Document type TRA-SBJ-TEC-EL-GEN-00180-R04

TECHNICAL SUBMITTAL for MDB-R-10 & Associated Panels


Load Schedules

Project : The Royal Atlantis Resort and Residences (TRA)


Client: ATLANTIS THE PALM LIMITED 2 (ATP2)
Consultant: DYNAMIC EINGINEERING CONSULTANTS (DEC)
Main Contractor : SsangYong - Besix Joint Venture (SBJV)
MEP subcontractor: SsangYong - Besix Joint Venture (SBJV)
INDEX
REFERENCE PAGE NO

MDB-R-10 1

BB-RB-03 2
SMDB-RB-2801 3
SMDB-RB-2701 4
SMDB-RB-2601 5
SMDB-RB-2501 6
SMDB-RB-2401 7
SMDB-RB-2301 8
SMDB-RB-2201 9
SMDB-RB-2101 10
SMDB-RB-2001 11
SMDB-RC-0301 12
SMDB-RC-LG01 13
DB-RC-LG01-01 14
DB-RC-LG01-02 15
DB-RC-GR01-01 16
DB-RC-GR01-02 17
DB-RB-2801-01 18
DB-RC-B101-SPH 19

REFERENCE DRAWINGS

REFERENCE NUMBER DATE TITLE


F+G-5134309-ATP2-LET-01980 2/7/2019 Release of Consolidated Electrical IFCs

RELATED DOCUMENTS

DRAWING NUMBER DATE TITLE


TRA-SPE-TEC-EL-GEN-00137 26/12/2018 Technical Submittal for Manufacturing Drawings of MDB-R-10 & Associated Panels
TRA-SBJ-RFI-EL-GEN-07777 3/2/2019 M2&M3: Capacitor Bank Cable Size
Site/Design Issue Resolution Form No. 0237: Changes to electrical Breakers based on DEWA LV
TRA-DEC-SBJ-01943 1/7/2020
Approval
M2&M3: TRA-SPE-TEC-EL-GEN-00100 (REV 02), 00103 (REV 02), 00110 (REV 02) & 00108 (REV
TRA-SBJ-RFI-EL-GEN-13556 9/24/2020
01) Clarifications
TRA-SBJ-RFI-EL-GEN-13158 23/08/2020 M2&M3: Load Schedule for DB-RC-3701-01 and DB-RB-2801-01 Panels
TRA-SBJ-RFI-EL-GEN-12633 5/31/2020 EI 0856 Clarification
TIME-PM-ADV-000814 19/11/2020 TRA - Public Area Toilet Automation (Electrical Drawings)
TRA-SBJ-RFI-GN-B00-18020 25/10/2021 B00- VIP Private Garage

This shop drawings replace and supersede the below listed shop drawings.

DRAWING NUMBER TITLE


TRA-SPE-SDG-PS-B00-00108 Basement Small Power DB Schedule Layout Sheet 108 (MDB-R-10)
TRA-SPE-SDG-PS-L00-00039 Lower Ground Small Power DB Schedule Layout Sheet 39 (MDB-R-10)
TRA-SPE-SDG-PS-G00-00013 Ground Floor Small Power DB Schedule Layout Sheet 13 (MDB-R-10)
TRA-SPE-SDG-PS-L03-00005 3rd Floor Small Power DB Schedule Layout Sheet 05 (MDB-R-10)
TRA-SPE-SDG-PS-L20-00005 20th Floor Small Power DB Schedule Layout Sheet 05 (MDB-R-10)
TRA-SPE-SDG-PS-L21-00008 21st Floor Small Power DB Schedule Layout Sheet 08 (MDB-R-10)
TRA-SPE-SDG-PS-L22-00007 22nd Floor Small Power DB Schedule Layout Sheet 07 (MDB-R-10)
TRA-SPE-SDG-PS-L23-00009 23rd Floor Small Power DB Schedule Layout Sheet 09 (MDB-R-10)
TRA-SPE-SDG-PS-L24-00005 24th Floor Small Power DB Schedule Layout Sheet 05 (MDB-R-10)
TRA-SPE-SDG-PS-L25-00005 25th Floor Small Power DB Schedule Layout Sheet 05 (MDB-R-10)
TRA-SPE-SDG-PS-L26-00005 26th Floor Small Power DB Schedule Layout Sheet 05 (MDB-R-10)
TRA-SPE-SDG-PS-L27-00006 27th Floor Small Power DB Schedule Layout Sheet 06 (MDB-R-10)
TRA-SPE-SDG-PS-L28-00005 28th Floor Small Power DB Schedule Layout Sheet 05 (MDB-R-10)
The references of the mechanical
FAHU EQUIP. ID TEC Status
equipments technical submittals

MAU-B1-1 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-2 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-3 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-4 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-5 TRA-SPE-TEC-AC-GEN-00027 B

AHU-B1-5 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-6 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-8 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-9 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-10 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-12-3 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-13-2 TRA-SPE-TEC-AC-GEN-00068 B

AHU-B1-13-3 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-13-5 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-14-1 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-14-2 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-14-3 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-15 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-16 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-17-1 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-17-2 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-18 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-19 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-22-1 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-22-2 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-22-3 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-23-1 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-23-2 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-24 TRA-SPE-TEC-AC-GEN-00004 B
The references of the mechanical
FAHU EQUIP. ID TEC Status
equipments technical submittals

AHU-B1-25 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-26 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-27 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-28 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-29 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-30 TRA-SPE-TEC-AC-GEN-00004 B

AHU-RR-01 TRA-SPE-TEC-AC-GEN-00079 B

MAU-RR-01 TRA-SPE-TEC-AC-GEN-00079 B

MAU-RR-02 TRA-SPE-TEC-AC-GEN-00079 B

DOAHU-B1-MK-01 TRA-SPE-TEC-AC-GEN-00026 B

AHU-FC-01 TRA-SPE-TEC-AC-GEN-00149 B

AHU-LG-01 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-02 TRA-SPE-TEC-AC-GEN-00011 B

AHU-02-01 TRA-SPE-TEC-AC-GEN-00167 B

MAU-LG-01 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-03 TRA-SPE-TEC-AC-GEN-00026 B

AHU-LG-04 TRA-SPE-TEC-AC-GEN-00149 B

DOAHU-LG-02 TRA-SPE-TEC-AC-GEN-00027 B

MAU-LG-02 TRA-SPE-TEC-AC-GEN-00149 B

AHU-LG-05 TRA-SPE-TEC-AC-GEN-00026 B

AHU-01-10 TRA-SPE-TEC-AC-GEN-00027 B

AHU-LG-06 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-07 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-08 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-09 TRA-SPE-TEC-AC-GEN-00026 B

AHU-LG-11 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-12 TRA-SPE-TEC-AC-GEN-00011 B

MAU-02-01 TRA-SPE-TEC-AC-GEN-00079 B

AHU-01-08 TRA-SPE-TEC-AC-GEN-00150 B
The references of the mechanical
FAHU EQUIP. ID TEC Status
equipments technical submittals

AHU-01-09 TRA-SPE-TEC-AC-GEN-00150 B

AHU-04-01 TRA-SPE-TEC-AC-GEN-00150 B

MAU-04-01 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-04 TRA-SPE-TEC-AC-GEN-00079 B

AHU-04-02 TRA-SPE-TEC-AC-GEN-00150 B

MAU-04-02 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-03 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-04 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-05 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-06 TRA-SPE-TEC-AC-GEN-00079 B

AHU-CA-01 TRA-SPE-TEC-AC-GEN-00026 B

AHU-CA-02 TRA-SPE-TEC-AC-GEN-00027 B

AHU-CA-03 TRA-SPE-TEC-AC-GEN-00027 B

AHU-CA-04 TRA-SPE-TEC-AC-GEN-00027 B

AHU-CA-05 TRA-SPE-TEC-AC-GEN-00026 B

MAU-CA-01 TRA-SPE-TEC-AC-GEN-00027 B

DOAHU-SPA-01 TRA-SPE-TEC-AC-GEN-00011 B

AHU-AD-LG-01 TRA-SPE-TEC-AC-GEN-00026 B

MAU-AD-LG-01 TRA-SPE-TEC-AC-GEN-00026 B

DOAHU-B1-MK-01 TRA-SPE-TEC-AC-GEN-00076 B

AHU-LG-Z9-01 TRA-SPE-TEC-AC-GEN-00036 B

AHU-02-BR-01 TRA-SPE-TEC-AC-GEN-00167 B

MAU-LG-BR-01 TRA-SPE-TEC-AC-GEN-00167 B

AHU-MR-B1-02 TRA-SPE-TEC-AC-GEN-00167 B

MAU-MR-B1-01 TRA-SPE-TEC-AC-GEN-00149 B

AHU-MR-B1-01 TRA-SPE-TEC-AC-GEN-00149 B

MAU-MR-B1-02 TRA-SPE-TEC-AC-GEN-00149 B
The references of the mechanical equipments
EQUIPMENT REFERENCE TEC Status
technical submittals

TEF-B1-1 TRA-SPE-TEC-AC-GEN-00127 B

TEF-B1-4 TRA-SPE-TEC-AC-GEN-00127 B

TEF-B1-5 TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-1 TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-2,3,3a TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-New TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-4 TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-5 TRA-SPE-TEC-AC-GEN-00127 B

DWEF-LG-01 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-LG-02 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-LG-04 TRA-SPE-TEC-AC-GEN-00021 B

PEF-B1-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-3 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-4 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-5 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-6 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-7 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-8-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-8-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-8-3 TRA-SPE-TEC-AC-GEN-00099 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

PEF-B1-9-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-9-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-10-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-21 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-11-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-11-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-11-3 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-12 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-13 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-14-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-15 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-16-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-16-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-17 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-18 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-19 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-20 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-22 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-23 TRA-SPE-TEC-AC-GEN-00099 B

SEF-45-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-36-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-21-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-21-2 TRA-SPE-TEC-AC-GEN-00098 B

SEF-29-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-38/37-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-B1-ETS-01 TRA-SPE-TEC-AC-GEN-00098 B

FP-REF-1 TRA-SPE-TEC-AC-GEN-00021 B

GEF-LG-01 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-02 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-03 TRA-SPE-TEC-AC-GEN-00015 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

GEF-LG-04 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-06 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-07 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-08 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-09 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-10 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-12 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-14 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-15 TRA-SPE-TEC-AC-GEN-00015 C

LPF-45-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-35-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-21-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-3 TRA-SPE-TEC-AC-GEN-00097 B

LPF-20-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-20-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-4 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-7 TRA-SPE-TEC-AC-GEN-00097 B

LPF-29-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-29-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-5 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-8 TRA-SPE-TEC-AC-GEN-00097 B

LPF-37-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-37-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-6 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-9 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-10 TRA-SPE-TEC-AC-GEN-00097 B

SPF-45-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-35-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-2 TRA-SPE-TEC-AC-GEN-00097 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

SPF-21-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-3 TRA-SPE-TEC-AC-GEN-00097 B

SPF-20-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-4 TRA-SPE-TEC-AC-GEN-00097 B

SPF-29-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-5 TRA-SPE-TEC-AC-GEN-00097 B

SPF-37-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-6 TRA-SPE-TEC-AC-GEN-00097 B

KEU-B1-1 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-2 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-3 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-4 TRA-SPE-TEC-AC-GEN-00038 B

KEU-LG-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-02 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-03 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-07 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-04 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-05 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-08 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-09 TRA-SPE-TEC-AC-GEN-00038 B

KEU-LG-03 TRA-SPE-TEC-AC-GEN-00038 B

KEU-RR-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-RR-02 TRA-SPE-TEC-AC-GEN-00038 B

KEU-CA-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-CA-02 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-MK-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-AD-LG-01 TRA-SPE-TEC-AC-GEN-00038 B

TEF-LG-01 TRA-SPE-TEC-AC-GEN-00021 B

TEF-LG-02 TRA-SPE-TEC-AC-GEN-00021 B

TEF-LG-04 TRA-SPE-TEC-AC-GEN-00021 B

EF-LG-05 TRA-SPE-TEC-AC-GEN-00021 B

EF-LG-08 TRA-SPE-TEC-AC-GEN-00021 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

EF-LG-09 TRA-SPE-TEC-AC-GEN-00021 B

TEF-02-01 TRA-SPE-TEC-AC-GEN-00021 B

TEF-CA-01 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-1 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-2 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-3 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-4 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-6 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-9 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-10 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-11 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-3 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-3 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-4 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-5 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-6 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-7 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-13 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-14 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-15 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-15 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-16 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-17 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-18 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-2 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-01 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-02 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-03 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-04 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-05 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-07 TRA-SPE-TEC-AC-GEN-00021 B

TEF-LG-07 TRA-SPE-TEC-AC-GEN-00021 B

EF-01-02 TRA-SPE-TEC-AC-GEN-00021 B

GEF-H-01 TRA-SPE-TEC-AC-GEN-00021 B
The references of the mechanical equipments
EQUIPMENT REFERENCE TEC Status
technical submittals

GEF-H-02 TRA-SPE-TEC-AC-GEN-00021 B

GEF-H-03 TRA-SPE-TEC-AC-GEN-00021 B

GEF-H-04 TRA-SPE-TEC-AC-GEN-00021 B

EF-RR-01 TRA-SPE-TEC-AC-GEN-00214 B

KEF-RR-01 TRA-SPE-TEC-AC-GEN-00021 B

KEF-RR-02 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-RR-01 TRA-SPE-TEC-AC-GEN-00021 B

GPEF-RR-01 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-AD-LG-01 TRA-SPE-TEC-AC-GEN-00021 B

TEF-FC-01 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-FC-02 TRA-SPE-TEC-AC-GEN-00021 B

KEF-FC-03 TRA-SPE-TEC-AC-GEN-00021 B

GEF-FC-04 TRA-SPE-TEC-AC-GEN-00021 B

PEF-B1-14 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-20 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-23 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-22 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-19 TRA-SPE-TEC-AC-GEN-00099 B
The references of the mechanical
SL NO FAHU EQUIP. ID TEC Status
equipments technical submittals

1 AHU-H-43-1 TRA-SPE-TEC-AC-GEN-00025 B

2 AHU-H-33-1 TRA-SPE-TEC-AC-GEN-00025 B

3 AHU-H-21-1 TRA-SPE-TEC-AC-GEN-00025 B

4 AHU-R-19-1 TRA-SPE-TEC-AC-GEN-00036 B

5 AHU-R-29-1 TRA-SPE-TEC-AC-GEN-00025 B

6 AHU-R-37-1 TRA-SPE-TEC-AC-GEN-00025 B

7 AHU-H-B1-1 TRA-SPE-TEC-AC-GEN-00010 B

8 AHU-H-B1-2 TRA-SPE-TEC-AC-GEN-00010 B

9 AHU-H-B1-3 TRA-SPE-TEC-AC-GEN-00010 B

10 AHU-R-B1-4 TRA-SPE-TEC-AC-GEN-00012 B

11 AHU-R-B1-5 TRA-SPE-TEC-AC-GEN-00012 B

12 AHU-R-B1-6 TRA-SPE-TEC-AC-GEN-00012 B
DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND
AREA: Palm Jumeirah Crescent, Dubai U.A.E.
PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

REF: MDB-R-10 CONSULTANT: DEC/WSP LOCATION :RESIDENCE LV ROOM #1(B-0626)

CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROPOSED TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
DB NO. MCCB kA SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
2500(D/O)
INCOMER 4P BY DEWA 2x150 1 2400/5A CT
SET AT 0.85
Via Temporary Flexible Cable
DEWA MOBILE GENERATOR INCOMER 4P 2500(D/O) Non Auto EPR/ HOFR CSP 12X1C 630 3X1C 400 95
( RFI 3575 & MAR 00468)
OUTGOING

PFC TP 1250 SET AT 800 50 XLPE/LSF/SWA/LSF/CU 4x4C 240 4 x1C 120 5 375kVAR CAPACITOR BANK 3x100Kvar+1x50Kvar+1x25Kvar(5 steps)
BB-RB-03 TP 2000 50 2000A BUSBAR 320.55 309.17 310.84 940.56 617.22 15 2
SMDB-RC-LG01 TP 1000 50 XLPE/LSF/SWA/LSF/CU 3x4C240 3x1C 120 90 146.38 148.51 146.64 441.53 307.68 4
SMDB-RC-0301 TP 500 50 XLPE/LSF/SWA/LSF/CU 2x4C 150 2x1C 95 104 79.55 78.31 77.02 234.88 148.71 6

SMDB CONNECTED TO: MDB-BP-1B1 TOTAL CONNECTED LOAD PER PHASE 546.48 535.99 534.50 1616.97 1073.61 21 6
MAXIMUM DEMAND [3PH] @ D.F 0.66 = 1073.61kW TOTAL CONNECTED LOAD [3 PH] 1616.97 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)


MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 1


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: BB-RB-03


CONSULTANT: DEC/WSP LOCATION : RESID CORE C ELEC .CLOSET
SMDB CONNECTED TO: MDB-R-10
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 2000 2000A BUSBAR
OUT GOING:
SMDB-RB-2801 TP 320 35 XLPE/LSF/SWA/LSF/CU 4C 240 1C 120 8 46.64 46.42 48.31 141.37 100.92 1 1

SMDB-RB-2701 TP 250 SET AT 200 35 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8 32.92 30.27 32.05 95.24 60.19 2

SMDB-RB-2601 TP 160 35 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8 21.85 20.09 19.56 61.50 41.79 1


DB DELETED AS PER M4 UPDDATED
SMDB-RB-2501 TP 400 SET AT 320 35 XLPE/LSF/SWA/LSF/CU 2 x 4C 240 2 x 1C 120 8 51.59 51.66 50.13 153.38 100.60 3 APARTMENT LOAD SCHEDULE RECEVIED
FROM FUTURE METRO
SMDB-RB-2401 TP 250 35 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8 36.55 34.17 33.20 103.91 66.98 2
SMDB-RB-2301 TP 200 35 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8 31.71 30.91 30.27 92.88 58.76 2
SMDB-RB-2201 TP 250 35 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8 35.73 34.69 33.71 104.13 68.75 2
78 KW LOAD REQURED ONLY160 A
SMDB-RB-2101 TP 160 35 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8 25.06 26.71 27.20 78.97 50.54 1
BREAKER (DELIVERD PANEL)
SMDB-RB-2001 TP 250 35 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8 38.51 34.24 36.42 109.17 68.69 2

TOTAL CONNECTED LOAD PER PHASE 320.55 309.17 310.84 940.56 617.22 15 2
MAXIMUM DEMAND [3PH] @ D.F 0.66 = 617.2kW TOTAL CONNECTED LOAD [3 PH] 940.56 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 2


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RB-2801


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (28B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 320 XLPE/LSF/SWA/LSF/CU 4C 240 1C 120 8
OUT GOING:

DB-RB-2801-R2801 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 23 15.29 14.50 15.89 45.68 28.99 1 3BED-TYPE 7


DB-RB-2801-R2802 TP 160 25 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 20 22.67 23.30 23.55 69.52 46.95 1 4BED-TYPE 5+skycourt
DB-RB-2801-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 2.078 2.026 2.268 6.37 5.17 TRA-SBJ-RFI-EL-GEN-13158
LP-LMR-RB-2803-PB-03 TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 30 6.6 6.6 6.6 19.80 19.80 With 500mA ELCB

TOTAL CONNECTED LOAD PER PHASE 46.64 46.42 48.31 141.37 100.92 1 1
MAXIMUM DEMAND [3PH] @ D.F 0.71 = 100.9kW TOTAL CONNECTED LOAD [3 PH] 141.37 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 3


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RB-2701


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (27B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 250 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8
OUT GOING:

DB-RB-2701-R2701 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 16 15.29 14.30 15.89 45.48 28.87 1 3BED-TYPE 7.1
DB-RB-2701-R2702 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 20 17.64 15.97 16.15 49.76 31.32 1 4BED-TYPE 4

TOTAL CONNECTED LOAD PER PHASE 32.92 30.27 32.05 95.24 60.19 2
MAXIMUM DEMAND [3PH] @ D.F 0.63 = 60.2kW TOTAL CONNECTED LOAD [3 PH] 95.24 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 4


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND
AREA: Palm Jumeirah Crescent, Dubai U.A.E.
PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RB-2601


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (26B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 160 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8
OUT GOING:

DB-RB-2601-R2601 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 20 17.64 15.97 16.15 49.76 31.32 1 4 BED - TYPE 4
DB-RB-2601-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 2.21 2.12 1.41 5.74 4.47
30mA ELCB for AV rack (RFI
AV-CB-L27-01 TP 20 25 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 60 2.00 2.00 2.00 6.00 6.00
13556)

TOTAL CONNECTED LOAD PER PHASE 21.85 20.09 19.56 61.50 41.79 1
MAXIMUM DEMAND [3PH] @ D.F 0.68 = 41.8kW TOTAL CONNECTED LOAD [3 PH] 61.50 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 5


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-RB-2501
CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (25B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 400 XLPE/LSF/SWA/LSF/CU 2 x 4C 240 2 x 1C 120 8
OUT GOING:

DB-RB-2501-R2501 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 20 16.74 17.66 16.19 50.58 33.54 1 2BR T2.1 DUPLEX+ SKY C (Level 1)
DB-RB-2501-R2502 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 20 15.97 14.85 15.00 45.83 29.13 1 3BED - TYPE 11
160A SET@
DB-RB-2501-R2503 TP 25 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 26 18.88 19.15 18.94 56.97 37.93 1 3BED-DUPLEX TYPE 9 (LEVEL 1)
125A
DB DELETED AS PER M4 UPDDATED
APARTMENT LOAD SCHEDULE
RECEVIED FROM FUTURE METRO

TOTAL CONNECTED LOAD PER PHASE 51.59 51.66 50.13 153.38 100.60 3
MAXIMUM DEMAND [3PH] @ D.F 0.66 = 100.6kW TOTAL CONNECTED LOAD [3 PH] 153.38 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 6


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RB-2401


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (24B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 250 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8
OUT GOING:

DB-RB-2401-R2401 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 18 15.85 15.45 15.14 46.44 29.38 1 3BED-TYPE 5.1
DB-RB-2401-R2402 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 20 15.85 15.45 15.14 46.44 29.38 1 3BED-TYPE 5
DB-RB-2401-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 4.84 3.26 2.93 11.03 8.22

TOTAL CONNECTED LOAD PER PHASE 36.55 34.17 33.20 103.91 66.98 2
MAXIMUM DEMAND [3PH] @ D.F 0.64 = 67.0kW TOTAL CONNECTED LOAD [3 PH] 103.91 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 7


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RB-2301


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (23B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 200 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8
OUT GOING:

DB-RB-2301-R2301 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 18 15.85 15.45 15.14 46.44 29.38 1 3BED-TYPE 5.1
DB-RB-2301-R2302 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 22 15.85 15.45 15.14 46.44 29.38 1 3BED-TYPE 5

TOTAL CONNECTED LOAD PER PHASE 31.71 30.91 30.27 92.88 58.76 2
MAXIMUM DEMAND [3PH] @ D.F 0.63 = 58.8kW TOTAL CONNECTED LOAD [3 PH] 92.88 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 8


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-RB-2201
CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (22B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 250 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8
OUT GOING:
DB-RB-2201-01 TP 32 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 2.36 2.12 1.77 6.25 4.99 AS PER SDIR 237
DB-RB-2201-R2201 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 14 15.85 15.45 15.14 46.44 29.38 1 3BED-TYPE 5.1
DB-RB-2201-R2202 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 20 15.85 15.45 15.14 46.44 29.38 1 3BED-TYPE 5
30mA ELCB for AV rack
AV-CB-L22-CM TP 20 25 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 60 1.67 1.67 1.67 5.00 5.00
(RFI 13556)

TOTAL CONNECTED LOAD PER PHASE 35.73 34.69 33.71 104.13 68.75 2
MAXIMUM DEMAND [3PH] @ D.F 0.66 = 68.8kW TOTAL CONNECTED LOAD [3 PH] 104.13 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 9


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RB-2101


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (21B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
78 KW LOAD REQURED ONLY160A
INCOMER TP 160 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8
ISOLATOR (DELIVERD PANEL)
OUT GOING:

DB-RB-2101-PH R2101 TP 160 25 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 40 25.06 26.71 27.20 78.97 50.54 1 PENTHOUSE TYPE 1

TOTAL CONNECTED LOAD PER PHASE 25.06 26.71 27.20 78.97 50.54 1
MAXIMUM DEMAND [3PH] @ D.F 0.64 = 50.5kW TOTAL CONNECTED LOAD [3 PH] 78.97 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 10


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RB-2001


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (20B02)
SMDB CONNECTED TO: BB-RB-03
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 250 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8
OUT GOING:
DB-RB-2001-R2001 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 16 15.29 14.50 15.89 45.68 28.99 1 3BED-TYPE 7
DB-RB-2001-R2002 TP 100 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 20 17.64 15.97 16.15 49.76 31.32 1 4BED-TYPE 4
DB-RB-2001-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 5.59 3.77 4.37 13.73 8.38

TOTAL CONNECTED LOAD PER PHASE 38.51 34.24 36.42 109.17 68.69 2
MAXIMUM DEMAND [3PH] @ D.F 0.63 = 68.7kW TOTAL CONNECTED LOAD [3 PH] 109.17 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 11


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RC-0301


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (28B02)
SMDB CONNECTED TO: MDB-R-10
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/
DB NO.
TP ACB MCCB MCCB DUTY kA
SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 500 XLPE/LSF/SWA/LSF/CU 2x4C 150 2x1C 95 104
OUT GOING:

DB-RC-0301-R0304 TP 80 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 55 12.39 12.62 12.48 37.50 23.51 1 2BED-TYPE 1


DB-RC-0301-R0305 TP 80 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 38 12.90 11.89 12.67 37.46 23.47 1 2BED-TYPE 6
DB-RC-0301-R0306 TP 80 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 49 12.38 13.29 11.56 37.23 22.95 1 2BED-TYPE 21.1
DB-RC-0301-R0307 TP 80 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 45 13.07 12.74 10.76 36.56 22.45 1 2BED-TYPE 22.1
DB-RC-0301-R0308 TP 80 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 38 11.89 12.52 12.97 37.37 23.40 1 2BED-TYPE 9
DB-RC-0301-R0309 TP 80 25 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 58 12.98 12.24 12.56 37.78 23.66 1 2BED-TYPE 2
DB-RC-0301-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C10 1C 10 10 3.94 3.02 4.02 10.98 9.27

TOTAL CONNECTED LOAD PER PHASE 79.55 78.31 77.02 234.88 148.71 6
MAXIMUM DEMAND [3PH] @ D.F 0.63 = 148.7kW TOTAL CONNECTED LOAD [3 PH] 234.88 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 12


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-RC-LG01


CONSULTANT: DEC/WSP LOCATION : ELEC.ROOM (LC02)
SMDB CONNECTED TO: MDB-R-10
RATING - AMPS CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
CIRCUIT/ PVC/
SP/ ISO/ FAULT 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
FEEDER/ XLPE/ 2 2 2
TP ACB MCCB MCCB DUTY kA mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
DB NO. SWA/LSF
N/A KW KW
INCOMER TP 1000 XLPE/LSF/SWA/LSF/CU 3x4C240 3x1C 120 90 LOAD BALANCED
OUT GOING:

DB-RC-LG01-01 TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 8.16 7.41 6.69 22.26 21.57

TOWNHOUSE 6 TP 160 25 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 55 24.05 25.15 25.59 74.79 47.87 1 200/5A


TOWNHOUSE 4 TP 200 25 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 36 32.39 31.5 32.61 96.50 61.76 1 200/5A
TOWNHOUSE 2 TP 200 25 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 22 32.39 31.5 32.61 96.50 61.76 1 200/5A
TOWNHOUSE 1 TP 200 25 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 35 32.39 31.5 32.61 96.50 61.76 1 200/5A
DB-RC-GR01-01 TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 25 8.74 8.79 8.84 26.37 24.41
DB-RC-LG01-02 TP 32 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 0.93 1.43 1.42 3.78 3.78 AS PER SDIR 237

DB-RC-GR01-02 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 15 4.84 3.84 3.76 12.44 12.38

DB-RC-B101-SPH TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 40 2.5 7.4 2.5 12.40 12.40 BMS METER (RFI 18020)

TOTAL CONNECTED LOAD PER PHASE 146.38 148.51 146.64 441.53 307.68 4
MAXIMUM DEMAND [3PH] @ D.F 0.70 = 307.7kW TOTAL CONNECTED LOAD [3 PH] 441.53 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 13


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-RC-LG01-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X 1C 16 mm2, CU/G/Y/LSF ECC
LOCATION : ELEC.ROOM(LC02) MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-RC-LG01
CONNECTED LOADS/POINTS LOAD PER CKT (W)
MCB

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING CKT CKT WIRE DEMAND DEMAND

EX. FAN

20A ISO

13A S/O
SH. S/O
ECC WIRE SIZE mm²

W A/C
SR. NO. RTG IN ROOM / AREA UNIT WATTS REMARKS

S A/C

MISC
CCU

FCU
W/H

D/W
INCOMER OF ELCB NO. SIZE mm² FACTOR LOAD(KW)

SB
Amp. R Y B

ELEC ROOM LC02,SERVICE LOBBY LC01, IT


1 R1 16 2.5 2.5 2, 4 ,4 52, 21, 31 312 LIGHT TYPE B1, BD1, BFL-5( EI 1246 (EIP)) 1.00 0.31
ROOM LC03,
2 Y1 16 SPARE 150 1.00 0.15

3 B1 16 2.5 2.5 POOL AREA - L0610 1 90 90 LIGHT TYPE F-F3 1.00 0.09

40A,4P, MULTI FUNCTION ROOM-1- (L-0606), 2(L0601),


100mA 4 R2 16 2.5 2.5 3(L0602), LOUNGE LOWER GROUND- 24, 8, 40.5, 4 9.6, 7, 8, 21 694 LIGHT TYPE F-L29, F-U4,F-L5, B-D1 1.00 0.69
L0603,PANTRY-1-L-0608, PANTRY-2-L-0607
TREATMENT ROOM-L-0628, MEN CHANGING
ROOM-L-0632, WOMEN CHANGING ROOM L- 24, 12, 1, 1, 61.4, 5.1, 10,90,9.6,24,2
5 Y2 16 2.5 2.5 1316 F-IDW,F-1DF, F-S1 , F-F3, F-L19, F-L11,F-U4 B-D1 1.00 1.32
0619, CORRIDOR-L0609, POOL-L0610, SHOWER- 4, 2 1
L-0614,SHOWER-L-0208
6 B2 SPACE

7 R3 16 2.5 2.5 RESIDENTIAL LOBBY LOUNGE(L-0603) 19.7M 36 709 F-L35A 35B(RFI 12642) 1.00 0.71

8 Y3 16 SPARE 100 1.00 0.10

40A,4P, 9 B3 16 2.5 2.5 POOL-L0610 1 90 90 LIGHT TYPE F-F3 1.00 0.09


100mA
10 R4 16 SPARE 100 1.00 0.10

11 Y4 16 SPARE 100 1.00 0.10

12 B4 16 SPARE 500 1.00 0.50

13 R5 16 SPARE 100 1.00 0.10

14 Y5 16 SPARE 100 1.00 0.10

40A,4P, 15 B5 16 SPARE 500 1.00 0.50


100mA R6 16 100 1.00 0.10
16 SPARE

17 Y6 16 SPARE 100 1.00 0.10

18 B6 16 SPARE 500 1.00 0.50

19 R7 16 SPARE 100 1.00 0.10

FCU-LG-126,17 REVISED AS PER TRA-SPE-TEC-AC-GEN-


20 Y7 20 4 4 ELEVATOR LOBBY LC00,SERVICE LOBBY 2 253 432 0.90 0.39
00030

21 B7 20 4 4 ELEVATOR LOBBY LC00,SERVICE LOBBY 100 100 CAV-R-LG-C 0.90 0.09


40A,4P,
100mA
VAV-LG-12-2,VAV-LG-12-4,VAV-LG-12-3)REVISED AS PER TRA-
22 R8 20 4 4 FITNESS(L-0201) 3 100 300 0.90 0.27
SBJ-RFI-EL-GEN-08443-00)

23 Y8 16 SPARE 200 0.90 0.18

24 B8 16 SPARE 500 0.90 0.45

25 R9 20 SPARE 1000 0.90 0.90


63A,TP, ISOLATOR

26 Y9 20 4 4 WOMEN CHANGE ROOM (L-0205) 1 1500 1500 HAND DRAWER 0.90 1.35
ELEVATOR LOBBY LC00, ELECTR RM
27 B9 20 4 4 5 200 1000 0.90 0.90
LC02,SERVICE LOBBY, IT ROOM LC03
40A,4P,
30mA 28 R10 20 4 4 MAN CHANGE ROOM (L-0202) 1 1500 1500 HAND DRAWER 0.90 1.35

FOR FAUCET SENSORS(20201119-SBJV-T-60026-L00,G00,L02-EL Public


29 Y10 20 4 4 MAN CHANGE ROOM (L-0202) 3 50 150 0.90 0.14
Area Toilet Automation EL IFC)
FOR FAUCET SENSORS(20201119-SBJV-T-60026-L00,G00,L02-EL Public
30 B10 20 4 4 WOMEN CHANGE ROOM (L-0202) 3 50 150 0.90 0.14
Area Toilet Automation EL IFC)

31 R11 1667 1.00 1.67


40A,4P,
32 Y11 20A TP 4 4 LOWER GROUND CORE C 1 5000 1667 AV-CC-LG-01 1.00 1.67
30mA
33 B11 1667 1.00 1.67

34 R12 SPACE

35 Y12 SPACE

36 B12 SPACE

37 R13 16 SPARE 200 1.00 0.20

38 Y13 16 SPARE 200 1.00 0.20

39 B13 16 SPARE 500 1.00 0.50


40A,4P,
100mA 40 R14 16 SPARE 200 1.00 0.20

41 Y14 16 SPARE 200 1.00 0.20

42 B14 16 2.5 2.5 POOL-L0610 57 19.2 1094.4 F-L20 1.00 1.09

43 R15 SPACE

44 Y15 16 2.5 2.5 PANTRY L-0611,STORAGE L-0211 6 21 126 LIGHT TYPE BD1 1.00 0.13

45 B15 SPACE

40A,4P, 46 R16 16 SPARE 100 100 1.00 0.10


100mA
PANTRY L-0608, L0607, CORRIDOR-L0609,MULTI
FUNCTION ROOM 1-L-0606,LOUNGE GROUND L0603, 14, 24,
47 Y16 16 2.5 2.5 6, 4,17.8, 8, 12, 8,8 1064 F-D6, F-D15,F-L8, F-D18,F-D29, F-D20, F-D30 1.00 1.06
MULTI FUNCTION ROOM-3-L-0602, MULTI FUNCTION 19.6,12.8,19,7
ROOM-2-L-0601

48 B16 SPACE
8.4,
49 R17 16 2.5 2.5 SHOWER-L-0208, POOL AREA L0610 5,31.5, 8, 7, 3 1077 F-D5, F-L20, F-D19, F-D16, F-F2 1.00 1.08
19.2,13.5,7.5,90
50 Y17 SPACE

40A,4P, 51 B17 SPACE


100mA
52 R18 SPACE

53 Y18 SPACE

54 B18 SPACE
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - TOTAL LOAD PER PHASE 8160 7405 6691 0.97 21.57
Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -
A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 22.26 KW
TOTAL LOAD (KW) 22.26
AMPS : 35.69 A
* - CIRCUIT BREAKER TYPE 1P44 COMMONDO (WITH TWIST LOCK)

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 14


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-RC-LG01-02 JOB REF.:
INCOMING CABLE SIZE : 1X4C 10 mm2 CU / XLPE/SWA/LSF+ 1X 1C 10 mm2, CU/G/Y/LSF ECC
LOCATION : ELEC.ROOM(LC02) MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-RC-LG01

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

20A ISO

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

W/H

D/W
SB
R Y B

1 R1 20 SPARE 700 1.00 0.70

2 Y1 20 SPARE 200 1.00 0.20

3 B1 16 2.5 2.5 STORAGE(L-0210, L-0209) 4 14 56 F-D13 (RFI-09455) 1.00 0.06

4 R2 16 2.5 2.5 CORRIDOR AREA 3 32 96 B-D1a ( RFI-09455) 1.00 0.10


40A,4P,
100mA
5 Y2 16 2.5 2.5 ELEVATOR LOBBY-LC00, CORRIDOR-L0609 64.2 19.2 1233 LIGHT TYPE-F-L8 1.00 1.23
40A,TP, ISOLATOR

F-D32(1), F-D28(4), F-L17(7.6), F-D12(2), F-


FITNESS-L0201, MAN CHANGE ROOM
1,4,15.2,4,46 16, 11.3,19.2 D13(2),F-L8(7.6), F-D30(32),F-L11(8.2),F-
6 B2 16 2.5 2.5 L0202,WOMEN CHANGING ROOM L- 1343 1.00 1.34
, 26.9,8,14 ,14,7,9.6,7.5,21 U4(12),F-D27(8),F-D23(2),F-T1(12), F-
0205,ELEVATOR LOBBY LC00,
L19(18.7),F-U5(2)

LANDSCAPE RESIDENTIAL FITNESS EGRESS


7 R3 16 4 4 14.2 , 2 8.5, 5 131 EX07,EX09 1.00 0.13
COURTYARD
8 Y3 SPACE
LANDSCAPE RESIDENTIAL FITNESS EGRESS
9 B3 16 4 4 4 6 24 EDL1 1.00 0.02
40A,4P, COURTYARD
100mA
10 R4 SPACE

11 Y4 SPACE

12 B4 SPACE

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - TOTAL LOAD PER PHASE 927 1433 1423 1.00 3.78
Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _
S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 3.78 KW
TOTAL LOAD (KW) 3.78
AMPS : 6.07 A
* - CIRCUIT BREAKER TYPE 1P44 COMMONDO (WITH TWIST LOCK)

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 15


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-RC-GR01-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 25mm2 CU / XLPE/SWA/LSF + 1X 1C 16 mm2, CU/G/Y/LSF ECC
LOCATION : ELEC.ROOM(GC02) MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-RC-LG01

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

20A ISO

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU
SIZE mm² SIZE mm²

FCU
INCOMER OF ELCB IN Amp. FACTOR LOAD(KW)

W/H

D/W
SB
R Y B

1 R1 16 2.5 2.5 IT ROOM GC03 2 22, 23 45 B-FL3,B-FL6 1.00 0.05

2 Y1 16 SPARE 200 1.00 0.20

3 B1 16 SPARE 100 1.00 0.10


40A,4P,
100mA
4 R2 16 SPARE 504 1.00 0.50

5 Y2 16 2.5 2.5 ELEC.ROOM GC02,SERVICE LOBBY 4,2,1 19, 52, 23 203 B-D2, B1, B-FL5( EI 1246 (EIP)) 1.00 0.20

6 B2 16 2.5 2.5 PANTRY G0103 3 21 63 B-D3 1.00 0.06

7 R3 20 4 4 PANTRY G0103 1 200 200 RLP-ITEM 4-ICE CUBER(EI-1267) 0.90 0.18

RLP-ITEM 15 TOWEL COOLER(EI-


8 Y3 20 4 4 PANTRY G0103 1 200 200 0.90 0.18
1267)

9 B3 20 4 4 VALET DESK 2 400 800 AS PER SDIR 0294 & RFI 12633 0.50 0.40
40A,4P,
30mA
10 R4 20 4 4 PANTRY G0103 2 400 800 SPARE SOCKETS(EI-1267) 1.00 0.80

RLP-ITEM 9 UNDER COUNTER


11 Y4 20 4 4 PANTRY G0103 1 600 600 1.00 0.60
FRIDGE(EI-1267)
12 B4 20 4 4 PANTRY G0103 1 200 200 RLP-ITEM 2 FLY KILLER(EI-1267) 1.00 0.20

13 R5 16 SPARE 100 1.00 0.10

14 Y5 20 4 4 LCP-RC-GR01-01 1 200 200 1.00 0.20

15 B5 16 SPARE 100 1.00 0.10


40A,4P,
100mA
16 R6 16 2.5 2.5 CORRIDOR G0100 16 7 112 LIGHT TYPE -F-U4 1.00 0.11

17 Y6 16 2.5 2.5 ELEVATOR LOBBY GC00 1, 4 1.6, 7 30 LIGHT TYPE -F-D32, F-D32 1.00 0.03

18 B6 16 2.5 2.5 ELEVATOR LOBBY GC00 38.8 19.2 745 LIGHT TYPE -F-L8 1.00 0.74

19 R7 16 SPARE 389 1.00 0.39

20 Y7 16 2.5 2.5 CORRIDOR G0100 35 19.2 672 1.00 0.67

21 B7 20 SPARE 1000 1000 1.00 1.00


40A,4P,
100mA
22 R8 20 4 4 ELEVATOR LOBBY GC00 1 100 100 VAV-R-GF-C 0.90 0.09

23 Y8 16 2.5 2.5 LIGHTING CANOPY 4 250 1000 1.00 1.00

24 B8 16 2.5 2.5 CANOPY LIGHTING 1 1000 1000 1.00 1.00

25 R9 32 2x4 2x4 CORRIDOR G0100 6 200 1200 RING 0.80 0.96


63A,TP, ISOLATOR

26 Y9 20 4 4 RECEPTACLE 4 200 800 0.80 0.64

27 B9 32 2x4 2x4 LIBARAY G0202 3 3 200 ,400 1800 RING 0.80 1.44
40A,4P,
30mA RLP ITEM 13 SPARE SOCKETS((EI-
28 R10 32 4 4 PANTRY G0103 3 400 1200 0.80 0.96
1267)
RLP ITEM 14 POS STATION((EI-
29 Y10 20 4 4 PANTRY G0103 1 400 400 0.80 0.32
1267)
RLP ITEM 12 BOTTLE DISPLAY
30 B10 20 4 4 PANTRY G0103 1 400 400 0.80 0.32
UNIT((EI-1267)

31 R11 16 SPARE 784 0.80 0.63

32 Y11 16 2.5 2.5 CORRIDOR G0100 35.8 36 1289 LIGHT TYPE F-L7 1.00 1.29

33 B11 20 4 4 FEMALE W.C-G0105, MALE TOLIET-G0104 2 200 400 0.90 0.36


40A,4P,
100mA
34 R12 20 4 4 ELEVATOR LOBBY GC00 2 100 200 CAV-R-GF-1A,CAV-R-GF-1B 0.90 0.18

35 Y12 20 SPARE 100 MOVE TO R3 0.80 0.08

36 B12 20 SPARE 100 MOVE TO Y3 0.80 0.08

FCU-G-19 REVISED AS PER TRA-


37 R13 20 4 4 SERVICE LOBBY GC01 1 253 253 0.90 0.23
SPE-TEC-AC-GEN-00030
40A,4P,
38 Y13 20 4 4 LOBBY (G-0203) 1 100 100 VAV-B1-27-07 0.90 0.09
100mA

39 B13 20 4 4 LOBBY (G-0203) 1 100 100 VAV-B1-27-06 0.90 0.09

40 R14 20 4 4 MAIL ROOM G0106 2 100 200 VAV-B1-27-02,VAV-B1-27-03 0.90 0.18


40A,4P,
41 Y14 20 4 4 MAIL ROOM G0106 1 100 100 VAV-B1-27-01 0.90 0.09
100mA

42 B14 20 4 4 LOBBY G0203 2 100 200 VAV-B1-27-04,VAV-B1-27-05 0.90 0.18

43 R15 16 SPARE 250 1.00 0.25

44 Y15 16 SPARE 15 0 1.00 0.00

45 B15 16 SPARE 300 300 1.00 0.30


40A,4P,
100mA XL13,XL5 (TRA-SPE-SDG-LT-G00-
46 R16 16 2.5 2.5 PODIUM FAÇADE LIGHTING RESI. PORTE COCHERE 32.6, 7.6 10,36.7 604.9 1.00 0.60
00102)
27.2, XL12,XL13,XL5 (TRA-SPE-SDG-LT-
47 Y16 16 2.5 2.5 PODIUM FAÇADE LIGHTING RESI. PORTE COCHERE 12, 10, 36.7 1005 1.00 1.01
40,7.6 G00-00102)
XSP1 (TRA-SPE-SDG-LT-G00-
48 B16 16 2.5 2.5 PODIUM FAÇADE LIGHTING RESI. PORTE COCHERE 10 4.1 41 1.00 0.04
00102)
XL-5,XL-13 (TRA-SPE-SDG-LT-G00-
49 R17 16 2.5 2.5 PODIUM FAÇADE LIGHTING RESI. PORTE COCHERE 7.6, 18.4 36.7, 10 462.9 1.00 0.46
00102)
40A,4P, XL-5,XL-13 (TRA-SPE-SDG-LT-G00-
50 Y17 16 2.5 2.5 PODIUM FAÇADE LIGHTING RESI. PORTE COCHERE 7.6, 27.6 36.7, 10 554.9 1.00 0.55
100mA 00102)
XL-14 (TRA-SPE-SDG-LT-G00-
51 B17 16 2.5 2.5 PODIUM FAÇADE LIGHTING RESI. PORTE COCHERE 16 10 160 1.00 0.16
00102)
52 R18 1333 1.00 1.33
40A,4P,
53 Y18 20A TP 4 4 GROUND FLOOR CORE C 1 4000 1333 AV-CC-GL-01 1.00 1.33
30mA

54 B18 1333 1.00 1.33

TOTAL LOAD PER PHASE 8738 8787 8842 0.93 24.41


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB- Sign Board _ D/W - Dish
Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 26.37 KW
TOTAL LOAD (KW) 26.37
AMPS : 42.29 A
* - CIRCUIT BREAKER TYPE 1P44 COMMONDO (WITH TWIST LOCK)

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 16


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-RC-GR01-02 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16 mm2 CU / XLPE/SWA/LSF+ 1X 1C 16 mm2, CU/G/Y/LSF ECC
LOCATION :GROUND LEVEL RESIDENTIAL LOBBY-CORE C MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-RC-LG01
CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE UNIT DEMAND DEMAND

EX. FAN

20A ISO

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA REMARKS

W A/C

S A/C

MISC
CCU

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² WATTS FACTOR LOAD(KW)

W/H

D/W
SB
R Y B

1 R1 32 SPARE 1 2607 2607 1.00 2.61


40A,4P,
100mA 2 Y1 20 SPARE 1 1602 1602 1.00 1.60

3 B1 20 SPARE 1 1830 1830 1.00 1.83

4 R2 1733 1.00 1.73


RLP ITEM 7 . UNDER COUNTER
40A,4P,
5 Y2 20A TP 4 4 PANTRY G0103 1 5200 1733 GLASS & DISH WASHER (ISO) (EI- 1.00 1.73
40A,TP, ISOLATOR

30mA
1267)
6 B2 1733 1.00 1.73

7 R3 200 1.00 0.20


40A,4P, RLP ITEM 16 . SPARE SOCKET(EI-
8 Y3 20A TP 4 4 PANTRY G0103 1 600 200 1.00 0.20
30mA 1267) (CKT FROM DB-RC-GR01-01)

9 B3 200 1.00 0.20


FOR FAUCET SENSORS(20201119-SBJV-T-
10 R4 20 4 4 FEMALE TOILET (G0105) 6 50 300 60026-L00,G00,L02-EL Public Area Toilet 0.90 0.27
Automation EL IFC)
40A,4P, FOR FAUCET SENSORS(20201119-SBJV-T-
30mA 11 Y4 20 4 4 MALE TOILET (G0104) 6 50 300 60026-L00,G00,L02-EL Public Area Toilet 0.90 0.27
Automation EL IFC)
12 B4 SPACE

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - TOTAL LOAD PER PHASE 4840 3835 3763 1.00 12.38
Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC
_ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 12.44 KW
TOTAL LOAD (KW) 12.44
AMPS : 19.95 A
* - CIRCUIT BREAKER TYPE 1P44 COMMONDO (WITH TWIST LOCK)

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 17


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-RB-2801-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 10mm2 CU / XLPE/SWA/PVC+ 1X 1C 10 mm2, CU/G/Y/PVC ECC
LOCATION : ELEC.ROOM(28B02) MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-RB-2801
CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

FCU/CAV
EX. FAN

20A ISO

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

W/H

D/W
SB
R Y B

1 R1 20 4 4 LCP-RB-2801 1 250 250 1.00 0.25

2 Y1 16 2.5 2.5 28TH FLR CORRIDOR LTG 57 710 1.00 0.71

3 B1 16 2.5 2.5 28TH FLR ELEV LOBBY LTG 25 609 1.00 0.61
40A,4P,
100mA
4 R2 16 2.5 2.5 28TH FLR AREA-2 LTG 6 72 432 1.00 0.43

5 Y2 16 2.5 2.5 28TH FLR AREA-2 ELEV LTG 3 72 216 1.00 0.22

6 B2 16 2.5 2.5 FAÇADE LIGHTING ENDWALL 02.3 1 609 609 1.00 0.61

28TH FLR
7 R3 20 4 4 2 100 200 0.90 0.18
FCU
40A,4P,
100mA 29TH FLR
8 Y3 20 4 4 1 100 100 0.90 0.09
FCU

9 B3 SPACE 0 0.00 0.00


28TH FLR
10 R4 20 4 4 2 50 100 0.90 0.09
CAV
40A,TP, ISOLATOR

40A,4P,
11 Y4 20 SPARE 200 0.90 0.18
100mA

12 B4 0 0.00 0.00

13 R5 20 4 4 28th FLR CORR. SOCKETS 4 200 800 0.50 0.40

14 Y5 20 4 4 28th FLR CORR. SOCKETS 2 200 400 0.50 0.20

15 B5 20 4 4 29th FLR CORR. SOCKETS 3 200 600 0.50 0.30


40A,4P,
30mA
16 R6 20 SPARE 200 0.50 0.10

17 Y6 20 SPARE 200 0.50 0.10

18 B6 SPACE 0 0.00 0.00

19 R7 16 2.5 2.5 FAÇADE LIGHTING ENDWALL 02.3 1 96 96 1.00 0.10

20 Y7 SPACE 1.00 0.00

21 B7 16 2.5 2.5 28th FLR BOH LTG 7 225 1.00 0.23


40A,4P,
100mA
22 R8 SPACE 0 0.90 0.00

23 Y8 16 SPARE 200 0.90 0.18

24 B8 16 2.5 2.5 29th FLR BOH LTG 7 225 0.90 0.20

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ TOTAL LOAD PER PHASE 2078 2026 2268 0.81 5.17
SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO-
Isolator_ MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 6.37 KW
TOTAL LOAD (KW) 6.37
AMPS : 10.22 A

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 18


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-RC-B101-SPH JOB REF.:
INCOMING CABLE SIZE : 1X4C 16 mm2 CU / XLPE/SWA/LSF+ 1X 1C 16 mm2, CU/G/Y/LSF ECC
LOCATION : VIP GARAGE MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-RC-LG01
CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

FCU/CAV
EX. FAN

20A ISO

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

W/H

D/W
SB
R Y B

1 R1 20 4 4 VIP GARAGE 1 500 500 ROLLER SHUTTER (RFI 18020) 1.00 0.50

2 Y1 1.00 0.00

3 B1 20 4 4 VIP GARAGE 1 500 500 ROLLER SHUTTER (RFI 18020) 1.00 0.50
40A,4P,
100mA
4 R2 16 SPARE 400 400 1.00 0.40

5 Y2 SPACE 1.00 0.00

6 B2 16 SPARE 400 400 1.00 0.40

7 R3 20 SPARE 400 400 1.00 0.40

8 Y3 SPACE 1.00 0.00

40A,4P, 9 B3 20 SPARE 400 400 1.00 0.40


100mA
10 R4 20 SPARE 400 400 1.00 0.40
63A,TP, ISOLATOR

11 Y4 SPACE 1.00 0.00

12 B4 20 SPARE 400 400 1.00 0.40

13 R5 20 SPARE 400 400 1.00 0.40


63A,4P,
14 Y5 63 SPARE 7400 7400 1.00 7.40
30mA

15 B5 20 SPARE 400 400 1.00 0.40

16 R6 20 SPARE 400 400 1.00 0.40


40A,4P,
17 Y6 SPACE 1.00 0.00
30mA

18 B6 20 SPARE 400 400 1.00 0.40

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ TOTAL LOAD PER PHASE 2500 7400 2500 1.00 12.40
SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO-
Isolator_ MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 12.40 KW
TOTAL LOAD (KW) 12.40
AMPS : 19.89 A

TRA-SBJ-TEC-EL-GEN-00180 (MDB-R-10 ) Page 19