTHER SUBMISSIONS:

The submissions pertaining to the construction /installation items that are not covered
under any of the above 11 categories shall be treated as “Category 012 –OTHER
CATEGORIES”
Attachment M                                                                                Page No. 38 
NAME OF THE COMPANY
(LOGO)
SUBMISSION REFERENCE No. xxxxx
Date: xxxxx

NUMBER OF PAGES: xxxxx


TO FROM

The Manager ------------------(Name of the Originator)


Industrial Planning & Development,
Post Box No: 22247 ------------------(Name of the Company)
Ras Laffan Industrial City
Fax: 474 8489 Tel: 474 8471
REPLY TO BE FAXED TO : XXXXXXXXXX

NAME OF THE PROJECT:


SUBJECT:

BRIEF DESCRIPTION

---------------------------Name of the Contact Person (for clarifications, if any, on the subject)


Tel : Mobile :
Email :

SUBMISSION CATEGORY CODE:

PURPOSE OF SUBMISSION (Please tick)

Approval

Supplementary submission*

Revised submission * (Leave this space blank- for RLC purpose only)

Response to RLC letters*

Information and Records

*Previous references

1.

2.
Attachments:

Signature Name
CROSSING MATRIX: TYPICAL EXAMPLE
Reference Crossing Identification drawing no. 123456 (Plan View) ATTACHMENT- N
Crossing Limits/Location
Crossing
Crossing Description Asset Owner & Contact Details
No. Easting Northing Easting Northing
Crossing of Dolphin Energy above Mr. Dolphin Energy, Construction Manager, Tel. 1234567,
e.g. CC-1 E231456.123 N461123.123 E231123.123 N456123.123
grade product pipelines fax: 1234567, mobile:123456, denergy@dolphin.com.qa
Crossing of existing underground RLC, Manager Industrial Planning & Development, Mr. Abdul
" UC-1 E231456.123 N461123.123 *** ***
power cable 33kV Qader Qaddumi, Tel.4748871, fax:474*&&^
Crossing of RLC Common Wet RLC, Manager Industrial Planning & Development, Mr. Abdul
" CC-2 E231456.123 N461123.123 E231123.123 N456123.123
Utility Corridor (10m wide) Qader Qaddumi, Tel.4748871, fax:474*&&^
K:\RLP\New Regulations- Draft 2008\Technical submission procedure\Approved on 02-02-2009\Attachments\Attachment - N- Crossing Matrix-Page no. 39
Page No. 40

ATTACHMENT- O
Drawing No. SK-RLC-02725 Rev.0

(Sketch A1, B1, C1 & D1)