How to use IEC 61850 in


REPORT

SC B5
Klaus-Peter BRAND
p ro t e c t i o n a n d a u t o m a t i o n (Switzerland),2
Christoph BRUNNER
from Ivan de MESMAEKER1 (Switzerland),3
Ivan de MESMAEKER
(Switzerland)

I n t ro d u c t i o n decentralized ones as used in fully developed


substation automation system
The use of numerical technology in Pro- • Be future-proof, i.e. to cope with the fast
tection and Automation has provided multi- development in communication technology in
functional equipment with serial communica- the slow evolving application domain of power
tion. The introduction of serial communication systems.
some years ago resulted in the use of propri-
etary protocols for the communication of con- These are very ambitious goals because all
trol and protection IEDs (IIntelligent Electronic functionality needed in substations had to be
Devices) installed in the substation. examined with respect to their communication
Of course, some IEC standards have been behavior and requirements.
issued: an important one standardized the
communication between substation and The resulting standard IEC 61850 [4] is now
remote control centre (IEC 60870-5-101/104 finalized but a joint group of users, editors and
[1], [2]), another one defined the protocol for IEC working group members is collecting
the communication with protection equip- experience from the use of the standard, iden-
ment (IEC 60870-5-103 [3]). These two have tifying points where clarification is needed and
been very well accepted but especially the areas where extensions are requested. The
IEC 60870-5-103 has shown its limited result will be short-term amendments and
design: designed as master-slave protocol long-term revisions. A challenge is the com-
restricted to some protection functions and prehensive range of the standard covering
a relatively little number of standardized functional aspects, communication aspects,
numbered data. engineering aspects and conformity tests. For
substation automation systems, first projects
Users request an open protocol for all func- are now realized and the first experiences will
tions like protection, control and monitoring be reported very soon.
at least inside substations (see e.g. in [11]).
Open means to have the possibility to make Taking into consideration all the different
extension without being dependant on the dedicated activities related to protection and
manufacturer having delivered the previous control inside substations it is also very impor-
parts of the substation equipment. This means tant to establish a clear understanding, how
also that third party equipment should be eas- the tasks have been solved until now and how
ily integrated in the system of another manu- they should be solved using the full power of
facturer. the standard. The goal of this paper is to facil-
itate the understanding and to explain how
The requested standard has to easy the standard can be applied to exploit all
• Cover all communication issues inside the applicable benefits. Therefore, a stepwise func-
substation tion-oriented approach is chosen covering
• Assure interoperability between the func- • SCADA application in the substation
tions existing inside the substation (as pre- • Time critical information exchange
liminary condition for interchangeability) • Connection of the primary process
• Support all types of architectures used, • Design, test and commission
e.g. centralized ones similar to RTUs and • Maintenance and extension

1. I. de MESMAEKER, Chairman of SC B5
2. Klaus-Peter BRAND, IEC expert
3. Christoph BRUNNER, IEC expert

No. 222 - October 2005 ELECTRA 11


0508-095Mep222 7/12/05 16:51 Page 12

SC B5
REPORT

Finally, an outlook is given to the future


ongoing and proposed work based on the
is the process or bay level IED, which provides
all data to the client at station or any remote
standard IEC 61850 and leading to seamless level. The data are provided on request by the
utility communication architecture. server or automatically by a report from the
server issued if certain conditions are fulfilled.
How to use IEC 61850 for SCADA The client is mostly a computer representing
application in substations the operator’s work place. The client can send
commands to the server for changing data in
Tasks the server to:
Supervisory control and data acquisition • Issue commands for the operation of to
(SCADA) is one of the basic tasks of a substa- the switchgear
tion automation system. This comprises: • Modify the behavior of the server through
• Local and remote operation of the the change of internal data (e.g. change of
switchgear and other high voltage equipment parameter sets, analog set-points, enabling or
• Acquisition of switchgear information and disabling functions)
power system measurands
• Handling of events and alarms. In a client-server communication, the client
controls the data exchange. Therefore, client-
The SCADA application is related to human server communication is very flexible in terms
operation of the network and is performed by of the data to be transmitted. Compared to
a local or remote operator. The data commu- a master slave system, the client-server con-
nication for this application is directed verti- cept allows the implementation of multiple
cally, i.e. from a higher hierarchical control clients in the same system. (Figure 1; e.g. both
level down to a lower one (commands of any the gateway and the HMI are clients). Client-
kind from the operators place) or reverse server communication relies on the full seven
(binary indications like breakers or isolators layer stack using a confirmed transmission layer
position, measurands from instrument trans- and is, as consequence, very reliable but rel-
formers and other sensors, events, alarms) as atively time consuming. Therefore, the client-
can be seen from Figure 1. It allows to oper- server communication is not suited for time-
ate and to supervise the power system. critical data transmission but very well for the
communication with an operator having a
response time of the order of 1 s.

IEC 61850 not only specifies the method


of the data transfer. It defines as well the pro-
cess data of the servers. For that purpose, IEC
61850 uses an object-oriented approach with
Logical Nodes (LN) as core objects (see [5], [7]).
A logical node is a functional grouping of data
and represents the smallest function, which
may be implemented independently in
devices. Examples are all data of a circuit
breaker contained in the Logical Node XCBR
or all data of a timed overcurrent protection
contained in the Logical Node PTOC. There-
fore, the substation or protection engineer
Figure 1: Vertical communication in the substation identifies easily the objects he knows from
automation system with hardwired process interface his daily work.

Model As outlined in Figure 2 all the Logical


For this vertical relationship IEC 61850 is Nodes have data, and all the data have
using the client - server concept [5]. The server attributes. For example, the LN class

12 E L E C T R A N° 222 - Octobre 2005


0508-095Mep222 7/12/05 16:51 Page 13

XCBR (QQ0_XCBR) has a data called Pos, with


one attribute s t Val, which indicates the posi-
To access the data, several services are
standardized as part of the client-server con-
REPORT

SC B5
tion (values according the common double cept. Besides the basic services to access the
point indication: off, on, intermediate-state, data model (individual read or write of data),
bad-state) and another attribute ctlVal for the more elaborated services are defined. As an
opening and closing command (values: off, on). example, for the SCADA application, event
The Logical Nodes, the data and the attributes driven transmission of data is essential. In IEC
including their names and semantic interpre- 61850, the report service is defined for that pur-
tation are defined by the standard. pose. The report service is not accessing indi-
vidual data, but group of data called dataset.
Logical Nodes are grouped in Logical The details of the event driven transmission are
Devices. Example: Logical Device Tampa_Pro- defined in the report configuration block. An
tection for a comprehensive two zone distance event causing a transmission may be a change
protection using one Logical Node PDIS per of a binary value, the crossing of a predefined
zone (PP D I S 1 and P D I S 2 in Figure 2). By alarm limit or the expiration of a cycle time.
enabling or disabling a Logical Device, it is pos- Based on the report configuration block and
sible to enable and disable the contained the related dataset, reports are sent to the
group of Logical Nodes together. client. Including the time tag of the event as
part of the dataset, event lists can be created.
Logical Devices are implemented in phys- For that purpose, the IED is typically synchro-
ical devices (IEDs). There is some actual infor- nized with accuracy in the order of 1 ms.
mation needed not only about the Logical
Nodes and Logical Devices but also about the Applications
complete IED like the status of the common A typical application of SCADA is the cre-
power supply. This information is modeled in ation of alarm lists and event lists. Today, the
the Logical Node LPHD, which has to be pro- data content of the alarm lists and event lists
vided in each Logical Device (see Figure 2). is specified through signal lists. With IEC
61850, datasets used together with the report
service can be used for that purpose. As an
example, a utility may specify a dataset per IED
that contains all data for the alarm list.

The NCC gateway provides the interface


from the NCC to the substation. It has two
basic tasks:
• Protocol and data conversion
• Data collection
For the data collection, the NCC gateway
is a client in the IEC 61850 based substation
automation system. The data is typically col-
Figure 2:
lected using the report model. The dataset
Hierarchical data model and naming
used in that case corresponds to the traditional
signal list specifying the information from the
An important aspect of a data model is the substation to be transmitted to the NCC.
unambiguous identification of the data. Accord-
ing to IEC 61850, the name is created by the How to use IEC 61850 for time
concatenation of the individual elements of the critical infor mation exchange
hierarchical data model: logical device, logical
node instance, data and data attribute. Exam- Task
ple for the status of the breaker Q0 in the bay There are several automated functions in
Tampa: Tampa_Control/Q0_XCBR.pos.stVal the substation automation system, which
(Figure 2). require a time critical exchange of binary

No. 222 - October 2005 ELECTRA 13


0508-095Mep222 7/12/05 16:51 Page 14

SC B5
REPORT

information between functions located within


the same bay or in different bays. Examples:
Model
The concept of logical nodes has been
• Exchange between line protection and introduced in clause 2.2. As an example, for
autorecloser the information exchange between the pro-
• Exchange between bays for breaker failure tection function and the breaker failure func-
• Exchange between bays for station inter- tion, the following logical nodes are involved:
locking • PTRC (P Protection Trip Conditioning) rep-
Typically, these functions are not using resenting the logic in a protection device that
human interaction and are time critical. They creates the binary outputs (start and trip out-
are time critical because they are safety criti- put of e.g. the line protection device)
cal. The maximal accepted communication • RBRF representing the protection Related
delay is in the range of several milliseconds [7]. function Breaker Failure function

If the functions exchanging the information The information exchange between these
are located in different IED’s, the information logical nodes is also modeled as data. The data
exchange may be done using copper wiring is part of the logical node that is the source of
with contacts and auxiliary relays or using serial the information exchange. As an example, the
communication. This information exchange logical node PTRC has a data Tr with an
is a horizontal communication between devices attribute general representing the trip output
at the same hierarchical level (Figure 3). of the protection device for a general trip. That
signal is not only used to operate the breaker,
Theoretically, the information exchange but it is used as well to trigger e.g. the breaker
could take place using the client-server com- failure function (see Figure 4 and Figure 5).
munication. However, client-server communi-
cation is using the full seven-layer stack and is For the exchange of this type of (binary)
therefore relatively time consuming. An appro- information over serial communication, IEC
priate communication concept used is a pub- 61850 introduces a specific information
lisher-subscriber communication. The publisher exchange service called GOOSE (Generic
is distributing the information over the com- Object Oriented Substation Event) based on
munication network; the subscriber may receive the publisher-subscriber concept. The con-
the information according his needs. In IEC tent of a GOOSE message is defined with a
61850 publisher-subscriber communication is dataset (similar like for the report model
not using confirmed services and is therefore described above). The GOOSE message is
transmitted over a reduced communication sent as a multicast message over the com-
stack resulting in a very short transmission time. munication network. That means that multi-
ple devices can receive the message and
retrieve the information required from the
message. The communication service is not
confirmed; instead, the message is repeated
several times.

In the example of the breaker failure func-


tion a GOOSE message is configured in the
protection device that contains at least the
data attribute PTRC.Tr. g e n e r a l . As soon as
PTRC.Tr. g e n e r a l changes its value to TRUE,
the GOOSE message is sent. The device per-
forming the breakure failure function is receiv-
ing this message and detects that
P T R C .Tr. g e n e r a l has changed its value to
Figure 3: Horizontal communication in the substation TRUE. Another GOOSE message is sent when
automation system with hardwired process interface the value changes back to FALSE.

14 E L E C T R A N° 222 - Octobre 2005


0508-095Mep222 7/12/05 16:51 Page 15

Applications
Basically, there are two types of applica-
the breaker failure function has already been
used as example to explain the model in the
REPORT

SC B5
tion, depending if the exchange of informa- clause 3.2. In case the concerned breaker does
tion is between devices inside the bay or not open, the breaker failure function may
between devices placed in different bays. RBRF.OpIn) and, without success send
retrip (R
a trip to all surrounding breakers. This is mod-
Exchange of information inside the bay: eled with the data RBRF.OpEx.
A typical example is the exchange of infor-
mation between Logical Device “Distance Pro-
tection” containing instances of LN PDIS per
zone and the LN PTRC ( and the Logical Device
“Recloser” containing the LN RREC (, in case
these both functions are installed in separate
devices (Figure 4).

The LD “Distance Protection” sends infor-


mation to the LD “Recloser”: start of starting
elements in LN PTRC (P PTRC.Str) and trip in LN
PTRC (PPTRC.Op). Based on these information
and depending on the settings (single pole
recloser or three pole recloser; RREC.TrMod)
the recloser function represented by RREC will
send information (RRREC.TrBeh) to the LD “Dis-
tance Protection” in order to enable the
expected trip (if one or three phases PTRC.Tr)
Figure 5: Breaker failure protection
to the breaker. The open command to the
in double busbar arrangement
breaker is issued by the recloser function
RREC.Op).
(R In Figure 5, the modeling of the breaker
failure function in a double bus arrangement
Exchange of information between bays: is shown. The breaker failure protection is ini-
The information exchange between pro- tiated by trip indications from the LD “Bay Pro-
tection device and breaker failure used to start tection” (PP T R C . O p ). The criterion for

Figure 4: Connection between distance protection and recloser functions

No. 222 - October 2005 ELECTRA 15


0508-095Mep222 7/12/05 16:51 Page 16

SC B5
REPORT

breaker failure protection is typically the cur-


rent (RRBRF.FailMod=current) with the setting
For the exchange of voltage and current
waveforms using standardized serial commu-
RBRF. D e t ValA. As first step the breaker fail- nication, IEC 61850 defines the service for sam-
ure function will issue a retrip to the circuit pled value transmission. All other information
breaker (R RBRF.OpIn) after a certain time delay exchange is using either the client-server con-
R B R F. S P Tr T m m s for single pole trip;
(R cept as described in clause 2 for SCADA appli-
R B R F. T P Tr m m s for three pole trip). If the cation and the GOOSE message as described
breaker didn’t open before the second time in clause 3 for the time critical communication
delay (R RBRF.FailTmms) is elapsed, the breaker like e.g. the transmission of a trip signal from
failure function will initiate an external trip the protection relay to the circuit breaker.
RBRF.OpEx). This external trip is forwarded
(R
according to the busbar image to the sur- Model
rounding breakers. While in conventional tech- The concept of logical nodes as functional
nology this is implemented with two auxiliary grouping of information has been introduced
relays, in IEC 61850 two instances of the LN in clause 2.2. There is a group of logical nodes
PTRC are used to model this. A GOOSE mes- that represents the data model of the high volt-
sage that contains the data P T R C 1 . O p and age equipment like
PTRC2.Op is distributed to all other bays. • XCBR representing a circuit breaker
• XSWI representing any other switching
How to use IEC 61850 for process equipment
connection • TCTR representing a single phase current
transformer
Task • TVTR representing a single phase voltage
The process connection provides the infor- transformer.
mation exchange between the substation
automation system and the high voltage equip- The logical nodes XCBR and XSWI include
ment: the data Pos with an attribute s t Val used to
• Voltage and current waveforms retrieve the position information and another
• Position and other status one ctVal to execute open and close commands
• Open, close and other controls (Figure 2). Additional data is used to model fur-
ther status information like e.g. the operation
The information exchange may be done capability of a circuit breaker (energy stored
using copper wiring (e.g. secondary nominal in the drive; e.g. o-c-o). For SCADA applications,
value of 100V/5A for voltage and current wave- these logical nodes and their data are accessed
forms) or using serial communication (Figure 6). using the client / server based communication.

The logical nodes TVTR and TCTR include


the data Vol and Amp. These data represent
the sampled value of the voltage and current
waveform. For the exchange of voltage and
current waveform over a serial communication,
a stream of these sampled values needs to be
transmitted.

An important aspect while using sampled


values of a power system is the phase rela-
tionship between the different measured sig-
nals, in particular between current and voltage.
IEC 61850 is using the concept of synchronized
sampling. All units performing sampling are
Figure 6: Process connection with serial communication globally synchronized with the required accu-
racy. The samples are taken all at the

16 E L E C T R A N° 222 - Octobre 2005


0508-095Mep222 7/12/05 16:51 Page 17

same time. Each sample is identified with a


number that provides the time reference. That
matical reclosure or manual switch on) a syn-
chrocheck function is useful in order to check
REPORT

SC B5
approach can deal with variable communica- if both voltages (the one at line side and the
tion delays, as they are inevitable when using one at bus side) are nearly identical (amplitude,
a network topology for the communication. phase frequency) allowing a switch on without
excessive stress. The bus voltage is normally
The message with the sampled values is not available per bay but only once per bus
typically transmitted as a multicast message zone on which the line will be connected. This
– that means the same telegram can be bus zone voltage can be taken from the cor-
received by multiple receiving devices. As for responding voltage transformer at the bus and
the GOSSE message the content of the mes- introduced to the device where the syn-
sage is defined with a dataset. chrocheck function is placed. Using IEC 61850
the samples representing the bus voltage can
Applications be sent over the serial link to the synchrocheck
A typical application for the process con- function installed in the line bay where the
nection is the information transfer between reclosing should take place.
instrument transformers, protection devices and
circuit breakers. This information transfer is time How to use IEC 61850 for
critical. It has a direct impact on the reaction substation automation design
time of the protection function. The acceptable
transmission delay is in the range of 3 µs [7]. I n t roduction to SCL
Substation automation design is a series of
The analog waveform of current and volt- steps from the specification up to the commis-
age is transmitted as a stream of samples as sioning of a project specific system. To show
described in clause 4.2. In order to fulfill the IEC 61850 is used in this process we have first to
requirements for the protection functions, the introduce shortly the Substation Configuration
synchronization accuracy for the sampling description Language (SCL) provided by the
needs to be in the range of 1…4 µs (e.g. phase standard for this process. SCL was introduced
relationship of currents for differential protec- for a comprehensive description of the complete
tion, phase relationship between current and SA system supporting the goal interoperability
voltage for fault locator and distance protec- of the standard. SCL allows describing the
tion). To achieve that synchronization accuracy, • single line diagram,
a dedicated synchronization network is cur- • function allocation to the single line dia-
rently required. gram,
• function allocation to devices,
To simplify the synchronization of samples • data as being mandatory and optional
from all phases all relevant TCTRs and TVTRs according to IEC 61850 (optional if needed or
may be implemented in a common Logical provided),
Device called Merging Unit (MU). One or many • data as being extended according to the
of theses Logical Devices are implemented extension rules (should be avoided but may be
in a common Physical Device sometimes con- needed),
fusingly called MU also. • the services provided and used,
• connection in the communication system,
The samples are used as current and volt- • setting of all configuration parameters as
age input e.g. for protection. The trip from the defined in IEC 61850,
protection device to the circuit breaker IED • defaults values of for all operational
X C B R . p o s . c t l ) can be transmitted over the
(X parameters as defined in IEC 61850.
same communication network using the
GOOSE concept introduced in clause 3.2. The SCL is based on the eXtended Mark-
up Language (XML), known also from the
Another interesting example is the syn- description of Web pages, with an XML Schema
chrocheck function. In case of reclosing (auto- defining the semantic use of XML in the

No. 222 - October 2005 ELECTRA 17


0508-095Mep222 7/12/05 16:51 Page 18

SC B5
REPORT

description of the substation and SA configu-


ration. The goal of SCL is to have a formal
If these are not given, the system integrator
has to make certain assumption to select the
description of the SA on engineering level, i.e. proper communication architecture out of the
files, which can be exchanged between pro- wide range of architectures possible with Eth-
prietary tools of different suppliers. ernet used in IEC 61850.

Specification by the user The customer may specify also pre-quali-


In a first approach nothing looks changed fied IEC 61850 compliant devices, e.g. differ-
in a specification for IEC 61850 compliant SA ent for main 1 and main 2 protection. This will
compared to previous specifications. The fol- limit the optimization process of the provider
lowing elements are part of the specification: but may be of special interest to get similar SA
• The single line diagram of the substation systems after a successful operation of the first
• Signal lists and data flow requirements optimized system.
• The specification of functionalities to be
performed (including performance figures and First considerations and recommendations
availability requirements if applicable) and their for the specification of IEC 61850 based SA
allocation to the single line diagram systems have been published in [12]. In addi-
• The interfaces both to the switchgear tion the WG 11 of the CIGRE SC B5 is working
(process interface) and to the NCC (protocol) out details to be used as guideline for utili-
• The geographical layout (extension, ties or other specifying parties.
buildings, cable channels, etc.)
• The environmental conditions For m of the specification
Using SCL, many of the above-described
If not more is specified the supplier will requirements can be formally specified in a Sys-
translate the specification to an optimized solu- tem Specification Description file (SSD). If the
tion based both on his experience and the customer does not yet do this it is left as task
framework of IEC 61850. for the supplier.

Since the data model of IEC 61850 is The SSD file is used to describe the single line
defined function oriented, i.e. according to the diagram and the allocated functions (feeder block
functional needs but not based on certain diagram). The optional data that need to be sup-
implementation in devices, a function oriented ported can also be described in the SSD file. This
specification facilitates the translation to an replaces the traditional signal list, the elements
IEC 61850 based SA system. All data defined of a signal list being the data of logical nodes. Up
as mandator y are provided according to the to now, the signal list is not only used to describe
data model in IEC 61850. If the user needs data the complete information content, but also to
declared as optional this has to be specified. describe the data flow. In IEC 61850, the data
If data are needed which are not specified in flow is implemented through communication ser-
the standard, they have to be listed for pos- vices like report or GOOSE where the content is
sible extensions. defined by data sets being a group of data.

The specification of functionality results The capabilities of an IEC 61850 compliant


basically in a selection of required logical nodes. device (IED) are described in an IED Capabil-
Some aspects of the functionality requirements ity Description (ICD) file. A vendor of devices
may have an impact on the services, e.g. there claiming conformance to IEC 61850 has not
are different command services available rang- only to supply paper documentation like a data
ing from a “direct control” to “select-before- sheet but also an ICD file.
operate (SBO) with enhanced security”.
F ro m s p e c i f i c a t i o n t o s y s t e m d e s i g n a s t a s k
Availability figures or scenarios may be pro- for the system integrator
vided answering the questions about the The specification has to be translated by
accepted or not accepted impact of failures. the provider to a system design (see e.g.

18 E L E C T R A N° 222 - Octobre 2005


0508-095Mep222 7/12/05 16:51 Page 19

[14]). The responsibility for the system design,


including the resulting performance, is the task
• The starting point of the engineering pro-
cess (Figure 7) is the formal description of the
REPORT

SC B5
of the system integrator. He has more respon- single line diagram, and part of the data model
sibilities in the multi-vendor environment pos- by the SSD file.
sible with IEC 61850. He has to consider not • Any selected IED if IEC 61850 compli-
only the direct impact of IEC 61850 but also ant has to have an IED Capability Description
all boundary conditions regarding environ- (ICD) file including its potential data model.
ment, performance, etc. as summarized in • A s y s t e m c o n f i g u r a t i o n t o o l will take
p.17. The system integrator may be part of the all these files written according to SCL and
main provider or of the utility, but he has to merge these by the system engineering pro-
have the know-how and experience for this job cess to a Substation Configuration Description
and, very important, powerful tools compliant (SCD) file.
with IEC 61850. Note that the standard is not • If the ICDs are properly selected, the data
defining tools but by SCL standardized infor- of all IEDs represented by the ICD files have
mation (see further) to be used by proprietary to fit with the data in the SSD file. Since the
tools. data in the models represent only the source
or client part, the data have to be configured
Any system integration tools needs the in data sets for the transmission by the appro-
SSD file and the ICD files of all devices of the priate services (e.g. Report, GOOSE) and in
system. The output is the Substation Config- so-called input sections of the SCL file, since
uration Description (SCD) file. For maintenance the receiver side has to be informed where the
and future system modifications the SCD files data needed for the functions coming from.
have to be archived as part of the project doc- • All data changes caused by the promo-
umentation. tion of the IEDs from the shelf to integrated
system components, i.e. in minimum some
P ro d u c t a n d s y s t e m e n g i n e e r i n g w i t h addressing information, have to be down-
compatible tools loaded to the IEDs.
Since the functions are not standardized,
device specific tools will remain at least for the The formal SCL description will result in a
next time. They are depending mostly on the consistent data exchange, allow exchanges
function algorithms and their implementation between compliant tools independent from
in the IEDs. If they are in series with the system the supplier and, finally, in a machine-readable
configuration tool they have be IEC 61850 com- documentation of the data and communica-
pliant, i.e. to be able to export and import SCL tion structure of the SA system. Any extension
files if applicable. The complete engineering or update in the future will not start from the
process is schematically shown in Figure 7. scratch but from the archived SCD file.

Figure 7: The engineering process using SCL files

No. 222 - October 2005 ELECTRA 19


0508-095Mep222 7/12/05 16:51 Page 20

SC B5
REPORT

How to USE IEC 61850


for testing and commissioning
have to be equipped with IEC 61850 interfaces.
The test of the functionality has to be done
same as before.
Confor mance testing
Devices are the physical (IED) building Commissioning and Site Acceptance Test
blocks of a system. To minimize problems with
interoperability in a project, any IED to be inte- The site acceptance test (SAT) has to prove
grated in an IEC 61850 based SA system the same as the FAT but now on site with the
should be IEC 61850 compliant by itself. The switchgear in the real substation environment.
report of the CIGRE TF 34.01 [8] gives some Conventional wiring requires mostly a conven-
general testing guidelines for communication tional point-to-point test. In case of a process
in SA, Part 10 of IEC 61850 [9] provides a frame bus, the data consistency in the SA system from
specification concerning conformance testing the NCC gateway down to the switchgear has
of devices including the mandatory ICD file. been already proven in the engineering pro-
The goal is that testing in any test laboratory cess with the resulting SCD file. The only mis-
is done in comparable and universal valid way. take could be an allocation mismatch between
The conformance test is depending on the the bay units and the process bus connectors
device under test but independent of a real plugged in. Only this check and outstanding
project. Note that the user group UCA Inter- function tests have to be performed. This
national tries to detail the test to facilitate the speeds up the SAT dramatically.
procedure. The device and its content have to
be the same as described by the mandatory How to use IEC 6 1 8 5 0
ICD file. during the life cycle

System per f o r mance testing The primary equipment as a whole needs


To check the performance classes as changing once every 30 – 60 years but may be
defined in the mandatory part IEC 61850-5 for extended during the life cycle time of the sub-
the device in a system (system conformance) station. One of the most important aspects
independent from a project, the IEDs may be during the life cycle time is the facility for
tested in a test system with reasonable data extensions or the refurbishment of existing
traffic in the background. parts of the SA system. In this respect it is to
be considered that the replacement of an IED
The Factory Acceptance Test may be needed because of maintenance rea-
The factory acceptance test (FAT) has to son (failure of the equipment) or because of
prove that the SA system as far as assembled in needs for a performance upgrade. In most
one factory fulfills the given specification of the cases the new coming in IED is not identical
customer. The prerequisite is that all compo- with the previous one, additional engineering
nents are conformant with IEC 61850 and that and testing works are needed.
the all SCL files used in engineering, especially With IEC 61850 the whole system descrip-
the resulting SCD file is available. With some tion and data remain available as formally pro-
minor exceptions for systems on MV level, the vided in the SCD file. This is part of the doc-
switchgear will not be available for the FAT. The umentation the user has received with the
missing switchgear and other missing parts have system delivery and has to be updated for any
to be simulated. For an IEC 61850 based sys- change in the system e.g. change of the event
tem appropriate simulators having serial inter- list. Using this documentation and taking over
faces according to the standard can easily do data coming from new devices or from new
this. If the system has also an IEC 61850 process functions to be introduced in the system, the
bus simulators may be plugged in to the bus system integrator can perform the required
representing the switchgear. Quasi-standard- extensions much easier than in the past.
ized or project specific switchgear plugs are
replaced by the standardized process bus inter- A practical issue is the extension of a new
face. Note that also devices monitoring the tests bay to an existing SA system, which is

20 E L E C T R A N° 222 - Octobre 2005


0508-095Mep222 7/12/05 16:51 Page 21

not yet IEC 61850 compliant. In this case it is


recommended to build the new bay according
International promotes the standard and tries
to support all users. The intended result is seam-
REPORT

SC B5
IEC 61850 in order to have the advantages set less communication architecture for utilities.
by the standard for the life cycle of a substa- Since IEC 61850 has high impact on the
tion automation system. For this reasons exten- investment and operation of power systems,
sion scenarios are very important but gener- the utilities will consider the standard very
ally individual per substation. actively same as the suppliers.

Note that all actual versions of the soft- R e f e rences


ware, hardware (IED) and switchgear are avail-
able and readable from remote if the optional [1] IEC 60870-5-101 “Telecontrol equipment
feature “name plate” is used. This nameplate and systems - Part 5-101: Transmission protocols -
is provided in Logical Nodes, Logical Devices, Companion standard for basic telecontrol tasks”

Physical Devices and as external nameplate for [2] IEC 60870-5-104 “Telecontrol equipment
and systems - Part 5-104: Transmission protocols -
switchgear also. Network access for IEC 60870-5-101 using standard
transport profiles”
Outlook and conclusions [3] IEC 60870-5-103 “Telecontrol equipment
and systems – Part 5-103: Transmission protocols –
Companion standard for the informative interface
The Standard IEC 61850 covers all aspects
of protection equipment
related to the communication inside substa-
[4] IEC 61850 “Communication networks and
tion. It supports important issues as the nam- systems in substations” (www.iec.ch)
ing and the engineering capabilities but also [5] IEC 61850-7-2 “Communication networks and
conformity, testing, etc. It is a comprehensive systems in substations – Part 7-2: Basic communica-
tion structure for substation and feeder equipment –
approach for the conception of the substation
Abstract communication service interface (ACSI)
automation and protection with serial com-
[6] IEC 61850-7-4 “Communication networks
munication. It doesn’t mean that all delivered and systems in substations – Part 7-4: Basic com-
systems will have the same “quality” inde- munication structure for substation and feeder
pendently of the manufacturer because archi- equipment – Compatible logical node classes and
data classes”
tecture remains free (architecture of the com-
[7] IEC 61850-7-3 “Communication networks
munication system as well as location of the and systems in substations – Part 7-3: Basic com-
different functionality) as well as the quality of munication structure for substation and feeder
each function involved (e.g. protection func- equipment – Common data classes”
tions). The first experiences done by manu- [8] IEC 61850-5 “Communication networks and
systems in substations – Part 5: Communication
facturers and utilities have now to confirm if
requirements for functions and device models
the expectations are fulfilled and if some exten-
[9] K.P. Brand et al., Conformance Testing
sions inside the standard will be needed. Guidelines for Communication in Substations, Cigré
Report 34-01 – Ref. No. 180, August 2002
Besides the mentioned maintenance of the [10] IEC 61850-10 “Communication networks and
standard for communication within substations, systems in substations - Part 10: Conformance testing”

activities have been started or are envisaged to [11] K.P.Brand, V.Lohmann, W.Wimmer “Sub-
station Automation Handbook”, UAC 2003, ISBN 3-
use IEC 61850 also outside the substation. Within 85759-951-5, 2003 (www.uac.ch)
IEC, there exists already working groups using the [12] K.P.Brand, M.Janssen “ The specification of
standard in wind power, hydro-power and dis- IEC 61850 based Substation Automation Systems”
tributed energy resources (DER). The feasibility Paper presented at the DistribuTECH 2005, January
25-27, San Diego
of IEC 61850 for the link to the NCC has been
[13] CIGRE SC B5, WG11 “The introduction of
proven, a harmonization between the data model IEC 61850 and its impact on protection and automa-
of IEC 61850 and the CIM model on Network tion within substations”, work started in 2003, report
Level is in progress. New work items to use IEC to be scheduled for 2005/2006
61850 for communication between both ends of [14] K.P. Brand, C. Brunner, W. Wimmer “Design
of IEC 61850 based Substation Automation Systems
a line protection (protection application) are in
according to customer requirements”, Paper B5-103
preparation. The IEC TC57 WG10 takes care to of the B5 Session at CIGRE Plenary Meeting, Paris,
the common data model, the user group UCA 2004, 8 pages ■

No. 222 - October 2005 ELECTRA 21