8

fischer FIRE STOP range S90-rated C30 cushion T1 fire stop compound C2 mortar M3
fire stop for cables

fischer FIRE STOP


Systems
Product range for passive fire protection

Peter Dengler, fischerwerke, Waldachtal


In early 2007 fischerwerke launched a new
product range for passive fire protection.
The fischer FIRE STOP products offer
comprehensive fire protection solutions for
building service installations, thereby
complementing the SaMontec and fixing
system product lines. As a full-range
supplier, fischer now offers a complete
product assortment with fire approvals.

fischer FIRE STOP systems


Fire stop types ID Fire stop constructions

Cable fire stops C Numerical hierarchy with single-digit


Pipe fire stops T numbers for LAR/LüAR solutions and
Combination pipe and cable fire stops M multi-digit numbers for tested and
Grouting for fire dampers V approved systems.
FIRE STOP 9

S90-rated M10 combination S90-rated C20 cable mortar S90-rated C40 cable block S90-rated C30 cable cushion R90-rated T60 fire stop V2 mortar M3
board fire stop fire stop fire stop fire stop sleeve

Fire-resistance period
• F30 to F180

Building Fire stop Trades


elements (wall / floor) • Type (C,M,T,V) • Insulation
• Building material type • Construction • Utility service type
• Finishes etc.

Installation
type: (cable/pipe)
• Combustible
• Non-combustible

Diagram showing various requirements placed on fire stops

Construction facilities rely on building ser- ventilation components. This division is re- Constructions complying with LAR specifi-
vice systems with the associated piping, flected by the statutory building control cations are deemed adequate for service
ductwork and cable ways for their proper framework and the common guidelines runs within these size limits. fischer FIRE
performance. The service distribution sys- adopted by all 16 German federal states, STOP products for such applications include
tems require a host of wall and floor pene- specifically the Pipe and Cable Installation the FDB fire protection compound, for sys-
trations, ideally through suitably designed Directive (LAR) and the Ventilation System tems C1 and T1, and the FM3 mortar, in
openings. Fire-rated walls and floors must Directive (LüAR). conjunction with the FBV anti-corrosion
be resealed to ensure the integrity of the fleece for pipes, in systems C2 and T2.
fire barrier or compartment. Fire stop sys- fischer’s FIRE STOP range features both
tems, whose purpose is to provide an effec- trade-specific and cross-trade solutions. For service runs beyond these size limits
tive barrier to the spread of fire, represent a The fire stops take on a variety of forms, and for several services penetrating a single
good-practice solution to these require- including board (e.g. S90-rated M10 combi- opening where the spacing requirements
ments. As a passive fire precaution, they nation board fire stop), mortar, blocks, foam cannot be met, the LAR requires tested and
reduce or minimise the hazards posed by and cushions. approved fire stop systems certified for
fire and smoke by ensuring local fire con- specific applications under building control
tainment. Fire stops to LAR legislation (national technical approvals or
(Pipe and Cable Installation Directive) building control test certificates). It also
Fire stop systems for building service For penetrations through space-enclosing requires the on-site marking/designation of
elements building elements, the provisions cover the the installed fire stops. fischer provides
The installations required for the distribu- following individual types of service run in self-adhesive signs to designate the sys-
tion of services within buildings include the separate or shared openings: tems. Moreover, applicators in some cases
piping, ductwork, conduits and cable ways require instruction in the use of the fire stop
of the power, heating, sanitary, refrigera- • Electrical cables – no limit on diameter systems and the fischer ACADEMY now
tion, ventilation and air-conditioning sys- • Non-combustible pipes – diameter offers special courses for its FIRE STOP
tems. The building services elements may < 160 mm customers.
be broken down into cable, pipework and • Combustible pipes – diameter < 32 mm
10

DIN 4102 Test Standard


Test standard 4102 includes different parts. Building materials are classified in non-flammable (A1, A2) and flammable (B1, B2, B3) classes of building materials.
Building members can be composed of different building materials. The relevant parts of DIN 4102 are listed below.

DIN 4102 Content Building members Classification

Part 3 Fire walls and non-load-bearing outside Walls and ceilings W


walls, terms, requirements and tests

Part 5 List and application of classified building materials, – –


building members and special components

Part 6 Fire protection seals, seals in lift shaft Doors, gates T


walls and in fire-resistant glazing; terms,
requirements and tests

Part 9 Cable fire stops, terms, requirements Ventilation systems L


and tests Fire stop flaps K

Part 11 Cable jackets, pipe fire stops, installation Pipe fire stops R
shafts and channels, seals for their inspection Installation channels I
openings; terms, requirements and tests and shafts

Part 12 Function maintenance of electrical cable systems Function maintenance E


Requirements and test of electrical systems

Part 13 Fire protection glazing; terms, requirements No heat crossing F


and tests With heat crossing G

The duration of fire resistance specifies the resistance to fire over a certain period of time (in minutes).
Building components are classified in fire resistance classes (F 30 – F 180 or e.g. R90, L90, S30, K90 . . . ).

The following fischer FIRE STOP con- • Block fire stops for 30-, 60-, 90- and 120- (fire and smoke dampers), which are nor-
structions are currently available as system minute fire resistance in systems C40 mally cast into solid building elements. The
solutions: and C41. The FBB fire stop is “a block for FM3 mortar in system V2 is provided for this
all seasons“ and can be applied without application.
• Mineral fibre board fire stops for 30-, ancillary materials and in conjunction
60- and 90-minute fire resistance in sys- with the FBS fire stop foam.
tems C10, C11, M10 and T10. The water-
proof and paintable coating and filler • Foam barriers for 30- and 90-minute fire
compounds FAB and FAS likewise resistance in systems C50 and C51. The
provide all the benefits of universal FBS fire stop foam is ideal for smaller
application. openings and highly economical, with
only 75 mm thickness in walls with 30-
• Mortar fire stops for 90-minute fire resis- minute fire resistance.
tance in systems C20, M20 and T20. The
lightweight mortar FMO offers a high • The FBM fire stop sleeve for 90-minute
coverage of as much as 2.7 litres/kg. fire resistance in system T60 can be
Moreover, the possibility of incorporating either plugged on and incorporated in
mineral fibre board as permanent shut- infill mortar. A sound-control insert is
tering in floor fire stops obviates the included.
need for external shuttering.
Fire stops to LüAR
• Cushion fire stops for 90-minute fire resis- (Ventilation System Directive)
tance in system C30. Available in four sizes The LüAR sets out the fire-resistance
(S, M, L, XL), the FBK fire stop cushions requirements for ventilation ducts and asso-
fit perfectly into the opening around the ciated shutter units. It also specifies the
cable or cable support systems. requirements relating to shutter devices
FIRE STOP 11

Examples for anchor applications


Application Regulations for use Anchor details Suitable anchors / plugs

DIN 4102, Part 4, Steel anchors with construction Zykon anchor bolt FZA
8.5.7.5 approval > M8; double depth but Zykon hammerset anchor FZEA II
anchored at a minimum depth of 6 cm; Anchor bolt FAZ II
max. theoretical load 500 kN per Anchor bolt FAZ A 4/C
anchor and max. 6 N/mm2 with Nail anchor FNA II
reference to steel cross-section or fire Injection mortar FIS V
protection certificate by approved High performance anchor FH II
testing station. Ceiling nail FDN
Concrete screw FBS

Fire-protected ventilation systems and utility


installations L30 to L120

VdS guidelines for Made of non-flammable material Zykon anchor bolt FZA
sprinkler systems and tested and approved by VdS; Zykon hammerset anchor FZEA II
(new directive minimum M8. Anchor bolt FAZ II
published in 2008) Anchor bolt FAZ A 4/C
Hammerset anchor EA
High performance anchor FH II
Hollow-ceiling anchor FHY

Sprinkler systems

DIN 4102, Part 4, Steel anchors with construction Nail anchor FNA II
8.5.7.5 approval > M8; double depth but Zykon hammerset anchor FZEA II
anchored at a minimum depth of 6 cm; Anchor bolt FAZ II
max. theoretical load 500 kN per Anchor bolt FAZ A4/C
anchor and max. 6 N/mm2 with Hammerset anchor EA
reference to steel cross-section or fire Concrete screw FBS
protection certificate by approved Hollow-ceiling anchor FHY
testing station. Ceiling nail FDN

General pipe systems

DIN 4102, Part 4, Steel anchors with construction Zykon anchor bolt FZA
8.5.7.5 and DIN 4102, approval > M8; double depth but an- Zykon hammerset anchor FZEA II
Part 12 for function chored at a minimum depth of 6 cm; Anchor bolt FAZ II
maintenance max. theoretical load 500 kN per Anchor bolt FAZ A 4/C
anchor and max. 6 N/mm2 with High performance anchor FH II
reference to steel cross-section or fire Hollow-ceiling anchor FHY
protection certificate by approved Hammerset anchor EA
testing station. Nail anchor FNA II
Concrete screw FBS
Injection mortar FIS V

Cable routes

DIN 4102, Part 4, Steel anchors with construction Anchor bolt FAZ II
8.5.7.5 approval > M8; double depth but Anchor bolt FAZ A4/C
anchored at a minimum depth of High performance anchor FH II
6 cm; max. theoretical load 500 kN Zykon hammerset anchor FZEA II
per anchor and max. 6 N/mm2 with Highbond anchor FHB II
reference to steel cross-section or Zykon anchor bolt FZA
fire protection certificate by approv- Injection mortar FIS V
ed testing station.

Heavy pipe systems and cable routes