You are on page 1of 5

APPLICATION

From:-DHANPAL BANSOD
Plot No. 30,
Krishna Park,
Rameshwar Nagar,
Jamnagar
Mobile No:- 09727360803/09537710487
MAIL ID – dhanpalbansod@gmail.com
dhanpal_14@rediffmail.com
To,

Sub:- Application for the post of (QA/QC OR Execution) Supervisor

Respected Sir,

I, the undersigned offered myself for the above post to which I consider and
humbly feel that I will satisfy the requirement of the post and if the opportunity is
offered, I will definitely prove myself.
I therefore submit my application along with resume for your kind consideration
and favour perusal.

Thanking you in soliciting favour of an interview.

Yours sincerely,

(DHANPAL BANSOD)

Place: Jamnagar

Date: 6th April


RESUME

Dhanpal. U. Bansod Mob no. - 9727360803


Email id—dhanpalbansod@gmail.com
Dhanpal_14@rediffmail.com -
___________________________________________________________

Career Objective:-
Challenging Project opportunity where I can contribute my talent to a successful team and to
further my knowledge in Engineering Construction Field for development of organization and self.

Industrial Training:-
Completed 4 years trade Apprentice Training (Mill Wright) trade from ordnance Factory
khamaria Jabalpur (MP) Govt. Of India, Ministry of Defence.

Professional:-
ASNT Level – II in RT, UT, MPT, DPT

JOB RESPONSIBILITIES (Execution):-


• Fabrication & Erection of spools.

• Study of plot plan, GAD, P&ID & isometrics.


• Hydro testing pack, Hydro test loop marking on P&ID, Isometrics & planning to execute the
erecting in order to complete hydro test, Mechanical completion of lines in association with
Engineers India Limited.(EIL). & controlling field construction activities at site.

• Supervision planning & Scheduling, progress Monitoring Quality Control, Monitoring


activities of contractor & subcontractor.

• I am responsible for supervision of A/G & U/G piping.

• Material co-ordination like erection spools from fabrication shop, Reconciliation & final
handed over at site for production.

• I am responsible for supervision of project.

GENERAL:-
• Interpretation of drawings & guiding the contractors to execute the work.
• Ensure that the work is carried out as per standards, drawings, maintaining quality & safety.

• Make necessary QC documents.


• Supervision the work & give necessary clarification to contractors as required.

• Make day-to –day planning & monitor the progress. At site.

• Arrange stage wise inspection as required & get clearance from competent authority.

• Scrutinize contractors’ bills & submit to site in charge.

MATERIAL HANDLING:-
Receiving & storing material like AS, CS, SS pipes, Material, fittings etc. for pipe work
fabrication.

AS, CS, & SS PIPING FABRICATION, ERECTION & TESTING.:-


• Prefabrication & fabrication of pipes & pipe fittings as per Isometric drawings.

• Erection of pipes area wise as per Isometrics drawings.

• Following piping standards for fabrication, erection & welding of all lines.

• After completing erection of all pipe lines, performing out pressure tests (Hydraulic) as per testing
schedule & standards provided by Quality person.

Job Activities (QA/QC):-

Looking after the following work:-


• Quality of welding electrodes,
• Visual Inspection of fit up pipe joint & coils,
• Weld Visual Inspection of pipe joint & coils,
• Monitoring of Preheating and Stress Reliving of pipe joint, coils and maintaining
records,
• Consumable Calculation,
• QCR, PWHT, Register maintain,
• Knowledge of DFT,
• Wrapping, coating & Holiday test,
• Hardness test,
• Tool - Box – Meeting,
• Welder – test,
• Welder – Performance,
• Spool – Release
• Mechanical Clearance
• Loop – Clearance
• Hydro – Test
• Capable for handling man power.

Experience at a Glance:-
Project -1:-
Durations :- May2005. to Jan. 2007
Employer :- Petron Engineering Construction Ltd.
Client :- Essar Oil Ltd.
Consultant :- E. I. L.
Project ;- CCR/NHT Unit
Designation :- QA/QCsupervisor
Project -2:-
Durations :- Jan. 2007 to Dec. 2007
Employer :- Gannon, Dunkerley & Co. Ltd.
Client :- Reliance Petroleum Limited
Consultant :- REAL QMD
Project :- Hydrogen– 04 &05)
Designation :- QA/QC (Supervisor)

Project 3
Durations :- Jan. 2008 to Oct. 2008
Employer :- Gannon, Dunkerley & Co. Ltd.
Client :- Reliance Petroleum Limited
Consultant :- REAL QMD
Project :- Mega PP
Designation :- QA/QC (In charge)
Project-4:-
Durations :- Oct.2008 to Apr.2009
Employer :- S.M.Construction(GDC)
Client :- Reliance Petroleum Limited
Consultant :- REAL QMD
Project :- OSBL
Designation :- SITE INCHARGE
Project-5:-
Durations : - May 2009 to August 2010
Employer : - Indian Oil Tanking Infrastructure & Energy Limited (IOTIES)
Client :- Indian Oil Corporation Limited.IOCL, Panipat (Haryana)
Consultant : - Engineers India Limited (EIL)
Project :- OFFSITE (PRAEP)
Designation :- Foreman(piping)
Running project-6
Durations :- September 2010 to 09-03-2011
Employer :- YK Enterprise
Client :- Essar Expansion project(Jamnagar).
Project :- SWS Fabrication&Erection
Designation :- Quality In charge

Personal Details

Name :- DHANPAL U. BANSOD


Father’s Name :- Shri Ukandrao. C. Bansod
Nationality :- Indian
D.O.B. :- 14-03 1967
Marriage Status :- Married
Language Known :- English, Hindi, Marathi, Gujarati
Special Interest :- Reading Books, News
DECLARATION:
Here by I declare that the above information produced is true to the best of my
knowledge.

PERMANENT ADDRESS YOUR FAITHFULLY


SAINIK NAGAR
NEAR VIDYAPITH COLONY
BYPASS ROAD (DHANPAL BANSOD)
AMRAVATI(M.S.)

Place: Jamnagar
Date: 6th April

You might also like