You are on page 1of 5

PÁªÀÄUÁjAiÀÄ ºÉ¸ÀgÀÄ : - PÀ£ÀPÀ¥ÀÄgÀ vÁ®ÆèPÀÄ ZÁPÀ£ÀºÀ½î

UÁæªÀÄ ¥ÀAZÁ¬Äw gÀAUÀ£ÁxÀ¸Áé«Ä ©½PÀ¯ï ¨ÉlÖzÀ ¸ÁªÀðd¤PÀ


gÀ¸ÉÛ PÁªÀÄUÁj CAzÁdÄ ¥ÀnÖ
Sl. Description of
Unit No L B D Qty Rate / Unit Amount
No. item

Construction of unlined surface drains of average cross sectional area 0.40 sqm in
soil to specified lines grades, levels and dimension excavated materials to used in
1
embankment with a lift of up to 3m and lead of 50m (average lead 25m as per
technical specification clause 307 (A) by manual means [p.no:36:I.no: 3.19 (A)
PRED SR 2018-20]

m 2 750.00 1500.00 97.85 146775.00


Basic Rate 95.00
AW 3% 2.85
Total Rs. 97.85

Construction of Embankment with Material obtained from Borrow pits.


Construction of embankment with borrow pits with a lift up to 1.5m approved
material obtained from transporting to site speading to The required slope and
2 compacting to meet requirement to tables 300.1 and 300.2 with lead upto 1000mt
as per technical specification clause 301.5 (P.No-31, I.No-3.4 PRED SR 2018-19]

cum 1 598.00 5.50 0.25 822.25


Deduct sinkage Qty 15% 123.34
698.91 298.70 208765.00
Basic Rate 290.00
AW 3% 8.70
Total Rs. 298.70

4 Total Rs. 355540.00

5 GST 12% 42665.00

6 Third party inspection charges 0.50% 1778.00

7 Miscellaneous and rounding off 17.00

Total Rs. 400000.00

Assistant Executive Engineer


Assistant Engineer -2 P.R.E Sub Division
Kanakapura
0.00
PÀ£ÁðlPÀ ¸ÀgÀPÁgÀ
¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï E¯ÁSÉ

PÁAiÀÄð¥Á®PÀ EAf¤AiÀÄgÀªÀgÀÄ
¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï «¨sÁUÀ gÁªÀÄ£ÀUÀgÀ

¸ÀºÁAiÀÄPÀ PÁAiÀÄð¥Á®PÀ EAf¤AiÀÄgÀªÀgÀÄ


¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï G¥À «¨sÁUÀ PÀ£ÀPÀ¥ÀÄgÀÀ

CAzÁdÄ ¥ÀnÖ
PÁªÀÄUÁjAiÀÄ ºÉ¸ÀgÀÄ : - PÀ£ÀPÀ¥ÀÄgÀ
vÁ®ÆèPÀÄ ZÁPÀ£ÀºÀ½î UÁæªÀÄ ¥ÀAZÁ¬Äw
gÀAUÀ£ÁxÀ¸Áé«Ä ©½PÀ¯ï ¨ÉlÖzÀ ¸ÁªÀðd¤PÀ gÀ¸ÉÛ
PÁªÀÄUÁj CAzÁdÄ ¥ÀnÖ

CAzÁdÄ ªÉÆvÀÛ:- gÀÆ. 4.00 ®PÀëUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ : 2019-20£Éà ¸Á°£À ²æÃ.r.PÀÄ¥ÉÃAzÀæ gÉrØ


gÁdå¸À¨sÁ ¸ÀzÀ¸ÀågÀÄ gÀªÀgÀ ¸ÀA¸ÀzÀgÀ ¸ÀܽÃAiÀÄ
¥ÀæzÉñÁ©üªÀÈ¢Ý AiÉÆÃd£É
- : ªÀgÀ¢ : -
PÁªÀÄUÁjAiÀÄ ºÉ¸ÀgÀÄ : - PÀ£ÀPÀ¥ÀÄgÀ vÁ®ÆèPÀÄ
ZÁPÀ£ÀºÀ½î UÁæªÀÄ ¥ÀAZÁ¬Äw gÀAUÀ£ÁxÀ¸Áé«Ä ©½PÀ¯ï
¨ÉlÖzÀ ¸ÁªÀðd¤PÀ gÀ¸ÉÛ PÁªÀÄUÁj CAzÁdÄ ¥ÀnÖ

PÀ£ÀPÀ¥ÀÄgÀ vÁ®ÆèPÀÄ ZÁPÀ£ÀºÀ½î UÁæªÀÄ ¥ÀAZÁ¬Äw gÀAUÀ£ÁxÀ¸Áé«Ä


©½PÀ¯ï ¨ÉlÖzÀ ¸ÁªÀðd¤PÀ gÀ¸ÉÛ PÁªÀÄUÁjAiÀÄ£ÀÄß ¤«Äð¸À®Ä ¯ÉPÀÌ ²Ã¶ðPÉ:
2019-20£Éà ¸Á°£À ²æÃ.r.PÀÄ¥ÉÃAzÀæ gÉrØ gÁdå¸À¨sÁ ¸ÀzÀ¸ÀågÀÄ gÀªÀgÀ
¸ÀA¸ÀzÀgÀ ¸ÀܽÃAiÀÄ ¥ÀæzÉñÁ©üªÀÈ¢Ý AiÉÆÃd£É C£ÀÄzÁ£ÀzÀrAiÀÄ°è gÀÆ.
4.00 ®PÀëUÀ¼À C£ÀÄzÁ£À ¤ÃrgÀÄvÁÛgÉ. DzÀÄzÀÝjAzÀ ¸ÀzÀj PÁªÀÄUÁjUÉ
¤ÃrgÀĪÀ C£ÀÄzÁ£ÀPÉÌ F PɼÀPÀAqÀ CA±ÀUÀ¼À£ÀÄß C¼ÀªÀr¸À¯ÁVzÉ.

1 Construction of unlined surface drains of average


2 Construction of Embankment with Material obtained from Borrow pits

ºÁUÀÆ EvÀgÉ CA±ÀUÀ¼À£ÀÄß C¼ÀªÀr¹zÉ.


F CAzÁdÄ ¥ÀnÖAiÀÄ£ÀÄß 2018-19£Éà ¸Á°£À ¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï
E¯ÁSÉ ¨ÉAUÀ¼ÀÆgÀÄ ªÀÈvÀÛ ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ zÀgÀ¥ÀnÖAiÀÄAvÉ gÀÆ.
4.00 ®PÀëUÀ½UÉ vÀAiÀiÁj¹zÉ. F PÁªÀÄUÁjAiÀÄ CAzÁdÄ ¥ÀÀnÖUÉÀ ¯ÉPÀÌ ²Ã¶ðPÉ:
2019-20£Éà ¸Á°£À ²æÃ.r.PÀÄ¥ÉÃAzÀæ gÉrØ gÁdå¸À¨sÁ ¸ÀzÀ¸ÀågÀÄ gÀªÀgÀ
¸ÀA¸ÀzÀgÀ ¸ÀܽÃAiÀÄ ¥ÀæzÉñÁ©üªÀÈ¢Ý AiÉÆÃd£ÉAiÀÄrAiÀÄ°è
vÁAwæPÀ/DqÀ½vÁvÀäPÀ ªÀÄAdÆgÁw ¤ÃqÀ¨ÉÃPÉAzÀÄ PÉÆÃgÀ¯ÁVzÉ.
zÀÈrüÃPÀgÀt:-
1. ¸ÀzÀj CAzÁdÄ ¥ÀnÖAiÀÄ£ÀÄß vÀAiÀiÁj¸ÀĪÀ ªÉÆzÀ®Ä £Á£ÀÄ RÄzÁÝV
¸ÀܼÀPÉÌ ¨sÉÃn ¤Ãr ¸ÀܼÀ ¥Àj²Ã°¹ DyðPÀ ¥Àj«ÄwUÀ£ÀÄUÀÄtªÁV CAzÁd£ÀÄß
vÀAiÀiÁj¸À¯ÁVzÉ.
2. ¸ÀzÀj PÁªÀÄUÁjAiÀÄÄ AiÀiÁªÀÅzÉà EvÀgÉ AiÉÆÃd£ÉUÀ¼ÀrAiÀÄ°è
¸ÉÃjgÀĪÀÅ¢®èªÉAzÀÄ zÀÈrüÃPÀj¸À¯ÁVzÉ.
3. ¥ÁægÀA¨sÀ : gÉÃSÁA±À : 12'33'14", CPÁëA±À : 77'30'45"
CAvÀå : : 12'33'11" :77'30'42"

¸ÀºÁAiÀÄPÀ C©üAiÀÄAvÀ ¸ÀºÁAiÀÄPÀ PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ


¥ÀAZÁAiÀÄvï gÁeï EAf¤AiÀÄjAUï G¥À «¨sÁUÀ,
PÀ£ÀPÀ¥ÀÄgÀ

You might also like