You are on page 1of 11

Exam Title

: Nortel 922-089 : Communication Server 1000 Rls. 5.0 Upgrades for Engineers

Version : R6.1

www.prepking.com

Prepking - King of Computer Certification Important Information, Please Read Carefully


Other Prepking products A) Offline Testing engine Use the offline Testing engine product to practice the questions in an exam environment. B) Study Guide (not available for all exams) Build a foundation of knowledge which will be useful also after passing the exam. Latest Version We are constantly reviewing our products. New material is added and old material is updated. Free updates are available for 90 days after the purchase. You should check your member zone at Prepking and update 3-4 days before the scheduled exam date. Here is the procedure to get the latest version: 1.Go towww.Prepking.com 2.Click on Member zone/Log in (right side) 3. Then click My Account 4.The latest versions of all purchased products are downloadable from here. Just click the links. For most updates,it is enough just to print the new questions at the end of the new version, not the whole document. Feedback If you spot a possible improvement then please let us know. We always interested in improving product quality. Feedback should be send to feedback@Prepking.com. You should include the following: Exam number, version, page number, question number, and your login ID. Our experts will answer your mail promptly. Copyright Each PDF file contains a unique serial number associated with your particular name and contact information for security purposes. So if we find out that a particular PDF file is being distributed by you, Prepking reserves the right to take legal action against you according to the International Copyright Laws. Explanations This product does not include explanations at the moment. If you are interested in providing explanations for this exam, please contact feedback@Prepking.com.

www.prepking.com

1. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0. Which hardware component introduced with Rls. 5.0 takes the place of an SSC controller card in an MG1000E ? A. DSP Daughterboard B. Media Card 32 Port Security C. Call Processor Pentium Mobile D. Media Gateway Controller Card Answer: D 2. A customer is upgrading an existing Communication Server (CS) 1000E at Rls. 4.5 to a CS 1000E Rls. 5.0. Which two call processor pairs could the customer use in the upgraded system? (Choose two.) A. CP3 B. CP4 C. CP PIV D. CP PM Answer: CD 3. A customer is planning to upgrade an existing system to Communication Server (CS) 1000E running Rls. 5.0. The upgraded system will include a Commercial Off-the-Shelf (COTS) Server configured as a

Signaling Server. To take advantage of the features provided by the Enterprise Common Manager framework, which other two options can be deployed? (Choose two.) A. Linux Operating System and HP DL 320 B. Linux Operating System and ISP 1100 C. Linux Operating System and IBM306m D. VxWorks Operating System and HP DL 320 E. VxWorks Operating System and IBM306m F. VxWorks Operating System and ISP 1100 Answer: AC 4. A customer is planning to upgrade an existing Communication Server (CS) 1000E Rls. 4.5 system to a Communication Server (CS) 1000E Standard Availability (SA) running Rls. 5.0. They need to provide DSP ports for IP-to-TDM connectivity. In addition, they want to provide a secure media path to and from all DSP channels. Which cards should they order? (Choose two.)
www.prepking.com

A. ITG-Pentium (ITG-P) B. DSP Daughterboard C. Media Card 32-port (MC32) D. Media Card 32-port S (MC32S) Answer: BD 5. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to CS 1000E Rls. 5.0 Standard Availability (SA) . The customer has decided to install a CP-PM Signaling Server Card. What must be done to configure the CP-PM card as a Signaling Server? A. Set the S5 switch to Position 2 to enable Hard Disk for FMD .

B. Set the S5 switch to ON to enable 1gb of additional memory . C. Set the S5 switch to OFF to enable 512mb of additional memory D. Set the S5 switch to Position 1 to enable Compact Flash for FMD Answer: A 6. A customer is upgrading an existing Communication Server (CS) 1000M Multi-Group at Rls. 4.5 to CS 1000M Multi-Group Rls. 5.0. The customer has decided to install a CP-PM Signaling Server Card. Which card must the customer install? A. Single-slot CP PM SS card with hard drive B. Single-slot CP PM SS card without hard drive C. Dual-slot CP PM SS card with hard drive D. Dual-slot CP PM SS card without hard drive Answer: C 7. A customer with multiple system types at various locations would like to upgrade their entire network to Communication Server (CS) 1000 Rls. 5.0. Each location is currently running CS 1000 Rls. 4.5. . .

Which two locations would require call processor upgrades in order to be eligible for an upgrade to Rls. 5.0? (Choose two.) A. Site A - CS 1000S SSC B. Site B - CS 1000M CP4 C. Site C - CS 1000E CP-PII D. Site D - CS 1000E CP-PIV Answer: AB 8. A customer is upgrading an existing Communication Server (CS) 1000S Rls. 4.5 to a CS 1000E Rls. 5.0 with a single Media Gateway 1000E chassis. In this configuration, which slot in the Media Gateway houses the Media Gateway Controller Card? A. Slot 0 B. Slot 1
www.prepking.com

C. Slot 2 D. Slot 3 Answer: A 9. A customer is upgrading an existing Communication Server (CS) 1000S Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability (SA) with a single Media Gateway 1000E chassis. Which component must be replaced on the Media Gateway 1000S in order to complete the upgrade? A. SSC Card B. Call Server C. Voice Gateway Media Card D. Nortel ISP 1100 Signaling Server Answer: A 10. A customer is upgrading an existing Communication Server (CS) 1000E Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability (SA) . What can the customer do to keep the SSC card with some limitations? A. Keep the SSC card in the existing Rls. 4.5 Call Server. B. The SSC card must be replaced when upgrading to Rls. 5.0. C. Keep the SSC card in the existing Rls. 4.5 Media Gateway 1000E. D. Keep the existing SSC card in the MG 1000T gateway being migrated into the CS 1000E system. Answer: C 11. A customer is upgrading an existing Media Gateway (MG) 1000B Rls. 4.5 to an MG 1000B Rls. 5.0. Which component must be replaced to complete the upgrade? A. SSC Card B. Call Server C. Voice Gateway Media Card D. Nortel ISP 1100 Signaling Server Answer: A 12. A customer is installing a new Communication Server (CS) 1000E Rls. 5.0 High Availability (HA). customer wants Advanced Call Center Services but does not require networking. Which Software Service Level should they order? A. Premium Service Package B. Business Service Package C. Enhanced Service Package D. Enhanced Business Service Package Answer: C 13. A customer is upgrading an existing Communication Server (CS) 1000E at Rls. 4.5 to CS 1000E Rls.
www.prepking.com

The

5.0 High Availability (HA). The customer has decided to keep the CP-PII call processor. What is the maximum number of Media Gateway 1000E systems supported in this configuration? A. 15 B. 25 C. 30 D. 50 Answer: C 14. A customer is upgrading a Meridian 1 Option 81C Rls. 4.5 equipped with a CP4 processor to a Communication Server (CS) 1000M Multi-Group. Which option is available for the call processor? A. CP-PM B. CP PII C. CP PIV D. 68060E Answer: C 15. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability (SA) with a single Media Gateway 1000E chassis. As part of this upgrade, a CP-PM Call Server Card has been added. What happens to the Terminal Number (TN) format during the upgrade? A. The format used by the small system (Card-Unit) is retained. B. It is automatically converted to the large system format of Loop-Shelf-Card-Unit for IP Phones only. C. It is automatically converted to the large system format of Loop-Shelf-Card-Unit for all assigned TNs. D. It must be changed to the large system format of Loop-Shelf-Card-Unit through manually re-programming all devices assigned TNs. Answer: C 16. A customer is upgrading an existing Media Gateway (MG) 1000T to a Communication Server (CS) 1000E and maintaining it in autonomous (standalone) mode. What best describes this upgrade? A. This upgrade is not a valid option in Rls. 5.0. B. The MG 1000T Call Server is upgraded to a CP-PM Call Server and all other hardware remains . C. The MG 1000T is upgraded to Rls. 5.0 maintaining all hardware but will require a new processor swap-out in the next release . D. The MG 1000T SSC Gateway Controllers are replaced by Media Gateway Controllers, one CP-PM CS is added, and the PRI Cards are maintained. Answer: D
www.prepking.com

17. A customer is upgrading a Communication Server (CS) 1000E Rls. 4.5 system to a Communication Server (CS) 1000E Rls. 5.0 High Availability system. They wish to provide backup Terminal Proxy Server (TPS) services in case of a Signaling Server failure. Which component does not provide backup TPS services? A. ITG-Pentium (ITG-P) B. DSP Daughterboard C. Media Card 32-port (MC32) D. Media Card 32-port S (MC32S) Answer: B 18. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0. They wish to utilize Media Security (SRTP). Which new hardware components can be used to replace the Voice Gateway Media Cards to support this requirement? (Choose two.) A. DSP Daughterboard B. Call Processor Pentium Mobile C. Commercial Off-the-Shelf Server D. Media Gateway Controller Card 32 E. Media Card 32S (MC32S) Answer: AE 19. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to CS 1000E Rls. 5.0 (SA). The customer has decided to install a CP-PM Call Server Card. What must be done to configure the CP-PM card as a call server? A. Set the S5 switch to Position 1 to enable Compact Flash for FMD. B. Set the S5 switch to Position 2 to enable Hard Disk for FMD. C. Set the S5 switch to ON to enable 1gb of additional memory. D. Set the S5 switch to OFF to enable 512mb of additional memory. Answer: A 20. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 and does not require enhanced security features. Which new hardware component would need to replace the Voice Gateway Media Cards to complete the upgrade? A. Media Card 32S B. DSP Daughterboards C. Media Gateway Controller Card D. Voice Gateway Media Gateway Cards can be re-used.
www.prepking.com

Answer: D 21. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with a Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into the CS 1000E and then upgrade the system to Rls. 5.0. Which component must be replaced in this situation? A. MG 1000E VGMC B. MG 1000E Call Server C. MG 1000T SSC cards D. MG 1000E SSC cards Answer: C 22. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with an Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into the CS 1000E and then upgrade the system to Rls. 5.0. The system Signaling Server is Nortel ISP 1100. What must be done to the Signaling Server to complete the upgrade? A. Upgrade Signaling Server software to Rls. 5.0 only. B. Replace hardware with a COTS or CP-PM Signaling Server. C. Upgrade to 1GB memory, then upgrade the software to Rls. 5.0. D. Upgrade to 1GB memory, add the new hard drive, then upgrade to Rls. 5.0. Answer: C 23. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with a Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into the CS 1000E and then upgrade the system to Rls. 5.0. Which two statements are true with regards to the MG 1000E Rls. 4.5 Voice Gateway Media Card? (Choose two.) A. The Voice Gateway Media Card in the MG 1000E is no longer needed. B. The Voice Gateway Media Card in the MG 1000E can remain at Rls. 4.5. C. The Voice Gateway Media Card in the MG 1000E can be upgraded to support Rls. 5.0. D. The Voice Gateway Media Card in the MG 1000E must be replaced if Secure Media SRTP is required . Answer: CD 24. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with a Media Gateway (MG) 1000T is planning to migrate the functionality of the MG 1000T into the CS 1000E and then upgrade the system to Rls. 5.0. Which statement regarding this particular upgrade situation is false? A. The PRI cards in the MG 1000T must be replaced. B. All PRI and DSP resources have to be added to the CS 1000E database.
www.prepking.com

C. All MG 1000T chassis are added to the CS 1000E as new IP Media Gateways. D. The NARS/BARS database on the MG 1000T must be replicated on the CS 1000E. Answer: A 25. A customer is upgrading an existing Communication Server (CS) Rls. 4.5 Media Gateway (MG) 1000T with an expansion, converting it into a stand-alone CS 1000E Rls. 5.0 with two IP Media Gateways. This upgrade includes a Media Gateway Controller card with two low-density DSP daughterboards per Media Gateway. How many DSP channels does this configuration provide per Media Gateway? A. 8 B. 16 C. 32 D. 64 Answer: D 26. A customer would like to upgrade their Communication Server (CS) 1000E Standard Availability system to a High Availability (HA) system. What is the mimimum requirement to consider the system a CS 1000E-HA? A. Dual Signaling Servers B. Alternate Call Servers with Automated database Replication C. Dual Call Processors using an SLAN for database sychronization D. Dual Call Processors using a High Speed Pipe (HSP) for database sychronization Answer: D 27. A customer would like to upgrade their Communication Server (CS) 1000E Standard Availability system to a High Availability (HA) system. If HA Package 410 is not present in the keycode, which two outcomes will result? A. An error occurs, and the customer must reboot the existing Call Server. B. The existing Call Server software is modified to block the HSP connection. C. The first CP-PM Call Server recognizes the second CP-PM Call Server, and the system runs as a High Availability system. D. The CP-PM Call Server runs as a single core system, even if the system has two cores and the HSP ports on both cores are connected. Answer: BD 28. A customer would like to upgrade their Communication Server (CS) 1000E Standard Availability system to a High Availability system. To function properly, the new keycode file must be loaded on which server(s)? A. the new CP-PM Call Server only
www.prepking.com

(Choose two.)

B. the existing CP-PM Call Server only C. both CP-PM Call Servers that utilize the SLAN D. both CP-PM Call Servers that utilize the High Speed Pipe (HSP) Answer: D 29. A customer has two office locations (sites A and B) that require a Communication Server (CS) 1000 Rls. 5.0 solution. Site A will have a CS 1000M Rls. 5.0 system with 500 IP Phone users, and site B will have a CS 1000M MG Rls. 5.0 system with 600 IP Phone users. The sites are 15 kilometers (9 miles) apart. The customer requires redundancy for IP Clients across the systems. Which redundancy configuration could provide this functionality? A. Campus Redundancy B. Signal Server Redundancy C. 1 + 1 Geographic Redundancy D. Controlled Load-Sharing Configuration Answer: D 30. When designing a Survivable Media Gateway geographic redundancy scheme for a Communication Server 1000E Rls. 5.0 system, how many survivable gateways can participate in automated database duplication? A. 5 B. 25 C. 50 D. 100 Answer: C

www.prepking.com

100% Pass Guaranteed or Full Refund Word to Word Real Exam Questions from Real Test Buy full version of exam from this link below http://www.prepking.com/922-089.htm

You might also like