You are on page 1of 323

ENGINEERING

STANDARDS
MANUAL
WATER OPERATING DIVISION
Los Angeles Department of Water and Power
(
ENGINEERING
STANDARDS
MANUAL
DEPARTMENT OF WATER AND POWER
CITY OF LOS ANGELES
SECOND EDITION
EFFECTIVE
AUGUST 3, 1992
TABLE OF CONTENTS
ENGINEERING STANDARDS
CHAPTER 1 - GENERAL
section
1.01
1.02
1. 03
1.04
1.05
1.06
Title
Authority
Effective Date of Standards
Revisions, Amendments or Additions
Organization and Interpretation of Standards
Definitions
Abbreviations
CHAPTER 2 - MAIN EXTENSIONS
section
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.ll
2.12
2.13
2.14
2.15
Title
Inside Los Angeles
outside Los Angeles
Engineering Standards to Apply
Application Procedure
Engineering
Plans and Specifications
Permits
construction Procedure
surveying
Placing survey Lines
Inspection
contractors and Applicants
A) Qualification
B) Letter of Credit
C) Guarantee of Workmanship, Materials,
and Equipment
Points of Delivery
Special conditions
Exceptions Under Chapter Two
CHAPTER 3 - SYSTEM DESIGN
Section
3.01
3.02
3.03
3.04
3.05
Title
General
Sizing of Distribution Mains
Operating Pressures Within the Distribution
system
Pressure Regulating stations
Storage Facilities
A) General
B) Environmental Documentation
C) Engineering and Geology
D) General Design criteria
CHAPTER 3 - SYSTEM DESIGN (Cont.)
3.06
3.07
3.08
Pumping Facilities
A) General
B) Environmental Documentation
C) Engineering and Geology
D) General Design Criteria
Telemetry and Control Systems
Connections to the Existing Distribution
system
CHAPTER 4 - EASEMENTS AND USE OF DEPARTMENT PROPERTY
section
4.01
4.02
4.03
4.04
Title
General
Procedure for Granting Easements to the
Department During Recordation of Subdivision
Procedure for Granting Easements to the
Department Not in Connection with Recordation
of Subdivision
A) Procedure
B) Approval of construction Plans
C) Acceptance of Main Extension
Procedure for Obtaining Permission to Use or
Cross Department Property
A) Procedure
B) Fees
CHAPTER 5 - LAYOUT AND DESIGN OF TWELVE-INCH (12") AND
SMALLER DISTRIBUTION MAINS
section
5.01
5.02
5.03
5.04
5.05
5.06
Title
General
Layout of the Distribution System
A) Width Requirements for Main Installation
B) Dedicated Streets
C) Easements
D) Alleys
E) Fire Hydrants
F) Line Valves
Materials and Testing
Sizing and Selection of Pipe
Pipe Fittings
A) Joints
B) Closure Fittings
C) Repair Fittings
D) Miscellaneous Pipe Fittings
E) Tapping Sleeves
F) Line Valves
G) Check Valves
Fire Hydrants
CHAPTER 5 - LAYOUT AND DESIGN OF TWELVE-INCH (12") AND
SMALLER DISTRIBUTION MAINS (Cont.) ~
5.07
5.08
5.09
5.10
5.11
5.12
5.13
5.14
Corrosion Mitigation
A) Polyethylene Encasement Material
B) Cathodic Protection
Blow-offs
Steel Pipe Standpipes and Maintenance Holes
Reinforcement of Openings in Welded Steel
Pipe
Thrust Blocks
Length of Restrained Pipe
Protective Concrete Slabs Over Pipe
Casing Pipe
CHAPTER 15 - SERVI CE LATERALS AND METERS
section
6.01
6.02
6.03
6.04
6.05
6.06
6.07
6.08
6.09
6.10
6.11
6.12
Title
General
Ownership and Maintenance
A) Ownership
B) Maintenance
C) Repair Services Available
Layout
Combination Service Laterals
Pumps
Service Taps
A) On Existing Water Mains
B) On New Water Mains
C) Tapping
D) Tapping Sleeves and Tees
E) Insulation
Service Laterals
A) Size
B) Pipe Material
C) Installation
Corporation Valves, Curb Valves, and Bronze
Fittings
Gate Valves and Standpipes
Meters
A) Type of Meters
B) positive Displacement Type Water Meters
C) Compound and Turbine Meters
D) Detector Check Valves
E) F.M. (Factory Mutual) Meters
F) Meter Setting
G) Meter Bypass Lines
Residential Meter Boxes and Covers
Large Service Vaults
A) Plastic Vaults
B) Precast Concrete Vaults
C) Grout-Filled Concrete Block Vaults
CHAPTER 6 - SERVICE LATERALS AND METERS (Cont.)
6.13
6.14
Backflow and Backflow Prevention Devices
On-Site Mains for Fire Services and
F.M. Services
CHAPTER 7 - EARTHWORK
section
7.01
7.02
7.03
7.04
7.05
7.06
7.07
7.08
7.09
7.10
7.11
7.12
7.13
7.14
Title
Earthwork Defined
Exploratory Excavation
Road Preparation
Excavation to Line and Grade
Trenching Operations
A) Trench Width
B) Trench Support
Excavation for structures
Surplus Excavation Material
Blasting
Dewatering
Foundations on Unstable Soil
Pipe Bedding
A) Installation of Bedding and Pipe
B) Bedding Material
Backfill and compaction
A) Pipes
B) Structures
Cleanup
Surface Restoration
A) Unsurfaced Areas
B) Surfaced Areas
C) Easements, cultivated or Agricultural
Areas
CHAPTER 8 - PIPE INSTALLATION
section
8.01
8.02
8.03
8.04
8.05
8.06
8.07
8.08
8.09
8.10
Title
Approval by the Department
Handling of Materials
Preparation and Inspection of pipe and
Fittings for Installation
Pipe Joint Lubricant
Cutting and Fitting of Pipe
Pipe Alignment and Grade
Deviation from Alignment and Grade Occasioned
by Other Structures
Temporary Bulkheads
Excavation, Bedding and Backfill
Ductile Iron Pipe
A) Push-On Joint
B) Flanged Joint
CHAPTER 8 - PIPE INSTALLATION (Cont.)
8.11
8.12
8.13
8.14
8.15
8.16
8.17
8.18
8.19
8.20
8.21
8.22
8.23
8.24
8.25
8.26
8.27
C) Caulk Joint
D) Mechanical Couplings
E) Polyethylene Encasement
Steel Pipe
A) Welded Joint
B) Flanged Joint
C) coating
D) Mechanical Couplings
E) Insulating Flanges
F) Cathodic Protection
Installation of Joint-Restraint Fittings
Installation of Valves
Installation of Valve Standpipes
Installation of Fittings
Installation of Tapping Sleeves
Installation of Blow-Offs
Criteria for the Separation of Water Mains
and Sanitary Sewers
A) Basic Separation Standards
B) Exceptions to Basic Separation Standards
C) Special Provisions
D) Alternate criteria for Construction
E) Notes and Definitions
Fire Hydrants
A) Installation
B) Corrosion Protection
Miscellaneous Metalwork and Piping
Thrust Blocks
A) Installation
B) Form Work
C) Minimum Curing Time
D) Compaction of Fill Over Thrust Blocks
Concrete structures
A) Form Work
B) Workability of Concrete
C) Mixing and Placing Concrete
D) Finishing concrete
E) Curing and Protecting Concrete
Reinforcing Steel for Concrete Structures
A) Installation
B) Placing of Reinforcing Steel
Hydrostatic Testing
Disinfection
Connections to the Department's System
A) Connections
B) Operation of Valves
C) Interruption of service
Acceptance and Release for Wet Taps
CHAPTER 9 - SIXTEEN-INCH (16") AND TWENTY-INCH (20") SUPPLY
MAINS
section
9.01
9.02
9.03
9.04
Title
General
other Standards to Apply
Design
Installation
CHAPTER 10 - TWENTY-FOUR-INCH (24'" AND LARGER TRUNK LINES
Section
10.01
10.02
10.03
10.04
10.05
10.06
Title
General
Other Standards to Apply
Preliminary Investigation
Design
Plans and Specifications
Installation
TABLE OF CONTENTS
MATERIALS SPECIFICATIONS
Page Number
Part A
Al-l thru Al-4
A2-1 thru A2-4
Part B
B1-1 thru Bl-8
Bl-9 thru Bl-14
B2-1 thru B2-4
B3-1
B4-1 thru B4-27
B5-1 thru B5-2
B6-1 thru B6-3
B7-1 thru B7-3
B8-1 thru B8-]
B9-1 thru B9-2
Material Specification Lists
0.1 Pipe Material Specification List
Steel Pipe Material Specification List
Material specifications
Spec. W 138 - Standard Specifications
for Fittings: Cast Iron Water Works
Spec. W 206 - Standard Specification for
Fittings: Ductile Iron, Waterworks,
Rubber Gasket Joint
Spec. W 220 - Standard Specifications
for Tapping Sleeve with Flanged Outlet:
Asbestos-Cement, Cast Iron, and Ductile
Iron Pipe
Spec. W 245 - Standard Specifications
for Lead: Common Grade for Caulking
Spec. W 302 - Standard Specifications
for Pipe: Steel, Electric-Fusion, Butt-
Welded, Lined and Coated
Spec. G 331 - Standard Specifications
for Cement: Portland, Type II
Spec. G 391 - Standard Specifications
for Aggregate: For Concrete and Other
Uses
Spec. W 1021 - Standard Specifications
for Tubing: Copper water
Spec. W 1022 - Standard Specifications
for Fittings: Bronze Water Works,
2-Inch and Smaller
Specifications for Bronze Service Clamps
for Asbestos-Cement or cast-Iron Water
Pipe
MATERIALS SPECIFICATIONS (Cant.)
Page Number
B10-1 thru B10-2 Specifications for Magnesium Anodes
Packaged with Backfill
B11-1 Specifications for 1-Inch and 1-1/2-Inch
Steel Welded Couplings
B12-1 Specifications for 2-Inch Cast Iron
Companion Threaded Flanges
STANDARD DRAWINGS
Standard
Sheet Drawing
Number Number
1 A9430
2A-2B A9431-1
A9431-2
3 A9432
4 A9433
5 A9434
6 A9435
7 A9436
8 A9437
9 A9438
10 A9439
11 A9440
12 A9441
13 A9442
14 A9194
15 A9443
16 A9444
17 A9445
TABLE OF CONTENTS
Title
Linestyle Standard
Standard Drafting Symbols
List of Common Pipe and Fitting Terms
Common Main Extension Plan Abbreviations
Suggested Use of Pipe Material
Typical Trench section
Typical Substructure crossing Detail
Sewer and Water Main Parallel Separation
Sewer and Water Main Perpendicular
Separation
Table of Allowable Joint Deflection in
Steel Pipe
Polyethylene wrap Installation
Instructions
Concrete Thrust Block Bearing Surface
and Installation
Standpipe for 4"-12" Line Valves
Anchor Box Assembly for Mechanical
Coupling Sizes 6" Thru 12" Only
2" stop-Cock and Blow-Off Installation
for D.1. Pipe
2" stop-Cock and Blow-Off Installation
for Steel Pipe
2" Bypass for 8" and 12" Line Valves in
D.1. Pipe
STANDARD DRAWINGS (Cont.)
Sheet
Number
18
19
20
21
22
23
24
25
26
27A-27D
28A-28D
29A-29B
30
31
32
33
34
Standard
Drawing
Number
A9446
A9447
A9448
A9449
A9450
A9451
A9452
A9453
A9454
A9455-1
A9455-2
A9455-3
A9455-4
A9456-1
A9456-2
A9456-3
A9456-4
A9457-1
A9457-2
A9458
A9459
A9460
A9461
A9462
Title
2" Bypass for 6
ft
, stl,
and 12" Line
Valves in Steel Pipe
2" Air Valve Installation for D.I. Pipe
2" Air Valve Installation for Steel Pipe
Check valve Installation for D. I. Pipe
Check Valve Installation for Steel Pipe
D.I. Pipe Connections to Existing A.C.,
C.l., or D.I. Pipe
D.I. Pipe connections to Existing Steel
Pipe
Steel Pipe connections to Existing A.C.,
C.I., or D.l. Pipe
steel pipe Connections to Existing Steel
Pipe
Steel Pipe Corrosion Mitigation Notes
and Details
Double-Outlet Fire Hydrant Installation
For D.I., C.l., and Steel Pipe
2-1/2" Built-Up Fire Hydrant Installation
Fire Hydrant Connection to Steel Pipe
2-Post Fire Hydrant Guard
3-Post Fire Hydrant Guard
Fire Hydrant Retaining Wall
Blow-off Installation for 16" and Larger
Steel Pipe
STANDARD DRAWINGS (Cont.)
Sheet
Number
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
standard
Drawing
Number Title
A9463 Air Valve Assembly
A9013 18" Welded steel Pipe Maintenance Hole
A9464 Standpipe for 16" and Larger Line Valves
A9465 1" Domestic Service Installation
(D.1. Pipe)
A9466 1" Domestic Service Installation
(st!. pipe)
A9467 1-1/2" Domestic Service Installation
(D.1. pipe)
A9468 1-1/2" Domestic Service Installation
(st!. pipe)
A9469 2" Domestic Service Installation
(D.I. pipe)
A9470 2" Domestic Service Installation
(st!. pipe)
A9471 No. 3 concrete Meter Box
A9472 3" Equivalent Service in Plastic
Meter Boxes
A9473 3" Equivalent Service in concrete
Meter Box
A9474 2" Fire Service Installation (D.I. Pipe)
A9475 2" Fire Service Installation (st!. Pipe)
A9476 corporation Valve Installation
(D.1. pipe)
A9477 corporation Valve Installation
(Steel pipe)
A9478 4" Domestic Service in Plastic Vault
(D.1. Pipe)
STANDARD DRAWINGS (cant.)
Sheet
Number
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
Standard
Drawing
Number Title
A9479 4" Domestice Service in Plastic Vault
(Stl. Pipe)
A9480 4" Fire Service in Plastic Vault
(D. I. Pipe)
A9481 4" Fire Service in Plastic Vault
(Stl. Pipe)
A9482 6" Fire Service in Plastic Vault
(D. I. Pipe)
A9483 6" Fire Service in Plastic Vault
(Stl. Pipe)
A9484 8" Fire Service in Plastic Vault
(0.1. Pipe)
A9485 8" Fire Service in Plastic Vault
(stl. Pipe)
A9486 10" Fire service in Plastic Vault
(D.I. Pipe)
A9487 10" Fire service in Plastic Vault
(stl. Pipe)
A9488 4" Domestic service in Precast concrete
Vault (0.1. Pipe)
A9489 4" Domestic service in Precast concrete
Vault (stl. Pipe)
A9490 6" Domestic Service in Precast. Concrete
Vault (0.1. Pipe)
A9491 6" Domestic service in Precast Concrete
Vault (Stl. Pipe)
A9492 4" Fire Service in Precast Concrete
Vault (D.I. Pipe)
A9493 4" Fire Service in Precast Concrete
Vault (Stl. Pipe)
STANDARD DRAWINGS (Cont. )
Standard
Sheet Drawing
Number Number Title
67 A9494 6" Fire Service in Precast Concrete
Vault (D. I. Pipe)
68 A9495 6" Fire Service in Precast Concrete
Vault (st!. Pipe)
69 A9496 8" Fire Service in Precast Concrete
Vault (D. I. Pipe)
70 A9497 8" Fire Service in Precast Concrete
Vault (St!. Pipe)
71 A9498 10" Fire Service in Precast Concrete
Vault (D. I. Pipe)
72 A9499 10" Fire Service in Precast Concrete
Vault (Stl. Pipe)
73 A9500 4" Domestic Service in Block-Type
Vault (D. I. Pipe)
74 A9501 4" Domestic Service in Block-Type
Vault (st!. Pipe)
75 A9502 6" Domestic Service in Block-Type
Vault (D. I. Pipe)
76 A9503 6" Domestic Service in Block-Type
Vault (st!. Pipe)
77 A9504 4" Fire Service in Block-Type Vault
(D. I. Pipe)
78 A9505 4" Fire Service in Block-Type Vault
(Stl. pipe)
79 A9506 6" Fire Service in Block-Type Vault
(D. I. Pipe)
80 A9507 6" Fire Service in Block-Type Vault
(St!. Pipe)
81 A9508 8" Fire Service in Block-Type Vault
(D. I. Pipe)
STANDARD DRAWINGS (Cant.)
Sheet
Number
82
83
84
85
86
87
Standard
Drawing
NUltlber
A9509
A9510
A9511
81985-S-1
D4353-S-1A
A9302
Title
8" Fire Service in Block-Type Vault
(Stl. Pipe)
10" Fire Service in Block-Type Vault
(D.I. Pipe)
10" Fire Service in Block-Type Vault
(Stl. Pipe)
Domestic and Fire Service Standard
Vaults - Plan and Elevation
Domestic and Fire Service Standard
Vaults - Top Slab Reinforcing
concrete Box Form Lumber
APPENDIX
Exhibit
1
2
3
4
5
TABLE OF CONTENTS
Title
Sample Acknowledgement Letter
Request for Contractor Prequalification
Standard Dedication Certificate for Roadway
Easements
Standard Dedication Certificate for Non-
Roadway Easements
Sample Agreement for Installation and
Transfer of Title of Water System Facilities
CHAPTER 1
GENERAL
1. 01 AUTHORITY
These Standards are promulgated by the Engineer in
Charge of Water Operating Division of the Department of Water and
Power ("Engineer").
These Standards apply to the preparation of the plans
and specifications for the installation of all water distribution
facilities under the control of the Engineer. Such control will
be exercised under authority granted by the Soard of Water and
Power Commissioners of the City of Los Angeles ("Soard") and in
accordance with the "Rules Governing Water and Electric Service
in the City of Los Angeles."
Any variance from these Standards that occurred or was
authorized in the past or that may be authorized in the future,
shall not restrict or limit the Department in the exercise of its
lawful powers. No action in violation of these Standards by any
person making any connection, disconnection, repair, or otherwise
doing work with respect to any water facility served with water
from the Distribution System, shall continue after discovery of
such violation, or the enforcement of corrective action pertain-
ing to such violation.
1.02 EFFECTIVE DATE OF STANDARDS
These Standards are effective August 3, 1992, and shall
supersede all former Engineering Standards of the Water operating
Division which are in conflict herewith.
1.03 REVISIONS. AMENDMENTS OR ADDITIONS
These Standards may be revised, amended, or added to,
and such revisions, amendments, and additions shall be binding
and of full force and effect when printed and distributed to the
holders of previous editions.
1. 04 ORGANIZATION AND INTERPRETATION OF STANDARDS
These Standards are composed of written Engineering
standards, Materials Specifications, Standard Drawings, and
Appendix. The interpretation of any section, or of differences
between sections, when appropriate, shall be made by the Engineer
Revised 07-92
or his or her
interpretation
application.
1.05 DEFINITIONS
1-2
authorized representative, and his
shall be binding and controlling
or
in
her
its
As used in these Standards, except where noted, the
words defined in this paragraph shall have the meanings herein
ascribed:
A. Applicant: Any person, association, corporation, en-
tity, or government agency desiring water service for
premises under their control which the Department is
obligated to serve; often a subdivider or developer.
B. Board: The Board of water and Power Commissioners of
the City of Los Angeles.
C. Contractor: In the context of these Standards, a con-
tractor employed by the Applicant to install a main ex-
tension.
D. Department: The plant, facilities, system assets, and
personnel controlled by the Board pursuant to its
Charter authority.
E. Design Engineer: The Professional Engineer (registered
by the state of California) employed by the Applicant
to design, prepare plans, and conduct related engineer-
ing activities necessary to complete a main extension.
Also referred to as applicant's engineer.
F. Distribution Main: A twelve-inch (12") or smaller di-
ameter p1pe along public streets or appropriate
right-of-way generally used for distributing water to
individual consumers.
G. Distribution System: Water Mains, together with all
appurtenant and necessary valves, fire hydrants, me-
ters, service laterals t and associated -material and
equipment which carry potable water and distribute it
to individual consumers.
H. Engineer: The Engineer
Operating Division (or his
tative) .
in Charge of the water
or her authorized represen-
I. Inspector: The authorized representative of the
Engineer assigned to a jobsite.
Revised 07-92
1-3
J. Los Angeles: The terr i torial limits of the city of
Los Angeles, inside which the Department has complete
control of the Distribution System, including owner-
ship, construction, operation, and maintenance of all
facilities, reading of meters, and billing of
customers.
K. Main Extension: An extension to the Distribution
System that is needed to serve a new development, in-
cluding replacement of an existing portion of the
Distribution System.
L. Private Pipe Extension: An extension that provides
on-site domestic service or fire protection service on
the consumer's side of the Department's water meter.
M. Section: The words Section and Division are used as
organizational subdi visions of the Department (e. g. ,
Planning Section, Water Operating Division, etc.).
N. Service Lateral: The pipe or tubing, fittings, valves,
and appurtenances necessary to convey water from the
Water Main to the Department's meter.
O. Supply Main: A greater than twelve-inCh (12") but
smaller than twenty-four-inch (24") diameter p ~ p e gen-
erally receiving potable water from a Trunk Line, pump-
ing station or storage facility which delivers water to
Distribution Mains or distributes it to individual con-
sumers.
P. ~ : Physical connection to a Water Main which, to-
gether with appropriate metering, effects water service
to individual consumers.
Q. Total Service Area: Los Angeles and the area surround-
ing Los Angeles where the Department is responsible for
the construction, operation, and maintenance of the
Distribution system, reading of meters, and billing of
customers in a manner like that within the City of Los
Angeles.
R. Trunk Line: A twenty-four-inch (24") or larger diame-
ter pipe carrying raw or potable water from or to
treatment facilities and storage reservoirs, and to de-
livery points which feed Supply and Distribution Mains.
May also, with approval of the Engineer, distribute
water to individual consumers.
S. Water Main: A Distribution or Supply Main.
Revised 07-92
1-4
1.06 ABBREVIATIONS
All references to documents or specifications shall be
the latest edition or revision thereof. -
A. A.A.S.H.T.O.: American Association of state Highway
and Transportation Officials
B. A.C.: Asbestos Cement
C. A.N.S.I.: American National Standards Institute, Inc.
D. A.S.T.M.: American Society for Testing and Materials
E. A.W.W.A.: American water Works Association
F. C. I : Cast Iron
G. ~ . G . : Center of Gravity
H. D. I. : Ductile Iron
I D. W P. : Department of Water and Power
J. DWPWS: Department of water and Power, water system
K. I.S.A.: Instrument Society of America
L. N.E.C.: National Electrical Code
M. N.E.M.A.: National Electrical Manufacturer's Association
N. O,S.H.A.: Occupational Safety and Health Administration
o. P.V.C.: Polyvinyl Chloride
P. S.A.E.: Society of Automotive Engineers
Revised 07-92
CHAPTER 2
MAIN EXTENSIONS
2.01 INSIDE LOS ANGELES
The Board has complete charge and control of its
Distribution System inside the City of Los Angeles under the
prov is ions of the Charter. The Department, under author i ty
extended by the Board, owns, operates, and maintains all
facilities within Los Angeles.
2.02 OUTSIDE LOS ANGELES
The Department generally serves only areas within the
ci ty of Los Angeles. However, it also serves var ious areas
outside the territorial boundaries of the City of Los Angeles
which were once served by water companies acquired by the
Department. The Department owns, operates, and maintains all
facilities in those areas.
2.03 ENGINEERING STANDARDS TO APPLY
All agreements for the receipt of water from the
Department and the design and installation of all such systems
are subject to all rules and regulations of the city Charter of
the city of Los Angeles and the Rules Governing water and
Electric Services in the city of Los Angeles. These Engineering
Standards apply only to main extensions which will be
incorporated into the Distribution System.
2.04 APPLICATION PROCEDURE
The Department has established, and may amend, proce-
dures to be followed by applicants for extension of mains. These
procedures will include all requirements for paperwork, submit-
tals, fees, engineering design, construction, and acceptance.
Applicants for main extensions will generally be required to
design and construct main extensions required for their develop-
ment. Construction should not be anticipated to start sooner
than four (4) months after plans for marking are received by the
Department and plan check and inspection fees are paid. The
following flow chart and subsequent text illustrates the
engineering design and construction portions of the application
procedure:
A. For new subdivisions,
Planning transmits to
final subdivision map_
new subdivision, the
Revised 07-92
the City Engineer or City
the Department a copy of the
For projects not involving a
Applicant SUbmits to the
2-2
Department's District water Service Representative
(DWSR) an overall or master plan showing the area to be
developed, and any other adjoining developments
proposed by the Developer; a preliminary subdivision
plan; lists of all properties to be served; and all
taps, if known, to be made on the proposed Main
Extension.
B. The DWSR transmits to the Applicant an interim letter
and estimate of charges.
C. At Applicant's request, the DWSR transmits to the
Applicant the "Agreement for Installation and Transfer
of Title of Water System Facilities," insurance forms,
Standard Specification No. DWPWS-D101, and an updated
estimate of charges.
D. The Applicant makes financial arrangements with the
DWSR and submits two (2) copies of the final
subdivision map, or master plan to the DWSR for marking
of required water system facilities.
E. The Department's Plan Check Engineer (PCE) holds a
pre-design meeting with the Applicant's Engineer (if
necessary) or transmits to same, the necessary drafting
media (mylars), information on the existing distribu-
tion system, and a copy of the marked plans showing:
1. Points of connection to existing facilities.
2. Size and material of mains to be installed.
3. General location of mains, gate valves and fire
hydrants to be installed.
4. Special features.
F. The Applicant submi ts to the PCE two (2) sets of
completed construction drawings, one (1) set of
original drawings on mylar, and spec if ications (other
than DWPWS-D101, when applicable) for- review and
approval in accordance with sections 2.05 and 2.06.
The acknowledgement letter described in Section 2.05,
grading plan, plot plan, recorded subdivision map or
easement deed, power plan (if available) , City
Engineer's substructure and sanitary sewer "wye
fl
maps,
and Public Works improvement plans signed by the City
Engineer or District/Division Engineer (or latest copy)
shall also be submitted at this time.
G. The Applicant submits to the DWSR the agreement
executed by the Applicant, financial guarantee, steel
pipe inspection fee if steel pipe is not purchased from
the Department, and completed insurance forms.
Revised 07-92
A
B
C
D
E
F
ENGINEERING DESIGN AND CONSTRUCTION
PROCEDURAL FLOW
SUBDivISION MAP OR MASTR PLAN SUBMITTED
!
ESTiMATE OF CHARCES TRANSMITTED
1
ACREEMENT. INSURANCE FORMS, SPECIFICATION D-! 01.
AND UPDATED ESTIMATE OF CHARGES rRANSMJTTED
,
SeRViCe Fees PAID
?Wo (2) COPIES OF SUBDIVISION MAP OR MASTI? PLAN SUBMt:I"TED
T
PREDSICN MEETING CONDUCTED
MYLAl?5 AND MARKED PLAN TRANSMITTeD

CONSTNUCTiQN DRAWINGS REVIEWED
ACKNOWLEDGEMENT {.ETTER AND PuBUC wORKS IMPROVEMENT PLANS SUBMITTED

AGREEMENT EXECUTED
G
WATER FACILITy CHARGES PAID
lNSU/?ANC FORMS SUBMITTED

H
MYLARS SIGNED
E.XCAVA nON PERMIT IS PRocesseD
,
I
PReCONSTRuCT/ON /s HeLD
,
J
MAiN EXTENSfOI\j CONS TRUCTED
!
K
FIELD NOiTS AND DRAWINGS SUBMITTED
!
L
FlNAlIICf/-f. GUARANTEE AND 8/{ ... L OF SALE 5UBMlTTD
.
" M
MAIN EXTENSION ACCEPTED
2-3
H. The PCE returns signed mylar drawing to the Applicant's
Engineer and applies for a utility excavation permit.
I. The Applicant or Applicant's Contractor calls the DWSR
to arrange for a pre-construction meeting to be held at
the Department's General Office Building at least two
(2) weeks prior to start of construction and no sooner
than two (2) weekS after approval of construction
plans.
J. The Applicant starts construction of the Main Extension
in accordance with section 2.08 after curbs and gutters
are in place.
K. The Applicant finiShes construction; prepares field
notes drawing and as-constructed drawing in accordance
wi th the water Operating Division's "Field Notes and
As-Constructed Drawings Manual" and submits said
drawings to the Department's Inspection Engineer for
review and approval.
L. The DWSR requests the Applicant to submit one-year
financial guarantee, a "Bill of Sale" and payment for
all fees including a deposit guaranteeing completion of
remaining work.
M. The DWSR notifies the Applicant that the Main Extension
is accepted.
2.05 ENGINEERING
All plans and specifications submitted to the Engineer
for review and approval of a main extension shall be prepared by,
or by someone under the direct supervision of, a Professional
Engineer registered by the State of California.
The Professional Engineer shall be responsible for the
preparation of the design, plans, specifications and for
conducting required field surveys for design purposes. All
submitted plans and specifications shall bear the Professional
Engineer's seal or stamp prior to approval for construction.
The Applicant, Contractor # and Professional Engineer
associated with the plans shall be responsible for the adequacy
and satisfactory performance of the design and the installation
or all items therein, and any failure or unsatisfactory
performance of the system, so constructed, shall not be a cause
for action against the Department. The Department does not
perform engineering services for any person or entity in
connection with its review of plans. Approval of plans by the
Department signifies only that the plans meet the minimum
requirements of these Engineering Standards based upon the
information provided to the Department by the Professional
Revised 07-92
2-4
Engineer and/or Applicant/contractor and makes no finding,
representation, or warranty that the system and associated
components will perform any certain function.
If the Professional Engineer responsible for the plans
disagrees with any changes required by the Engineer as a result
of the Department's review of the plans, such disagreement shall
be brought to the attention of the Engineer for resolution prior
to the start of construction of the project set forth in the
plans. The seal or stamp of the Professional Engineer on plans
corrected and approved for construction will signify that the
Professional Engineer has reviewed, approved, and authorized the
corrected plans for construction.
The plans and specifications approved by the Engineer
shall govern when in conflict with this Engineering Standards
Manual, DWPWS-D101, and other plans or specifications.
A letter acknowledging that the provisions of this
Section have been read and understood by the Applicant and
Professional Engineer shall be sent to the Department. A sample
acknowledgement letter is shown on Exhibit 1 of the Appendix.
2.06 PLANS AND SPECIFICATIONS
All plans and specifications submitted shall be in
strict compliance with the Engineering Standards contained herein
and shall meet any special conditions that may be reasonably
required. Sample plans, in addition to the two (2) provided in
the back cover pocket of binder, will be provided when
appropriate at the time marked plans are transmitted to the
Applicant's Engineer. The most recent copy of "Standard
specification No. DWPWS-D101, Developer-Installed Water
Distribution System Extension" will also be available at that
time. DWPWS-D101 shall be used as the required specifications
unless the Department informs the Applicant's Engineer that it is
inadequate. The design and installation of all facilities shall
ensure development of an integrated water system. No work shall
commence on any facilities until the plans and specifications are
approved in writing by the Department and all necessary permits
are obtained. Plans and specifications become the property of
the Department when submitted.
TWo (2) sets of detailed plans and specifications
(other than DWPWS-D101, when applicable) shall be submitted to
the Department for review and approval. The plans shall conform
to, and contain the following:
A. All plans shall be drawn on Department-provided mylar
sheets that are fourteen inches (14") high by multiples
of eight and one-half inches (8-1/2") wide to a maximum
of thirty-four inches (34").
Revised 07-92
2-5
B. The original drawing shall be legible, drawn in plastic
pencil or ink using the Department's linestyle standard
and standard drafting symbols on Sheets 1', 2A, and 2B
of the Standard Drawings. and of sufficient quality to
meet the Department I s standards. Computer-generated
drawings are acceptable provided the printing is non-
smudging. Use of "paste-on" drafting film is accept-
able provided the printing is non-smudging and the film
will not wrinkle or detach from the mylar sheet.
C. Lettering shall be Reinhart Style - uppercase, vertical
or slanted, with size and weight appropriate to the
size and the importance of the text.
D. A title block on each sheet in the lower right hand
corner, containing pertinent information concerning
that sheet, including the street name(s), sheet number,
and date completed.
E. A title sheet containing the following:
1. A key map of a suitable scale showing the limits of
each subsequent sheet, and having the North Arrow
directed in an upward position.
2. A Department-provided
paste-on sheet.
"Notice to Contractors"
3. "General
special
standard
Notes" listing water service requirements,
construction notes, and the Department
drawings applicable to the Main Extension.
4. Job titles, plan numbers, and construction permit
numbers of Public Works plans and other agency
plans for work within the limits of the Main
Extension. The information shall be placed
directly above the title block.
5. "Inspection Work Order No." and DWP "Connection
Work Order No." when applicable, directly above the
title block and to the right of the information
required under Item 4.
6. A business block identifying the name and address
of the business that prepared the plan. The
business block shall be located to the left of the
title block.
7. The stamp and signature of the Professional
Engineer registered in the state of California
responsible for the design of the Main Extension.
The stamp shall be placed adjacent to the business
block.
Revised 07-92
2-6
B. Details showing unusual utility crossings and water
system installations not contained in the Drawings
section. Details may overflow onto subsequent
sheets.
F. Layout sheets drawn in accordance with the following
guidelines:
1. Lettering in Reinhart Style - uppercase, vertical
or slanted, with size and weight appropriate to the
size and the importance of the text. Street names
shall be the largest size. The next smaller size
shall be used for Work Order numbers, centerline
designations, street widths, pipe activity
instructions, and material items. The smallest
sized letters shall be used for substructure
identification, informational notes, curb
locations, and similar information. The importance
of the information to be conveyed by the words or
symbols shall determine the lette;:- size and the
boldness of the text.
2. North Arrow shall be directed in an upward position
and towards the left if necessary. The arrow shall
not point down or to the right except for segmented
portions of winding streets where continuity to the
adjoining portions of the drawing is important.
3. Horizontal scale shall be one inch equals forty
feet (1"=40'), except on occasions when the drawing
is extremely congested with details or
substructures; then a scale of one inch equals
twenty feet (1"=20') or one inch equals ten feet
(1"=10') shall be used.
4 . Substructures and water mains shall be referenced
laterally in accordance with the following rules:
a. For the area north of Mulholland Drive,
calculate the horizonal distance along the line
perpendicular to the street centerline from the
latter to the center of the facility being
referenced.
b. For the area in and south of Mulholland DriVe,
calculate the horizontal distance along the
line perpendicular to the nearest property line
(right-of-way line) from the latter to the
center of the facility being referenced.
5. Connections, fire hydrants, blow-offs, services
larger than two-inch (2"), air valves, and bends or
Revised 07-92
2-7
elbows causing a shift in lateral location of main
referenced longitudinally in accordance with the
following rules:
a. For the area north of Mulholland Drive,
calculate the distance along the longitudinal
street centerline, from the nearest point of
intersection of street centerlines to the point
whose tangent is perpendicular to the line
projected to the facility being referenced.
b. For the area in and south of Mulholland Drive,
calculate the distance along the surface over
the pipe and parallel to the nearest property
line from the point where the pipe intersects
the nearest crossing property line (produced),
to the center of the facility being referenced.
6. Plan based on actual field surveys by Land
surveyor, registered by the state of California,
and referenced to official survey control points,
and be of sufficient accuracy so that the
facilities can be accurately staked for
installation, and can be readily located after
installation for operation maintenance, tapping,
and control.
G. Layout sheets showing:
1. Location and dimensions of dedicated streets
and easements.
2. Lots to be served.
3. All existing and proposed curbs and pavement
including pavement join lines.
4. A table containing water line curve data for steel
water main extensions showing deflection, radius,
and length of each curve.
5. The proposed alignment of the water main properly
symbolized if cathodically protected and the
location of all proposed Distribution system
facilities such as fire hydrants, blow-offs, air
valves, etc.
6. All existing and proposed substructure utilities
properly identified and located. See Sheet 1 of
the Standard Drawings.
7. All existing and proposed obstructions such as
vaults, catch basins, traffic islands, etc.
Revised 07-92
H.
2-8
8. All existing and
bends, reducers,
etc.
proposed fittings such as tees,
insulating joints, - gate valves,
9. All proposed thrust
restraining devices.
blocks or other joint
10. Lists of material identifying all pipe and fittings
used on each street for every sheet in accordance
with Sheet 3 of the Standard Drawings.
11. The approved permanent water source which can
supply sufficient water for chlorination, flushing
and hydrostatic testing.
12. Sufficient adjacent area to give the relation of
new facilities to existing facilities.
Layout sheets with a center of pipe
main extensions in non-paved areas.
show:
1. Existing ground line.
2. Finished grade.
profile for all
Profile shall
3. The C. G. elevation at grade breaks and the slopes
of the water main.
4. The C. G. elevations of all outlets.
5. All proposed and existing utility crossings.
When a conflict occurs between or within standards,
specifications, and drawings in this manual, an interpretation
shall be made by the Engineer pursuant to Section 1.04 of these
Standards.
Addenda and modifications to the drawings and specifi-
cations take precedence over the original documents. On the
drawings, calculated dimensions shall take precedence over scaled
dimensions and noted material over graphic indication.
Dedicated streets and easements shall conform to the
requirements of other Sections of these Standards. The copy of
the recorded subdivision map furnished in the final submittal, or
a recorded copy of the deed for the property involved, or a
recorded copy of an easement shall be furnished to the Department
as evidence of conformance with section 5.02 of these standards.
2 07 PERMITS
Permi ts for construction of main extensions in pUblic
Revised 07-92
2-9
rights-of-way and easements to the Department will ~ b e secured by
the Department following approval of the plans and specifications
and pr ior to start of construction. The Department, however,
reserves the right to require the Applicant to obtain specific
permi ts. Permi ts required for use of Department property shall
be secured by the Applicant in accordance with section 4.04.
2.08 CONSTRUCTION PROCEDURE
In addition to all construction requirements contained
in other portions of these Standards, the Applicant and
Contractor shall observe the following:
A. Construction shall commence wi thin six ( 6) months of
the approval date shown on the plans, or the plans
shall be resubmitted for review and approval. If
construction on the main installation is halted for
more than six (6) months, plans shall be resubmitted
for review and approval.
B. The Contractor shall contact the appropriate Water
Services Representative at the telephone number shown
on the approved plans under "Notice to Contractors" to
arrange a preconstruction meeting with the Professional
Engineer who designed the Main Extension, Department
personnel, and the Applicant at least two (2) weeks
after approval of construction plans and at least two
(2) weeks prior to initiating any distribution system
construction. The purpose of the meeting shall be to
discuss the construction project, scheduling,
procurement of material, hand out the Field Notes
print, and to define responsibilities for the personnel
involved in the project. The Contractor shall give at
least 48 hours' notice to the Department prior to com-
mencing construction by calling the Inspection Engineer
at (213) 580-3890.
In case of an emergency during non-working hours, the
Department s customer telephone service, (213)
481-5411, shall be notified.
C. The Contractor shall make provisions for notification
of customers who will be temporari ly out of water.
Outages shall be kept to a minimum in compliance with
Section 8.26(C) of these Standards.
D. Construction shall not commence until proposed curbs
and gutters are in place.
E. The Main Extension shall be surveyed in accordance with
Sections 2.09 and 2.10 of these Standards if installed
in an area without curbs.
Revised 07-92
F.
2-10
Prior to the installation of mains in dedicated streets
and easements, construction shall have progressed to
within fifteen inches (15") of the finished street
grade.
G. All material needed to complete the work shall be
available at the start of construction so that the
project may proceed without delay.
H. Welding shall be performed by Department-approved
operators currently qualified under the Standard
Qualification Procedure of the American Welding
Society, as last revised.
I. Steel main extensions shall be placed under a galvanic
cathodic protection system installed and tested by a
corrosion Engineer (someone under the direct
supervision of or by a Corrosion Specialist certified
by the National Association of Corrosion Engineers or a
Corrosion Engineer registered by the State of
California) .
J. The Contractor shall cooperate with the Design Engineer
in compiling as-constructed data of the Main Extension
by completing the Field Notes Drawing in accordance
with the Department's latest "Field Notes and
As-Constructed Drawings Manual." Accuracy shall be to
within 0.5 feet horizontally and to within 0.1 feet
vertically. As-constructed survey data shall be
provided for sixteen-inch (16") and larger Supply
Mains, Trunk Lines, and Distribution Mains installed in
the absence of curbs.
K. The Inspector shall be notified whenever it becomes
necessary to open or close a valve on the existing
water system. Only authorized Department personnel are
to operate valves in the Distribution System. See
Section 8.26(B) of these Standards.
L. Mains shall not be installed unless they can be
extended from an approved permanent water source which
can supply sufficient water for flushing, hydrostatic
testing, and disinfection.
M. All standpipes, maintenance holes, fire hydrants, and
other main appurtenances shall be adjusted to the final
finished grade by the Contractor.
N. All service taps on the existing Distribution System
will be made by the Department or when specifically
approved by the Department, by a Department-approved
tapping contractor. All service taps on the proposed
Main Extension shall be made by the Contractor.
Revised 07-92
2-11
Application for service shall be received and approved
by the Department before any taps are made on the main.
o. Meters less than four inches (4") in size shall be set
by the Department, except when specifically approved by
the Department.
P. Service installation documents will be prepared by the
Inspector unless the Department directs the Contractor
to do so, or services are not installed in conjunction
with installation of main. The Contractor shall
cooperate with the Inspector in compiling
as-constructed service lateral data.
Q. Mains shall be hydrostatically tested and disinfected
in accordance with sections 8.24 and 8.25 of these
Standards.
R. As-Constructed drawings conforming to the Department's
latest "Field Notes and As-Constructed Drawings
Manual", shall be prepared by the Design Engineer and
together with the Field Notes Drawings be submitted to
the Engineer for approval no later than two (2) weeks
after completion of the project. Accuracy shall be to
within 0.5 feet horizontally and to within 0.1 feet
vertically.
S. The Applicant shall submit a
Department will verify payment
final documents.
2.09 SURVEYING
Bill of Sale and the
of all fees and prepare
Line and grade for Distribution Mains in the absence of
curbs and gutters approved by the City Engineer, will be
established by, and as-constructed surveying done by the
Department at Applicant's expense or when specifically approved
by the Department, by a Professional Engineer or by a Land
surveyor licensed to practice in the State of California or by
his or her authorized representative. All work shall be done in
a professional manner.
When surveying is performed by someone other than the
Department, the correct alignment and elevation of the water
mains as shown on the approved drawings becomes the responsibil-
i ty of the Applicant and Contractor. Approval of the staked
alignment and elevations by the Department's Inspector does not
relieve the Applicant and Contractor in any manner from the
responsibility for field errors. Sufficient line and grade shall
be staked to ensure continual work progress.
Revised 07-92
2-12
2.10 PLACING SURVEY LINES
When surveying is required, hubs and stakes shall be
set on an offset line to mark the location of the centerline of
the main. Centerline hubs and stakes may be used in addition to
the offset hubs and stakes; however, they may not be set in place
of the offset hubs and stakes. Normal practice is to set offset
hubs and stakes five feet (5') to ten feet (10') off the center-
line of the main.
survey points shall be set a maximum distance of one
hundred feet (100') apart. All valves, crosses, tees, horizontal
and vertical bends, and fire hydrants shall be staked for
location and grade. Points of curvature and points of tangency
of curves, as well as points on the curve, shall be staked for
location and grade. All stakes shall be flagged to increase
their visibility.
stakes shall be positioned so that the survey hub is
between the stake and the main. The side of the stake facing the
main shall be marked to show the point being referenced and the
distance from the hub to the centerline of the main. The back
side of the stake shall be stationed. Grade stakes shall be set
at each hub and shall state the vertical distance from the top of
the hub to the top of the pipe. This vertical distance will be
based on the fact that the distance from the official street
elevation to the top of the pipe shall be as specified in Section
8.06 or as shown on the approved plans.
The Applicant and the Contractor shall take reasonable
steps to prevent alteration, displacement or removal of hubs and
stakes.
2 . 11 INSPECTION
Installation of all new facilities will be inspected
and approved by the Department.
The Department will ensure that the provisions of the
approved plans and specifications are complied with, especially
with regard to the quality of workmanship and materials.
Problems which may require sound field judgment, in lieu of
strict interpretation of the Specifications, shall be resolved by
the Department and the contractor, and any resulting monetary
differences shall be resolved between the Contractor and the
Applicant.
All work shall be performed in accordance with accepted
workmanship practices and these Engineering Standards. Any work
not accepted by the Department shall be done over until
compliance with these Engineering Standards is achieved.
Revised 07-92
2-13
All appropriate permits shall be on the jobsite and
shall be checked by the Inspector before starting construction.
Orders given by the Department relating to quality of
materials and workmanship shall be complied with promptly by the
Contractor.
All materials used shall be subject to the inspection
and approval of the Department at all times, and shall not be
used before being inspected and approved by the Inspector. The
Department has the right to perform any testing deemed necessary
to ensure compliance of the materials with the Materials
Specifications. Failure or neglect on the part of the Department
to condemn or reject work or materials not in accordance with the
Materials Specifications, shall not be construed to imply their
acceptance should their inferiority become evident at any time.
Materials rejected by the Department shall be immediately removed
from the jobsite.
2.1.2 CONTRACTORS AND APPLICANTS
Contractors performing all work for main extensions
shall be competent, licensed firms with adequate manpower and
equipment to accomplish the work in accordance with the approved
plans and specifications. A representative of the Applicant and
the Contractor shall be present at the jobsite whenever work is
being conducted by sub-contractors.
Contractors and applicants shall meet the following
requirements with regard to qualification, financing, and
guarantees:
A. Qualification: Contractors desiring to install main
extensions or other water facilities for the Department
on behalf of an applicant shall be prequalified.
"Request for Contractor Prequalification" forms (see
Exhibit 2 of the Appendix) may be obtained from, and
returned to the Department at least thirty (30) days
prior to the date the Contractor anticipates beginning
installation of the Main Extensions. Following
evaluation of the completed form, written notice of
acceptance or denial will be transmitted to the
Contractor. Prequalification is subject to yearly
application and renewal.
B. Letter of Credit: Applicants shall provide the
Department with an acceptable irrevocable Letter of
credit, or other suitable financial guarantee from a
financial institution authorized to do and doing
business in the State of California, valid until the
Main Extension is accepted by the Department. The
Letter of Credit shall be for an amount determined by
the Department.
Revised 07-92
2-14
The purpose of the Letter of Credit is to provide
protection to the Department for any expenses it may
incur as a result of:
1. Failure by the
installation.
Contractor to complete the
2. Necessary repairs caused by poor installation
techniques.
3. Necessary repairs caused by the installation of
defective material.
4. Failure by the Contractor to perform in accordance
with the approved plans and specifications.
5. Material liens against the Department.
C. Guarantee of Workmanship. Materials. and Equipment:
The Applicant shall guarantee that the Main Extension
installed by the Contractor (or Applicant) be free from
any and all liens and encumbrances and free from any
and all defects in materials and workmanship for a
period of one year after final acceptance by the
Department. This guarantee shall be in the form of an
irrevocable Letter of Credit for an amount determined
by the Department, beginning at the date of final
acceptance of the Main Extension by the Department.
The Department will make any necessary repairs and
charge the Letter of Credit.
2. 13 POINTS OF DELIVERY
The Department will deliver water for the connection
from the nearest available, adequate and feasible point on the
Distribution system. The Department s determination of this
point shall be final.
2.14 SPECIAL CONDITIONS
All conditions involving another agency, such as cross-
ing a railroad or a highway, shall be satisfied. All designs,
drawings, and calculations submitted to said agency shall also be
submitted to the Department for approval. Should a conflict in
the plans and specifications occur between the Department and the
other agency, the plans and specifications yielding an acceptable
product, as determined jointly by the Department and the other
agency, shall prevail.
Revised 07-92
2.15 EXCEPTIONS UNDER CHAPTER 2
The Department reserves the right to and/or
install mains when it is in the best interest of Department.
This determination is solely at the discretion of the Engineer.
The Applicant shall pay all design and installation
costs for extending mains whether installed by its own contractor
or by the Department.
Revised 07-92
CHAPTER 3
SYSTEM DESIGN
3.01 GENERAL
The purpose of this chapter is to provide general
information on the design of a water distribution system
acceptable to the Department. The Department's Distribution
System is designed to deliver water to its customers in
sufficient volumes and without excessive headloss. Specific
design and layout criteria for Distribution Mains, service
installations, Supply Mains, and Trunk Lines are covered in
Chapters 2, 5, 6, 9, and 10 respectively.
3.02 SIZING OF DISTRIBUTION HAINS
The Department designs its distribution facilities to
obtain the lowest cost over their expected life. This may not
necessarily result in the lowest initial cost when long-term
operation and maintenance costs are considered. This policy f
however I results in a water supply system that yields optimum
quality service at the lowest total cost to the consumer.
All mains will be sized by the Department large enough
to provide the consumer a minimum of forty-three
pounds-per-square-inch (43 psi) residual pressure at the building
pad at peak-hour demand for domestic needs and twenty-five
pounds-per-square-inch (25 psi) residual pressure at the building
pad at peak-hour demand plus private fire demand (established by
the local fire department) for fire services. Mains will also be
sized to meet the public fire supply requirements of the local
fire department. The Main Extension shall be capable of provid-
ing a minimum residual pressure of twenty pounds-per-square-inch
(20 psi) at the most critical fire hydrant with peak-hour demand
plus fire demand established by the local fire department.
Generally I Distribution Mains are sized for a headloss of five
feet per thousand feet (5 '/1000') of main at peak-hour flows.
The Department reserves the right to size mains to provide
service for future needs.
All new Distribution Mains shall be of the standard
sizes used by the Department. Standard sizes are: six-inch (6") I
eight- inch (8") I and twel ve- inch (12") mains. Four- inch (4")
main may be used in short cul-de-sacs not requiring fire hydrants
or fire services larger than two inches (2") in size.
The sizing of Distribution Mains normally follows a
standardized grid based upon careful consideration and analysis
of results of distribution system studies utilizing network
simulation.
Revised 07-92
3-2
In residential districts zoned R-1, mains are usually
six inches (6") in diameter in a grid system and four inches (4")
in diameter in short cul-de-sacs.
In residential districts zoned R-3,
system is usually comprised of a mixed pattern
and eight-inch (8") grid.
the distribution
of six-inch (6")
In areas zoned R-4, Commercial, and Industrial, a grid
of eight-inch (8") mains and sometimes twelve-inch (12") mains is
generally adequate to meet domestic and fire protection needs.
Looping is done whenever possible in conjunction with the Main
Extension to maintain water quality and improve reliability of
the system.
The present sizing of the grid system has the benefit
of utilizing the system as an integral part of the overall supply
system to distribute water without excessive headloss. The
Department will analyze grid systems for developing areas to
determine their adequacy.
3.03 OPERATING PRESSURES WITHIN THE DISTRIBUTION SYSTEM
Pressures within the Distribution system shall be a
minimum of forty-three pounds-per-square-inch (43 psi) at the
building pad during peak-hour demand, whenever possible. At
building site elevations where the minimum pressure is under
forty-five pounds-per-square-inch (45 psi), the Contractor is
required to install oversized plumbing in accordance with the
Los Angeles City Plumbing Code. An Elevation Agreement shall be
executed by the Applicant and the Department for the portion of
any lot having a minimum pressure of less than thirty-five
pounds-per-square-inch (35 psi). Every effort shall be expended
to grade the lots within subdivisions to enable the Distribution
System to provide a minimum pressure of thirty-five
pounds-per-square-inch (35 psi). Future growth and main deterio-
ration result in future consumer problems if water pressure is
not provided at adequate levels. Domestic pressure regulators
are required in accordance with the Los Angeles city Plumbing
Code Where the maximum static pressure exceeds eighty
pounds-per-square-inch (80 psi) at the building site elevation.
3.04 PRESSURE REGULATING STATIONS
Pressure regulating stations are used within the
Distribution system to control pressures between service zones.
When main extension plans are submitted for review, the need for
a pressure regulating station will be determined by the
Department based on existing pressure zones and the existing
Distribution System. The Department will make all pressure set-
tings and field adjustments on pressure regulating stations
within the Distribution System.
Revised 07-92
3-3
In certain situations, the Department -will require
monitoring of the station's rate of flow and upstream and down-
stream water pressures via electronic telemetry. The equipment
used shall be of the manufacture and type specified or approved
by the Department. See section 3.07 of these Standards.
3.05 STORAGE FACILITIES
A. General: Water storage facilities will be allowed for
storing water within the Distribution System only where
specifically authorized by the Department. The type,
size, and location of storage facilities to be used
shall be determined by the Department.
It is the policy of the Department to require the
Applicant to design and construct water storage tanks
if the tank is required for the Applicant's
development. The Department, however, reserves the
right to design and/or construct (with its contractor)
tanks when it is in the best interest of the
Department.
All plans and specifications submitted to the
Department for review and approval of water storage
facilities shall be prepared by a Professional Engineer
registered by the State of California. The Applicant
is encouraged to contact the Department at least three
years in advance of when a storage facility may be
needed so adequate time is available for environmental
documentation, engineering, and construction.
B. Environmental Documentation: Environmental
documentation for tanks should be dealt with at an
early date so that the cumUlative impacts of deve-
lopment can be considered. Normally, this means that
special water supply facilities, such as tanks, should
be discussed in the Subdivision Environmental Impact
Report. Performing environmental documentation on a
tank as a separate project may result in significant
delays to the Applicant.
C. Engineering and Geology: It is extremely critical that
no grading occur on a potential tank site prior to
obtaining engineering and geology approval of the
grading plan. The Department requires that its tanks
be constructed on bedrock when possible. The
Department will establish the high water elevation and
tank dimensions after review of preliminary development
plans.
D. General Design Criteria: Specific design criteria for
the tank will be established after consideration of all
Revised 07-92
3-4
site conditions and current development plans for the
area. The following general design criteria will apply:
1. The structure shall conform to the requirements of
the Los Angeles City Building Code except as
modified by the Department to provide an increased
factor of safety.
2. All soils and geology reports shall be approved by
the Los Angeles City Department of Building and
Safety and the Department.
3. All footings shall be founded on bedrock.
4. Design of walls shall include dynamic earth
pressure.
5. Walls shall be designed to withstand possible
surcharge due to an earthquake.
6. All design criteria shall be placed on the drawing
and approved by the Department.
7. water level controls and vault shall be provided.
8. Recording instruments that accurately record water
elevation shall be provided.
9. A cathodic protection system shall be provided.
10. Adequate attention shall be given to security of
the tank.
11. An adequete roadway and apron shall be provided on
the perimeter of the tank.
12. Acceptable access for workers and equipment shall
be provided.
13. Adequate ventilation shall be provided.
14. positive drainage away from the tank shall be
provided.
15. A system for cleaning, including gravity floor
drain, hose bib connections, and properly secured
electrical outlets shall be provided.
16. Ladders, cages, guardrails, etc., must meet Cal-
OSHA requirements. . Stainless steel bolts and
inSUlation shall be provided and protective coating
shall be applied on all metal work.
Revised 07-9.2
3-5
17. Adequate landscaping shall be provided for the area
around the tank, including all slopes.
18. The Design Engineer shall obtain all required
clearances, approvals, and permits.
3.06 PUMPING FACILITIES
A. General: Pumping facilities may be needed to provide
adequate water pressure in the Distribution System.
The type, size, and location of all pumping stations
within the Distribution System shall be specifically
authorized by the Department. The Department will
prohibit the installation of pumping facilities where,
in its opinion, such installations would be injurious
to the operation, or future operation, of the
Department's Distribution System.
It is the policy of the Department to require the
Applicant to design and construct pumping stations if
the pumping station is required for the Applicant's
development. The Department, however, reserves the
right to design and/or construct (with its contractor)
pumping stations when it is in the best interest of the
Department.
All plans and specifications submitted to the
Department for review and approval of pumping stations
shall be prepared by a Professional Engineer registered
by the State of California.
B. Environmental Documentation: Environmental docu-
mentation for pumping stations should be dealt with at
an early date so that the cumulative impacts of
development can be considered. Normally, this means
that special water supply facilities, such as pumping
stations, should be discussed in the Subdivision
Environmental Impact Report. Performing environmental
documentation on a pumping station as a separate
project may result in significant delays to the
Applicant.
C. Engineering and Geology: It is extremely critical that
no grading occur on a potential pumping station site
prior to obtaining engineering and geology approval of
the grading plan. The Department requires that its
pumping stations be constructed on bedrock when
possible. The Department will establish the exact
location after review of preliminary development plans.
Revised 07-92
3-6
D. General Design Criteria: Specific design criteria for
the pumping station will be established after
consideration of all site conditions and current
development plans for the area. The following general
design criteria will apply:
1. The building shall conform to the requirements of
the Los Angeles City Building Code except as
modified by the Department to provide increased
resistance to damage due to seismic loads.
2. All soils and geology reports shall be approved by
the Los Angeles City Department of Building and
safety and the Department.
3. All footings shall be founded on bedrock.
4. All design criteria shall be placed on the drawings
and approved by the Department.
5. The building shall be aboveground and be located so
that the pumps will be supplied by gravity water.
6. The architectural style of the pumping station
shall be compatible with or similar to the style of
the neighboring residences.
7. Adequate parking and access control shall be
provided for the facility.
8. Noise within the pumping station shall be within
acceptable levels.
9. Noise emanating from the pumping station shall be
limited to a maximum of fifty (50) decibels, DBA,
measured at any point along the property line.
10. Adequate attention shall be given to security of
the building.
11. An adequate air conditioning
and efficient operation of
equipment, instrumentation,
provided.
system to' insure safe
all piping, pumping
and alarms shall be
12. Adequate ventilation shall be provided to cool the
building in the event of air conditioning failure.
13. Toilet facilities, usually accessible only from
outside the building, shall be provided.
14. Adequate landscaping shall be provided for the area
around the building, including all slopes.
Revised 07-92
3-7
15. An adequate building floor drain shall be provided.
16. The Design Engineer shall obtain all required
clearances, approvals, and permits.
3.07 TELEMETRY AND CONTROL SYSTEMS
Telemetry and/or data acquisition and control systems
installed for use by the Department to collect data, monitor,
control remotely and coordinate the operations of its water sys-
tem, or the operations between a distributor's water system and
the Department's system, shall be designed, installed and main-
tained by the Department unless other specific arrangements are
made during the design phase of trunk line, pressure regulating
stations, storage facilities, or pumping facilities.
3.08 CONNECTIONS TO THE EXISTING DISTRIBUTION SYSTEM
connections to Distribution Mains or Supply Mains will
generally be made by the contractor unless the Department deter-
mines it is in its best interest to have the Department make the
connection. See Section 8.26 of these Standards.
All connections to Trunk Lines owned or controlled by
the Department will be made by the Department. The Department
will provide and install all fabricated pipe, tapping sleeves,
valves, etc., that are necessary to construct the connection.
Revised 07-92
4.01 GENERAL
CHAPTER 4
EASEMENTS
AND
USE OF DEPARTMENT PROPERTY
The following procedures have been developed to process
easements as quickly as possible through the Department. These
procedures have been developed for ease of administration and to
provide the Department with legal documents and specifications.
Requests that do not follow these procedures and required
attachments will not be considered.
4.02 PROCEDURE FOR GRANTING EASEMENTS TO THE DEPARTMENT DURING
RECORDATION OF SUBDIVISION
Easements shall be granted to the City of Los Angeles
for use of the Department using the Department's Standard
Dedication certificate. The easement shall be accurately shown
on the sUbdivision map. The Department's Standard Dedication
certificate shall be incorporated as part of the Ownership
Certificate and executed by the owner of the subdivision prior to
the recording of the subdivision map. contents of the Standard
Dedication certificate for easements over roadway and nonroadway
areas are shown on Exhibits 3 and 4 of the Appendix.
4.03 PROCEDURE FOR GRANTING EASEMENTS TO THE DEPARTMENT
CONNECTION WITH RECORDATION OF SUBDIVISION
A. Procedure: A letter signed by the grantor requesting
the Department to accept the easement shall be
submitted to the Engineer and addressed as follows:
Mr. Laurent McReynolds,
Engineer in Charge of Water operating Division,
Department of Water and Power,
P.O. Box 111, Los Angeles, California 90051,
Attention C. Hamvas, Room 1450, GOB
The letter of request shall contain the exact name of
the company, corporation, partnership, etc., granting
the easement, the names and titles of the persons
authorized to sign the easement document, and include
the following attachments:
Revised 07-92
4-2
1. A legal description approved by a person who is
'registered or licenced to practice Land Surveying
in the jurisdictional area within which the
property is located. The legal description shall
be correctly defined, unambiguous, and shall truly
represent the intention of the parties involved.
It must also be based on an accurate field survey
of the land involved and clearly state the
monuments on which the survey is based.
To accomplish this, there shall be correct plat
designations and references, proper location
information, mathematical fitness, and sufficient
references to matters of record concerning
boundary lines, corners, and monuments.
2. Two copies of an overall site plan. The site plan
shall accurately show the relationship of the
following:
a. The proposed water facility and easement.
b. All exceptions listed in the Title
commitment.
c. All existing and proposed utilities on the
site.
d. Proposed buildings and private roadways on
the site.
e. Cross section of private roadways over the
proposed water facility easement.
The Department will then prepare the Easement Deed
which will incorporate the applicable Standard
Dedication Certificate (Exhibits 3 and 4 of the
Appendix) .
B. Approval of Construction Plans: Main Extension Plans
will not be approved until the letter of -request and
attachments referenced in Section 4.03(A) are reviewed
and approved.
C. Acceptance of Main Extension: Acceptance
Department of the Main Extension is subject
easement deed being recorded with the Los
county Recorder's Office.
Revised 07-92
by the
to the
Angeles
4-3
4.04 PROCEDURE FOR OBTAINING PERMISSION TO USE OR CROSS
DEPARTMENT PROPERTY
A. Procedure: A letter requesting the Department's
permission to use or cross its property shall be
submitted to the Chief Real Estate Officer. The
request shall contain the exact name of the company,
corporation, partnership, etc., which will own, operate
and maintain the proposed facilities, the names and
titles of the persons authorized to sign the agreement,
and include, but not be limited to the following
attachments:
1. A reproducible drawing on Department-provided
mylar, conforming to the following specifications.
Drawings which do not comply with the following
specification, and/or that are folded, stapled, or
damaged are not acceptable:
a. Lettering: All lettering shall be neat and
legible Leroy Machine Lettering or
equivalent.
b. Scale: The drawings shall be at an
appropriate recognized engineering scale.
The scale used shall be large enough so that
all dimensions are clearly shown. Whenever
possible, the entire crossing shall be on one
drawing. Break lines, except the direct land
corner ties, are not acceptable.
c. Tie: All crossings shall have a direct tie
to the nearest available recognized tract
boundary or city Engineer's survey marker.
d. All distances shown on the drawing shall be
to the nearest hundredth of a foot.
e. All drawings shall have a typical profile of
the crossing unless specifically waived by
the Department.
2. Requests shall include prints of the overall job in
the area of the crossing, when available, and
prints of new or proposed subdivisions whenever
this information would clarify or identify the
location of the request.
B. Fees:
1. The fee for the use of Department property will be
determined by the Department using accepted real
estate appraisal practices.
Revised 07-92
CHAPTER 5
LAYOUT AND DESIGN OF
TWELVE-INCH (12" ~ AND SMALLER DISTRIBUTION MAINS
5.01 GENERAL
The purpose of this chapter is to provide specific
information on the design of Distribution Mains acceptable to the
Department. Design and layout criteria for service
installations, Supply Mains and Trunk Lines are covered in
Chapters 6, 9, and 10, respectively. Chapter 8 contains detailed
pipe installation information which shall be incorporated in the
design as appropriate.
5.02 LAYOUT OF THE DISTRIBUTION SYSTEM
A. Width Requirements for Main Installation: All mains
shall be installed in the paved roadway section of
dedicated streets having alignment and grade approved
by the City Engineer. When the Department determines
it is not feasible for an installation to be made in a
dedicated street, the installation shall be made in an
easement. The conditions under which such an exception
will be allowed will be determined for each individual
case, and only easements which conform to the terms of
the Department's Standard Dedication Certificate will
be accepted (see Exhibits 3 and 4 of the Appendix).
The minimum width of exclusive easements accepted by
the Department is twenty feet (20'). Nonexclusive
easements will be accepted only over full-width private
streets that conform to the City Engineer's standards
for public streets. Installations may be made in
streets or easements of other widths only when author-
ized by the Department.
B. Dedicated Streets: Mains shall be installed in
dedicated public streets of such grade, alignment,
curvature, and other characteristics as to permit them
to be laid and maintained in the normal and usual
manner. Main alignment shall be parallel to property
lines. Normal practice is to lay the main no closer
than and preferably a distance of six feet (6') from
the curb on the south or the west side of the street
except in hillside areas where they are located on the
uphill side of the street. The main shall be installed
no closer than four feet (4'), centerline to centerline
from adjacent substructures. In no case shall there be
less than two feet (2') clear between the trench line
of the main and the trench lines of adjacent
substructures. Special conditions detailed in section
8.18 apply to mains installed adjacent to or crossing
sanitary sewers.
Revised 07-92
5-2
C. Easements: Mains installed in easements shall conform
to the terms of the corresponding Department Standard
Dedication Certificate including proper surface
drainage (see Exhibits 3 and 4 of the Appendix).
D. Alleys: New installations of mains
strictly prohibited. Replacement of
allowed under special circumstances.
in alleys are
mains may be
E. Fire Hydrants: All fire hydrants shall be installed
within dedicated streets. When the Department
determines it is not feasible for a hydrant to be
installed in this manner, it shall be installed in an
easement contiguous to said dedication. The fire
hydrant easement shall be acquired on the corresponding
Department Standard Dedication Certificate (Exhibits 3
and 4 of the Appendix) and have a minimum width and
length of five feet (5') for standard installations.
Fire hydrants shall be installed at general locations
determined by the local fire department, and modified
by the following field conditions:
1. Normally on the short lateral side of the street.
2. On the uphill side of the street in hillside
areas.
3. No closer than four feet (4') clear of adjacent
substructures or aboveground facilities.
4. At lot lines.
5. No closer than and preferably at
clear of adjacent driveways
wheelchair ramps.
five feet (5 ' )
and sidewalk
6. For curbs having a radius of twenty feet (20') or
larger, no closer than and preferably at five feet
(5') from the B.C. of the curb, not in the curb
radius, and twenty-two inches (22 to) from the curb
face to the center of the fire hydrant.
7. For curbs having a radius smaller than twenty feet
(20'), no closer than and preferably at ten feet
(10') from the B.C. of the curb, not in the curb
radius, and twenty-two inches (22") from the curb
face to the center of the fire hydrant.
F. Line Valves: Line valves are required approximately
every six hundred feet (600') to twelve hundred feet
(1200') in all twelve-inch (12") and smaller
Distribution Mains receiving water from the Department.
Revised 07-92
5-3
Where blocks exceed six hundred feet (600') in length,
or if two (2) or more hydrants are connected to the
same main, additional line valves may be' required in
the middle of the block. For a succession of short
blocks perpendicular to the direction of major feed and
without residential services, several intersections may
have the valve omitted in that direction but should
retain the six hundred foot (600 ') to twelve hundred
foot (1200') interval requirement. Line valves are
generally installed adjacent to the fitting connecting
intersecting mains. Street intersections carrying
heavy traffic, or containing major Distribution Mains
in both streets may require four (4) valves, one at or
near each extended property line and adjacent to fire
hydrants, if possible.
5.03 AND TESTING
The materials and construction methods specified herein
are based upon lowest life cycle cost, not upon lowest initial
costs. The Department considers long-term operation and mainte-
nance costs to procure a water supply system that yields optimum
quality service at the lowest total cost to the consumer.
Detailed technical specifications (or a reference to
industry specifications) for purchase or approval of materials
are included in the Materials Specifications Section of these
Standards. All materials shall conform to the Materials
specifications and to all limitations on acceptable makes and
styles. Steel pipe not purchased from the Department is subject
to inspection and testing in accordance with DWP specification W-
302, at Applicant's expense. The Department shall be notified at
least four (4) weeks prior to start of manufacturing.
All materials furnished shall be new, undamaged, and
clearly marked to allow identification during installation.
Everything necessary to complete all installations in accordance
with the Engineering standards of the Department shall be
furnished and installed whether shown on approved drawings or
not, and all installations shall be completed as fully operable
functioning parts of the Department's Water System.
Where mains are extended by the applicant, it shall be
the applicant's responsibility to provide all materials necessary
for the installation. However I certain materials not readily
available from waterworks suppliers may be purchased from the
Department.
Acceptance of materials, or the waiving of inspection
thereof, shall in no way relieve the Applicant of the
responsibility for furnishing materials meeting the requirements
of the Materials Specifications.
Revised 07-92
5-4
New water industry products or materials will be tested
by the Department if the Engineer feels the product or material
has some merit. The Department will establish the criteria for
testing and evaluating the product. Adequate lead time shall be
allowed for testing of previously unapproved materials so as to
not delay the project. The Department reserves the right to
accept or reject any product or material regardless of the test
results.
5.04 SIZING AND SELECTION OF PIPE
All mains will be sized by the Department in accordance
with section 3.02.
Pipe materials will be selected by the Department in
accordance with the guidelines on Sheet 5 of the Standard
Drawings. However, the Department reserves the right to deviate
from those guidelines in specific circumstances.
5.05 PIPE FITTINGS
A. Joints: Joints and fittings shall conform to applica-
ble DWP and AWWA Specifications. Acceptable joint
types for straight lengths of ductile iron and steel
pipe are push-on and slip-joint welding, respectively.
Mechanical joints for straight lengths of pipe will be
allowed only when specifically approved by the
Department.
Lead joints may be required when installing special
fittings. Flange joints are required when installing
four-inch (4") and larger line valves in steel pipe,
four-inch (4") and larger tapping sleeves, and other
fittings. No other type of joint shall be used without
the specific approval of the Department.
Flanges and flanged fittings shall have a rating that
meets the maximum static pressure at the location of
installation. Care should be exercised to select
flanges and flanged fittings that have matching
drilling templates. As a rule of thumb, flanges and
flanged fittings having a 200 PSI or smaller rating or
class, match. Also, flanges and flanged fittings
having a greater than 200 PSI rating or class, match.
B. Closure Fittings: Mechanical couplings shall be of a
gasketed, sleeve-type, with diameter to properly fit
the pipe. Tolerance on pipe and coupling, together
with proper bolt and gasket arrangements, shall be
sufficient to ensure permanent watertight joints under
Revised 07-92
5-5
all conditions. Where pipes of different outside
diameter are connected together, or where pipe is
connected to fittings of different materials, care
shall be exercised to select the proper ring or
adapter.
C. Repair Fittings: Repair clamps, repair sleeves, joint
clamps, and similar devices shall not be used to repair
or join water mains. Pipe damaged during installation
shall be removed and replaced.
D. Miscellaneous Pipe Fittings: Adapters, plugs, end
caps, bulkheads, slip sleeves, anchor boxes, lock-joint
gaskets, yokes and rods, and other appurtenances shall
be used where appropriate throughout the system,
subject to the approval of the Department. The
Department does not intend to unreasonably limit the
installation of any type of fitting, joint, or
proprietary device; however, the installation of any
such fitting, not specifically approved by these
standards, is subject to the approval of the
Department. written request for approval of deviating
items shall be made in advance through the Department.
E. Tapping Sleeves: Tapping sleeves or clamps shall be
used to tap existing water mains that are in service
and under pressure without interrupting service. NO
TAP SHALL BE MADE IN ANY EXISTING WATER MAIN W:ITHOUT
WRITTEN CONSENT OF THE DEPARTMENT. Care shall be
exercised to select sleeves and gaskets which are
properly sized to fit the type and class of pipe to be
tapped. Where four-inch (4") or larger tapping sleeves
or clamps are used, a thrust block shall be formed and
poured behind the sleeve to prevent possible damage to
the main from pressure shocks which develop as valves
are first opened. Most tapping sleeves four-inch (4")
and larger currently used by the Department require
rubber gaskets. Pouring of molten lead during
installation may be required in some cases.
F. Line Valves: Line valves shall be gate valves conform-
ing to the Department Specifications. Line valves
shall be the same size as the main and shall open to
the left (counterclockwise). Line valves in ductile
iron pipelines shall have push-on ends. Line valves in
welded steel pipelines and valves used in conjunction
with tapping sleeves shall have flange ends. six-inch
(6") and larger line valves shall be fitted by the
Contractor with a two-inch (2") by-pass valve in
accordance with Sheets 17 and 18 of the Standard
Drawings.
Revised 07-92
5-6
G. Check Valves: A check valve permits flow in one direc-
tion only, closing when the flow stops so that no flow
reversal can occur. They are generally used in meter
installations and at service zone boundar-ies to allow
the lower service zone to provide supply to the higher
service zones during emergencies. They are otherwise
prohibited unless specifically approved by the
Department. (See Sheets 21 and 22 of the Standard
Drawings. )
5.06 FIRE HYDRANTS
Fire hydrant type and size is determined by the local
fire department. Standard types of fire hydrants currently used
by the Department are two and one-half-inch (2-1/2") single
built-up, two and one-half-inch (2-1/2") by four-inch (4") dou-
ble, and four-inch (4") by four-inch (4") double. The single
type is used where the maximum static pressure is in excess of
two hundred and ten pounds-per-square-inch (210 psi) and the two
double types are used where the maximum static pressure is two
hundred and ten pounds-per-square-inch (210 psi) or less.
Fire hydrant installations shall have all joints within
the lateral restrained. Push-on joints, cast mechanical
couplings, and steel mechanical couplings shall be fitted with
lock-j oint gaskets I yokes and rods, and anchor box assemblies I
respectively. Ductile iron fire hydrant installations shall have
the lateral, bury ell and mid-section encased in polyethylene
material in accordance with section 5.07(A) and S.10(E).
All steel mains shall have fire hydrant laterals of
steel only. Ductile iron mains can have fire hydrant laterals of
either ductile iron or steel. See Sheets 28A thru 33 of the
Standard Drawings.
5.07 CORROSION MITIGATION
For all main extensions, the Applicant shall provide to
the Department after the curbs and gutters have been-installed, a
soil resistivity survey of the main installation area performed
by a Corrosion Specialist certified by the National Association
of corrosion Engineers, or a corrosion Engineer registered by the
State of California. The soil resistivity readings shall be
taken at each intersection, cul-de-sac, 500 foot intervals, and
both sides of obvious cut and fill areas.
A. Polyethylene Encasement Material: Polyethylene tUbes
shall be used on all cast iron or ductile iron pipe,
fittings, rods, and appurtenances. Polyethylene mater-
ial shall conform to the Materials specifications and
shall be installed as shown on Sheet 11 of the standard
Drawings.
Revised 07-92
5-7
B. Cathodic Protection: All steel mains shall be placed
under a galvanic cathodic protection system that is:
1. Designed in accordance with guidelines established
in this Section.
2. Reviewed and approved by the Department.
3. Installed and tested as shown on Sheets 27A thru
27D of the Standard Drawings, by a Corrosion
Engineer (someone under the direct supervision of,
or by a Corrosion Specialist certified by the
National Association of Corrosion Engineers, or a
Corrosion Engineer registered by the State of
California.
Revised 07-92
Steel mains, including fire hydrant laterals and
service laterals four-inch (4") and larger shall be
electrically isolated from cast iron, ductile iron,
concrete cylinder, and existing steel mains with
Department-furnished pre-assembled insulating
flanges.
Test stations shall be located, in order of
preference, adjacent to fire hydrants, adjacent to
line valves, and adjacent to insulating flanges.
Following is a table that lists insulating flange,
anode, and test station requirements for various
situations that may be encountered during design of
a main extension involving steel pipe:
5-8
Pre-Ass'd
Ins.
No. Description
Flange
Required
2.
3.
4.
5.
6.
7.
Steel main connection to *Yes
non-steel main (cast iron,
ductile iron, reinforced
concrete cylinder, pre-
stressed concrete cylinder,
and modified pretension
pipe. )
steel main connection to Yes
existing steel main.
Steel main at 2500-foot Yes
maximum intervals.
steel main at fire hydrant No
laterals spaced 1000 feet
or less, or steel main at
600-foot maximum intervals
in the absence of strategi-
cally spaced fire hydrants.
Steel main or steel *Yes
fire hydrant lateral of
length between 50 feet and
100 feet connected to non-
steel main.
steel main or steel fire *Yes
hydrant lateral of length
less than 50 feet connected
to non-steel main.
Encased steel main or steel *Yes
fire hydrant lateral of
length less than 100 feet
connected to non-steel main.
No. of Anodes
Required
(Pipe Dia.)
(4" - 12"1"
4
4
**2
1
2
*steel mains need no insulation from A.C. mains.
Test
Station
Required
Yes
Yes
Yes
Yes
No
No
No
**Any two fire hydrant laterals separated by a distance greater
than 600 feet shall be provided with an extra anode at both
hydrants for every additional 200 lineal feet of spacing or
portion thereof.
Revised 07-92
5-9
5.08 BLOW-OFFS
Two- inch (2") blow-offs shall be required whenever a
Distribution Main dead-ends unless a fire hydrant, which can
serve as a blow-off, is provided at the same location. Two-inch
(2") blow-offs shall be assembled as shown on Sheets 15 and 16 of
the Standard Drawings.
5.09 STEEL PIPE STANDPIPES AND MAINTENANCE HOLES
Steel pipe standpipes and maintenance holes shall be
provided for access to four-inch (4") and larger check valves and
other installations. See Sheets 21 and 22 of the Standards
Drawings.
5.10 REINFORCEMENT OF OPENINGS IN WELDED STEEL PIPE
Fittings used to divide or combine flows (i.e., tees,
crosses) do not have as high a resistance to internal pressure as
pipes of the same thickness. This is because a portion of the
side wall of these fittings is removed to allow for the branching
pipe. The strength of these fittings shall be investigated and
reinforcement provided in accordance with Sections 13.3 thru 13.7
of AWWA MIl, "Steel Pipe - A Guide for Design and Installation",
as last revised.
5 11 THRUST BLOCKS
Concrete thrust blocks shall be sized for the test
pressure of the main and the allowable soil bearing capacity.
The test pressure is generally one and one-half times the maximum
static pressure. For design purposes, a minimum of 200 psi shall
be used for all main installations. Standard sizes and shapes of
thrust blocks based on two hundred (200) psi water pressure and
various types of soil are shown on Sheet 12 of the Standard
Drawings.
The thrust blocks shall be two thousand (2000) psi or
greater compressive strength concrete conforming to the Materials
Specifications.
5.12 LENGTH OF RESTRAINED PIPE
Ductile iron fittings subjected to unbalanced
hydrostatic forces and the adjacent sixty
pipe (ten (10) lineal feet for horizontal
shall be restrained with lock-joint gaskets
mechanical couplings).
Revised 07-92
(60) lineal feet of
11-1/4 degree bends)
or yokes and rods (at
5-10
steel pipe shall be restrained throughout the entire
length. Noninsulating mechanical couplings shall be fitted with
anchor boxes and shall be electrically bonded in accordance with
Sheet 14, and Sheets 27A and 27B of the Standard Drawings,
respectively.
5.13 PROTECTIVE CONCRETE SLABS OVER PIPE
Under unusual circumstances, it may be necessary to lay
pipe at shallow depths. Concrete slabs shall be used over the
pipe to protect it from traffic. The slabs shall be designed to
support traffic loads without transmitting the impact, or load,
to the pipe whenever the pipe cover is less than two feet (2').
Concrete slabs shall be installed only with the approval of the
Department.
5.14 CASING PIPE
Installation of mains through rights-of-way or ease-
ments of others, such as highways, railroads, etc., may require
encasement or thimbles. The type of casing materials and its
properties will be specified by the agency granting permission to
cross. The casing shall not come in contact with the pipe being
encased. Such crossing shall also be subject to approval by the
Department to avoid conflicts in requirements or standards
between the Department and the persons or agency granting
permission to cross.
Revised 07-92
CHAPTER 6
SERVICE LATERALS AND METERS
6.01 GENERAL
water is conveyed from mains to the plumbing of
customer's premises by service laterals. In the context of these
Standards, service laterals include all pipe, fittings, valves,
and appurtenances up to the meter. All water pipe beyond the
meter is controlled by the Los Angeles Plumbing Code.
All new or replacement domestic and fire service
laterals installed in areas being supplied with potable water
from the Department shall conform to the following minimum
standards which shall be binding regardless of the regulations of
any other agency covering like installations.
6.02 OWNERSHIP AND MAINTENANCE
. Rule 16 of the Rules Governing Water and Electric
Service in the City of Los Angeles deals extensively with
ownership, installation, and maintenance of service laterals and
meters. These Engineering Standards are intended to be
supplemental and subordinate to those rules and will be so
construed in any conflicting situations.
A. Ownership: The service lateral and meter through which
a customer receives water service from the facilities
of the Department are the sole property of the City
under the control of the Department and installed at
the expense of the Applicant.
B. Maintenance: The Department will maintain the service
lateral and meter except as set forth under the refer-
enced rules.
A customer shall provide and maintain reasonable access
for Department representatives to all service laterals,
meters, backflow prevention devices, or other facili-
ties pertinent to water service installed on the
customer's premises.
C. Repair Services Available: The Department will main-
tain and repair the service lateral and the meter. The
customer has total responsibility for all repairs be-
yond the meter.
Revised 07-92
6-2
6.03 LAYOUT
service laterals shall not be installed within a
three-foot (3') horizontal distance of other utilities.
The main to be tapped shall extend along the front lot
line of the property to be served. In the case of corner lots,
the property may be served from the side lot line.
If service is requested for lots at the end of a
cul-de-sac street, the main to be tapped shall not be more than
fifty feet (50') from any property line in the cul-de-sac.
6.04 COMBINATION SERVICE LATERALS
A property requiring a domestic service lateral and a
fire service lateral is generally served from a single tap. The
domestic service lateral is connected to the fire service lateral
ahead of the fire service curb valve. No more than one domestic
service connection shall be installed on a fire service lateral
unless specifically approved by the Department. occasionally,
services and fire hydrants are supplied from a single tap.
6.05 PUMPS
Except where specifically authorized by the Department,
the installation of pumps designed to increase water pressure in
service laterals is prohibited.
6. 06 SERVICE TAPS
A. On Existing Water Mains: Service taps (connections) on
existing mains are generally made by the Department
while the main is in service. The Contractor may be
required to install four-inch (4") and larger services
by connecting to the valve provided by the Department.
In specific instances, the Department may allow service
taps to be made by an approved contractor. -
B. On New Water Mains: service taps on new mains
installed by contract are made by the Contractor.
Service connections shall be wet-tap. Wet-tap
connections shall be made after testing and
disinfection of the main installation. Refer to
section 8.27 for other conditions which must be met
prior to wet-tapping.
Revised 07-92
6-3
C. Tapping: Adjacent taps shall be spaced - a minimum of
two feet (2'). In tapping water mains, it may be
necessary to dig out bedding material and to cut or
remove part of the polyethylene wrapping in ductile
iron pipe and to remove part of the enamel undercoating
and cement coating in steel pipe. When tapping steel
pipe, the reinforcing wire in the cement mortar coating
must not come in contact with the pipe or the
corporation valve. After the taps are made, the
polyethylene wrap in ductile iron pipe shall be
repaired or replaced in accordance with Sheet 11 of the
Standard Drawings, and the steel pipe recoated with
coal-tar enamel and cement that conform to the
Materials Specifications. Any bedding material removed
during excavation shall be replaced in kind and
compacted in accordance with section 7.11(A).
D. Tapping Sleeves and Tees: Tapping sleeves or clamps
are used to tap existing mains that are in service and
under pressure without interrupting service. They are
also used to tap new mains. Care shall be exercised to
select sleeves and gaskets which are properly sized to
fit the type and class of pipe to be tapped. Where
four-inch (4") and larger tees and tapping sleeves are
used, a thrust block shall be formed and poured behind
the sleeve or tee to prevent possible damage to the
main from pressure shocks which develop as valves are
first opened. Tapping sleeves and tees shall conform
to the Materials Specifications of these Engineering
Standards.
The tapping fitting required for a given type and
of water main shall be as follows:
TYPE OF MAIN AND SIZE OF TAP
SIZE DUCTILE IRON STEEL
OF (INCHES) (INCHES)
MAIN 1 1-1[2 4 6 8 12 1 1-1l2
~
6 8
4" B B T N N N W W F N N
6" B B C T N N W W F F N
8" B B C C T N W W F F F
12" B B C C C T W W F F F
"B" - Double-strap bronze clamp required.
"C" - Tapping sleeve/clamp required.
size
12
N
N
N
F
"T" - Tee required when the minimum peak-hour pressure is
under seventy-five (75) psi. Tapping sleeve/clamp
may be allowed under shutdown situations that cause
severe customer inconvenience.
"N" - Connection is not permitted.
"W" - Steel welding coupling is required.
"F" - Steel flanged nipple required.
Revised 07-92
6-4
E. Insulation: Two-inch (2") and smaller service
connections to all steel water mains shall be
electrically insulated by means of insulating couplings
that conform to the Materials specifications.
Four-inch (4") and larger ductile iron service laterals
shall be encased in polyethylene material in accordance
with Sheet 11 of the Standard Drawings. Four-inch (4")
and larger steel service laterals shall be provided
with a galvanic cathodic protection system in
accordance with Sections 5.07(B) and 8.11(F). The
Contractor may be required to install a total of two
(2) pre-assembled insulating flanges in four-inch (4")
and larger steel service laterals when the main being
tapped is of non-steel, or of steel that lacks adequate
cathodic protection.
6.07 SERVICE LATERALS
A. Size: Service laterals shall be sized to supply the
requirements of the property being served. The minimum
size allowable for a service pipe shall be one inch
(1")
B. Pipe Material: Plastic pipe shall not be used. All
service laterals supplying water from the Department's
system shall conform to one of the following
specifications:
1. Seamless Copper Tube
Specifications shall
through two-inch (2")
conforming to the Materials
be used for one-inch (1")
service pipe.
2. Ductile Iron Pipe conforming to the Materials
Specifications shall be used for four-inch (4") and
larger service pipe connected to cast iron, ductile
iron or asbestos cement water mains.
3. Steel Pipe conforming to the Materials
specifications shall be used for four-inch (4") and
larger service pipe connected to steel water mains,
or where required by the Department.
C. Installation: Service laterals shall be designed and
installed as shown in Sheets 38 thru 50 of the Standard
Drawings for size two-inch (2") and smaller, and in
conformance with Chapters 3, 5, 7, and 8 for size
four-inch (4") and larger, except Where noted differ-
ently in this Chapter.
All joints in four-inch (4") and larger service
laterals shall be firmly anchored to each other.
Revised 07-92
6-5
Cover from top of service lateral to nearest gutter
grade shall be a minimum of two feet (2') for two-inch
(2") and smaller service laterals, a minimum of two and
one-half feet (2-1/2') for four-inch (4") to eight-inch
(8") service laterals, and three feet (3') for
twelve-inch (12") service laterals. The service
lateral shall be installed at lower depths if the
Department determines that the installation at normal
depth is not desirable.
6.08 CORPORATION VALVES, CURB VALVES, AND BRONZE FITTINGS
Corporation valves provide the connection for the
service lateral to the main for small services. By utilizing a
corporation valve, a service can be connected to the main without
taking the main out of service. Corporation valves are also used
in a variety of other miscellaneous installations.
Curb valves are set on the service lateral of small
services on the inlet side of the meter box to provide a means to
shut off the service lateral during repair or replacement of the
meter.
Miscellaneous bronze fittings (i.e., elbOWS, insulating
couplings) shall be used where appropriate throughout the system,
subject to the approval of the Department.
Corporation and curb valves and miscellaneous bronze
fittings shall conform to the Materials Specifications.
6.09 GATE VALVES AND STANDPIPES
Four-inch (4") and larger gate valves of the same size
as the service lateral shall be installed on the service lateral
adjacent to the tee or tapping sleeve, on the inlet side of the
detector check meter, and on both sides of the domestic meter.
Four-inch (4") and larger gate valves used with steel
or ductile iron service pipe within the service vault shall be
flanged gate valves with cast iron or ductile iron bodies
conforming to the Materials Specifications. All eight-inch (8")
and larger gate valves installed in a vault or aboveground shall
be supported by concrete stands or grout-filled concrete blocks.
Unless installed in a vault or aboveground, all
four-inch (4") and six-inch (6") gate valves shall be equipped
with a cast iron vertical gate cap, steel split sleeve, and steel
standpipe. All eight-inch (8") and twelve-inch (12") gate
valves, not installed in a vault or above-ground, shall be
equipped with a cast iron vertical gate cap, steel split sleeve,
Revised 07-92
6-6
steel standpipe, and eight-inch (S") by six-inch (6") steel
standpipe bottom. The standpipe shall not bear and transmit
shock, external loads, or electrical continuity to the valve and
shall be centered and plumb over the wrench nut of the valve,
with the gate cap set to finished grade or an elevation
determined by the Department. See Sheet 13 of the Standard
Drawings.
6.10 METERS
All meters installed for billing purposes
under the control of the Department, be obtained
Department, and conform to the Engineering Standards.
shall be installed until the proposed installation
approved and the meter tested by the Department.
Shall be
from the
No meter
has been
There are three (3) categories of meters currently
being installed by the Department. Meters used to record volume
of water for domestic needs are called domestic meters. Meters
used to detect fire line usage are called detector check valves
and are used on fire services. Dual-purpose meters used to
measure combined large flows (for fire protection systems) and
small flows (for domestic systems) are called F.M. (Factory
Mutual) meters.
The characteristics which
meters are accuracy, sensitivity,
cost, and ease of maintenance.
are of special importance in
durability, pressure loss,
All meter installations will be inspected and approved
by the Department. Installations which do not comply with the
approved plans and specifications shall be made to conform prior
to acceptance by the Department.
A. Type of Meters: The various types of meters currently
being installed in the Distribution System are positive
displacement, compound, turbine, detector cheCk valve,
and F.M. The type of meter installed shall be
determined by the Department at the time of application
based upon size, service and f low requirements,
location of meter, and other conditions which may
exist.
B. positive Displacement Type Water Meters: Displacement
meters are positive in action. The measuring Chambers
supply a fixed quantity of water for each nutation or
oscillation of the disc or piston when operated under
Revised 07-92
6-7
positive pressure. Meters are available in five
eights-inch (5/8") thru two-inch (2") sizes. One and
one-half-inch (1-1/2") and two-inch (2")" meters are
equipped with inlet and outlet oval type flanges.
C. Compound and Turbine Meters: Compound meters consist
of two meters in a single case separated by a check
valve. One meter measures small flows and the other
measures large flows. Compound meters are designed so
that the small meter operates during low flows and as
flows begin to increase, the check valve opens and the
large meter takes over. When the large meter is in
operation, the small meter is also in operation.
Turbine meters are deigned to measure primarily large
flows, and should not be used where the possibility of
small flows (below the manufacturer's stated minimum
flow) exists.
D. Detector Check Valves: Detector check (DC) valves are
assemblies that consist of a check valve in the main
line and a positive displacement meter in the bypass
line to detect flow. Detector check valves are
designed to provide large, unmeasured flows for fire
protection purposes with minimum pressure losses.
E. F.M. (Factory Mutual) Meters: F.M. meters allow the
consumer to use one service line to supply various
combinations of domestic, private fire hydrant, and
f ire sprinkler systems. F. M. meters measure large
flows and are always used in combination with a smaller
meter to measure the smaller flows through a bypass
line.
F. Meter setting: All meters shall be installed in a
horizontal position and housed in a Department-approved
box or vault. The Department will set all meters
smaller than four-inch (4") except when the Contractor
is specifically authorized in writing by the
Department.
G. Meter Bypass Lines: Bypass provisions are required for
all four-inch (4") and larger domestic service
installations, unless otherwise specified by the
Department. Bypass designs mayor may not contain a
meter but shall contain an independent control valve on
each end of the installation. Bypass lines permit the
consumer to have water while the domestic meter is
being repaired or replaced.
Revised 07-92
6-8
6.11 RESIDENTIAL METER BOXES AND COVERS
Small service meters are housed in t ~ e following
manner:
Service
Size
1"
1-1/2" & 2"
3" Eq.
Meter Box
and Cover Tvpe
No.2 plastic (high-den-
sity polyethylene molded
structural foam) box with
No. 2 concrete cover and
C.l. hinged lid.
No. 2 concrete (cast-in-
place) box with No. 2
steel algrip cover.
No. 3 plastic (rein-
forced polymer mortar
(RPM) top ring and fiber-
glass reinforced plastic
(FRP) walls) with No. 3
reinforced polymer concrete
(RPC) cover.
No. 3 concrete (cast-in-
place) box with No. 3
steel algrip cover.
Two No. 3 plastic (RPM top
ring and FRP Walls) boxes
(side by side) with one
No. 3 RCP cover per box.
Concrete (cast-in-place)
box with two No. 3 steel
algrip covers.
Application
Sidewalk
loading
Traffic
loading
Sidewalk
loading
Traffic
loading
Sidewalk
loading
Traffic
loading
Sheets 38 thru 43, and 45 thru 46 of the Standard
Drawings show one-inch (1") thru three-inch equivalent (3" Eq.)
services designed for sidewalk loading applications.
Revised 07-92
6-9
6.12 LARGE SERVICE VAULTS
Large services are generally installed ih underground
vaults or when authorized by the Department, on aboveground
concrete pads. Services installed underground shall be provided
with vaults designed by a registered Civil Engineer in accordance
with accepted reinforced concrete theory.
All vaults, except those that are installed flush with
the surface grade, shall be designed for a depth of cover that
may vary from one foot (1') to four feet (4') and be equipped
with removable top deck(s) and an access pre-cast concrete
manhole, ring, frame, and cover. Vaults installed flush with the
surface grade shall incorporate the Department's No. 3 or No.4
meter box cover into the top slab.
The Department will accept the following types of
vaults subject to approval by the City of Los Angeles, Public
Works Department, Bureau of Engineering, Structural Engineering
Division:
A. Plastic Vaults: Plastic Vaults are generally installed
in parkway areas flush with the surface grade and are
designed for sidewalk loading only. Sheets 51 thru 60
of the Standard Drawings show services housed by
City-approved plastic vaults designed for sidewalk
loading.
B. Precast Concrete Vaults: Concrete vaults are generally
installed in parkway and roadway areas. Vaults
installed in roadway areas shall be designed to meet or
exceed the Department's Standard Specification for
Precast Concrete substructures and Accessories, as last
revised. Sheets 61 thru 72 of the Standard Drawings
show services housed by standard-size pre-cast concrete
vaults.
C. Grout-Filled Concrete Block Vaults: Concrete block
vaults are generally installed in parkway areas flush
with the surface grade and are designed for sidewalk
loading only. Sheets 73 thru 84 of the Standard
Drawings show services housed by standard-size
grout-filled concrete block vaults; sheets 85 and 86 of
the Standard Drawings show city-approved reinforcement
for same vaults.
Large domestic meters and detector checks are housed in
the following manner:
Revised 07-92
service size
and Type
4" Dom.
Service
6" Dom.
Service
8" Dom.
Service,
10" Dom.
Service,
8" F.M.,
10" F .M.,
Combination
Dom. Service
and Fire
Service
4" Fire
Service,
6" Fire
Service,
& 8"Fire
Service
10" Fire
Service
Revised 07-92
6-10
Vault and Cover
Sizes and Types
48-inch by 72-inch plastic
RPM (Reinforced Polymer Mortar)
top and RPM or FRP (Fiberglass
Reinforced Plastic) walls)
vault with RPM cover.
48-inch by 78-inch precast
concrete vault with one-inch
thick No. 3 steel hinged cover.
40-inch by 88-inch concrete
block vault with three No. 3
concrete-filled meter covers.
72-inch by 96-inch precast
contrete vault with one-inch
thick No. 4 steel hinged cover.
Special
48-inch by 48-inch plastic (RPM
top and RPM or FRP walls) vault
with RPM cover.
48-inch by 60-inch precast vault
with one-inch thick No. 3 steel
hinged cover.
48-inch by 72-inch plastic (RPM
top and RPM or FRP walls) vault
with RPM cover.
72-inch by 96-inch precast
concrete vault with one-inch
thick No. 4 steel hinged cover.
Application
Sidewalk
Loading
Traffic
Loading
Sidewalk
Loading
Traffic
Loading
Sidewalk
Loading
and
Traffic
Loading
Sidewalk
Loading
Traffic
Loading
Sidewalk
Loading
Traffic
Loading
6-11
6.13 BACK FLOW AND BACKFLOW PREVENTION DEVICES
Backflow, which is the flow of water or other liquid or
foreign materials into the Department's Distribution System from
another source, is strictly prohibited and shall be prevented by
the installation of an appropriate, approved backflow prevention
device; purchased, installed, and maintained by the consumer at
the consumer's expense.
The type and complexity of the backflow prevention de-
vice shall be determined by the Department and shall be based
upon the degree of hazard caused to the public from contamination
by toxic, or nontoxic substances.
6.14 ON-SITE MAINS FOR FIRE SERVICES AND F.M. SERVICES
Private fire hydrants found in large parking lots, long
driveways, and fire protection systems found in department
stores, warehouses, etc., are supplied by on-site water lines
through either fire services or F.M. services. The water line
shall be sized by the local building and safety department or
fire department and the persons responsible for the structure it
protects. The Department will not size on-site water lines.
Revised 07-92
CHAPTER 7
EARTHWORK
7.01 EARTHWORK DEFINED
Earthwork shall include all clearing, grubbing,
grading, excavation, fill, backfill, excess excavation, bedding
material, borrow material, and surface restoration as may be
required to complete the work.
7.02 EXPLORATORY EXCAVATION
All underground utilities and structures that may
interfere with construction shall be located and the location
verified sufficiently in advance to permit necessary relocations
without delays.
7.03 ROAD PREPARATION
Prior to installation of water mains in streets, curbs
and gutters shall be in place and road construction shall have
progressed to within fifteen inches (15") of the finished street
grade. The road surface shall be smooth, clear of debris, and
free from deep holes, ruts and large rocks which may hamper main
installation.
7.04 EXCAVATION TO LINE AND GRADE
All excavations shall be made to lines and grades
established by the approved drawings. Pipe trenches shall be
excavated to a minimum depth of six inches (6") below the bottom
of the pipe. Deviation from grades will be allowed when approved
by the Department, in accordance with Sections 8.06 and 8.07 of
these Standards.
7.05 TRENCHING OPERATIONS
A. Trench Width: All existing asphalt or concrete
surfacing shall be saw-cut vertically in a straight
line that is slightly wider on each side than the
trench excavation to prevent raveling of the remaining
pavement during excavation and construction. Removed
asphalt or concrete surfacing material in its existing
form shall not be used in any fill or backfill.
Revised 07-92
7-2
The trench shall be excavated to a m ~ n ~ m u m width of
eighteen inches (18") or a minimum of six inches (6")
on each side of the pipe, whichever is greater, for
proper placement and densification of the bedding and
backfill material.
B. Trench Support: The Contractor shall comply with
Section 6500 of the Labor Code of the State of
California by preparing a detailed plan for the
excavation of all trenches five feet (5') or more in
depth showing the design of shoring, bracing and
sloping, or other provisions to be made for worker
protection from the hazard of caving ground during the
excavation of such trenches. A copy of this plan shall
be submitted to the Department, for information only,
in advance of construction. If such plan varies from
the shoring system standards established by the
construction Safety Order of the Division of Industrial
Safety, the plan shall be prepared by a Civil or
Structural Engineer registered by the State of
California. The Inspector will confirm that a
Registered Engineer has prepared the plan.
All excavations shall be shored in accordance with the
California Department of Industrial Relations
Construction Safety Orders, Article 6, Paragraph 1541,
Trenches, Section e, Trench Shoring Systems, and all
other related sections.
7.06 EXCAVATION FOR STRUCTURES
Except as otherwise dictated by construction
conditions, the excavation shall be of such dimensions as to
allow for the proper installation and removal of concrete forms,
or precast slabs and panels, and to permit the construction of
the necessary pipe connections. Care shall be taken to ensure
that the excavation does not extend below established grades. If
the excavation is made below such grades, the resulting excess
excavation shall be filled in with sand or graded gravel,
deposited in horizontal layers not more than six inches (6") in
thickness after being compacted, and shall be moistened to within
two percent (2%) of the optimum moisture content required for
compaction of that soil. After being conditioned to have the
required moisture content, the layers shall be compacted in
accordance with section 7.12(B).
Revised 07-92
7-3
7.07 SURPLUS EXCAVATION MATERIAL
All surplus excavation material shall be "removed from
the jobsite and disposed of properly. If the surplus excavation
is disposed of on private property, written permission shall be
obtained from the owner and a copy given to the Department.
7.08 BLASTING
In general, blasting will be allowed in order to
expedite the work if a permit by the local authority having
jurisdiction is granted. All explosives and appurtenances shall
be transported, handled, stored, and used in accordance with the
laws of the local, state, and federal governments as applicable.
7.09 DEWATERING
All pipe trenches or structure excavation shall be kept
free from water during pipe laying and other related work. The
method of dewatering shall provide for a completely dry
foundation at the final lines and grades of the excavation. All
water shall be disposed of in a suitable manner without being a
menace to public health or causing pUblic inconvenience. No
water shall be drained into other work being completed or under
construction.
The dewatering operation shall continue until such time
as it is safe to allow the water table to rise in the
excavations. Pipe trenches shall contain enough backfill to
prevent pipe flotation. When pipe is laid in a casing or tunnel
longer than thirty (30) pipe diameters, the pipe inside the
casing or tunnel shall be secured so flotation does not occur
when the pipe is empty.
Water shall not be allowed to rise in the excavation
until the concrete has set a minimum of twenty-four (24) hours,
and the forms have been removed. Water shall not be allowed to
rise unequally against unsupported structural walls.
7.10 FOUNPATIONS ON UNSTABLE SOIL
If the bottom of the excavation is soft or unstable
and, in the opinion of the Department, cannot satisfactorily
support the pipe or structure, a further depth and width shall be
excavated and refilled to six inches (6") below grade with
bedding material suitably densified to provide a firm foundation
for the pipe or structure.
Revised 07-92
7-4
7. 11 PIPE BEDDING
A. Installation of Bedding and pipe: After completion of
the trench excavation and proper preparation of the
foundation, pipe shall be laid a minimum of six inches
(6") above trench bottom on sand bags adjacent to pipe
bells before placement of bedding material. As an
alternative, a minimum of six inches (6") of sand
bedding material may be placed on the trench bottom for
support under the pipe with bell holes dug deep enough
to provide a minimum of two inches (2") of clearance
between the bell and bedding material. All pipe shall
be installed in such a manner as to ensure full support
of the pipe barrel over its entire length.
The minimum limits of bedding shall be from six inches
(6") below the bottom of the pipe to six inches (6")
above the top of the pipe. Approved backfill may then
be installed to the ground line. See Section 7.12 of
these Standards for backfill and compaction of
backfill.
Sand shall be water densified by flooding when
installing ductile iron pipe, and by flooding or
jetting when installing steel pipe, prior to
backfilling.
B. Beddina Material: The bedding material shall be 3/4
sack sand-cement slurry, or clean, well-graded, washed,
concrete sand with an electrical resistivity of not
less than 10,000 ohm per cubic centimeter and shall
conform to Subsection 200-1.5.3 of the Standard
Specifications for Public works Construction, as last
revised. When slurry is used, the pipeline shall be
laid on sandbags to ensure a minimum of six inches of
slurry under and around the pipe. The Department
reserves the right to specify the type of bedding
material to be used at any time.
7.12 BACKFILL AND COMPACTION
A. Pipes: Backfill shall be the fill placed above the
bedding. All backfill, except that within State
Highways, shall be placed as specified in Subsection
306-1.3.2 or 306-1.3.3, and compaction requirements
shall be in accordance with Subsection 306-1.3.4 of the
Standard Specifications for Public works Construction.
Backfill within State Highways shall be in accordance
with Caltran's latest specifications.
Revised 07-92
7-5
Excavations performed under permit by the City of Los
Angeles within the roadway portion of all paved streets
and alleys shall be backfilled with 3/4 sack
sand-cement slurry, unless otherwise permitted by the
City Engineer.
The backfill material on unpaved streets shall be
suitable native soil, suitable sand, or sand-cement
slurry. Suitable native soil shall consist of material
free of organics, rubbish, debris, and other
objectionables. Sand-cement slurry shall contain 3/4
of a sack of Portland cement to one cubic yard of
washed concrete sand with sUfficient water to
facilitate placement.
Backfilling shall be conducted at all times in a manner
to prevent damage to the pipe to prevent mixing of
bedding and backfill material or its coating and shall
be kept as close to the pipe laying operation as
possible.
B. Structures: Backfill for structures shall be from the
subgrade of the structure to ground level on dirt
surfaces or bottom of base layer on paved surfaces.
Compaction, material, and other requirements shall be
the same as for backfill for pipes.
7 . 13 CLEANUP
Upon completion of the Main Extension, all rubbish,
unused materials, concrete forms and other like material shall be
removed from the jobsite. All excess excavation shall be
disposed of properly and the areas shall be left in a state of
order and cleanliness.
7.14 SURFACE RESTORATION
A. Unsurfaced Areas: All surface cuts shall be restored
to a condition equal to that prior to construction. All
streets shall be restored in accordance with the
regulations and requirements of the agency having
control or jurisdiction over the street, roadway, or
easement.
B. Surfaced Areas: All surface cuts shall be, as a
minimum, restored to a condition equal to that prior to
construction. All streets shall be restored in
accordance with the regulations and requirements of the
agency having control or jurisdiction over the street,
roadway, or easement.
Revised 07-92
7-6
C. Easements, Cultivated or Agricultural Areas: In
easements, cultivated or agricultural areas, topsoil to
a depth of eight inches (8") shall be removed from the
area of general disturbance and stockpiled. After
installation of all pipelines, appurtenances and
structures, and completion of all backfill and
compaction, the stockpiled topsoil shall be
redistributed evenly over all disturbed areas. Care
should be taken to conform to the original ground
contour or final grading plans.
Revised 07-92
CHAPTER 8
PIPE INSTALLATION
8.01 APPROVAL BY THE DEPARTMENT
Throughout these Standards, many handling and installa-
tion procedures, tools, equipment, and materials require approval
by the Department. Approval by the Department is used solely as
a means to ensure quality control and safety, and in no manner
shall it render the Department liable for any injuries suffered
or equipment damaged. Safety of workers shall be provided as
required by the California Occupational Safety and Health
Administration (Cal-OSHA).
8.02 HANDLING OF MATERIALS
Pipe and fittings shall be loaded and unloaded by
lifting so as to avoid shock or damage. Under no circumstances
shall such material be dropped. If, however, any part of the
coating or lining is damaged, the replacement or repair of the
damaged pipe shall be done to the satisfaction of the Department.
Any pipe or fittings that are not acceptable to the Department
shall be removed from the jobsite immediately. All pipe handling
equipment and pipe handling methods shall be approved by the
Department.
8.03 PREPARATION AND INSPECTION OF PIPE AND FITTINGS FOR
INSTALLATION
Before placing pipe in the trench, each pipe length or
fitting shall be thoroughly cleaned of all foreign material, kept
clean thereafter, and carefully examined for cracks and other
defects before installation. Bell ends and spigot ends are to be
examined with particular care.
8.04 PIPE JOINT LUBRICANT
Joint lubricant shall be as supplied by
manufacturer and approved by the Department. Joint
shall be nontoxic and water soluble.
8.05 CUTTING AND FITTING OF PIPE
the pipe
lubricant
pipe shall be cut, whenever necessary, to conform to
location of fittings, line, or grade. All cuts shall be straight
and true, and made in a workmanlike manner so as to leave a
smooth end without damaging the pipe. The cut ends of pipe shall
have all burrs removed and be lightly rasped or filed. All tools
used in cutting pipe shall be approved by the Inspector.
Revised 07-92
8-2
POWER-DRIVEN SAWS WITH ABRASIVE DISCS (MASONRY BLADES)
SHALL NOT BE USED FOR DRY CUTTING OR BEVELING A"SBESTOS-CEMENT
PIPE IN RECOGNITION OF EFFORTS TO REDUCE THE INCIDENCE AND
CORRESPONDING DANGER OF AIRBORNE PIPE FRAGMENTS WHEREVER CUTTING
IS NECESSARY.
8.06 PIPE ALIGNMENT AND GRADE
In laying pipe, the intent is to lay and set line and
grade within a tolerance of three inches (3") plus or minus. On
relatively level ground, the intent 1S to lay to grade.
Fittings, valves and hydrants shall be installed at specified
locations and elevations.
When laying pipe on curves, the intent is to lay to the
alignment. The pipe shall be kept in alignment by placing all
the joints on the curve. When laying ductile iron pipe, short
lengths of pipe or eleven and one quarter (11-1/4) degree bends
shall be used as necessary to accomplish the curvature without
exceeding individual joint deflections specified by the pipe
manufacturer. When laying steel pipe, specified alignment may be
accomplished by pulling joints, trillUlling spigots, using elbows,
and using short lengths of pipe in accordance with Sheet 10 of
the Standard Drawings.
The cover on pipes smaller than twelve inches (12") in
diameter shall be not less than thirty inches (30") nor more than
forty-two inches (42"); and on pipe twelve inches (12") or larger
in diameter, the cover shall be not less than thirty-six inches
(36") nor more than forty eight inches (48"). Cover shall be
measured to nearest gutter flow line grade. If difficulties
arise when crossing substructures, deviations from cover limits
will be permitted in accordance with Sheet 7 of the Standard
Drawings.
Any changes in alignment and grade shall be authorized
by the Department and shall be accomplished by the installation
of additional fittings. Pulling of joints is permitted only when
installing pipe where the finished surface has horizontal or
vertical curves.
pipe shall be laid with bell ends facing the direction
of laying, unless directed otherwise by the Inspector.
8.07 DEVIATION FROM ALIGNMENT AND GRADE OCCASIONED BY OTHER
STRUCTURES
Whenever obstructions not shown on the plans interfere
to such an extent that an alteration in the plans is required,
the Department shall have the authority to determine the best
method of correction. The Department will request the plans to
Revised 07-92
8-3
be modified and order a deviation from l i n e ~ and grade,
arrangements may be made with the owners of the structure for its
removal, relocation, or reconstruction. If the extent of the
plan modifications require a revised permit, the modified plans
shall be submitted to the Department for approval.
8.08 TEMPORARY BULKHEAPS
Whenever the installed pipe is left unattended,
temporary plugs shall be installed at all openings. Temporary
plugs shall be watertight and designed to prevent children and
animals from entering the pipe. All temporary plugs shall be
approved by the Department.
8.09 EXCAVATION, BEppING AND BACKFILL
See Chapter 7 of these Engineering Standards for all
specifications on earthwork.
8.10 DUCTILE IRON PIPE
A. Push-on Joint: Immediately before joining two lengths
of ductile iron pipe, the inside of the bell, the
outside of the spigot end, and the rubber gasket shall
be thoroughly cleaned to remove oil, dirt, grit, excess
coating, and other foreign matter. The rubber gasket
shall be flexed inward and inserted in the gasket
recess of the bell socket. caution shall be exercised
to ensure the correct type of gasket is used.
A thin film of gasket lUbricant shall be applied to
either the inside face of the gasket, or the spigot end
of the pipe being inserted, or both.
The spigot end of the pipe shall be placed in the bell
end with care to prevent the joint from contacting the
ground. The joint shall be completed by slowly and
steadily pushing the pipe home. Pipe furnished without
a depth mark shall be marked before assembly to assure
insertion to full depth of the joint. The spigot end
of field-cut pipe lengths shall be filed, or ground to
resemble the spigot end of such pipe as manufactured.
B. Flanged Joint: Before joining flanged joint fittings,
all parts and jointing surfaces shall be thoroughly
cleaned to remove oil, dirt, grit, excess coating, and
other foreign matter.
Prior to
shall be
flanges.
Revised 07-92
bolting flanges, connecting fittings or pipe
properly supported to reduce stress on the
With the flanges properly aligned, the gasket
8-4
shall then be slipped into position, and secured in
position by inserting the bolts through the flanges.
All nuts shall be turned finger tight and tightened in
a staggering sequence by a wrench. .
C. Caulk Joint: Before joining caulk joint fittings, all
parts and jointing surfaces shall be thoroughly cleaned
to remove grit, excess coating, and other foreign
matter.
Caulk joints, Where required, shall be constructed with
the lead embedded in the joint a minimum of two and
one-half inches (2":;"). Rubber or paper packing shall
be packed tightly in the bottom of the joint. The
joint shall be poured with molten lead in one
continuous pour. After the poured lead has cooled, all
clay or material used as a mold shall be removed from
the pipe, and the lead shall be caulked a minimum of
four (4) passes to ensure a secure, watertight joint.
Lead shall meet the requirements of the Standard
Specifications.
D. Mechanical Couplings: When installing mechanical
couplings, care shall be taken to ensure that the
connecting pipe ends, couplings, and gaskets are clean
and free of all dirt and foreign matter with special
attention given to the contact surfaces of the pipe,
gaskets, and couplings. These couplings shall be
assembled and installed in conformity with the
recommendations and instructions of the coupling
manufacturer. The two sections of pipe connected by
the mechanical coupling shall be separated by a minimum
of one inch. Coupling bolts shall be tightened so as
to secure a uniform annular space between the follower
rings and the body of the pipe and all bolts tightened
approximately the same amount. Diametrically opposite
nuts shall be tightened progressively and evenly.
Final tightening shall be done with a torque-limiting
wrench set for the torque recommended by the coupling
manufacturer.
Mechanical couplings installed within sixty feet (60')
of fittings SUbjected to unbalanced hydrostatic forces,
shall be restrained by using yokes and rods furnished
by the Department.
E. Polyethylene Encasement: Ductile iron pipe and all
appurtenances shall be wrapped with polyethylene tubes.
The pipe must be clean prior to installation of the
polyethylene tubes. The polyethylene encasement shall
prevent contact between the pipe and bedding material.
polyethylene pipe wrap material shall be applied to
line pipe and appurtenances in the manner shown on
Revised 07-92
8-5
Sheet 11 of the standard Drawings. The polyethylene
shall be clear colored, have a minimum wall thickness
of eight (8) mils, and shall conform to the Materials
Specif ications. A 10-mil thick dielectric pressure-
sensitive tape shall be used to close seams or hold
overlaps. Damage to polyethylene pipe wrap in the
trench prior to and during backfill shall be repaired
to the satisfaction of the Department. Exposure to
sunlight of the polyethylene pipe wrap shall be
minimized to prevent deterioration.
8. 11 STEEL PIPE
Installation of steel pipe and appurtenances shall be
in accordance with the AWWA MIl Steel Pipe Design Manual, as last
revised, except where noted differently herein.
A. Welded Joint: Field-welded joints and connections
shall be performed in accordance with the procedure of
the American Welding society by operators currently
qualified under the Standard Qualification Procedure of
the American Welding Society I as last revised. The
Department's Inspector shall have the right to require
any welder to qualify by making tests at a designated
Department yard at no cost to the Department. The
Inspector shall have the right at any time to call for
and witness the making of test specimens by any welder.
B. Flanged Joint: Before joining flanged joint fittings,
all parts and jointing surfaces shall be thoroughly
cleaned to remove rust-preventing grease, oil, grit,
burrs, excess coating, and other foreign matter.
Prior to bolting flanges, connecting fittings and pipe
shall be properly supported to reduce stress on the
flanges. With the flanges properly aligned, the gasket
shall then be slipped into position, and secured in
position by inserting the bolts through the flanges.
All nuts shall be turned finger tight and tightened in
a staggering sequence by a wrench.
C. Coating: Field-welded joints, holidays, connections,
gate valves, mechanical couplings and all other
fittings shall be coated in accordance with AWWA C203
standards (hot-applied, coal-tar enamel) or AWWA C209
standards (cold-applied, tape-coating, type I or II),
and AWWA C205 standards (reinforced cement-mortar
coating), as last revised. As an alternative,
field-welded joints and mechanical couplings may be
fitted with heat shrink sleeves made for corrosion
protection that conform to the Materials
Specifications.
Revised 07-92
8-6
D. Mechanical Couplings: Mechanical couplings installed
on steel main extensions shall be non-insulating type
and shall be bonded in accordance with Sheets 27A thru
27D of the Standard Drawings. When installing
mechanical couplings, care shall be taken to ensure
that the connecting pipe ends, couplings, and gaskets
are clean and free of all dirt and foreign matter with
special attention given to the contact surfaces of the
pipe, gaskets, and couplings. These couplings shall be
assembled and installed in conformity with the
recommendation and instructions of the coupling
manufacturer. Coupling bolts shall be tightened so as
to secure a uniform annular space between the follower
rings and the body of the pipe and all bolts tightened
approximately the same amount. Diametrically opposite
nuts shall be tightened progressively and evenly.
Final tightening shall be done with a torque-limiting
wrench set for the torque recommended by the coupling
manufacturer.
Anchor boxes conforming to Sheet 14 of the standard
Drawings shall be installed on all mechanical
couplings.
E. Insulating Joints: Insulating joints, in general,
shall be installed between dissimilar metals, every two
thousand five hundred feet (2500 ') of steel main and
between old steel main and new steel main. Pre-
assembled insulating joints shall be purchased from the
Department. Special care shall be exercised during the
installation of these fittings to prevent electrical
conductivity across the insulating joint.
F. Cathodic Protection: All steel water mains shall be
placed under a galVanic cathodic protection system
installed and tested by a Corrosion Engineer registered
by the State of california, a Corrosion Specialist
certified by the National Association of Corrosion
Engineers, or someone under the direct supervision of a
Registered corrosion Engineer. The Department retains
the option of installing and testing this-system, the
cost of which shall be borne by the Applicant.
The following guidelines shall
installing and testing a cathodic
See also Sheets 27A thru 27D of the
be observed when
protection system.
standard Drawings:
Revised 07-92
The Contractor shall protect the cathodic
protection system including, but not limited to,
inSUlating joints, anodes, wire leads, and test
stations.
2.
8-7
Two-inch (2 ") and smaller
connected to steel pipe shall
coated as shown on Sheet 50
Drawings.
service laterals
be installed and
of the Standard
3. Test stations shall be located, in order of
preference, adjacent to fire hydrants, adjacent to
line valves, and adjacent to insulating joints.
4. Test station locations shall be recorded.
5. Test station wire leads shall be properly
identified using N, S, E, W directions and capable
of allowing current readings using a 0.01 ohm, 6
amp. capacity shunt installed on the terminal
block.
6. Test station wire leads shall have a minimum of
four feet (4') of excess wire measured from the
gate cap.
7. Anodes shall be 32-lb. Dow Galvo Pack, or equal.
8. Anodes shall be installed in accordance with the
following conditions:
a. A minimum distance of two feet (2 ') clear
from the water main.
b. A minimum distance of five feet (5') clear
from each other.
c. vertically or horizontally.
d. On either or both sides of the water main.
e. Watered prior to being covered with soil.
f. Nested against, and covered with a minimum of
six inches (6") of native soil, and a minimum
cover of three feet (3') from finished grade.
9. Bond wire shall be 8 gauge, THHN, 600V, blue
solid.
10. Wire leads shall be 12 gauge, THHN, 600V, blue
stranded.
11. All noninsulating mechanical couplings connecting
steel pipe to steel pipe shall be bonded across
and through.
12. Wires shall be connected to steel pipe walls using
a thermite welding method.
Revised 07-92
8-8
13. Connection of two (2) wires shall be done by using
solder less crimp connectors. Where three (3) or
more wires are connected, a split bolt connector
or a "Direct Bury Splice Kit" may be 'used.
14. All wire splices shall be tightly wrapped with a
minimum of four overlapping layers of electrical
plastic tape under a waterproof electrical
coating.
15. Wire leads shall be taped together every three
feet (3') to form a wiring harness. The harness
shall be strategically located to minimize
possible future damage to the wire leads. Minimum
depth must equal the pipe cover.
16. The joints of cement-mortar coated and
enamel/dielectric undercoated steel main shall be
coated with a dielectric coating under a minimum
one-inch (1") thick cement-mortar coating.
17. The Contractor shall coat all bare portions of
steel pipe and appurtenances with a dielectric
coating.
18. The dielectric coating on welded joints shall
overlap the original coating by a minimum of two
inches (2") on each end.
19. Insulating joints shall have the
coating extended a m ~ n ~ m u m of two
diameters onto adjacent non-steel pipe.
dielectric
(2) pipe
20. Fittings that connect steel pipe to A.C. pipe
shall be fully coated with a dielectric coating.
21. All field enameling or wrapping shall be tested by
the Contractor using an electrical holiday
detector in accordance with AWWA C203 section
2.14.12 for enameling and AWWA C209 Section 4.4
for wrapping. Any flaws or holidays' found shall
be repaired by the Contractor in accordance with
AWWA C203 Section 2.15 for enameling and AWWA C209
section 4.4 for wrapping.
22. The cement-mortar coating reinforcing wire shall:
Revised 07-92
a. Not come in contact with the steel pipe wall.
b. Overlap the original cement-mortar coating a
minimum of two inches (2") on each edge.
8-9
23. The cement-mortar coating on welded joints shall
overlap the cement-mortar coating reinforcing wire
by a minimum of two inches (2") on each end.
24. As an alternative, welded steel joints and
mechanical couplings on welded steel pipe may be
protected with "Raychem Heat Shrink Joint
Protection Sleeve GAP 7" and "Raychem Thermofit
Dresser Sleeve", respectively, or equal.
25. The following tests shall be performed and
certified by the Corrosion Engineer:
a. Test soil resistivity at 500 foot intervals,
all street intersections and cul-de-sacs, and
both sides of cut and fill areas.
b. Test the cathodic protection system for pipe-
to-soil values and current output at all
cathodic protection stations, and submit a
report including the data to the
c. Test the cathodic protection system to ensure
a minimum theoretical life of 75 years (add
as many anodes as necessary to conform).
d. Test all insulating
electrical isolation.
joints to ensure
e. Test all service laterals to ensure no shorts
are present.
26. The Corrosion Engineer shall prepare and submit
for Department approval an accurate as-constructed
record of the cathodic protection system
installed. As-constructed record shall have all
test stations and anodes located and referenced to
the centerline of the main and the insulating
joints.
8.12 INSTALLATION OF JOINT-RESTRAINT FITTINGS
Anchor boxes conforming to Sheet 14 of the Standard
Drawings shall be provided on all mechanical couplings installed
on steel main extensions.
Lock-joint gaskets (U.s. Pipe "Field Lok" or
equivalent) or yokes and rods shall be installed for the entire
length of ductile iron fire hydrant, fire service, and domestic
service laterals and within ten (10) lineal feet of all
horizontal 11-1/4 degree bends and sixty (60) lineal feet of all
other bends, plugs, blow-offs, tees, crosses, and tapping
sleeves.
Revised 07-92
S-lO
S 13 INSTALLATION OF VALVES
Valves shall be handled in a manner which prevents
injury or damage. Valves shall be operated prior to installation
to ensure good operating condition. Valves shall be set with the
valve stems plumb and be joined to the pipe in the manner
previously specified for cleaning, laying, and joining flanged
and push-on joints. Valves installed in ductile iron main
extensions shall be wrapped with polyethylene encasement material
as instructed on Sheet 11 of the Standard Drawings. Val ves
installed on steel main extensions shall be coated in accordance
with section S.ll(C).
Line valves shall be located at intersecting points of
mains, at intersecting points of property line extended and main,
or adjacent to fire hydrant laterals. Any deviations from this
shall be at the sole discretion of the Department.
8.14 INSTALLATION OF VALVE STANDPIPES
A valve standpipe and gate cap shall be provided for
every valve not installed above ground or in a vault. Twelve-
inch (12") and smaller line valves shall be provided with a
six-inch (6") cast iron gate cap, steel split sleeve, and steel
standpipe. Eight-inch (S") and twelve-inch (12") gate valves
also require a steel standpipe bottom. Gate valve caps, split
sleeves, standpipe bottoms, and standpipes shall be obtained from
the Department. The standpipe shall be electrically isolated
from the valve, shall not bear, transmit shock or external loads
to the valve, and shall be centered and plumb over the wrench nut
of the valve, with the gate cap set to finished grade or an
elevation determined by the Department. See Sheet 13 of the
Standard Drawings.
8.15 INSTALLATION OF FITTINGS
All fittings shall be in compliance with the Materials
Specifications. Fittings shall be set and joined in the manner
described in sections 8.10 and 8.11 of these Standartls. The use
of "wyes" in main extensions is strictly prohibited.
All fittings installed in ductile iron main extensions
shall be wrapped with polyethylene encasement material as
instructed on Sheet 11 of the Standard Drawings. All fittings
installed in steel main extensions shall be coated in accordance
with Section S.ll(C).
Revised 07-92
8-11
8.16 INSTALLATION OF TAPPING SLEEVES
A tapping sleeve or clamp is used to make a "wet tap"
connection to an existing main without placing the main out of
service.
Tapping sleeves or clamps may be installed side-by-side
when spec if ically approved by the Department. A two-foot (2' )
minimum space is required between adjacent taps. An example of
such an installation would be side-by-side fire service and
domestic service laterals that serve a building. The use of two
tapping sleeves, either side-by-side or back-to-back, as a
sUbstitute for a cross is strictly prohibited.
Tapping sleeves and service laterals shall be wrapped
with polyethylene encasement material as instructed on Sheet 11
of the Standard Drawings.
Four-inch (4") and larger tapping sleeves require
pouring of a concrete thrust block behind the sleeve to prevent
possible damage to the main from pressure shocks which develop as
valves are first opened.
8.17 INSTALLATION OF BLOW-OFFS
In all installations where the main is permanently
dead-ended, such as a cul-de-sac, a blow-off assembly shall be
installed. Where the main is temporarily dead-ended, for example
the boundary of a SUbdivision, a blow-off shall be installed
unless a fire hydrant, which can serve as a blow-off, is located
at the main's temporary end.
The standard required blow-off assembly for twelve-inch
(12") and smaller mains shall be a two-inch (2") as shown on
Sheets 15 and 16 of the standard Drawings. Under special
conditions, such as a long run with few taps, a larger blow-off
may be required.
8.18 CRITERIA FOR THE SEPARATION OF WATER MAINS AND SANITARY
SEWERS
The contents of this section are excerpts from the
State of California, Human and welfare Agency, Department of
Health Services' "criteria for the Separation of water Mains and
Sanitary Sewers" dated April 5, 1983.
A. Basic Separation Standards: The
Standards" sets forth the
requirements for water mains and
Revised 07-92
"California waterworks
minimum separation
sewer lines. These
8-12
standards, contained in section 64630, Title 22,
California Administrative Code, specify:
(c) (1) Parallel Construction: The horizontal
distance between pressure water mains and
sewer lines shall be at least ten feet (10').
(2) Perpendicular construction (crossing) :
Pressure water mains shall be at least one
foot (1 ') above sanitary sewer lines where
these lines must cross.
(d) Separation distances specified in (c) shall be
measured from the nearest edges of the facilities.
(e) (2) Common Trench: water mains and sewer lines
must not be installed in the same trench.
When water mains and sanitary sewers are not adequately
separated, the potential for contamination of the water
supply increases. Therefore, when adequate physical
separation cannot be attained, an increase in the
factor of safety should be provided by increasing the
structural integrity of both, the pipe materials and
joints.
B. Exceptions to Basic Separation Standards: Local
conditions, such as available space, limited slope,
existing structures, etc., may create a situation where
there is no alternative but to install water mains or
sewer lines at a distance less than that required by
the Basic separation Standards. In such cases,
alternative construction criteria as specified in
Section D should be followed, subject to the special
provisions in Section C.
Water mains and sewers of twenty-four inches (24")
diameter or greater may create special hazards because
of the large volumes of flow. Therefore, installations
of water mains and sewer lines twenty-four inches (24")
diameter or larger should be reviewed and- approved by
the health agency prior to construction.
C. Special Provisions:
1. The Basic Separation Standards are applicable
under normal conditions for sewage collection
lines and water distribution mains. More
stringent requirements may be necessary if
conditions, such as high groundwater exist.
Revised 07-92
8-13
2. Sewer lines shall not be installed wi thin
twenty-five feet (25') horizontally of a low head
(five (5) psi or less pressure) water-main.
3. New water mains and sewers shall be pressure
tested where the conduits are located ten feet
(10') apart or less.
4. In the installation of water mains or sewer lines,
measures should be taken to prevent or minimize
disturbances of the existing line. Disturbance of
the supporting base of this line could eventually
result in failure of this existing pipeline.
5. Special consideration shall be given to the
selection of pipe materials if corrosive
conditions are likely to exist. These conditions
may be due to soil type and/or the nature of the
fluid conveyed in the conduit, such as a septic
sewage which produces corrosive hydrogen sulfide.
6. Sewer Force Mains:
a. Sewer force mains shall not be installed
within ten feet (10') horizontally of a water
main.
b. When a sewer force main must cross a water
line, the crossing should be as close as
practical to the perpendicular. The sewer
force main should be at least one foot (1')
below the water line.
c. When a new sewer force main crosses under an
existing water main, all portions of the
sewer force main within ten feet (10')
horizontally of the water main shall be
enclosed in a continuous sleeve.
d. When a new water main crosses over an
existing sewer force main, the water main
shall be constructed of pipe materials with a
minimum rated working pressure of two hundred
(200) psi or equivalent pressure rating.
D. Alternate criteria for Construction: The construction
criteria for sewer lines or water mains where the Basic
Separation Standards cannot be attained are shown in
Sheets 8 and 9 of the Standard Drawings. There are two
situations encountered:
Revised 07-92
8-14
Case 1 New sewer line
new or existing water main.
Case 2 New water main
existing sewer. line.
For Case 1, the alternate construction criteria apply
to the sewer line.
For Case 2, the alternate construction criteria may
apply to either or both the water main and sewer line.
The construction criteria should apply to the house
laterals that cross above a pressure water main but not
to those house laterals that cross below a pressure
water main.
Case 1: New Sewer Being Installed (Sheets 8 and 9 of
the Standard Drawings)
Zone Special Construction Required for Sewer
A Sewer lines parallel to water mains shall not be
permitted in this zone without approval from the
responsible health agency and water supplier.
B A sewer line placed parallel to a water line shall
be constructed of:
1. Extra strength vitrified clay pipe with
compression joints.
2. Class 4000, Type II, asbestos-cement pipe
with rubber gasket joints.
3. Plastic sewer pipe with rubber ring joints
(per ASTM 03034) or equivalent.
4. Cast or ductile iron pipe with compression
joints.
5. Reinforced concrete pressure pipe
compression joints (per AWWA
with
C A sewer line crossing a water main shall be
constructed of:
Revised 07-92
1. Ductile iron pipe with hot dip bituminous
coating and mechanical joints.
2. A continuous section of Class 200 (DR 14 per
AWWA C900) plastic pipe or equivalent,
centered over the pipe being crossed.
8-15
Zone Special Construction Required For Sewer
3. A continuous section of reinforced
pressure pipe (per AWWA C302-74)
over the pipe being crossed.
concrete
centered
4. Any sewer pipe within a continuous sleeve.
D A sewer line crossing a water main shall be
constructed of:
1. A continuous section of ductile iron pipe
with hot dip bituminous coating.
2. A continuous section of Class 200 (DR 14 per
AWWA C900) plastic pipe or equivalent,
centered on the pipe being crossed.
3. A continuous section of reinforced concrete
pressure pipe (per AWWA C302-74) centered on
the pipe being crossed.
4. Any sewer pipe within a continuous sleeve.
5. Any sewer pipe separated by a ten-foot by
ten-foot, four-inch thick reinforced concrete
slab.
Case 2: New Water Mains Being Installed{Sheets 8 and 9
of the Standard Drawings)
A No water mains parallel to
constructed without approval
agency.
sewers shall be
from the health
B If the sewer paralleling the water main does not
meet the Case 1, Zone B, requirements, the water
main shall be constructed of:
Revised 07-92
1. Ductile iron pipe with hot dip bituminous
coating.
2. Dipped and wrapped
welded steel pipe.
one-fourth-inch-thick
3. Class 200, Type II, asbestos-cement pressure
pipe.
4. Class 200 pressure rated plastic water pipe
(DR 14 per AWWA C900) or equivalent.
5.
8-16
Reinforced concrete pressure
cylinder type, per AWWA C300-74
C303-70.
pipe, steel
or C301-79 or
C If the sewer crossing the water main does not meet
the Case 1, Zone C requirements, the water main
shall have no joints in Zone C and be constructed
of:
1. Ductile iron pipe with hot dip bituminous
coating.
2. Dipped and wrapped
welded steel pipe.
one-fourth-inch-thick
3. Class 200 pressure rated plastic water pipe
(DR 14 per AWWA C900) or equivalent.
4. Reinforced concrete pressure pipe, steel
cylinder type, per AWWA C300-74 or C301-79 or
C303-70.
D If the sewer crossing the water main does not meet
the requiremerits for Zone D, Case 1, the water
main shall have no joints within four feet from
either side of the sewer and shall be constructed
of:
1. Ductile iron pipe with hot dip bituminous
coating.
2. Dipped and wrapped
welded steel pipe.
one-fourth-inch-thick
3. Class 200 pressure rated plastic water pipe
(DR 14 per AWWA C900) or equivalent.
4. Reinforced concrete pressure pipe, steel
cylinder type, per AWWA C300-74 or C301-79 or
C303-70.
E. Notes and Definitions: The following notes and
definitions apply to this section only:
1. HEALTH AGENCY: The Department of Health Services.
Revised 07-92
For those water systems supplying fewer than two
hundred (200) service connections, the local
health officer shall act for the Department of
Health Services.
8-17
2. WATER SUPPLIER: "Person operating a public water
system" or "supplier of water" means any person
who owns or operates a public water system.
3. LOW HEAD WATER MAIN: Any water main which has a
pressure of five (5) psi or less at any time at
any point in the main.
4. Dimensions are from outside of water main to
outside of sewer line or manhole.
5. COMPRESSION JOINT: A push-on joint that seals by
means of the compression of a rubber ring or
gasket between the pipe and a bell or coupling.
6. MECHANICAL JOINTS: Bolted joints.
7. RATED WORKING WATER PRESSURE OR PRESSURE CLASS: A
pipe classification system based upon internal
working pressure of the fluid in the pipe, type of
pipe material, and the thickness of the pipe wall.
8. FUSED JOINT: The jointing of sections of pipe
using thermal or chemical bonding processes.
9. SLEEVE: A protective tube of steel with a wall
thickness of not less than one-fourth inch (1/4")
into which a pipe is inserted.
10. GROUND WATER: Subsurface water found in the
saturation zone.
11. HOUSE LATERAL: A sewer connecting the building
drain and the main sewer line.
8.19 FIRE HYDRANTS
A. Installation: All hydrants shall be field staked for
location and grade. Final location shall be ~ n
accordance with approved drawings, where possible. Fire
hydrants shall be set so that the elevation of the
center of the top section flange or the center of the
threaded coupling is set at the finish grade of the
ground or top of the curb. All hydrants shall stand
plumb and be installed as indicated on Sheets 28A thru
2BD, 29A, and 29B.
Each hydrant shall be connected to the street main by a
six-inch (6") lateral. An independent six-inch (6")
gate valve shall be installed on each fire hydrant
Revised 07-92
lateral
in the
other.
8-18
adjacent to the connection fitting. All joints
lateral shall be firmly restrained to each
B. Corrosion Protection: corrosion protection shall be
provided in accordance with sections 8.10(E) and
8.11(F) of these Standards.
8.20 MISCELLANEOUS METALWORK AND PIPING
All fabrication shall be equal to the best practice in
modern fabricating shops. Welding shall be performed by Depart-
ment-approved operators currently qualified under the Standard
Qualification Procedure of the American Welding Society, as last
revised. All exposed welds shall be ground smooth, and all weld
splatter shall be properly removed to the satisfaction of the
Inspector.
Installations involving steel pipe shall have field-
welded joints, gate valves, mechanical couplings, and all other
fittings coated in accordance with AWWA C203 standards (hot-
applied, coal-tar enamel) or AWWA C209 standards (cold-applied,
tape-coating, type I or II) and AWWA C205 standards (reinforced
cement-mortar coating), as last revised. As an alternative,
field-welded joints and mechanical couplings may be fitted with
heat shrink sleeves made for corrosion protection that conform to
the Materials Specifications.
All metal exposed to weather shall be painted with a
minimum of two coats each of red oxide primer and paint of the
type and color specified on the plans or by the Inspector.
Surfaces to be painted shall be cleaned of oil, grease, weld
spatters, burrs, grit, dust or other objectionable surface
irregularities. Copper, aluminum or galvanized pipe need not be
painted, unless so directed by the Department.
All miscellaneous piping shall be installed in the best
workmanlike manner. All threads on steel pipes shall be cut with
sharp dies to standard depth, left clean cut, and tapered.
Threaded pipe joints shall be properly sealed with' an approved
joint compound applied on the male threads only. When soldering
copper tubing, the joint of the copper tubing shall be properly
cleaned, flux applied, and soldered with lead-free solder, all
applied in the best workmanlike manner. As a corrosion
mitigation measure, soldered tubing shall be flushed with water
to remove any flux residue.
Revised 07-92
8-19
8 . 2 1 THRUST BLOCKS
A. Installation: Concrete thrust blocks shall be provided
for all bends and fittings subjected to an unbalanced
hydrostatic force. Care shall be taken not to block
outlets or to cover bolts, nuts, clamps or other
fittings, or to make them inaccessible. Ductile iron
pipe shall be polyehtylene encased prior to installing
thrust blocks. If a large thrust block is to be
poured, it shall be separated into sections by a
suitable material. Sheet 12 of the Standard Drawings
show sizes and shapes of thrust blocks. If, in the
opinion of the Department, the soil-bearing capacity is
not suff icient to provide adequate restraint based on
minimum bearing areas shown on the Standard Drawings,
then the minimum bearing area shall be increased to a
size that will ensure adequate restraint. In every
instance, the thrust block shall bear against
undisturbed soil.
Before placing concrete, all equipment for mixing and
transporting the concrete shall be clean. All debris
or water shall be removed from the place to be occupied
by the concrete. Concrete shall be placed only in the
presence of the Inspector unless inspection has been
waived prior to the placement.
B. Form Work: All forming for concrete thrust blocks
shall be done by bulkheading around the shape of the
thrust block with wood, burlap, or reinforced paper
sacks filled with sand. Sacks shall be of a size
easily handled when full, and shall be left in place in
the trench. Wood forms shall be removed before
backfilling.
If the main must be placed into service immediately,
wood may be used to form up thrust blocks. Wood forms
shall be of such design as to support the thrust until
the concrete has set and shall not be considered a
substitute for the concrete thrust block.
No horizontal struts or braces required for trench
shor ing shall remain in the concrete thrust blocks.
Prior to placing concrete, the forms and trench wall
shall be inspected and approved by the Inspector.
When concrete is deposited against the ground without
the use of forms, the ground shall be thoroughly
moistened or other provisions made to prevent the
ground from absorbing water from the concrete.
C. Minimum CUring Time: Newly placed concrete shall be
allowed to set undisturbed for a minimum of twenty-four
(24) hours.
Revised 07-92
8-20
D. compaction of Fill Over Thrust Blocks: Backfill may be
placed over thrust blocks after the surface has set
sufficiently to resist the weight of the backfill.
However, no tamping or compacting shall" be allowed
above the thrust block for a minimum of twenty-four
(24) hours after placement.
8.22 CONCRETE STRUCTURES
A Form Work: Forms shall conform to shapes, lines and
dimensions of the members as shown on the drawings.
Form work shall also be in compliance with applicable
local building and construction codes. Embedded metal
ties with snap-off ends shall be used for internal form
ties. Use of ordinary wire ties will not be allowed,
nor will withdrawal of form ties through the walls be
permitted.
Forms may be made of wood or metal, subj ect to the
approval of the Department. Where the finished
concrete surface will be exposed, the forms shall be
void of any irregularities, such as knotholes and
chips.
Before concrete is placed, all forms shall be carefully
cleaned, all reinforcement securely tied, and all
necessary openings blocked out. Any material necessary
for the support of piping and valves shall be supplied
by the Contractor.
Forms shall not be disturbed until concrete has
hardened sufficiently to permit their removal with
safety. The removal of forms shall be carried out in
such a manner as to ensure the safety of the structure.
supervisory personnel shall be present at the time the
forms are removed, and shall be responsible for the
safety of this operation.
B. Workability of Concrete: Concrete shall be of a
consistency and composition that it can be worked
readily into the corners and angles of the forms and
around the reinforcement without permitting the
materials to segregate, or free water to collect on the
surface. No chlorides shall be added to the concrete
mix.
c. Mixing and Placing Concrete: Before placing concrete,
all equipment for mixing and transporting concrete
shall be clean. All debris or water shall be removed
from the places to be occupied by the concrete. Wooden
forms shall be thoroughly wetted or oiled. No concrete
Revised 07-92
8-21
shall be placed until forms, reinforcing steel, and
cleanup have been approved by the Department.
concrete shall be placed only in the presence of the
Department Inspector unless inspection has been waived
prior to the placement.
Concrete shall be conveyed from the mixer to the place
of final deposit by methods which will prevent
separation or loss of materials. All concrete placed
shall have a temperature of at least 50
0
F (10
0
C), but
not more than 90
0
F (32
0
C).
Concrete shall be deposited, as nearly as practi-
cable, in its final position to avoid segregation due
to rehandling or flowing. No concrete that has
partially hardened or been contaminated by foreign
materials shall be deposited, nor shall retempered
concrete be used.
D. Finishing Concrete: All unformed surfaces shall be
screeded and wood float-finished. Floor surfaces shall
be roughened by light brooming following the wood
float-finish.
After the form work is removed, the voids in all formed
surfaces shall be filled with patching mortar and form
ties cut back and dry packed if necessary.
E. Curing and Protecting Concrete: The finished concrete
shall be protected for a period of three days and
maintained at a temperature of not less than 50 F (10
0
C) . Precaution must be taken during hot weather to
prevent cracks due to thermal contraction. Newly
placed concrete shall be allowed to set undisturbed for
a minimum curing time of twenty-four (24) hours.
When concrete is deposited against the ground without
the use of forms, the ground shall be thoroughly
moistened or other provisions made to prevent the
ground from absorbing water from the concrete.
Concrete shall be protected with a Department-approved
curing membrane immediately after removal of the forms,
or on completion of finishing of floors or slabs.
White membrane shall be used on non-water-bearing
surfaces where concrete is exposed to the direct rays
of the sun. The membrane shall be a nontoxic type.
Revised 07-92
S-22
S.23 REINFORCING STEEL FOR CONCRETE STRUCTURES
A. Installation: Reinforcing steel shall be accurately
formed to the dimensions indicated on the drawings.
Bends in bars shall be made cold. Bars with kinks or
bends not shown on the drawings shall not be used.
Splices shall be located where shown on the drawings.
Splices at other locations shall be approved by the
Design Engineer. Welded wire mesh shall be lapped one
space and securely wired together. Before the
reinforcement is embedded in concrete, the surfaces of
the bars, and bar supports, shall be cleaned of heavy
flaky rust, loose mill scale, dirt, grease, or other
foreign substances which are objectionable.
Reinforcement will be inspected for compliance with
requirements as to size, shape, length, splicing
position, and amount after it has been placed.
B. Placing of Reinforcing Steel: Reinforcing steel shall
be accurately placed and secured in position by using
annealed iron wire ties so that it will not be
displaced during the placing of the concrete. Chairs,
hangers, spacers, and other supports for reinforcement
may be concrete, galvanized, or plastic coated metal,
or other approved material.
steel reinforcement shall be protected by the thickness
of concrete indicated on the plans. Where not
otherwise shown, the thickness of concrete over the
reinforcement shall be as follows:
L Where concrete is deposited against the ground
without the use of forms, not less than three
inches (3").
2. Where concrete is exposed to the weather, or
exposed to the ground but placed in forms, not
less than two inches (2") for bars more than five
eight-inch (5/S") diameter and one and one-half
inches (1-1/2") for bars five eight-'inch (5/S")
diameter or less.
3. In slabs and walls not exposed to the ground or to
the weather, not less than three quarter inches
(3/4")
4. In all cases, the thickness of concrete over the
reinforcement shall be "clear" and at least equal
to one and one-half (1-1/2) diameters that of the
reinforcement bars.
Revised 07-92
8-23
8.24 HYDROSTATIC TESTING
No hydrostatic testing shall be made on any portion of
the pipeline until field-placed concrete has had adequate curing
time as defined for thrust blocks in Section 8.21 of these
Standards.
The Department shall be notified twenty-four (24) hours
in advance of testing. The main being tested shall not be
restrained against the existing main or its appurtenances.
Testing against shut gate valves is prohibited. All testing
shall be made in the presence of the Department Inspector.
Only the following methods are acceptable for supplying
potable water for hydrostatic testing:
1. Water may be taken from a nearby pressurized water
source which has been previously disinfected,
tested and accepted by the Department, such as a
fire hydrant.
2. water may be delivered to the site in a
disinfected water truck having a minimum capacity
of three hundred (300) gallons. The water truck
shall be used exclusively for the transportation
of potable water.
3. Any previously tested, disinfected and Department-
accepted main which is pressurized and is to serve
the new main extension may be tapped on the
pressurized side of the closed valve.
In any event, the method of supplying water as well as
the source of water for hydrostatic testing shall be certified
and approved by the Department. Use of barrels, sani tary or
otherwise, to supply water for hydrostatic testing is strictly
prohibited.
The Department will not furnish the calibrated meter or
the pump required for testing. The main shall be properly back-
filled and shall be in a state of readiness for testing. All
bulkheads, pumps, taps, and appurtenances necessary to fill the
main and maintain the required pressure shall be in place. The
main shall be filled with water at a rate which will not cause
any surges or exceed the rate at which the air can be released.
The main shall be subjected to a hydrostatic pressure of one and
one-half (1-1/2) times the maximum static pressure at the point
of testing and not less than one and one-quarter (1-1/4) times
the maximum static pressure at the highest point along the test
section by means of a continuously operating pump, equipped with
a bypass valve for regulating pressure. The specified test
Revised 07-92
8-24
pressure shall be based on the elevation of the lowest point of
the line or section under test and corrected to the elevation of
the test gage.
All air in the main shall be properly purged. Where
blow-offs or hydrants are not available or are not effective in
purging air from the line, the Department shall require a tap to
purge the main. The location and size of tap shall be at the
Department's discretion.
The test pressure shall be maintained at plus or minus
five (5) PSI for a period of two (2) continuous hours during
which an examination of the main shall be made, and any leaks
repaired. Any pipe or fitting found to be faulty shall be
removed and replaced. No leakage shall be allowed through the
bonnet of line valves. Any valve leaking through the bonnet shall
be repaired in place or removed and replaced. Cutting and
replacing pavement, excavating, and backfilling may all be
necessary parts of locating and repairing leaks discovered by
pressure testing of pipe.
After all visible leaks have been stopped, the full
test-pressure shall be maintained for two (2) continuous hours.
Leakage for steel pipe with welded joints shall not be allowed.
Allowable leakage for ductile iron pipe shall not exceed the
amount determined by the following formula:
L =
S =
D =
P =
L = SDP/133,200
Allowable leakage (gallons per hour)
Length of pipe tested (feet)
Nominal diameter of the pipe (inches)
Average test pressure during the test (PSI)
Testing against closed valves is prohibited. When fire
hydrants are in the test section, the test shall be made against
the closed fire hydrants.
Should testing show a leakage rate in excess of the
rates computed, the main shall not be accepted. The main shall
be repaired and retested as described in this section until it
meets the test requirements.
8.25 DISINFECTION
All main extensions will be disinfected by the
Department before they are accepted by the Department. The
Contractor shall install temporary valved inlets at points
designated by the Inspector to enable disinfection of the mains.
Revised 07-92
Disinfection of the completed main installation shall be done
after hydrostatic testing. Before filling the pipe with water,
the pipe shall be clean and free of debris to the satisfaction of
the Department's Inspector. The Department shall be notified at
least forty-eight (48) hours prior to the desired disinfection
time.
8.26 CONNECTIONS TO THE DEPARTMENT'S SYSTEM
A. Connections: Connections to the Distribution System
are generally made by the Contractor. Connections shall
be performed in a neat and workmanlike manner in
accordance with Sheets 23 thru 26 of the Standard
Drawings. The Department's Inspector shall be present
at all times during construction of the connection.
The connection shall be subject to approval by the
Department. Under no circumstances shall a
non-disinfected main, which cannot be isolated, be
connected to a disinfected main.
The Department is not responsible for water tightness
of its valves on existing facilities. If existing
valves leak, the Department will assist in reducing the
influx of water, but the Contractor shall use methods
at his or her own disposal to work with the resulting
leakage.
B. Operation of Valves: In connecting to the Department's
system, it may be necessary to operate existing
Department valves. All line valves in the Department's
system shall be operated by Department personnel only.
The Contractor shall give the Department at least
forty-eight (48) hours' notice to arrange for operation
of the valves. Both the Contractor and the
Department's Inspector shall be present when the valves
are operated.
C. Interruption of Service: The Contractor shall provide
written notification twenty-four (24) hours in advance
to all affected Department customers of temporary water
outage on contractor-installed connections that cause
interruption in service.
8.27 ACCEPTANCE AND RELEASE FOR WET TAPS
A main will be accepted by the Department and released
for wet taps only when the following conditions have been met:
Revised 07-92
8-26
A. The main and all appurtenances have been installed to
the satisfaction of the Department and all pertinent
notes and measurements have been made.
B. The main has been successfully pressure tested to the
requirements of Section 8.24.
C. Water Quality Division has disinfected and released the
main for taps.
Revised 07-92
9.01 GENERAL
CHAPTER 9
SIXTEEN-INCH 116") AND TWENTY-INCH (20")
SUPPLY MAINS
New developments are commonly designed with curved
streets, only one or two access roadways, and many cul-de-sacs.
Mains supplying these subdivisions often cannot be sized using
the hydraulic grid system common in most of Los Angeles. In some
instances, the maximum water demand within these developments
exceeds the allowable design capacity of a twel ve- inch (12")
Distribution Main, but is often considerably under that of a
twenty-four-inch (24") Trunk Line. As a result, it has become
necessary to install sixteen-inch (16") and twenty-inch (20")
pipe to supply this type of development.
9.02 OTHER STANDARDS TO APPLY
Chapter 9 addresses only sixteen-inch (16") and twenty-
inch (20") Supply Mains. All standards that apply to four-inch
(4") through twelve-inch (12") Distribution Mains shall apply to
sixteen-inch (16") and twenty-inch (20") Supply Mains along with
the requirements or exceptions discussed in this Chapter. In
case of conflict with any other Chapter or Section in these
Standards, this Chapter shall govern for sixteen-inch (16") and
twenty-:-inch (20") pipe.
9.03 DESIGN
Sixteen-inch (16") and twenty-inch (20") Supply Mains
shall be designed in accordance with Chapters 3 and 5 of these
Standards and the following additional requirements:
A. Only welded steel pipe and ductile iron pipe that
conform to the Materials Specifications or better shall
be used. The Applicant should be aware that large
diameter pipe and fittings may require long lead times
and it is the responsibility of the Applicant to assure
materials are on hand.
B. Restrained joints for ductile iron pipe installations
shall be of the boltless type, capable of deflection
after assembly, and designed for a minimum working
water pressure of two hundred and fifty
pounds-per-square-inch (250 psi).
Revised 07-92
9-2
C. Line valves shall be optimally placed such that outages
to services during future repairs or construction are
minimized. Generally, this will require the ability to
isolate and alternately supply all Distribution Mains
(or Supply Mains) extending from the Supply Main but in
no instance should the spacing between valves exceed
one thousand two hundred feet (1200').
Line valves shall be of the same size as the main or
one diameter size smaller when specifically approved by
the Department. The size and type of valve to be used
shall be clearly indicated on all submitted drawings.
A rectangular vault or pipe manhole used as a standpipe
shall be used to house sixteen-inch (16") and larger
line valves. See Sheet 37 of the Standard Drawings for
a steel pipe manhole assembly.
If the Department requires the installation of remote
control and monitoring equipment for its operation, the
line valve shall be a butterfly valve with a
rectangular vault housing both the electric motor
operator and telemetering equipment. Each installation
will require individual approval.
D. Blow-off assemblies, as shown on Sheet 34 of the
Standard Drawings, shall be installed at all low point
in Supply Mains and wherever a Supply Main dead ends
unless a fire hydrant which can serve as a blow-off is
provided at these locations.
E. Automatic air valves (air release valves (ARV), air and
vacuum valves (AW) and combination air valves (CAV))
shall be required for Supply Mains at the discretion of
the Department. Air valve assemblies, as shown on
Sheet 35 of the Standard Drawings, are generally
installed at high points in the Supply Main, where
there is an abrupt change of slope, and at the
downslope side of line valves, or as determined by the
Department.
F. Each Supply Main shall be examined individually to
determine special conditions and/or requirements (e.g.,
air valves, check valves, etc.).
G. A galvanic cathodic protection system shall be provided
on all steel Supply Mains in accordance with sections
5.07(B) and 8.11(F), and the following table:
Revised 07-92
1.
2.
3.
4.
5.
6.
7.
9-3
Description
Pre-Ass'd
Ins. Flange
Required
Steel main connection to *Yes
to non-steel main (cast
iron, reinforced concrete
cylinder, prestressed
concrete cylinder, and
modified pretension
pipe. )
Steel main connection Yes
existing steel main.
Steel main at 2,500-foot Yes
maximum intervals.
Steel main at fire hydrant No
laterals spaced 1,000 feet
or less, or steel main at
600-foot maximum intervals
in the absence of strategi-
cally spaced fire hydrants.
Steel main or steel fire *Yes
hydrant lateral of length
between 50 feet and 100 feet
connected to non-steel main.
Steel main or steel fire *Yes
hydrant lateral of length
less than 50 feet connected
to non-steel main.
Encased steel main or *Yes
steel fire hydrant lateral
of length less than 100
feet connected to non-steel
main.
No. of Anodes
Required
(Pipe Diam.)
16" 20"
3 4
6 8
6 8
**3 4
3 4
2 3
3 4
*Steel mains need no insulation from A.C. mains.
Test
Station
Required
Yes
Yes
Yes
Yes
No
No
No
**Any two fire hydrant laterals separated by a distance greater
than 600 feet shall be provided with an extra anode at both
hydrants for every additional 200 lineal feet of spacing or
portion thereof.
Revised 07-92
9-4
9.04 INSTALLATION
Installation of sixteen-inch (16") and twenty-inch
(20") Supply Mains will generally be done by the Applicant or the
Applicant's contractor. The Contractor shall be prequalified by
the Department for the installation of sixteen-inch (16") and
twenty-inch (20") pipe. As with four-inch (4") through
twelve-inch (12") mains, the Department reserves the right to
install sixteen-inch (16"), and twenty-inch (20") Supply Mains
when it is in the best interest of the Department. This
determination is solely at the discretion of the Department. The
Applicant shall pay all costs for extending mains whether
installed by its contractor or by the Department.
Line and grade will be established by, and
as-constructed surveying done by the Department at applicant s
expense, or when specifically approved by the Department, by a
Professional Engineer or by a Land surveyor licensed to practice
in the State of California or by its authorized representative in
accordance with sections 2.09 and 2.10.
Revised 07-92
CHAPTER 10
TWENTY-FOUR-INCH (24") AND LARGER TRUNK LI-NES
10.01 GENERAL
It is the policy of the Department to design
twenty-four-inch (24") diameter and larger Trunk Lines to ensure
a high-quality, uninterrupted, low-maintenance water service
system. The function of Trunk Lines is more important than that
of Supply or Distribution Mains, and the risk is correspondingly
greater if the Trunk Lines are improperly designed or installed.
The Department reserves the right to design and install
Trunk Lines when to do so is in the best interest of the
Department. All Trunk Lines which will become part of the
Department system will be designed by the Department unless other
arrangements are made. Trunk Lines will be installed by the
Applicant when practical.
Design of the Trunk Line should proceed only after
approval to design and/or construct the Trunk Line is received
from the Department. The concept, size, location, and any other
pertinent details shall be reviewed by the Department prior to
the submittal of plans and specifications required by Section
2.06.
The Applicant shall pay all costs for the design and
construction of Trunk Lines including those incurred by the
Department for inspection, testing of materials, and other
Department services.
10.02 OTHER STANDARDS TO APPLY
Chapter 10 addresses only Trunk Lines. All Standards
that apply to four-inch (4") through twelve-inch (12")
Distribution Mains and to sixteen-inch (16") and twenty-inch
(20") Supply Mains shall apply to Trunk Lines along with the
additional requirements and exceptions stated herein. In case of
conflict with any other Chapter of these Standards, this Chapter
shall govern for Trunk Lines.
10.03 PRELIMINARY INVESTIGATION
If the Applicant is
conduct its own preliminary
requirements shall be met:
allowed by the
investigation,
Department to
the following
A. A subsoil investigation shall be performed by a
geotechnical engineer from exploratory holes dug to
determine design values, slide areas, fault crossings,
Revised 07-92
10-2
backfill suitability of the soil, presence of
groundwater or bedrock, and any other condition which
may affect the construction of the Trunk Line. Test
holes shall be dug with a maximum spacing of seven
hundred and fifty feet (750') and at railroad, highway,
and river crossings. soil resistivity readings shall
be taken at depths of 5 feet and 10 feet.
B. A stationed alignment of the proposed Trunk Line is
required to define the route with lines, angles, and
curvatures referenced to land corners and other
official survey control points when available. No
negative stationing is allowed. The angle points,
curve points and the centerline at a minimum spacing of
one hundred feet (100') shall be marked on the ground
with an accuracy of at least one part in five thousand
(5000) which shall be checked by the Department prior
to acceptance of the survey work.
All points of intersection (PI's), points of curvature
(PC's), points of tangency (PT's), angle points (AP's),
and any points on the tangent (POT's) needed for
intervisibility shall be marked with semi-permanent
steel pins in the ground such as concrete reinforcing
bars, P-K nails or survey spikes.
C. A ground surface profile of the alignment in National
Geodetic Vertical Survey Datum of 1929 tied to official
survey bench marks is required. Additional
semi-permanent bench marks shall be established every
fifteen hundred feet (1500') by closed loops of
Third-Order accuracy. The profile shall consist of
ground surface elevations along the proposed Trunk Line
centerline at everyone hundred-foot (100') station and
at grade breaks. All level loop and profile data shall
be recorded in field books.
D. Topographical features within the street or easement
and any topographic feature outside the easement which
may interfere with the operation or installation of the
Trunk Line shall be accurately shown in field books by
both note and drawing. Topographic features may also
be compiled by aerial photogrammetry methods. In areas
where the ground slope perpendicular to the centerline
of the Trunk Line exceeds five percent (5%), cross
sections shall be taken at all profile points and shall
extend at least twenty-five feet (25') to each side of
the centerline. All cross section data shall be
entered into field books.
E. All utility crossings or close utility interference
shall be exposed by digging test pits. Field books
shall be used to record the size, nature, and location
of the interference by station offset and elevation.
Revised 07-92
10-3
F. All survey data compiled in the determination of the
route location, the extent of the interference, the
centerline profile, the cross sections, and level loops
shall be entered into field books provided by the
Department and submitted with the plans and
specifications.
10.04 DESIGN
Trunk Lines shall be designed in accordance with all
other applicable Sections of these Standards and the following
additional requirements:
A. Pipe shall conform to the Materials Specifications.
Trunk Lines shall be of welded steel but may be of
reinforced concrete cylinder, prestressed concrete
cylinder, or ductile iron if specifically approved by
the Department. The design criteria for reinforced
concrete and ductile iron pipe shall be those currently
specified by the Department for Trunk Lines. Prior to
construction, the Contractor shall submit for approval
by the Department, the manufacturer's detailed shop
drawings, design calculations, material list, laying
schedule, and marking diagram. The Applicant should be
aware that large diameter pipe and fittings may require
long lead times and it is the responsibility of the
Applicant to assure materials are on hand.
B. Line valves shall be placed such that outages to
consumers during future repairs or construction are
minimized. Generally, this will require the ability to
isolate and alternately supply all mains extending from
the Trunk Line, but in no instance should the spacing
between valves exceed one (1) mile.
Line valves shall be butterfly valves with flanged-end
connections conforming to the Material Specifications.
A pipe manhole used as a standpipe or a rectangular
vault shall be used to house each valve. The valve
installation shall include a tap on each side of the
valve for chlorination and/or air release. See Sheet
37 of the Standard Drawings for a typical steel pipe
manhole assembly.
If the Department requires the installation of remote
control and monitoring equipment for its operation, the
line valve shall be a butterfly valve with a
rectangular vault housing the electric motor operator
and telemetering equipment. Each installation will
require individual approval.
Revised 07-92
10-4
C. Blow-off assemblies shall be installed at all low
points, dead ends, and at line valves where the Trunk
Line slopes toward the valve. See Sheet 34 of the
Standard Drawings for blow-off installations for
sixteen-inch (16") and larger steel pipe.
D. Automatic air valves (air release valves (ARV) , air and
vacuU1l1 valves (AVV) and combination air valves (CAV
assemblies are generally installed at high points,
where there is an abrupt change of slope, and at the
downslope side of line valves, or as determined by the
Department. See Sheet 35 of the Standard Drawings.
E. Access manhole assemblies as shown on Sheet 36 of the
Standard Drawings shall be installed at intervals not
exceeding one thousand feet (1000 ') unless otherwise
approved by the Department. Pipe manhole assemblies
similar to those required on large line valves (Sheet
37 of the Standard Drawings) shall be installed over
every other access manhole installed under paved
finished surfaces, or where required by the Department.
F. The location and design of outlets, tie-ins to any
existing or proposed facilities, and bulkheads shall
be approved by the Department.
G. Each Trunk Line plan shall be examined individually to
determine any special condition and/or requirements by
the Department (e.g., pressure regulating valves,
telemetering, pitots, etc.).
H. Vertical clearance between the Trunk Line and crossing
interferences shall be at least one foot (1 I )
Horizontal clearance shall be at least five feet (5').
I. All welded steel Trunk Lines shall be provided with a
galvanic cathodic protection system designed, installed
and tested by a Corrosion Engineer (someone under the
direct supervision of, or by a Corrosion Specialist
Certified by the National Association of Corrosion
Engineers) registered by the State of california). The
system shall be SUbject to approval by the Department.
10.05 PLANS AND SPECIFICATIONS
Detailed plans and specifications for Trunk Lines shall
be prepared on mylars provided by the Department for approval in
accordance with Section 2.06. Plan and profile scales shall be
Revised 07-92
10-5
one inch (1") equals forty feet (40') horizontal, and one inch
(1") equals ten feet (10') vertical. In addition to the
requirements of Chapter 2, the plans shall contain the following
information and exceptions:
A. A plan view showing:
1. The proposed alignment of the Trunk Line and the
location of outlets, valves, blow-offs, air
valves, pitots, thrust blocks, bends, reducers,
bulkheads, and connections to all facilities.
2. All existing and proposed substructure utilities
and obstructions complete with dimensions to the
Trunk Line.
3. All survey bench marks and alignment data.
B. Top-of-pipe profile showing:
1. Existing ground line.
2. Official street grades where the Trunk Line is
located beneath roadways.
3. Proposed final ground surface where the Trunk Line
is installed within an easement and not located in
a roadway.
4. The C.G. elevation of grade breaks and the slopes
of the Trunk Line.
5. The C.G. elevations of all outlets, valves,
reducers, etc.
6. Any proposed or
proposed Trunk
dimensions.
existing utility crossings of the
Line complete with clearance
C. A location map with a list of all bench marks and field
book references.
D. Detail sheets showing outlets, connections, valves,
etc.
E. The location and log results of the test holes.
Revised 07-92
10-6
10.06 INSTALLATION
The Department may permit the Applicant to have its own
contractor install a Trunk Line. The I?epartment reserves the
right to install or have its contractor install Trunk Lines when
it is in the best interest of the Department. This determination
is solely at the discretion of the Department and the Applicant
shall pay all installation costs, whether installed by its
contractor or by the Department or its contractor.
The Trunk Line installation shall be inspected by the
Department at the expense of the Applicant. The Department will
also provide plant inspection during pipe fabrication at
applicant's expense. The Applicant shall also furnish, at
applicant's expense, such labor as will be required by the
Department to enable thorough inspection and culling of all the
materials by the Applicant and shall furnish reasonable samples
of materials at the job to afford adequate testing.
Line and grade will be established by, and
as-constructed surveying done by the Department at applicant's
expense, or when specifically approved by the Department, by a
Professional Engineer or by a Land Surveyor licensed to practice
in the State of California or by its authorized representative in
accordance with Sections 2.09 and 2.10.
Revised 07-92
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
14.
Material Descrjption
Ductile iron pipet
Tyton jo;nt, double
cement li ned
Ductile iron pipe,
Tyton joint. doubte
cement tined
Gray or ductile iron
fittings, Tyton
cement lined
C.I. spools, cement
lined
C.I. single-back
fl anged c I afllS
C.I. double-baCK
flanged
flanged tapping
sleeves
Machine bolts for
2"-12" anct 18
11
flanges
Hex nuts for 2"-1211
end 18
11
flanges
Stud bol ts for 16
n
I
ZOu, and targer
flanges
Hex nuts for 16
11
,
20tl, and: larger
flanges
solid wedge.
resil. seat, gate
val YeS
C.l. double disc,
square disc, gate
valves
C.1.. swing
check valves
; "''''rl fl7 -q?
Al1
DUCTILE IRON PIPE
SPECIFICATION lIST
Size
i.!!J.,.l
4-12
16,20
4-20
4-8
612
412
4-8
4-12
16,20
4-16
Specification!
Drawing
Reference
Drawings
InclOOed
in Part 9
AWA Cl50,
Class 52, Clll,
Cl04
AWA Cl50,
Class 51, C111,
Cl04
AWl/A CIa 250
cno, Cl11, Cl04
DIIP Spec. No. 11206
OWP spec. No. Yes
W 138 (DWP
Drawing No. A9093)
D\JP Specification Yes
No. II 138 (DI/P
Or-awing Nos.
A9061-1 and ,2)
OUP Specification Yes
No. W 138 (DIIP
Drawlng A9061-1,
-2, aM
DWP Specification Yes
No. II 220
ASTM A307, Grade
8, ANSI 818.2
AST" A563, Grade
B, ANSI 818.2
AST" A193, Grade
8, ANSI B18.2 (DWP
Drawing
and -2)
AST" A194, Srade
2H. oil quenched,
ANSI B18.2
OWP Specification
No W 244 (tow press.,
r.g. and flg.)
DWP Specification
No_ 265, (low
and high press. fig.,
and caulKed bell)
DWP Specification
No. \I 1086
No
*Avai labte
from Water
System
Stores
No
No
No
No
No
No
No
No
No
No
No
Yes
Yes
No
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Material Spec;fication
C.I. air and vacuum
valves
gaskets
Yokes
Lead
Polyethylene encasement
Standpl pes for 4".1.2.
1
gate valves
C.l. vertical gate caps
inch manhole ring,
frame, .,nd cover
Double-outlet fire
hydrants (including
bury ell)
Copper service pipe
Curb and corporation
valves and bronte
fittings.
Revised 07-92
She

2'6
4-12
4-20
4-20
4-20
2-1/2x4
4,4
1-2
1-2
Al-2
Specification
Drawing
Reference
APeD 144, 152,
and 153, or equal
U.s. P'pe uField
Lok", or equa l
DYP Prawing Hos.
A90731, 'lA, -3,
-4, -5, and -6;
A9081-1. -2, '3,
-4, .. and
7; A9396, 95040-1,
2, and -3
Rockwell No. 441
and 433 cast ductile
lron, stainless
steel bolts and
nuts. or equal
OWP Spec;fication
No. W 245
ANSI/AWA Cl05,
A2L5, Class A,
Tube form
DWP Drewing Nos.
A2021, AnOI
Specification
No. W138 (DUP
Drawing No. A9034-1)
OUP Spec. No. II 159
(OUP Drawing No.
C626)
Latest DWP spec.
(OWP Drawing Ho.
02870)
DWP Specification
No. W 1021
DWP Specification
No. IJ 1022. Curb
valve: teflon
coated ball valve,
iron pipe female
with lockwing and
lever handle.
Corporation valve:
teflon coated ball
AWWA taper
threaded inlet,
flared cos;>per
connection outlet.
James Jones Co. t
Ford Meter 80x Co
or equal.
Drawings
Included
in Part B
No
No
No
No
NO
Yes
*Avaiable
fran Yater
System

No
No
Yes
NO
Ne
No
Yes
Yes
Yes
Yes
Ne
valve
& fittings:
Corp. valve
Yes
Curb valve:
Ne
A1 '3
-Available
Specification/ Drawings from \Jater
Size Drawing !nclvded System
Material $oeci ficat 100
.I.!!J.l
Reference in Part B

27. C.I. threaded 2 Latest O\JP spec. Yes No
flange (DIJP Drawing No .
9005)
28. Bronte service clamps 1-2 Latest DWP spec. Yes No
29. No. 2 plastic Latest OWP spec. No Yes
meter boxes (OWP Drawing
.9420)
30_ No.3 plastic latest OWl> spec. No Ye.
meter boxes (OWP 0 rawi n9 No.
.9422)
31- 48- inch by 48- inch latest OWP No Y
plastic vaults and (COR Sy.tems
covers Corp. Oralo;;ng
No. 102800)
32. 48-inch by 72- inch Latest OWl> spec. No Yes
plastic vaults and (COR Systems
covers Corp. Drawing
NO. 102800-1)
33. No. 2 concrete meter OlJP Drawing No. No Yes
covers 85050-4
34. No. 2 plastic Latest OWP spec. No Yes
meter covers (DIJP DraWl n9 No ..
B5096 and .9204-3)
35. Jrio. 2 steel meter
OWP Drawing
No_
No Yes
covers
.9259-1
36. No. 3 concrete meter DWP Spec. No_W 153 No Ye.
covers (OWP Drawing Nos.
A9204-2 and A9204-3)
37. No. 3 plastic meter Latest DWP spec. No Yes
covers CD'-IP Orawlng No.
85096 and A9204-3)
38. 3 steet meter OWP Drawing
No_
No Yes
covers A9260-'
39_ frames, OWl' Spec. No. \I 153 No Ye.
pieces. and rings for (DWP Drawing Nos.
concrete meter boXes .9289 and A9290)
40. Meters 5/8-'0
DWP Spec_ Nos_ \I 128, Yes
W 135, W 378, and
\I 1086
41- Type II Port land DWP Specification No
cement No. G 331
Revised 07-92
42.
Material Descriptigo
Aggregate for
concrete and other
us.s
Size
i!.!W
Al4
Specification/
Drawing
Reference
DWP Specification
No. G 391
*some materials may not be available from DwP Stores at all times.
Materials noted "Noll may be procured from DWP Stores under unusual
circumstances ~ h i c h are identified and agreed to when financial
arrangements are made.
Revised 07-92
Drawings
Included
in Part 8
*Available
from Water
System
Stores
No
A2-1
SrliJ:L PIP<
MATERIAL SPECifICATION LIST
*Available
Specifitationl Drawings from Water
Size Drawing Include<! System
Material Description
ll!hl
Reference in Part 8
!l2!:u
1. Steel pipe, with 4-20 DWP Spe<. No. Ves No
sl ip joint for W 302 (DWP Drawing
field welding, cement Nos. A 1867 and
li ned and coated A3821 )
2. Steel fittingSt 420 ANSI 816.9 No
cement lined and
coated
3. Flanges 420 ANSI 816.5 No
4. Machine bolts for ASTH A307, Grade B. No
2 .... 12" and 18" ANSI 818.2
flanges
S. Hex nuts for 2
0
"12" ASTM A563, Grade a, No
and 18" flanges ANSI 818.2
6. Stud bol ts for 16" I ASTM A19l j Grade S, No No
20
11
, and larger ANSI 818.2 (DWP
flanges Drawing Nos.
ar<! ,2)
7. Hex nuts for 16
11
, ASTH A194, Grade 2M, No
20", and larger 01 l quenchea
t
ANSI
flanges 818.2
8. Gaskets 4-20 Garlock No. 8798, No
or equal
9a. Mechanical couplings 420 SmithSlair No. 411 No
insulat ing or equal
9b. Mechanical couplings 420 Smith"'SLair No. 416 No
Insulating or equal
lOa. Tiewrods and anchor 412 Sheet 14 of the No
boXes Standard Drawings
lOb. Insulat ing steeve and 4'20 Pacific seal, No
washer, one piece acetal or equal
11. Insulating flange 420 DWP Drawing No Ves
asseabl ies A9367 ar<! A9417
12. Ancdes Latest OWP No
32-lb. Dow 'iGalvo
Pack", or equal
13. Heat shrink steeves 420 IIRaychem Heat No
for corrosion Shrink Joint
protection Protection Sleeve
GAP7
11
and Raychem
"Thermof i t Dresser
Sleeve'l. or equal
Revised 07-92
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Material SpecjficatlOO
lead
Cold'applied tape
wrap
C.l. double djsc
1
square disc gate
valves
C.I. solid wedge,
seat, gate
valves
C.!. sol id wedge
gate valves
C.I. double disc
gate valves
swing
valves
air and vacuum
valves
Standpipes for 12"
gate valves
C41. vertical gate
caps
24-inch manhole
frame and cover
Double-outlet fire
hydrants (including
bury ell)
Suilt-up fire
hydrants
Revised 07-92
Size
i!.!W.
10,20
4-12
4-8
12
4-16
2-6
4-12
6
2Y>x4
and 4x4
A22
Specificationl
Drawing
Reference
Draw;ngs
Included
in Part B
DUP specification
No. W 245
polyren "#930
Tape", 50-mil
thick. over Polyken
"#927 Pi pel jne Primer
ll
or "Pol yken #929
Pipet ine Primer" and
Polyken u#931 Filler
if necessary;
Tapecoat IICT 10/40\,111 J
spiral wrap, over
Tapecoat "Tt Cold
Pr;me
P
primer: or
equal
OWP Specification
No. 265 (low press.
and high press. flg.,
and c .... bell)
OWP Specification
No. W 244 (low
press. ftg.)
O\lP Specification
No. W 117 (high
press. Itg.)
DWP Specification
No. W 171 (high
pre ... fIg.)
owP Speclfication
No. Wl086
APCO 144, 152_ and
153, or equal
OWP Drawing Nos.
A202l and AnOl
DWP Specification
No. W 138 (Dill'
Drawing No.
O\lP Specification
No. W 159 (DWP
Drawing No. C626)
Latest OWP spec.
(OWP Drawing No.
02870)
O\lP Drawing No.
A9143-2
No
No
No
No
No
"Available
from Water
System

No
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
Material
Copper service pi pe
Curb and corporation
valves and bronze
fittings
C .. L
threaded flange
Service welding
coupl ings
Service insulating
coupl ings
No. 2 plast ic
meter boxes
3 plastic
meter boxes
4B-inch by 48-inch
plastic vaults and
covers
48inch by 72 inch
plastic vaults and
covers
No. 2 concrete meter
covers
No. 2 plastic meter
covers
No. 2 steel meter
covers
Revised 07-92
Size
i.!!:kl
1-2
12
11'"
11Y,
A23
Speci f1 cat i on/
Drawing
Reference
Specification
No. 1021
Specification
No. \I 1022. curb
valve: teflon
coated ball valve,
iron pipe female
with lockwing and
lever handle.
Corporation valve:
teflon coated bail
valve, AWWA taper
threaded inlet,
flared copper
connect i on out let.
James Jones Co.,
ford Meter Box Co
or equal
Latest DtJP spec.
(DYP Drawing "0.
A9005)
Latest DiJP spec.
(D\oIP Drawing Has.
A9364 and A9365)
Ford Meter Sox Co.,
or equal
Latest D\JP spec
(DtJP Drawing Ho.
A9420)
latest otJP spec.
(OUP Orawing No.
A9422)
Latest OYP spec.
(CDR Systems Corp.
Drawing No. 102800)
Latest OtJP spec.
(CDR Systems Corp.
Drawing No.
latest D\JP spec.
(DUP Drawfng Nos.
A92041 and A9204-3)
Latest OUP spec.
(OYP Drawing
85096 and A92043)
D\oIP Orawing No.
A9259- 1
Drawings
Included
in Part S
Yes
res
Yes
No
No
No
No
No
No
No
*Availabte
frcrn Yater
System

No
Corp. valve
& fittings:
Yes
Curb valve;
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
39.
40.
41.
42.
43.
44.
45.
P;Z-4
Speciftcstionj
Size Drawing
Material Specification
il!k.1
Reference
~ o . 3 concrete OWP Spec. No_ W 153
meter covers (OWP Drawing Nos.
A9204-2 aod A9204-3)
No.3 plastic Latest DUP spec.
meter covers (oW? Drawing Nos.
B5096 aod 9204-3)
No. 3 steel meter DlIP Drawing Ho.
covers A9260-1
c ~ r _ frames, center OWP Specification
pieces, and rings for No. W 153 (OWl'
concrete meter boxes Drawing Hos. A9289
aod A9290)
Meters 5/8-10 DWI' Spec. Nos. W 128,
W 135, W 31'll, and
W 1086
Type I I Portlaod DWP Specification
cement NO. G 331
Aggregate for concrete OWP Specification
and other uses No. G 391
Some materials may not be available from DWP Stores at all times.
Matedals noted nNol1 may be procured from OWP Stores IJf"Jder unusual
circumstances which are identified and agreed to when financial
arrangements are made.
Revised 07-92
Available
Drawings from Water
Included System
in Part 8 Stores
No Yes
No Yes
Ho Yes
No Y
Yes
No
No
B1-1
Department of Water & Power
of The City of Los Angeles
STANDARD SPECIFICATIONS
For
Fl'ITINGS: CAST- IRON WATER WORKS
Spec. !of l38-R"
(Revised 11- 14-75)
Supersedes
Spec. W 138-R3
...------------------------------------------
1. These specifications set forth the
requirements for cast-iron water works fittings for working
water pressures of 250 and ,,00 pounds per square inch.
2. of All fittings shall
comply with drawings classified in the following groups and
shall be cement lined as specified:
a. Group B fittings shall be
cored pressure fittings in sizes from" inches through 12 inches
in accordance with the following drawings:
A9324
A90l0
A90l1
M018
A9022-2
A9022-3
A9022-11
A9030 -1. - 2
A9031-1. -2
A9032
A9033
A9036-1. -2
A9037-l
A9037-2
A90" 5
A9047
A9049- 1. -2
A9051
A9056
A9066
A9067
A9069
A9093
Titl!
C.I. Fire Hydrant Middle
Section 12" Offset
15 Degree Bends
C.l. Adapter With Bell to Fit
Transite Pipe
30 Degree Bends
Long sweep Offsets
Standard c.r. Bell & Bell Offsets
Standard c.r. Bell & Spigot Offsets
Crosses
Tees
45 Degree Bends
90 Degree Double Bell Ells
Plug Reducers
Plugs
Plug - C.I. for c.r. Pipe with
Rubber Gasket Joint
Beaded Nipples
Double Bell Solid Sleeves
Taper Reducers
Long Slip Sleeves
175 lb e.r. Bell Cap Fitting
Flanges for C.I. Fittings
c.r. Connection - Flange to Bell
or Spigot
c.r. connection Flange to Mechanical
Joint
C.1. Spools
cement Lining
__
No
Yes
Yes
Ye;::;
Yes
Yes
Yes
YeS
Yes
. Yes
Yes
No
No
No
Yes
No
Yes
NO
No
No
yes
Yes
yes
B1
Std. Spec. W
--------------------------------.------------------_.------
b. Group C fi tt.ings shall be
cored pressure fittings in sizes inches and larger' in
accordance with the following drawings:
A9010
A9011
A9018
A9022-2.
A9030-1, -2,
-3
A9031-1, -2,
-3
A9032
A9033
A9036-1, -2,
-3
A9037-'
A9037-2


A9049-1, -2,
"'3 r "'4
M051
A9056
A9066
A9067
15 Degree Bends
C.l. Adapter With Bell to Fit
Transite Pipe
30 Degree Bends
Long Sweep Offsets
Crosses
Tees
45 Degree Bends
90 Degree Double Bell Ells
Plug Reducers
Plugs
Plug - C.l. for C.l. pipe With
Rubber Gasket Joint
Beaded Nipples
Double Bell Solid Sleeves
Taper Reducers
Long Slip Sleeves
175 lb Co!. Bell cap Fitting
Flanges for Col. Fittings
Co!. Connection Flange to Bell
or spigot
Cement Lining

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
Yes
No
Yes
No
No
No
Yes
c. Group D fittings shall be
noncored pressure fittings, all sizes, in accordance with the
following drawings:
A9060-1
A9061-1, -2,
-3
Title
---
Single C.l. Flanged Clamps
Double Clamps, Flanged OUtlet
Cement Lining
__
No
NO
Bl-3
std. spec. W 138-Rij
------------------------------"-------
d. Group E fittings shall be
gate caps in accordance with the following drawings:
A903ij-l
A903ij-2
A9035-1
A9035-2
6" Vertical Gate Cap
8" vertical Gat'! cap
6" 30 Degree Gate Cap
8" 30 Degree Gate Cap
Cement Lining

No
No
No
No
* Bell and spigot details on fittings in Groups S, C,
and D shall also comply with Drawing A90ij3-l.
3. Patterns: The contractor shall furnish all
patterns required-lor-fabricating fittings. The patterns shall
remain the property of the Contractor.
ij. Markings: Each fitting shall have l-inch letters
raised 1/8-inch cast on the outside indicating the
manufacturer's name, month, year of casting, and showing the
size and type df fitting. NO markings shall be cast within 8
inches of the spigot end. castings shorter than 8 inches shall
be marked in a practical position. After the coating has been
applied, the weight shall be conspicuously painted in white on
each fitting lU inches and larger to be furnished under Groups C
and D.
5. Weight: If the weights listed in the Proposal
SChedule are different from the weights listed on the drawings,
the weights list"ed in the Proposal SChedule shall control. The
actual weights of fittings shall not vary more than 10 percent
from the listed nominal weights.
6. All hub and spigot ends under Groups
Band C shall the requirements of the Department's gauging
rings as shown on Drawing A90ij8. Other tolerances shall not
exceed those specified in AWWA Cll0, as last revised,
7.
a. The thickness of blank, flat-
faced flanges shall be 1/8 inch to l/U inch greater than the
required finished flange thickness.
b. When specified in the order,
all flanges shall be flat faced and serrated. Serrations shall
be made in accordance with Manufacturer's Standardization
Society (MSS) , Standard Finishes for COntact Faces of Pipe
FlangeJ and Connecting-End Flanges of Valve and Fittings SP-6,
as last revised, and shall have a minimum depth of 0.005 inch.
Bl-4
Std. Spec. W 138-RU
----------------------------------------
-------------
8. Grag.L.sll.!L2!!ality
* a. Fittings shall be made of gray iron meeting the
requirements of ASTM A UB, Class 30 or Class UO, as last
revised. In addition the gray iron shall be of a quality and
character to make the fittings strong, tough, and of even grain
without undue brittleness and soft enough to permit machining,
drilling, cutting, and chipping with reasonable ease. Fittings
shall be sound and smooth, free from swells, cold shuts, scale,
lu!nps, blisters, sand holes, scabs, and defects. The fittings
shall be free from admixture of cinders, slag, or sand. Bells
and spigots shall be circular in cross section with concentric
inner and outer surfaces. Plugging, filling, burning-in, or
other methods to repair defects shall not be done, except that
welding to eliminate defects may be done if, in the opinion of
the Engineer, the fittings can be satisfactorily repaired.
Before welding, defects shall be chipped out exposing clean
metal.
b. Fittings that are not machineable and fittings
which, upOn machining or chipping. are found to contain defects
which cannot be satisfactorily repaired will be rejected.

following:
c. The metal of the fittings shall comply with the
Sulphur . not more than 0.151
Manganese ............... O. to O.
Phosphorus not more than
9. Fittings made from Class 30
Iron shall withstand a working water pressure of 250 pounds per
square inch. Fittings made from Class UO Iron shall withstand a
working water pressure of UOO pounds per square inch.
a. The Contractor shall cast 2 transverse test
bars from each heat or run of metal for the castings to be
furnished. Testing shall be performed in accordance with ASTM A
438, as last revised.
b. The Contractor shall have a loading and
deflection test made on one test bar from each heat or run of
metal. The Department will have the option of conducting bar
tests. No test bars shall be broken until the Contractor has
notified the Department.

deflection
follows:
c. The minimum breaking load and the
at the breaking load of the test bars shall be as
Std. Spec. W 138-Rq

Controlling Section
of Fitting in Inches
Nominal Diameter of
Test Bar in Inches
Class 30 cast Iron
------------------
Breaking Load at
Center - Minimum, lb
Deflection of Breaking
Load - Minimum. in
Breaking Load at
Center - Minimum, lb
Deflection at Breaking
Load - Minimum, in
Test Bar Size
__
A_ ------a-----:--c
- --- ---
0.25
to O.SC
0.88
1150
O. 12
14CO
O. 14
O. 51
to 1.00
1.20
2200
2600
0.28
1.01
to 2.00
2.00
7600
0.25
9100
0.30
d. The numerical value of the deflection in inches
at the breaking load of the "A" and -B- bars shall be not less
than 0.0001 of the breaking load of the bar.
.. e. If the first transverse test bar fails to meet
the requirements of these specifications and the second
transverse test bar does meet the requirements of these
specifications, the fitting will be accepted. If both
transverse test bars fail to meet the requirements of these
specifications, the Contractor may test a tension specimen
machined from the broken end of either transverse test bar. If
this tension test specimen meets the requirements for the class
of cast iron specified, the fitting will be accepted.
f. In addition to the above transverse test
the Department may require that the Contractor furnish the AWWA
standard test bar.
.. g. Test bars shall either be tested in the
presence of the Department Engineer or tested by a recognized
testing laboratory. The Contractor shall notify the
Department's Materials Testing Laboratory of the Water
Engineering Design Division, 510 East 2nd Street, Telephone
Number (213) 481-5704, not less than 24 hours before the test.
After the test the Contractor shall send 3 copies of certified
Bl-6
Std. Spec. W 136-R4
------------------------------
------
test reports covering the results of all bar testing to the same
address.
11. Prior to hydrostatic testing, lining,
and coating, all fittings shall be thoroughly cleaned of all
. sand, scale, dirt, grease, other foreign matter, surface
impurities, irregularities, rust, and chaplets.
12. Before lining and coating, all
fittings shall be thoroughly inspected and hammer tested by the
Contractor to determine any flaws or defects. Cored pressure
fittings to be hydrostatically tested shall be hammer tested
while under

13. !!.2!!rosti!j;ic TesllmI:
a. All Group B fittings shall be tested
hydrostatically prior to lining and coating. The Department
reserves the right to require hydrostatic testing of Group C
fittings. Fittings of Class 30 Iron shall be subjected to a
test pressure of 350 pounds per square inch. Fittings of class
40 Iron shall be subjected to a test pressure of 700 pounds per
square inch. The required hydrostatic test pressure shall be
maintained for a minimum period of one-half minute. Fittings
shall be subjected to a hammer test while under the required
pressure. Fittings that leak or sweat will be subject to
rejection.
... b. Where slight sweating occurs during the
hydrostatic test the Engineer may approve peening to stop
sweatinq.
c. If the fittings are to be transshipped, they
shall be hydrostatically tested at the location of the last
point of loading.
14.
a. All fittings designated in Article 2 as cement
lined, shall be cement-mortar lined in accordance with AWWA
C10ij, as last revised.
... b. Cold- applied T&O Tar-Ba se Paint (commonly
called T&O Tank Solution) shall be used as a protective coating.
The coating shall be applied after the cement lining has set
firmly and before any drying cracks have appeared, but in every
case the coating shall be applied within 24 hours after lining.
The tar-base paint shall be tasteless, odorless, and nontoxic.
The paint shall be self-priming, fast drying, and formulated to
minimize taste and odor contamination of water. The paint shall
contain no added filler, pigments, or fibrous materials.
Bl-7
std. Spec. W
------------------------------------------
ASphalt of either petroleum or natural base shall not .be used as
a part of the ingredients. The paint shall comply with the
requirements of the following table:
{lrope;;u
Viscosity. 25C
Weight per gal
Ash. maximum
Distillation at 200C,
maximum
Flash pOint, minimum
100 g at
60-75 sec
88.7-9.7 lb
0.51
Residue
1151 by weight
70F (2'C)
ASTM Test Method
sUM.LBSlYised_
D 562
Ignition
D 20
D 56
c. The thinner shall be compatible with the T&O
Tar-Base Paint and shall be fast drying and shall not curdle or
congeal the paint. The thinner shall not impart taste or odor
to water after coating has dried for liS hours.
'5. The paint shall be applied by
immersing the fitting in T&O Tar-Base Paint. The fitting shall
then be removed and allowed to drain. Each fitting shall be
inspected; if holidays or other imperfections are found in the
coating, the fitting shall be immersed until there are no
imperfections. The fitting shall then be set aside to dry.
Accumulation of surplus material in the bells and other places
shall be removed by brushing or scraping.
16. Inspection: The Department's representative
shall at all times have the right to inspect the work in the
course of manufacture and make such tests from time to time as
he may deem advisable, providing no delay in production of
acceptable materials or equipment is caused thereby. The
Contractor shall furnish. at his own expense, reasonable
facilities including tools and instruments for so doing and for
obtaining such information as the representative desires
respecting the progress and manner of the work and the character
of the materials used. However, final inspection will be made
upon receipt at the Department's specified receiving pOints;
and. if any materials or equipment do not meet the requirements
of these specifications. the lot or any faulty portion thereof
may be rejected.
Before offering a lot for inspection. the manufacturer
shall eliminate any portion which in his opinion is or
does not meet the requirements of the specifications. All
expense of the initial acceptance test will be borne by the
Department. The expense of subsequent tests due to failure of
materials or equipment first offered will be charged against the
Contractor. The fact that the materials or eqUipment have been
Bl-8
Std. spec. w
-------------------------------------_.
----------
successfully inspected, tested, and accepted by the Department's
representative, shall not relieve the COntractor of
responsibility in the case of later discovery of flaws or
defects.
17. 2hiYEins: The material shall be prepared for
shipment in such a manner as to ensure acceptance by common
carrier for transportation at the lowest rate and to afford
protection from the normal hazards of transportation. Each
shipment shall be legibly marked with the purchase order number
and name of supplier. The specification number Shall be Shown
when specified.
Asterisk (*) indicates changeS in a paragraph.
(END OF STANDARD SPECIFICATIONSI
Sl-9
of
of The City of Los Angeles
STANDARD SPECIFICATIONS
FOR
FITTINGS' DUCTILE IRON, WATER
WORKS, RUBBER-GASKET JOINT,
CEMENT-HORTAR-LINED, q INCHES
THROUGH 2q INCHES, FOR AWWA
DUCTILE IRON PIPE
Spec. W 206-Rl
(Revised 8-13-90 )

Spec. W 206
* 1. Scope' These specifications the
fittings, with push-on
joints and cement-mortar lining, up to
350 pounds per square inch working water pressure and use
with AWWA ductile-iron pipe with push-on joints.
* 2. and Specifications: All standards and
specifications referred to in these specifications shall be as
last revised, unless stated otherwise in these specifications.
3. Material Requirements'
* a. Ductile shall meet the applicable
of ASTH A 536, Grade 70-50-05 and shall meet the
chemical of AWWA Cll0-a7, Section 10-12.2.
* b. Fittings shall meet the of
ANSI A21.10 (AWWA Cll0 C153) for push-on joints, except as
modified herein.
* c. Rubber gaskets, as specified on Drawings A9380,
BS089, and BS091 shall meet the requirements of ANSI A21.11
(AWWA Clll) for Tyton type push-on joints, except as modified
Tyton gaskets shall be included with each fitting only
if specified in the
d. lining of the designated fittings
shall meet the of ANSI A21.4 (AWWA Cl04), except as
modified herein.
*
Hote' The asterisk (*) indicates changes in a paragraph.
B 1 - 1 0
std. Spec. W 206-R1
4. Dimensions and Weights:
a. Dimensions and weights of all fittings shall be
in accordance with the following drawings:
Drawing
No.
A9381
A9382
A9383
A9384
A9385
A9386
A9387
A9388
A9389
A9390
A9391
A9392
B5089
B5091
'"
estimated
weight of
Title
11-1/4-Degree Double Bell Bends
22-1/2-Degree Double Bell Bends
45-Degree Double Bell Bends
90-Degree Double Bell Bends
Double Bell Sleeve
Tees
Crosses
Taper Reducers. Spigot-by-Bell
Taper Reducers. Bell-by-Spigot
Fire Hydrant Tees
Flange-to-Bell Adapter
Blind Plug
Bell Cavity Detail and Spigot Dimensions.
4-Inch - 12-Inch
Bell Cavity Detail and Spigot Dimensions.
16-Inch - 24-Inch
Cement
Lining
Reguired
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
b. All weights listed in the above drawings are
weights. The bidder shall list the actual shipping
each size of fitting in the proposal.
'" c. Dimensions A in Drawings A9381 through A9384
are minimum dimensions. Dimensions L in Drawings A9385 and
A9391 are minimum dimensions. Dimensions Hand J in
Drawing A9386 are minimum dimensions.
5. Patterns: The Contractor shall furnish all
patterns required for fabricating fittings. The patterns shall
remain the property of the Contractor.
6. Markings: Each fitting shall be marked in
accordance with Subsection 10-9 of ANSI A21.10. No markings
shall be cast within 8 inches of the spigot end. Castings
shorter than 8 inches shall be marked in a practical position.
After the coating has been applied. the weight shall be
conspicuously painted in white on each fitting 14 inches and
larger.
Note: The asterisk ("') indicates changes in a paragraph.
B 1 - 11
Std. Spec. W 20G-Rl
* 7. Weights: If the weights listed in the Proposal
Schedule are different from the weights listed on the drawings,
the weights listed in the Proposal Schedule shall govern. The
actual weights of fittings shall not vary more than 10 percent
from the weights listed by the Contractor in the proposal.
8. Tolerances: All bell-and-spigot ends shall meet
the requirements specified in ANSI A21.10.
9. Ends:
a. Blank Flanges: The thickness of blank, flat-
faced flanges shall be 1/8 inch to 1/4 inch greater than the
required finished flange thickness.
b. Machined Flanges: When specified in the order,
all flanges shall be flat faced and serrated. Serrations shall
be made in accordance with Manufacturer's Standardization
Society (MSS), Standard Finishes for Contact Faces of Pipe
Flanges and connecting-End Flanges of Valves and Fittings, SP-6
and shall have a minimum depth of 0.005 inch.
c. Bells: Internal and external dimensions of
bells shall conform to the Tyton type push-on joint as shown on
Drawings B5089 and B5091.
d. Spigots: Internal and external dimensions of
spigots shall conform to the Tyton type push-on joint as shown
on Drawings B5089 and B5091.
10. Grade and Quality 0; Castings'
a. Fittings shall be a quality and character to
make the fittings strong, tough, and of even grain without undue
brittleness and soft enough to permit machining, drilling,
cutting, and chipping with reasonable ease. Fittings shall be
sound and smooth, free from swells, cold shuts, scale, lumps,
blisters, sand holes, scabs, and defects. The fittings shall be
free from admixture of cinders, slag, or sand. Bells and
spigots shall be circular in cross section with concentric inner
and outer surfaces. Plugging, filling, burning-in, or other
methods to repair defects shall not be done, except that welding
to eliminate defects may be done if, in the opinion of the
Engineer, the fittings can be satisfactorily repaired. Before
welding, defects shall be chipped out exposing clean metal.
b. Fittings that are not machineable and fittings
which, upon machining or chipping, are found to contain defects
which cannot be satisfactorily repaired will be rejected.
Note: The asterisk (*) indicates changes in a paragraph.
B 1 - 12
std. Spec. W 206-R1
% 11. Pressure Requirement: Fittings made from
Grade 70-50-05 ductile iron shall withstand a working water
pressure of 350 pounds per square inch for Tyton Joint fittings,
and 250 pounds per square inch for flanged fittings.
12. Bar Testing:
a. Ductile Iron: The Contractor shall cast and
prepare 2 test bars from each heat or run of metal for the
castings to be furnished. The Contractor shall cast and prepare
either the Standard Round Test Specimen or the Y-Block type.
Heat treatment of test shall be identical to that of the
casting to be furnished. Test bars and testing shall be in
with ASTM A 536, except that the grade shall be
70-50-05. The acceptance values shall be as follows: minimum
tensile strength 70,000 psi, minimum yield strength 50,000 psi,
and minimum elongation 5 percent.
* b. Test Bars' Test bars shall either be tested in
the presence of the Engineer or tested by a recognized testing
The Contractor shall notify the Department's
Materials Testing Laboratory of the Water Engineering Design
Division, 510 East 2nd street, Telephone Kumber (213) 481-5704,
not less than 24 hours before the test. After the test, the
Contractor shall furnish 3 copies of certified test reports of
all bar testing.
13. Cleaning: Prior to hydrostatic testing, lining,
and coating, all fittings shall be cleaned of all
sand, scale, grease, other foreign matter, surface
impurities, irregularities, rust, and protruding chaplets.
14. Testing: lining and coating, all
fittings shall be inspected and hammer tested by the
contractor to determine any flaws or defects. Fittings to be
hydrostatically tested shall be hammer tested while
pressure.
15. Hydrostatic Testing:
* a. When specified in the order, fittings shall be
tested hydrostatically prior to lining and coating. Tyton joint
fittings shall be subjected to a test pressure of 525 pounds per
square inch and flanged fittings shall be subjected to a test
Hote: The asterisk (*) indicates changes in a paragraph.

B1 13
std. Spec. W 206-Rl
pressure of 375 pounds per square inch. The required
hydrostatic test pressure shall be maintained for a minimum
period of one-half minute. Fittings shall be subjected to a
hammer test while under the required pressure. Fittings that
leak or sweat will be subject to rejection.
b. Where slight sweating occurs during the
hydrostatic test, the Engineer may approve peening to stop
sweating.
c. If the fittings are to be transshipped, they
shall be hydrostatically tested at the location of the last
point of loading .
16. Lining and Coating:
* a. All fittings designated in Article q as cement
lined shall be cement-mortar lined in accordance with ANNA Cl0q
with double thickness lining.
* b. The exterior ferrous surfaces of each fittings
shall be thoroughly cleaned of rust, dirt, grease, and all other
foreign matter before the application of a protective coating.
The protective coating shall be applied after the cement lining
has set firmly and before any drying cracks have appeared, but
in every case the protective coating shall be applied within
aq hours after lining. The protective coating shall be
tasteless, odorless, and nontoxic. Coating shall be black,
self-priming, fast drying, formulated to minimize taste and odor
contamination of water, and shall be composed of pitch derived
from selected tars suitably blended with coal-tar solvent,
Koppers Company T & 0 Tank Solution or Bituplastic No. 28, or an
alternate coating meeting the requirements of Section 53-10.1 of
AWWA elS3.
c. The thinner used shall be compatible with the
above protective coating, shall be fast drying, and shall not
curdle or congeal the paint. The thinner shall not impart taste
or odor to water after coating has dried for qS hours.
* 17.
coating shall
in protective
shall then be
be inspected.
the protective
immersed until
then be dried.
be removed.
Protective Coating Procedure. The protective
be applied by spraying or by immersing the fitting
coating. Nhen applied by immersion, the fitting
removed and allowed to drain. Each fitting shall
If holidays or other imperfections are found in
coating, the fitting shall be resprayed or
there are no imperfections. The fitting shall
Accumulation of surplus coating material shall
Hote: The asterisk (*) indicates changes in a paragraph.
31-14
std. Spec. W 206-Rl
18. Inspection: The Engineez shall at all times have
the zight to inspect the wozk in the couzse of manufactuze and
make such tests fzom time to time as the Engineez may deem
advisable. pzoviding no delay in pzoduction of acceptable
matezials oz equipment is caused thereby. The Contzactoz shall
fuznish, at the Contzactoz's own expense. zeasonable facilities
including tools and instzuments foz so doing and foz obtaining
such information as the zepzesentative desizes zespecting the
pzogress and mannez of the wozk and the character of the
matezials used. However. final inspection will be made upon
zeceipt at the Depaztment's specified zeceiving pointsl and. if
any matezials or equipment do not meet the zequizements of these
specifications. the lot oz any faulty poztion thezeof may be
zejected.
Befoze offezing a lot foz inspection. the Contzactoz
shall eliminate any poztion which aze defective oz does not meet
the zequizements of the specifications. All expense of the
initial acceptance test will be bozne by the Depaztment. The
expense of subsequent tests due to failuze of matezials oz
equipment fizst offezed will be chazged against the Contzactoz.
The fact that the matezials or equipment have been successfully
inspected, tested, and accepted by the Engineez shall not
zelieve the Contzactoz of zesponsibility in the case of latez
discovery of flaws oz defects.
19. Shipping: The fittings shall be pzepazed foz
shipment in such a mannez as to ensure acceptance by common
cazzier for transpoztation at the lowest zate and to affozd
protection from the nozmal hazazds of tzanspoztation. Each
shipment shall be legibly mazked with the puzchase ordez number
and name of suppliez. The specifications numbez shall be shown
when specified. The fittings shall be secuzely banded to
wooden. non-zeturnable. q-way forklift entzy pallets. and shall
be delivered by trucks. The tzuckbed shall be open and
accessible on 3 sides foz access by a conventional fozklift.
Note: The asterisk (*) indicates changes in a pazagraph.
(END OF STANDARD SPECIFICATIONS)
1=012. FLAt-Ju: DE-TAILS SeE. A90"
c
I
E-
12/
I
Q
r

I-I .. o-------D -+--+---------<-i

f
u
t
I
,
I
-r-
I
B
!
-*-
F-
BOLT HOLE:;>
H / I"
EQUALLY S LIIo.Q..G.E-t2. THAN BALES
51t-JGLE- CAST F-LAN<":2ED CLAMPS 0
I

,. i"D
l> . IE
IA. i t
\V..
o. " 0
..... '"
(j) :
l
O
"'ni

I
"'"
I V ..(
I!
I.>
(j') ABC D E F <=. H J K M N R. T 1'; I u w y 'ri;
L I'l: 4" 1.15 t.O 14 14.4. 25 a.s. Z,O 1.0451:-45 "'15 1;4 ...:15l4_.!OS I.ZlS 125
(j'\ It" 6' " .. \.5+_,,-- -.: " b 16.3 .. . .," u! "_" 140
I 4" .' ... " ... __ ". i-... ; .. 13.4!_' zoe
,,," .. -". -" 1.5 " .. :.." .. ..-', +"T' ' ". 0 i "" .. -". ".:
16' ____ " .. ..:' ___ l,f.5' .. .".05 a .';.-r:' " __ ... .. __ __
1.0" -'4'; -:";." 'iii __ ".1$,. 4 "6,6
_ '2.(j' b" " .. .L!1L ... _" " 6 "._ . _ :t? __ IAZt
.. ;:_ .. .:;
,.. 4" 4
r- 24"' btl t. f. 1.5 to I' I' 6 t' to u tf \1 .80" If t' 40<
._--"". ---r--'- r- .... - ..
1f .... --> .. :!:fs .. :: I -::. -:
JG Z4!' I'Z" .. I. 85.. ,. 11. ._. __ .. "_ ..... -'-'- ... ':... ... ...', __ ,1 "._ _ r-
o .. ................ - ---- .. " ............ -- .... -- -----1---'
() ,30' ...... " .... .. 1.+. J":5 .4 .. 143. 4!5_ ".. .. ./.15 -15 4. .. 49!
r 30' b" }'.. __ .. , .. ::. __ ._.:... .. ... :: .... ... _ __ __ ..lIZf
)a. t--20" S" _: .. __ _ .. jE!.,?.8.. __ "_._" " " __ .! ....... "_ .. ,atS .: .. _
3: 30 __ ... _h .. .!1: __ -'O . .. '.' .. (,0 5.5." .. _'.:.
'0 !I O I 'l." I' \. Bco ,. to .. I'l. .. . .. '.4" t' " foet
(p
4. BALE:S R&.Q. ON A.LL C.LAMPS
3"
.. .1
.. \Z" TO to MA'NS
'" C
g
4
1"
" 24" 4 30' 01
" "
l-4
ea
llKC;-, ...... ;
8
.1 '
--' J


r ;
:; :-,
"
.
- -,
-
-;
,. r
m
., .
...
i I \
I, - :::: it _I
1
,,---.....'
... .. "I t", ....
. ' .. ,-,"1' ... ,
"
""1.:"' .
'. " 'I
j "-
"'{.;"I .J .....
I
I, '.:. :.:. ;. I
, 't. '"
. I., , !')
", ",',
' . 1'- ' -,
f ....:\ "-:
t: ':. ::.
t 'I"
:,. II
. .... ' ...
I
i ""
" t',=:-" ,"-...:
,_<2._ '\..J

; 0 "'1
;!] :'1

;: ;:, 1.. ... .1 r\ _ "'-
v "';I' ...
' ; .... (1 ......
I:;J i I i'J)
1
2.,..-1
0

'1

:- = :: ; ,
1
- "'>2 I:-\.
L - -t,..., '....J
:::! q CO ,-"

....
... " ...... !II 'J
, K" ""
i ') "';' l ..
j,
.-
1
'i
,1

r' '1
.J;J
\i
I "-1
"I
I
. I
-_l3d
t I-I.
,-
DOt/BlE CLAbIP-rLAAI(}D OUTLfT
516Al(l
(C,-4ST IRON)
American Standard rlanges
As Ordersd,-- ___
See OrvOA90(,G) ,
I(l
I
I
"
00/1' hold
:rtl . l/ !I t"-
<1 I' ---.JI
--- i' .1,
I
r--.l' '1'-1
: : Ii II!' O 1 :
__ i_llil' Ili!1 II Ii; y]
__ f
I A 1..- i JAL
1 ' H' L.t ___ .,
NoT' S:- Set" to pI' !wo
All CCI",iIf#rJ .6# 1'/lkltt'cI

All bel,. hc/u <1"'?/'J' J',Dl"'od """d
<'Dr,d ...... ,,.,,,,,.r or 'I.I:'!' Jhow", .
R."};q ,"" It" '-7</.-:1/ ,:'J"> a;:
r;1/t (:J('fd I"'''.;r /o.be >rd /0"" ,6,,/,
"'>'1d 1101'17or J"'Jt? nO(;#:1.;O""/,

CD
o
(j)
-,
I
I
',I < "
, ..
1 j r, 0"
f " " (1
It " ., C
'. 'i-
j- I' Ij .......
. I I 'J
1 . ('J
f'i');,'t
-, <'<, .' '';;::
; I' '. " t. t-....
'J I . f'l,
I "j .
"
rJ
. f',
l
' "-
". .....
. ..:;. "
... 1: "--

. ,
"I
, J __ _
m
c
;0
111 0
<. I'l
, C 11
j ,.
" 0 lJ
n "TI ;!

(6 -< ... 0.4
1 > =i ..(
Jl -1 0
- 111 0 ...
Ill;u"'''
r 0
i .:: ;:;: VI
_ < l> ..
Q 0 ... ;z
l .... (II"
..... :0'"
r"
III II> ....
"'
'j R> 11
I" 0
t III
e(ll
l):O
l)
I
-<
I

h..
....

(j)




'I

,
r-
DOUBLE CLAMP-/ZANCfD OUTLET
J 16-5 R
(CAST IRON)
SIZE
PIPE
DfMeNS IONS IN INCHeS
C/,.,ss .......
"-

"
I -- r I
i I ... ......
.. II , T I {/ IP .. .

.......
AIBICIc,IEIr;IHI/IJIKWINlr
""."
1 4 4 . So "'5 oJ n /.!J. J S I C'{' ,J,,() -f ., I .. i, .)
6 4- (50 .5 /.(/,5 35.0 i
36 0 :50, -;5 - g' .1"-'" "'5 n(l 1.'5 S /L1'j
-:1. 8 :; '7S /..1,"0 4.0 14.j ;;;; 39.5/25 'l.:lC 6' 1/" J!, i
"5 816 : .. IS'; (;,Oi6,-3 1.2.;, "6 1/,,,,,1.3 i
6- 81 8 -_._ . . 8.0 t; /10 i .1.
.'--='':' . _ '. t. ;.' _. _. _ _ _ _ _
7 10,4 . .,-01'9i 1,0 ;-f()" 4.0;'13 ;",11:30 I.,z,,' 6' " ;.! ,i, .,
8
,,?
"', I
a ;; 7u
11 )/5
8 ,;
b'
,I' 1.
/
a 'J HI
In
-";;:. .-::;;. . ..:::.:..:...= .-.;--.;:::; -- '.=' ;;.;:;:,.-- ==:... -. . -
PATrERN
MAO:

'fl' "l;' ;icc '"." 6 0 /6' .;:;, 40. ;" ". 1;5 "I' l;; !
9 /i) 8 I;;iO :9:; .851.65' '.1:'08.0 /til.: 405160.'.10 I.L5 6' 1.'5 ./.'1 .f
10 IO'!/O l?i,; I;; /.00 :75 ;,iDioo 20.:1 IJ!}940 I;;:' /.Jo I . , e !./< 1.;"4 (
1/ /.2 v' I;), .iM.,4-!::l1 14-: 7 ,::.I,J',,_i. 6' J"l . _
12 I;: o,S 8OISOf..jvo.O
I
6.3 '.2.854451501-15/..,10 7 I:!O.165 I d .;_1',
12 885 .65 -130 18.3 - --- --------. 7 I.';:, ./:.,) I 6>
14 12 20 1.00.75'-13< 10.0.'0.3 :.1'/44.15/ 7 120,594 I 10
/5 12. - -- --... - -- -- '7' 1.20 I 10 ,.wf ----.- ---.-
':11/ i4. -.?. . "
i 17 14!.. ",0';) _8
18 14 7 1.25;';'8 8
i9 /,1- 10 ISO':?!,:, 7 i.z
s
I Ie -----.
z"i:) 14. 12 /.40 2(J(1""J!j 120. 22,3 .,' "4 15,'i 1<,0/.15 /.1 -,-- 125 .;:-: I -10---'---
j; 16 .i 75 /4(';:;;:;'U ',f0 14 J 4.;.0;' /:;'u /5i? ;, ;::'033.'1 ;'J8 ,_,
22 /5 - --. .. W/J(I(l60 15;;:; 4-;' 1/51:><) 1St' 7 /.30 /} 1i;1( -------------
123 lIS . 85 /o'.:f\5'80 :() j,!2 I. !:;!!J 7 I !(lIH ",J ';5i ----
?1 't;,lq 1752..20 I:OOI7'i I<l',?!' 10.0 '!',;.!4IiJ!/.:i' 1.50 1St 7 /.101:;'1,1.'_ 8 __ _
/r;: 1752.,,0 1.4C.' ,') '''IV /2 (i)L 3 :!.'::'I 1.5:; .. .. ., /'.!(Ii'.::::: If
------------
- - ---------,
--'---'---' ---------
l>
<D
o
()J
I
; I' . , 5 l6 . C 1<.2
I I I ,-- I .-----..
. OOIJBLE OUrLET
, I, -
j l.,",
(CAST IRON)
I .'"
S I Z E "--r- _.n __ " -,
, .. ,
:r "1 t.
. , \.jJ
,
I"
t.i .......
ll.i. ; 'I
",
f.,- .1'
i' '.1" :
h .. '
Ie" "
I, !
_.G3.
OJ
C
;U
g
< C 'll
)-
j 0 11
i,1 7t
"'$I'1D
Q
_ Z ..
J> 4 -<
- -i 0
ComO'"
-1 ::u .., r
n 0
- <::::. III
!D<:J>
o.O"Z
,,\::oI!J"
:;;;: -r II I"l
.J,..... r
Z O'l i!>
{fl 0> 11
-< 0
(.; ill ::;
i c ITl
,1):tl
" 1)
r
-<
f'

..
..
...
\::j
I

l
..
"-
<

t::i


I"l)
'i
.)
PIPE
Chua C
DIMENSIONS IN INCHES
"
t/1 jIAI
8
ICIC:IEIG'IHI /IJIKIMINlr

P ... rTERN
MAOE
20
1
8 4- 1.7: 240 1514010qZ 40 -191/751'50 135 J:Ol/d
!;.'z'i'it i; 17 -t-'W. JJa 15Q 9 1.;t-;-;i 1.50 1<501 :7 I3S 3..1
1
,.>;
2.':1 18 8 11. 240 dM1$5.',?f)Z 11' ISu 1.50 \' /,.35 -", II:
-- -- -, ,-- ' -_. -- -. --.- - - , , I I
2'2 II! /0 17. 2401Oo! ."'9" 1002038",.J:J() 1,5, 1-50 ,'( /,35,!'9J /8
;'d IL ;7524(; 140.!iJ .In';; 0 27:3 4;01 /,:;0 :q 1/.3S
i
CU6 /;
<)
.,
"
III
I ()
/1'1

10:.:5
.:2' IN'l
J /.!J . 75 '4.0 ;:':J /. 7-;>' < /,-101--1.'011 j
,3;1 2n (> e /J{ll.sq '.100 6" ;;:4 5J :'O JI 140. o3.3[.i l ;
3:1,'0
1
t!. JJ/6:J 8._, 51 /.:/5 d 1.405381/,/
34 :"'1 I,? ':Q.q:.!t':! 3"'9:.;:. ,M5 160 i(;v! !J j /;}
.35 it; 15 Z 5j 1;1tz !"!JJO 51c /75 .If'n c'l 1.41" ,,11/
1&'10
I 31; 74 -1 1 1.4(;) '{J2 ,40 (4 8.41 XCI: I 1';0.2. <,59.':':',') Ii
.37 2/ 6 !J5 .8!21. Q .?IJZ !,Q 16:! :'o.!!.. :?v
u
16. .).50 t.:!

.'i
,j'
38 N . !..!..? . .fJl.oq 27.3 B.t:? 18, '179 fl.'-,? /1
:::119 N, 2/5 l.ool:JS EJ2 10!! 20,3 'z.Js 5:;", :lo(J /GO 160 li!. 5.'J
c
t (llfQ
40 ?-f. 12 12 9 15(.) 5:>' 1 J /0
I 4, :;0 .J .. !.!<) 1 ,f} . ,' ..
. .it
(L
1701.::iOI,l
43 3,0 8 _ 170 5.i /.!
44 /i"O S9:!. ('/
4, Iv 120 22 3 ''0".,.6 ;;.'(l .( ,:l, 170 I. 70 /0 170 Ii:)'; 1
. .3.
.tl
rS..
1/7()
9W
-" 1---- .----
fO!J5
-1-' -----.--- ,

.. _- . --
,.:.:.-"t''j

.---
( '1- ----,. .
"', '2C1 J-9tG
B
t-e----_ -_B.C_. __ .l --lI-iJlo It
0.0.
S IZ E
AMERICAN STANDARD 125 LB. FLANGES
S.
C 0 T B.C 0.0. NO. HOLES
! 112 5/8 0.3 2.1 9/16 3 7/8 5 4
2 3/4 0.35 2.7 5/8 4 3/4 6 4
3 3/4 0.4 3.8 3/4 6 7 112 4
4 3/4 0.5 5.0 15/16 7 112 9 8
6 718 0.6 7.2 I 9 V2 II 8
8 7/8 0.7 9.4 I lIB II 3/4 13 tfZ 8
10 1 0.8 11.6 I 3/16 14 114 16 12
12 I 0.9 13.8 I 1/4 17 19 12
14 I 1/8 1.0 16.0 t 3/8 18 3/4 21 12
16 I V8 1.1 18.2 I 7/16 21 1/4 1/2 16
20 I V4 1.3 22.5 I 11/16 25 27 1f2 20
24 I 31B
26.7 I 7/8 29 112 32 20
30 I 3/8 1.75 33.3 2 1/8 36 28
36 I MI 2.0 39.6 2 3/8 423/4 46 32
S I Z E
AMERI :AN STAN lARD 25C .8. F'
i -
1 V2 7/8 0.3 2.1 13/16 4 112 6 1/8 4
2
7/8 0.4 3.8 I 1/8 6 5/8 8 I \<I. 8
4 7/8 0.5 5.0 1114 77/8 10 8
7/8 0.6 7.2 I 7.16 105/8 12 1/2 12
I 0.7 9.4 5. 8 13
I' I 1/8 0.8 11.6 7. 8 15 ii' 1/2
I I 1/4 0.9 13.8 17 ) 1/2
" I II" 1.0 16.0 1/8 20 I' 23
IE I V8 1.1 IB.2 1/4 22 iI 251/2
2( I 3/8 I. 3 22.5 2 I 12 27 30 1/2 ! 4
::g:6.,7 3/4 32 36 24,
30 2 rs 33.3 39 1/4 43 28'
..
OIM[olSIC"S 1'< INCHES
I'" I
' .
!.,..-
. -.. .. -:-'O ..... --- ::.-- .--. --.--.
:..: .. ;..::. __ " L.) 1 . __ _ . __ ._._____ _..:
. , .
. - .
.-.
-.
-

,.....
&()
- 1-,
C\J
----

,.....- -
-
-
L
-
--- -
SEE DWG. A 9066
; 125 La. FLG. DRILLING
\ALL g,ORNERS";;, IE FILLETED
T
,
NOTE:
PeLT ON THE OI'!"OSITE
TO f RADIUS HALL.". ON THE
SAM ALIGNMEN.
SIZE
L.fll.TM UIlIllA' .....
1.0. T 00
LIII.TII
.WEliHT LIS.
UOOMACIIUIfD
'UII" iliAC""
ITEM
FLAII.ES TIIICI<II5$
FLANGE
'LAIIH,
"OUIII I '''',",D
!IICHES
IIICHES
fMC""S
IIIa<f:S
'"CHES
IIICMfS
IIICIiU
I 4
6.1

I '
l'
4.24

,
I 31
:K)
I
4
241 It
4.24 .52 9 24 71 70
3 4
"
IT
424
,!
t t 41 n
4 4
tli tt
4.14 51
,
II 10
,.
t 4
It
4.24
\112
,
II ...
.,
,
I
2f Ii\
Ii 00
.1'
II'
T
I 41 I.
1 6
31
'k
6.00
ilL
..
3 10 52

6
It Ii-
6.00 .75
III
Ii
I' I' 4
GJ
t 6
t2t 1;\ '.00
11
II'
12 I.
T
10 6 lIt til
Ii 00 15
Ill..
"
III
10'
..
II I
24-1 IA
1.00 .7&
lit
I.
. 140
II"
12 6
3-2-1
, 600 75
lit
32 17. 167
15

Ii\
1.00
l'
III
T
14
I Iii 11.
130 60 13t I 11 II
I'
I
24-1 Ii\
.. 30 60 13, 24 110 III
II 8
12i lil
1.30 liO
13t
12
I'
11
11 8
18f 1-&
1.30 .10
131-
"
128 11O
II 10
18t Ii
10.26 .68 16
I'
It 12
18t

11.21
.1'
19 II
,
CAST

IRON SPOOLS
..... ,,,, .. n I 0 .. WATltlt ANE) "
1_ ..... _ .....
...... 0...-
.-...
I ....... !-"JM
. __ . ....,.
!t_
w._
, ..
..... 1.._ ... - I.:;: i0oi.
,
j.! ... ,../ .....
II .... :;;;;..',... ' Ill-.
..
'

,......
.f . j' .... ,7_,,'.1' ,.-Aon",.. .......
".,. . .". It". Ift!.M. If ... -.. UC 7,_ /If ......
,. ,. .,.,. ...... - _rl AN: __ 7 _U 1"'.6.
6Z-1
of UateE e PoweE
of The C1ty of Los Angeles
STAKDARD SPECIFICATIOKS
FOR
SLEEVES: TAPPIKG, BOLT-OK TYPE,
UITH FLAKGED OUTLETS,
FOR CAST-IROK AKD
DUCTILE-IROK PIPE
Spec. U 220-R2
(Issued 10-23-91 )
Supercedes
Spec. U 220-Rl
1. Scope: These specifications cover the
EequiEements fOE cast-iEon and ductile-iEon machine tapping
sleeves for use through 16-inch cast-iEon pipe
(Class 250, AWWA, Class C-D) and ductile-iEon pipe (AWWA,
Class 52). Outlet bEanch sizes Eange from inches thEough
12 inches in diameter. The sleeves shall withstand a wOEking
wateE pEessure of 200 pounds peE square inch.
2. Standards and Specifications: All standards and
specifications EefeEEed to in these specifications shall be as
last Eevised, unless stated otheEwise in these specifications.
3. GeneEal ConstEuction: The tapping sleeve shall be
a bolt-on type with a single compEession seal gasket. One of
the halves shall have a flanged outlet. The sleeve size and tap
size shall be cleaEly marked on the sleeve exteEioE.
Component Parts of Sleeves: The sleeve fOE
cast-iron and ductile-iron pipe shall consist of a back half, a
flanged outlet half with a Eing groove in the inneE side, Eing
sealing gasket, and hex head low-alloy steel attachment bolts
and nuts. Bolts shall be of sufficient length to have not less
than 3 thEeads pEotruding through the nut when the nut is fully
tOEqued on a cast-iron, Class C-D pipe.
5. MateEials: Component paEts shall be made of the
following specified mateEials:
a. The body shall meet the requiEements of
ASTM A 536, Grade 70-50-05 fOE ductile-iron or ASTM A 126,
Class B for cast-iEon.
* b. Bolts: Bolts shall meet the Eequirements of
ASTM A 193, Grade R8M (Type AISI 316), Class 2, stainless steel
bolts.
* c. Kuts shall meet the requiEements of
ASTM A Grade 8M (Type AISI 316), heavy hex, stainless steel
nuts.
Kote: To prevent galling, the threads on the bolt or on the nut
shall be coated with a teflon-based OE nylon-based coating.
Kote: Asterisk (*) indicates a change.
82-2
std. Spec. W 220-R2
d. Gaskets: Gaskets shall be neoprene rUbber with
a Shore durometer hardness between 55 and 60 or EPDft Buna-M.
e. Support Pads: support pads, if present, shall
be neoprene rubber with a Shore durometer hardness between 55
and 60.
6. Grade and Quality of Castings:
a. Castings shall be of a quality and character to
make the sleeves strong and tough) shall be of even grain
without undue brittleness; and shall be soft enough to permit
machining, drilling, cutting, and chipping with reasonable ease.
Sleeves shall be sound and smooth and free from swells, cold
shuts, scale, lumps, blisters, sand holes, scabs, and defects.
The sleeves shall be free from admixture of cinders, slag, or
sand. Plugging, filling, burning-in, or other methods to repair
defects shall not be used. Welding may be used to eliminate
defects, if in the opinion of the Engineer, the sleeve can be
repaired without impairing the quality of the casting. Before
welding, defects shall be chipped out exposing clean metal.
b. Sleeves that are not machineable and sleeves
which, upon machining or chipping, are found to contain defects
which cannot be satisfactorily repaired shall be rejected.
7. Flanged End:
a. The flange of the outlet half which faces the
flanged end of a ZOO-psi working water pressure gate valve shall
conform in dimensions and drilling to AKSI BI6.1, Class lZ5.
The flange face shall not be raised.
b. The flange shall have a serrated finish
obtained by using a V-shaped tool. Serrations shall have
grooves 1/64 inch in depth and 1/3Z inch apart. Serrations may
be concentric or spiral.
8. Protective Coating: Interior and exterior
surfaces shall be coated with a liquid epoxy coating such as
Scotchkote 302 or fusion-bonded epoxy coating such as
Scotchkote 134, to a minimum dry-film thickness of 10.0 mils,
applied in accordance with the manufacturer's printed
instructions. Epoxy coatings shall be electrically-tested for
defects with a 67-1/2-volt Tinker and Rasor holiday detector.
The Contractor shall repair and retest any defect prior to
shipping to ensure a holiday-free coating.
When different back-half sizes are used for different
pipe classes, the back-half shall be coated in a color that is
clearly identifiable with the pipe class.
82-3
Std. Spec. W 220-R2
9. Shipment: shipments shall be properly crated,
bOKed, pacKed, or otherwise protected to prevent damage in
transit and storage. Each pacKage be marKed with
the purchase order number and the name of the supplier. The
Department's contract number be shown when specified. The
shipment be made using trucKs that will a forKlift
to unload the from 3 sides of the trucK. The tapping
sleeves shipped shall be securely banded to nonreturnable wooden
pallets. Each tapping sleeve shall be pacKaged to prevent
contact between each sleeve during shipment. Extra spacing or a
protective barrier between sleeves may be used to ensure that
the epoKY coating will not be damaged during delivery.
10. Inspection and Tests:
a. Agcess: The Engineer shall have the right to
inspect the Contractor's and the subcontractor's worK in the
course of manufacture or fabrication and shall make such tests
from time to time as may be deemed advisable, provided that such
tests will cause no delay in the production of aooeptable
or equipment. The Contraotor furnish. at the
Contractor's own expense, reasonable facilities, inoluding tools
and instruments for so doing. and for obtaining such information
as the Engineer desires, respecting the progress and manner of
the worK and the oharaoter of the materials used.
b. Tests: Two certified oopies of mill tests
shall be furnished by the Contractor when speoified or when
requested by the Engineer.
The Department reserves the right to section and
test any part of the tapping sleeve furnished. Test results for
each part mechanically tested shall be not less than 90 percent
of the required values for test bars meeting the reqUirements
specified in Artiole 5 of these specifications.
o. Hydrostatic Testing:
(1) Cleaning: Prior to hydrostatio testing and
coating. all sleeves shall be cleaned of all sand. soale, dirt,
grease, other foreign matter, surface impurities.
irregularities. rust, and protruding chaplets.
(2) Test Pressure: Sleeves shall be subjected
to a test pressure of qOO pounds per square inch and the test
pressure maintained for not less than 30 seoonds. Fittings that
or sweat be subject to rejeotion.
(3) Pressure Requirements: When bolts are
torqued between 90 and 110 foot-pounds, sleeves shall withstand
a water working pressure of 200 pounds per square inoh.
B2-4
std. Spec. W 220-R2
d. Release: Materials or to he
inspected hy the Engineer at the contractor's actory,
yard. or warehouse shall not he released or shipment until they
have satisactorily passed the Engineer's inspection and test.
Materials or shipped without respecting this
may be rejected.
11. 2uality Assurance: All or equipment
urnished and delivered under the contract shall he suhject to
rigorous inspection by the Engineer. Beore oering any
or equipment or inspection or testing, the Contractor
shall all which are deective or do not the
requirements o the speciications. I any items or articles
are ound not to the o the speciications
the lot or any aulty portion thereo may be rejected. The act
that the materials or equipment have heen successully
inspected, tested, or accepted hy the Engineer shall not relieve
the Contractor o responsihility in case o later discovery o
laws or deects.
The eKpense oi the initial acceptance tests. aiter
receipt at the Department's speciiied receiving points, will be
borne by the The eKpense oi subsequent tests will
be charged against the Contractor when due to iailure oi
iirst-oiiered materials or equipment to comply with the
speciications.
(END OF STANDARD SPECIFICATIONS)
B3-1
Department of Water & Power
of The City of Los Angeles
STANDAFD SPECIFICATIONS
For
LEAD: COMMON GFADE
FOF CAULKING
Spec. No. w 2ij5-FZ
(Fevised 12-20-73)
Supersedes
spec. No. W 2ij5-F1
-----_._-------------------
1. General: The lead shall be suitable for caulking
of cast-iron pipe joints, uniform in purity, quick melting, free
flowing, and pliable, meeting the requirements of ASTM E 29, as
last revised, for common desilverized lead.
2. Marking and Packaging:
a. Common grade lead shall be furnished in
approximately 25-pound pigs, divided into 5 sections of
approximately 5 pounds each, or in approximately 25-pound
strings, divided into approximately 5-pound sections.
b. A brand shall be cast or otherwise legibly
marked upon each pig, by which the manufacturer may be
identified.
c. The manufacturer shall furnish certified weight
ticket with each load. The lead shall be delivered on
nonreturnable wooden pallets or blockS for fork-lift handling.
Each stack shall be plainly marked with the number of pigs or
strings.
(END OF S'IANDAFD SPECIFICATIONS)
B4-1
Department of Water t Power
of The City of Los Angeles
STANDARD SPECIFICATIONS
FOR
PIPE: STEEL, ELECTRIC-FUSION,
BUTT-WELDED. LINED AND COATED
Spec. 11 302-R2
(Revised 10-19-88)
Supersedes
Spec. W 302-R1
1. These specifications cover the manufacture
of electric-fusion. butt-welded, lined and coated steel water
pipe with either straight or spiral longitudinal weld seams
employing either shielded metal-arc welding or submerged arc
welding. The lined and coated pipe will be used for the
conveyanca of water.
Thasa specifications include steel made either in
accordance with ASTH A S3 or in accordance with these
specifications.
The pipe shall be furnished in straight sections or
special sections. with interior cement-mortar lining and an
exterior reinforced cement-mortar coating with coal-tar enamel
undercoat, reinforced cement-mortar coating with polyolefin
undercoat, polyolefin coating, or as specified in the order.
2. General Requirements:
* a. National Standards: All standards referred to
in these specifications shall be as last revised. The
furnished under these specifications shall be constructed and
tested to meet all of the applicable requirements of ASTH, ASHE,
AlIlIA, API, AlIS. and SSPWC Standards. In case of conflict, the
Department's specifications shall govern.
b. Sections'
(1) Straioht straight sections shall
be fabricated from steel plate Joined together by the submerged
arc-welding process.
(2) Hitered bevels, angles,
branching pipe, tapered sections, and other special sections
shall be fabricated from steel plate joined together either by
the submerged arc-welding process or by the shielded metal arc-
welding process.
c. De;tinitions: Under these specifications, the
following definitions shall apply: .
(ll Butt Joint: Butt joint is a joint between
2 members lying approximately in the same plane.
B4-2
std. Spec. W 302-R2
:0: (2) Butt Weld: Butt weld is a weld whose
throat lies in a plane disposed approKimately 90 degrees 'with
respect to the surfaces of not less than one of the parts
joined. The size of a butt weld shall be eKpressed in terms of
its net or unreinforced throat dimension in inches. A double
welded butt joint is one in which the filler metal is added to
both sides. A single welded butt joint is one in which the
filler metal is added to one side only.
( 3 )
Filler Metal: Filler metal is the metal to
be added in making a weld.
( ~ ) Fusion: Fusion is the melting together of
a filler metal and base metal.
(5) Fillet Weld: Fillet weld is a weld
approKimately triangular in cross section jOining 2 surfaces
approKimately at right angles to each other.
(6) Shielded Metal Arc Welding: An arc-welding
process wherein coalescence is produced by heating with an
electric arc between a covered metal electrode and the work.
Shielding is obtained from decomposition of the electrode
covering. Pressure is not used and filler metal is obtained
from the electrode.
(7) Submerged Arc Welding: An arc-welding
process wherein coalescence is produced by heating with an
electric arc or arcs between a bare metal electrode or
electrodes and the work. The welding is shielded by a blanket
of granular, fusible material on the work. Pressure is not used
and filler metal is obtained from the electrode and sometimes
from a supplementary welding rod.
d. Material: All material shall be of the quality
specified. Any plate or fabricated pipe with scars or injuries
from hammering, pits greater than one inch in diameter and
deeper than 1/16 inch, laminations greater than 1/32 inch in
depth, or any other physical defects that cannot be corrected by
welding so as to restore the designed strength will be rejected.
e. Arc Weldino Eauipment:
(1l Machines: Generators and transformers
shall be designed eKpressly for welding, capable of delivering
substantially constant current, and be adjustable through a
range ample for the reqUirements of the work. Generators and
transformers shall be provided with devices for controlling the
welding current.and arc voltage and with meters indicating the
,c:"4. amount of each at all times.
~ ,:.;:;
---
B4-3
stG. Spec. ~ 30Z-R2
(2) Automatic lIelding Heads: Automati.c welding
heads with auxiliary handling equipment to provide control of
eleotrode speed and welding arc shall be subject to the
requirements of these specifications.
f. Drawings' The following drawings are a part of
these specifications:
.1.-3821 .......................... )jelded Slip Joints
A-1867 .......................... )jeld Test Specimens
3. Description of Steel Pipe:
a. General: The steel pipe shall be in accordance
with either one of the following'
(1) Electric-resistance welded steel pipe
meeting the requirements of ASTn A 53. Type E. Grade A, except
for Subitem 16.3. Pipe wall thickness, as measured on
inspection, shall neither be less than 3 percent nor greater
than 2 percent of the pipe wall thickness specified in the
order. The pipe shall meet the requirements of Subarticles 3d
through 3h. The hydrostatic test specified in Subarticle 6c of
these specifications shall not apply to pipe furnished in
accordance with ASTn A 53.
(Z) steel pipe meeting the requirements of
Subarticles 3b through 3h.
b. Steel Plate:
(1) Steel plate shall meet the requirements of
ASTn A 283, Grade C. or ASIn A 570. Grade 30. except as follows:
(al That portion of Table 2. Tensile
Requirements. of ASTn A 570 relating to thickness, now reading:
"0.2299 to 0.0972, in . incl."
is changed to read:
"0.375 to 0.0972. in . incl."
(b) That portion of Section 8.1 0: AS!M A
570 relating to the number of tests now reading'
"Two tension and 2 bend tests shall be
made from each heat Or lot of 50 tons"
f ' ~ ' : . :
.. _ is changed to read:
, ....... ;"/1;;
B4-4
std. Spec. W 302-R2
ftOne tensile test specimen shall be taken
from the approximate center lap; and one tensile test specimen
and one bend test specimen shall be taken from the outer lap of
the coil. The maximum tensile strength of the specimen taken
from the outer lap of the coil shall not exceed 70,000 psi.
ft
(2) Capped or rimmed steels or other such non-
killed steels shall not be used.
(3) Steel plate shall be of the specified
nominal thickness with a maximum allowable variation of 0.01
1nch less than the specified thickness.
(4) The Contractor shall furnish the Department
3 certified copies of mill test reports. Hill test reports
shall show results of the chemical and physical tests made on
each heat of steel representing the steel plate furnished under
these specifications.
(5) The Engineer may the Contractor to
furnish specimen plates of the steel to be Used in the
fabrication of the pipe. Specimen plates shall be large enough
to provide the number of test specimens in the plate
specifications. Should any test specimen fail to meet the
requirements of the plate specifications, a second specimen
plate shall be furnished. Should anyone test specimen from the
second specimen plate fail then all plates furnished from the
same heat number will be rejected. Tests of these specimens
will be made by the Department. The Department will charge the
Contractor for all expenses incurred in making the second test.
(6) Plate will be subject to inspection.
testing, and approval of the Engineer as to compliance with
these specifications prior to fabrication of pipe.
c. 0; Pi "e: Pipe size may be specified
by either the inside diameter or the outside diameter. Pipe
shall be manufactured with the diameter specified subject to the
tolerances of these speCifications. The diameter specified
shall be the nominal diameter. The inside diameter of pipe
whose outside diameter is specified shall be the nominal outside
diameter minus twice the nominal plate thickness. The outside
diameter of pipe Whose inside diameter is specified shall be the
nominal inside diameter plus twice the nominal plate thicKness.
d. Tiller Metal: The filler metal used in the
automatic welding process shall be comparable to and compatible
with the base material in its metallurgical properties and
mechanical properties. Electrodes for manual welding shall meet
the of AWS 5.1, Classification E6010 or E70 Low
Hydrogen Series.
B4-5
Std. Spec. W 302-R2
e. Lengths 0; Sections' All straight pipe
sections shall be furnished in specified lengths. The
Department shall have the right to specify shorter sections for
closures and proper location of special sections.
sections and
shown on the
f. Ends 0; Sections'
special sections shall
drawings'
Ends 0; straight pipe
be of the following types
(1) Ends with slip joints for field welding.
(2) Plain or beveled ends for butt welding.
(3) Plain ends for butt straps.
as
(4) Ends for mechanically coupled field joints.
g. Longitudinal and Girth Seams:
36 inches in diameter shall be fabricated with
longitudinal seams. Pipe 36 inches in diameter
be fabricated with not more than 3 longitudinal
more than 3 girth seams in each section.
Pipe less than
not more than 3
and larger shall
seams and not
h. Special Sec;ions' Curves, tees, branches,
transitions. adaptors, fittings. and other special sections
shall be fabricated in accordance with the drawings.
i. Double Butt-Welded Coil Ends: Coil ends may be
welded together provided they are made with a full penetration
double-butt weld and placed at a distance greater than 12 inches
from the ends of the pipe. Hot more than one coil end weld nor
more than a combined total of 3 girth welds and coil end welds
shall he used in anyone pipe section.
4. fabrication:
a. Pipe fabricated of steel plate shall
be shaped to the required curvature and joined by welding.
Longitudinal edges shall be lap hroken prior to shaping. The
desired curvature may be obtained by rolling or forming in a
press. The specified diameter of the plate shall not be
obtained by hammering. Plates will be inspected before
longitudinal seams are welded.
n. 0; P'ate Edoes ;or We'd'nc:
(1) Edges of plates to be joined by automatic
welding shall be cut or formed to the shape required for the
particular welding process. Edges of plates to be by
hand welding shall be formed to the shape shown on drawings or
B4-6
std. Spec. W 302-R2
in accordance with the Contractor's drawings reviewed with no
exceptions noted.
(2) 7he width of the plate before rolling shall
not vary by more than inch from the width required to
the circumference.
(3) Special sections having abutting plates of
different thicKnesses shall have the thicKer plate so
that the apex of the weld groove shall correspond with that of
the thinner plate.
(4) All plates shall be cut to size, with all
edges straight, uniform, smooth, and free from scale and slag
accumulations. All plate edges and surfaces adjacent to the
edges to be welded shall be cleaned of oil, grease, rust, and
mill scale by wire brushing, sandblasting, or other
methods suitable for the intended purpose.
c. 7he longitudinal edges of all
plates shall be lap broKen prior to the plate forming operation.
lap breaking operation shall be either by rolls or by a
press using dies. 7he lap breaking operation shall produce a
true, uniform curve at the edge of the plate equal to the curve
of the pipe-shell.
d. form ina of Plate: Plates shall be formed to
the proper curvature either by rolling or pressing. The forming
operation shall produce a true, uniform, circular curve. Plates
will be inspected after forming. Defective plates will be
rejected. Plates shall be formed before the seams are welded.
e. Up: The plates being welded shall be
accurately matched and retained in position during the welding
operation. The method employed shall result in a finished pipe
of circular section throughout its entire length.
Abutting edges of plate, after welding, shall not have a radial
offset (misalignment) greater than 1/32 inch. 7acK welds may be
used to hold the edges in position, provided the tack weld
will permit the tack weld to become thoroughly fused
and part of the strength weld in the welding operation.
f. 2yalification 0; welders and Weldino
(1) All welders and welding operators shall be
qualified under the applicable provisions of the standard
qualification procedure of the ASHE Boiler and Pressure Vessel
Code, Section
1- (2) 7he Engineer will have the right at any
time to call for and witness the making of test specimens by any
B4-7
Std. Spec. W 302-R2
welder in accordance with these specifications.
be at the Contractor's own expense.
The tests shall
g. Welding procedure Specifjcations: Welding
procedure specifications shall be furnished to the Engineer
prior to the welding of pipe. The specifications shall specify
the type of plate edge preparation, welding method, arc-voltage,
arc-amperes, travel speed, wire size and type, flux type, and
all other procedures necessary to make the weld.
h. Welding:
(1) All welds shall be made by a shielded metal
arc-welding or submerged arc-welding process. Where required by
the Engineer, inspection of the background area by the
Contractor shall be made by the Dye Penetrant Method and will be
witnessed by the Engineer.
(2) Each layer of welded metal shall be
thoroughly cleaned before additional filler metal is applied to
its surface. Finished weld bead shall be central to the seam,
and the finished joint shall be free from depressions, burrs,
undercut edges, irregularities, and valleys. The inner surface
of the pipe shall be free from burrs and other irregularities
resulting from welding.
(3) The welding process shall produce complete
fusion of base metal and filler metal, free from cracks, oxides,
and gas pockets within the limits set forth under these
specifications.
(4) When welding is interrupted, the weld shall
be cleaned and flux redistributed before work is resumed.
(5) The outside weld bead shall be not less
than 1/16 inch nor more than 1/8 inch in height above the plate
surface. That portion of the outside weld bead exceeding 1/8
inch in height shall be removed by grinding or chipping. All
longitudinal and girth welds on the inside of the pipe shall be
ground or chipped down so that the height of the weld bead shall
be not more than 1/16 inch above the plate surface. The ueld
bead shall not be ground or chipped below the surface of the
plate.
i. Correction to Welds:
(1l Welds found deficient in dimensions, but
not in quality, shall be enlarged by additional welding after
thoroughly cleaning the surfaces of previously deposited metal
and the adjoining plate. When subsequent work has made the ueld
inaccessible or has caused neu conditions uhich uould make such
r .
("
V
B4-8
std. Spec. W 302-R2
enlargement inadvisable. the original conditions shall be
restored by removal of welds, memhers, or both, hefore enlarging
the defioient weld.
(2) A defeotive weld or a weld made contrary to
the provisions of these speoifioations shall he removed and
remade throughout its length. The defective.weld shall be
removed by chipping, outting, or melting throughout its depth to
olean hase metal. The melting or chipping shall not extend into
the base metal beyond the heat-affeoted zone. When' more than 5
percent of the total length of original weld per pipe seotion is
the section will be rejeoted.
(3) Burnt metal resulting from melting shall be
removed by chipping Or grinding to expose clean sound metal.
(4) Overheated filler metal and the overheated
base metal adjoining it shall be removed and replaced by new
filler metal properly applied. Plate damaged by overheating
whioh oannot be satisfactorily repaired by filler metal shall be
replaced.
(5) Repair welds shall be ground to the
existing surfaoe contours.
;. Welding:
(1) All longitudinal, spiral. and girth seams
of straight pipe sections and special sections, when
practicable, shall be welded by an automatic welding prooess.
(2) Prior to the start of the automatic welding
for each pipe diameter and plate thickness.
Contraotor shall fabrioate a section of welded steel cylinder of
sufficient length to estah1ish a welding procedure. As directed
by the tngineer. weld tests shall be taken of 2 locations from
this section. Weld tests will include one reduced seotion
tensile test, 2 guided bend tests, and one spot x-ray at each
location. The tests shall be conducted by the Contraotor and
the results fUrnished to the tngineer for approval as to
compliance with the requirements of these specifications.
Should any of the tests fail to meet the reqUirements of these
specifications. adjustments shall he made to the
welding procedure. and another test cylinder of sufficient
length to establish a revised test procedure shall be mace and
tested as described above. This procedure shall be
until the welding procedure meets the requirements of these
specifications. Following the approval of a welding procedure.
the contractor may proceed with production.


B4-9
Spec. W 302-R2
(3) The Contractor shall prepare and submit to
the Engineer the welding procedure established from the welding
tests which shall include the type of plate edge preparation,
welding method, are-voltage, are-amperes, travel speed, wire
size and type, flux type, and all other procedures as required.
This procedure speCification shall be used as a guide in the
fabrication of pipe during each shift's production. ninor
adjustments may be made to the procedure as necessary to
accommodate production variations provided the Engineer is
notified of such change.'
k. Hand Welding:
(1) Hand welding may be done only when it is
not possible to use an automatic welding machine. Hand welding
may be done on straight pipe sections to make tack welds, to
repair structural defects in the plate, and to repair automatic
machine welds. provided the hand welds meet same testing
requirements as for automatic welding.
(2) Fillet welds shall fully penetrate into the
corner. Cut back of the plate edges of fillet welds Shall not
be done. Butt welds shall be made by adding filler metal to
both sides of the joint. The backside of the weld shall be
chipped out. and all slag and unsound metal removed before
additional weld material is placed. Filler metal shall be
deposited in successive layers so that there will be a minimum
number of passes as there are complete multiples of 1/8 inch in
the plate thickness.
1. Preparation of Ends 0; Pipe:
(1) Joints for Field Weldina: Pipe ends
with slip joints shall be prepared in accordance with
A-3821. The bell ends shall be pressed or rolled to the
required shape without hammering. The length of the straight
portion of the bell shall be not less than 3 inches for
sizes larger than 24 inches and not less than inches for
pipe sizes 24 inches and smaller.
(2) Ends for Butt Weld1no: Ends of pipe
sections for butt welds shall be prepared in accordance with
these specifications and as shown on the drawings.
(3) Ends :0= Butt Straps: Plain end pipe for
butt shall have the outside longitudinal welds ground
flush with the plate surface for a distance of & inches back
from the ends.
(4) Ends for Mechanically-Coupled Field Joints:
Ends for mechanically-coupled field joints shall be as
B4-10
Std. Spec. W 302-R2
The outside plain end pipe shall be
objectionable deiects and shall have the longitudinal
welds flush with the plate a distance 10
inches back the ends. Plain, grooved, banded ends shall
be to the type of mechanical couplings to be used.
5. Tolerances:
a. Tolerance for Circum;erence, Roundness, Joints,
Straightness, Length, and Ends: Each section pipe shall meet
the set below, that such
do not with the making of the jOints.
(1) Ci;cumference'
(a) The of the pipe shall be
as computed rom the nominal diameter.
(b) The circumference of the pipe
within a inches each end shall not be than 1/8 inch
than the computed 1/16 inch less than
the computed circumference.
(c) The of the pipe,
except within a inches each end, shall not be than
9/32 inch than the computed nor 3/32 inch
less than the computed
(2) Figld-Welded Slip Joints: The inside
diamete: of the bell a slip joint shall be between 1/32 inch
and 1/16 inch than the outside diameter of the plain
end.
(3) Roundnes s :
(a) Within a inches the ends, the pipe
shall not be out-of-round on any diameter by than plus or
minus 0.4 percent the specified diameter.
(b) Except within 8 inches from the ends,
the pipe shall not be on any diamete: by more than
plus minus one percent of the specified diameter.
(c) shall be measured
radially on the inside or outside of the pipe with a segmental
template. The template shall have an arc length equal
to 10 of the pipe and a radius equal to
one-half the specified inside or outside pipe or bell diameter.
The maximum permiSSible radial deviation between the pipe shell
and the template shall be 0.5 percent of the specified diameter
but not more than 0.25 inch.
B4-11
Std. Spec. W 302-RZ
Cd) Pipe sections that exceed these.
roundness tolerances may be reconditioned by rolling or by
pressure. Reconditioning shall not be done by hammering.
Reconditioned sections will be reinspected and retested
hydraulically.
(4) Straightness: The alignment 0: finished
pipe sections shall be straight with walls parallel to the axis
0: the pipe. Pipe sections with a misalignment :rom a straight
line parallel to the pipe axis exceeding 1/8 inch :or 10 :eet 0:
pipe length will be rejected.
(S) Length: Length of straight pipe sections
shall not vary from the specified length by more than Z inches.
Length of special sections shall not vary from the specified
length by more than 1/8 inch.
C6l ~ : The ends of pipe sections shall not
vary more than 1/8 inch at any point from a plane at right
angles to the axis of the pipe.
6. factory Inspection and Testing of Steel Pipe:
a. Gene;al: Any or all tests provided herein to
determine compliance with these speci:ications shall be made
under the supervision 0: and have the approval of the Engineer
as to compliance with these specifications. The Contractor
shall notify the Engineer a suf:icient time in advance of the
manufacture or production 0: materials to be furnished under
this contract in order that the Engineer may arrange for mill or
factory inspection and testing of same. naterials to be tested
and inspected by the Engineer shall not be released for shipment
until they have satisfactorily passed the Engineer's inspection
and test or until notice has been received from the Engineer
that sllch inspection and testing will not be required. The
Contractor shall also furnish to the Engineer, 3 certified
copies of all required factory and mill test reports. Any such
tests or inspections shall not relieve the Contractor of
obligations under the contract.
The Contractor shall bear all expenses of all
factory tests on all material furnished. The Department will
bear all expenses of final acceptance tests excepting salaries
and expenses of the manufacturer's representatives during such
tasts.
The Engineer shall be notified 5 calencar days
prior to the start 0: pipe fabrication. Pipe shall be
:abricated only when the Engineer is present. This requirement
may be waived by the Department.
. ':..
B4-12
std. Spec. W 302-R2
The Engineer will reject any or all pipe sections
that do not meet the requirements of these specifications.
The Engineer shall have free access to those parts
of all plants that furnish materials or perform under these
specifications.
The Contractor shall furnish the Engineer
reasonable facilities and space. without charge. for inspecting.
testing. and obtaining information respecting the character
material used and the progress and manner of the
b. Weld Tests of Steel Pipe:
(1) General: One set of weld tests of
production welds shall be prepared and tested from each shift's
production run or 600 linear feet of weld. whichever is smaller.
as designated by the Engineer.
(2) Specimen Plates: Test specimen plates
shall be large enough to provide the test specimens shown on
Drawing 1.-la67. The pipe area from which the specimen plate is
cut shall be repaired by inserting a plate of the same material.
and curvature as the pipe and shall be butt welded in
place.
( 3 )
Tgsts: The test requirements shall be as
follows:
(a) Results of Reduced Section Tens;le Test:
The yield point and ultimate tensile strength shall be not less
than the minimum of the specified tensile range of the plate
used.
(b) Guided Bend Test: Bend tests shall be
performed on both root and face weld specimens. The specimen
shall be bent cold without fracture lao degress around a pin or
mandrel. having a diameter 3 times the of the plate.
and shall show an elongation of not less than 20 percent across
the weld.
inch spot
Engineer.
uith l.SME
(c) Radiographic Test: A 4-1/2-inch by 17-
x-ray shall be at a location directed by the
Procedures and interpretation shall be in accordance
Boiler and Pressure Vessel Code. Section a. Division
I. Part UW51.
(4) Porosity: The maximum acceptable porosity
shall be as set forth in Appendix IV of the l.SME Boiler and
Pressure Vessel Code .
.'
B4-13
Std. Spec. W 302-R2
(5) Retest of- Welds: Additional weld may
he should be any indication that an
unsatisfactory weld has been made. These weld tests shall he
made and the results approved by the Engineer as to compliance
with these specifications prior to heginning shift's

Retest of welds shall be entirely at
the Contractor's own expense and shall be made and approved
he fore heginnning the next shift's production in accordance with
the following:
(a) Should any of the weld tests taken from
the shift's production fail to meet any of the of
these specifications, one additional set of weld tests shall he
made from each of the adjoining pipe sections.
(b) Should any of the additional tests fail
to meet the requirements of these specifications, all pipe
sections of that shift's production run will he rejected.
(c) If the additional tests meet the
requirements of these specifications, the pipe of the
shift's production run shall he deemed acceptahle. The original
pipe may he reconditioned and resuhmitted for inspection and
additional tests shall he made on the original pipe.
(6) Reinspection of Pipe Ends: A Section of
pipe or any portion of a pipe helled, sized, or otherwise
deformed after the hydrostatic test shall have the weld at the
ends reinspected in accordanoe with the API Std. SLX, Section 7,
Paragraphs 7.14 through 7.17, inclUSive.
c. Hydrostatic Tests 0; Steel Pipe:
(1) General: All straight pipe seotions,
hranohing pipe sections, tapered pipe seotions, and speoial
seotions shall he hydrostatically tested. Hitered hends made
from straight sections previously tested may have the girth
welds examined radiographically in lieu of a test.
In all cases, pipe repairs shall he retested in the
manner hy which the defect was detected.
(2) Procedure: The pipe or special section
shall he completely filled with water. Vents shall he provided
at the high points for the air to escape while the pipe is heing
filled. The required pressure shall. he maintained for not less
than 2 minutes. While under pressure the welded seams shall he
inspeoted for leaks, and eaoh leak location plainly marked. Any
seotion having less than one leak for each 5 feet of welded seam
\.Y shall have the leaks repaired hy ohipping the weld and rewelding
B4-14
Std. Spec. W 302-R2
by hand, which the pipe be
On a the pipe section not have any leaks in,the
welded seams, and if any the section be
Any section showing than one leak each 5 feet of welded
seam will be Leaks not be closed by means of a
caulking tool. Accepted pipe sections will he hy the
with a legible identification
(3) Straight Pipe Sections: tach pipe
section he tested to a test
determined hy the following
2st
p=
D
where
P = in psi.
s = = of specified minimum yield

t = Wall thickness of pipe in inches.
D = Outside in inches of pipe section and
the outside of sections unless
specified.
Branch Connectigns: Pine Sections,
and Special Sectlons' tach pipe, pipe sectlon,
and special section shall be tested
to a of 1-1/2 times the design operating
at the point of installation 100 pSi, whichever is
Branch connections, pipe sections, and
sections shall be pipe sections which
have been tested in with the
specified herein for straight pipe sections.
7. Cleanino and Delivery 0; Steel Pipe Linino
Coatincr
a. Cleaning of Steel Pipe: Each section of pipe
he cleaned of loose mill scale. paint, oil.
burned flux, molten and fo=eign
substances, hoth inside and outSide.
b. Del;very Steel pipe: The steel pipe
he hraced in each end of pipe section when to prevent
damage to the pipe by excessive deformation of the pipe during
handling and delivery.
c. finished Steel at Delivery Destination:
B4-15
std. Spec. U 302-R2
(1) All steel pipe sections special sections
that show dents, kinks. changes of curvature than
specified. injuries at the destination will be
subject to rejection. All pipe sections special
that have been a crane prior to completion
of delivery will be subject to rejection. The shall
at the own expense, such section
with an undamaged section may recondition the rejected
section.
(2) Pipe rejected because of substantial damage
may be reconditioned by rolling or by pressure. not hy
hammering, if the pipe can he returned to its design strength
and specified characteristics. Pipe rejected because of gouges.
scars, other minor injuries shall he reconditioned so as to
return the pipe to its design strength and
characteristics in a manner approved by the tngineer.
reconditioning has required and replacement of a weld
hy rolling. the reconditioned area shall be inspected
hy spot or retested hydrostatically by the

8. Lining and Coatina:
a. Lininar
surfaces shall have cement-mortar lining
C205, with the following modifications:
The pipe
in accordance with AWWA
(1) The lining shall be either
flush or held hack from the spigot or plain end of the and
shall he held from the bell end the distance shown on
A-3821 in accordance with the size of pipe to he cement
lined.
(Z) Cement: Cement shall meet the requirements
of the Department's Standard G 331 for
cement. Type II.
Sand shall meet the requirements of
AWWA CZ05.
(4) Cleanincr:
application of the lining. the
slime) dirt, loose rust, loose
materials.
Immediately prior to the
pipe shall be cleaned of all
mill scale. and all other
(5) finish: After the mortar is distributed to
a uniform thickness. the speed shall be increased to
produce a dense mortar with a smooth surface and a minimum of
shrinkage.
"., ... ..;
'-'
B4-16
std. Spec. U 302-R2
b. Coal-Tar Enamel Undercoat: Uhen specified in
the order, the coal-tar enamel undercoat shall be in accordance
with AUUA C203, Section 2, Coal-Tar Enamel, Hot-Applied.' The
undercoat shall be held the following distances from the
pipe ends:
Pipe Ends
Spigot or plain
Bell
for Pipe
4 thru 24
(Inches
5-1/2
4
Sizes
Over 24
(Inches)
7
4
c. Rein;orced Cement-Mortar Coating: When
specified in the order, the exterior surfaces of the pipe shall
be protected a reinforced cement-mortar coating in
accordance with AWUA C205, with the following modifications:
(1) Cement: Cement shall meet the requirements
of the Department's Standard Specifications G 331 for portland
cement., Type I!.
(2) Sand shall meet the requirements of
AUUA C205.
(3) Cu;incr: As soon as the coating has set
sufficiently for the pipe to be moved, the pipe shall be
for a minimum period of 14 days by continuous water
spraying or by intermittent water spraying while Keeping the
pipe covered with canvas or burlap.
The cement-mortar coating shall be brought to
within the following distances of the pipe ends:
Pipe Ends
Spigot or plain
Bell
For Pipe
4 thru 24
(Incnes)
7-1/2
6
Sizes
Over 24
(!nches)
9
6
The wire reinforcement shall extend to the end of
the cement-mortar coating but shall not project outside of the
coating.
d. Polyolefin Coating:
(1) General: Uhen specified in the order, the
exterior surfaces of the pipe shall be coated a multilayer
B4-17
Std. Spec. W 302-R2
polyolefin coating system. The coating system shall be one of
the following systems each as modified herein:
(al Polyken YGll1 System.
Cb) pleKco X-TRU-COAT System.
(2) Materials and Properties:
(al Polyken YG111 System: The Polyken YG1"
System shall be a multilayer polyethylene system consisting of
one layer of pipeline coating primer, Han-Flammable Ho. 929-5;
one layer of pipeline coating tape. Xo. 989 Innerwrap 20; and
one or more layers 0% pipeline coating. Xo. 956 Outerwrap 30.
[1 I Ptimer: The Han-Flammable Xo. 929-5
primer shall be fast drying and shall form an instantaneous.
firm bond when the adhesive on the innerwrap tape comes into
contact with the primed pipe surface. For optimum bonding, the
primer shall be dry-to-touch at the time the tape inner wrap is
applied over the primer. The physical properties of the primer
shall be as follows:
PhYSical Properties
Total solids:
Material
Percent, min
Hominal weight per gallon,
pounds. min
Viscosity
Flash point
Drying time, sec, mak
ReO'ui;ements
Rubber and synthetic resins
10. 6
10.65
"Thin syrup"
Hone
60
(21 Tape
The Ho. 989 Innerwrap 20 tape shall consist of a polyethylene
backing with a butyl-based adhesive laminated to one side of the
backing film. The polyethylene backing film and adhesive shall
be made by the calendaring system to assure maximum bonding of
the adhesive to the backing film. The adhesive shall be
formulated to form an instantaneous. =irm bond when it contacts
the primed pipe surface. The phYsical and
properties of the innerwrap tape shall be as follows:
Physical Properties
Total thickness. nominal. mils
BacRing :film:
lIaterial
Color
Thickness, nominal. mils
Adhesive:
I'!aterial
Thickness. nominal. mils
PrQPerti@s
Tensile strength, lb/in width,
min
Elongation. percent. min
Adhesion to primed steel.
oz/in width, min
Dielectric strength, volts/
milo: thickness, min
Water transmission rate.
g/100 sq in. in 24 hours
Operating for
normal servJ.ce
B4-18
1STI'!
I'!itbod
ASTI'!
Method
D 1000
D 1000
D 1000
D 149
E 96
Std. Spec. W 302-R2
Requirements
20
Low- or high-density
polyethylene
BlacR
9
Butyl rubber and
synthetic resin
1 1
Reguirements
30
200
200
100
o 0 1 'to O. 2
-Eor to ... zoor
[3] pipeline Coatincr Tape (Outerwrap):
HO. 956 outerwrap 30 tape shall consist 0: a polyethylene
backing :film with a butyl-based adhesive lamina'ted to one side
0: the backing film. The polyethylene backing film and the
butyl adhesive shall be made by the calendaring process to
assure maximum bond o:f 'the adhesive to the backing :ilm. The
adhesive on the outerwrap shall form a :firm, continuous bond to
the backing :film o:f the innerwrap tape. The physical and
performance properties of the outerwrap tape shall be as
:ollows:
Physical Properties
Total thickness. nominal. mils
Backing :ilm:
Material
Color
Thickness. nominal. mils
Adhesive:
Material
Thickness. nominal. mils
pe;forrnance Ptoperties
Tensile st:::ength. Ib/in
width, min
Elongation. pe:::cent. min
Adhesion to backing. oz/in
width, min
Dielect:::ic strength. volts/
mil thickness. min
Wate::: vapo::: :::ate,
g/sq in. in 24 hours. max
tempe:::ature :fo:::
no:::mal service
B4-19
A S II'!
Method
ASTI'!
Method
D 1000
D 1000
D 1000
D 149
.E 96
Std. Spec. W 302-R2
Requirements
30
Low- or high-density
polyethylene
White
25
Butyl :::ubbe::: and
synthetiC :::esin
5
Requirements
55
200
78
1000
-30r to +200r
Cb) PIexgo System: The Plexco X-
TRV-COAT System shall be a multilaye::: system consisting 0: a
layer o:f modi:fied :::ubber-blend adhesive and an extruded
jacket o:f polyethylene mate:::ial.
11 J Bubbep-Blend Adhes've: The physical
and pe::::o:::mance properties 0: the rubber-blend primer
shall be as :follows:
Physical Propertiis
Thickness, nominal, mils
all pipe class
Compound:
B4-20
ASTrI
Method
std. Spec. W 302-R2
Reqyirements
10
Material Modified ruhher-
hlend thermoplastic
Color Black
[2] Polyethylene Exttuded Jacket: The
physical and performance propirties of thi extruded polyethyleni
jacket shall he as follows:
physical Properties
Thickness, nominal. mils
all pipe sizes
Jacket:
Material
Color
Pe.r;Qrmance. P;gpe.rties
Tinsile strength, psi, min
percent. min
Water vapor transmission
rate, g/100 sq in.
in 25 hours, max
Dielectric strength. volts/
mil of thickness. min
Operating temperature for
normal service
ASTrI
Method
1<5TI1
Method
D 638
D 638
E 96
D 149
Re.ayire.1Tlents
60 (actual 54-66)
Prime, virgin. high-
density polyethylene
Yellow
Reayirements
3000
'00
0.0001
1000
-40F to +150F
(3) Preparation: The pipe shall he
dried hy preheating prior to cleaning. The exterior surfaces tc
I') he coated shall he thoroughly cleaned of all, grease. oil, rust,
'.../ mill seale, d.l.rt. and all other forei gn subs tances . Oil or
B4-21
Std. Spec. W 302-R2
grease shall be removed before mechanical cleaning by
the surfaces with Chlorothane H.V. Ihe surface of the
pipe shall then be mechanically cleaned with sand or grit or by
shot blasting in accordance with Steel structures Painting
Specifications Ho. SP&. Pipe sections shall then be cleaned of
all steel shot. sand, or dust remaining on the or
interior surfaces.
Following cleaning. each length of pipe shall be
inspected for dents. grooves, and slivers. III defects
shall be repaired or corrected to provide bond and
integrity of the coating system to be applied.
At the Contractor's option. preparation of steel
surfaces and the subsequent coating application may take place
before or after the application of the cement-mortar lining;
however, any damage resulting to the lining or coating. by
reason of the sequence of their application. shall be repaired.
(4) Coating Application:
(al Hold llacks: Pipe ends shall be
protected from any contact with primer, adhesive. or coating for
the specified distances. Ihe method of protecting such areas
shall be subject to the approval of the Engineer as to
compliance with this reqUirement.
Fo!: S ;bze s
4 th!:u 24 Over 24
Pipg Ends (Inch". )
(I;,,:he s )
Spigot ox: plain 5-1/2 7
:S"ll
4 4
(b l
l':!2ll!J.:en
YG111
[11 Primer: Primer shall be applied to
the cleaned pipe surface as a thin film at a coverage rate of
apprOXimately one gallon per 800 square feet of tape applied.
=he primer shall be thoroughly mixed prior to application and
shall be agitated during application to prevent segregation.
The primer may be applied by spray or with other suitable
methods to obtain uniform coverage on the pipe surface. The Ho.
9295 primer may be thinned with Chlorothane H.U. only when
necessary to restore the primer to the original content of the
solids. Thinning shall not exceed one part primer to one part
thinner. The primed pipe surface shall be free of all cleaning
grit, dirt. rust, or other substances that would prevent
intimate contact with the innerwrap tape application.
B4-22
Std. Spec. Y 302-R2
-
!2J Innerwrap: The Ho. 989 Innerwrap 20
tape shall be applied with suitable equipment
will attach the tape to the pipe with a minimum oi 10 pounds oi
tension per inch oi tape width. The application shall produce a
smooth. wrinkle-iree covering. The tape shall be applied at a
minimum roll temperature oi 70T. Optimum roll temperature
during application is 70T to 95T. The tape shall be spirally
applied with a one-inch overlap and plus 1/4-inch tolerance.
The end lap oi each new roll shall overlap the end oi the
preceeding roll by a minimum oi & inches. The end lap shall be
hand-applied or applied with SUitable mechanical equipment to
produce a wrinkle-iree lap joint. The spiral angle shall
parallel the spiral angle of the previous roll. Machine
adjustments. including brake tension. shall be made and
maintained to continuously accomplish a uniform. tight. smooth,
wrinkle-free coating. The tape-width drawdown shall not exceed
5/8 inch.
[31 The Ho. 956 Outerwrap 30
tape shall be applied simultaneously and in the same manner as
the innerwrap tape. The spiral lap jOints of the 2 tapes shall
not occur on top of each other. The outerwrap tape shall be
applied under 12 to 14 pounds of tension per inch of tape width.
(c) Plexco X-TRU-COAT System:
[1 I Adhesive: As a part of a continuous
operation and immediately following cleaning and surface
preparation. the modified ruhber-blend compound shall be applied
to the pipe surface with a thickness of 10 mils. The
temperature of the pipe surface and the thermoplastic adhesive
shall be maintained at levels to insure optimum adhesion and
continuous coverage of the cleaned pipe surface.
[2 J Polyethylene Ixt;;uded Jacket: As a
part of a continuous operation and immediately the
application, the adhesive coated pipe shall be moved
a crosshead extrusion die for application 0% the
polyethylene jacket. The speed of the pipe shall be carefully
controlled to insure a uniform, void free jacket thickness.
Temperature of the polyethylene material shall be carefully
controlled to provide the required thickness and physical
properties. Tollowing the coating operation. the pipe may be
cooled by water quenching. If insufficient clearance through
the extrusion die prohibits extrusion coating of pipe with
belled ends. the pipe may be belled after If belling
is done after coating, any damage to the coating or cement
t lining shall be repaired.
V
B4-23
std. Spec. W 302-R2
9. Inspection of the Cement-Mortar Lined and Coated
Welded Steel Pipe:
a. General: The Department's Engineer shall at
all times have the right to inspect the work in the course of
application of the lining and coating to the welded steel pipe
and make such tests from time to time as may be advisable
providing no delay in production of acceptable materials or
equipment is caused thereby. The Contractor shall furnish, at
the Contractor's own expense, reasonable facilities including
tools and instruments for so doing and for obtaining such
information as the Engineer desires respecting the progress and
manner of the work and the character of the materials used.
However, final inspection will be made upon receipt at the
Department's specified receiving points; and, if any materials
or equipment do not meet the reqUirements of these
specifications, the lot or any faulty portion thereof may be
rejected.
Before offering a lot for inspection, the
manufacturer shall eliminate any portion which is defective or
does not meet the requirements of the specifications. All
expense of the initial acceptance test will be borne hy the
Department. The eXpense of subsequent tests due to failure of
materials or equipment first offered will be charged against the
Contractor. The fact that the materials or equipment have been
successfully inspected, tested, and accepted by the Engineer
shall not relieve the Contractor of responsibility in the case
of later discovery of flaws or defects.
~ b. Test 0; Coatina System; Upon completion of the
coating or extrUSion-coating operation, each length of coated
pipe shall be visually inspected and s h a ~ l have the entire
coated surface tested with an electrical holiday tester for
holidays, thin spots, or damage. The tester shall be operated
at the follOwing minimum voltages:
the Enginee:.
Coatina System
Polyken YG111
Plexco X-TRU-COAT
Volts
(Minimum)
6,000
10,000
All testing shall be perfo:med in the presence of
c. Rgpairs' A l ~ holidays and other defects
ohserved or holidays detected during inspection shall be
repaired.
B4-24
std. Spec. W 302-R2
10. Delivery o the Cement-Mortar and Coatee
Welded Steel Pipe: Xhe hracing, transporting. and handling of
the lined and coated pipe shall he in accordance with
7h.
11. Shipping and Handling Lined and coated Welded
Steel Pipe: The lined and coated welded steel pipe he
handled, stored, and shipped by the Contractor in a that
will prevent to the coating, lining. pipe, and pipe ends.
The pipe shall he hoisted by means of wide belt slings. Chains,
cables. tongs. hooks. or other devices likely to cause damage to
the lining or coating shall not,be used. Pipe shipped from the
coating yard shall employ sufficient dunnage. covers. padding,
and banding to preserve the integrity of the pipe coating during
shipment to the point of receipt by the
Hote:
Asterisk (*) indicates changes in the paragraph.
(END Of STANDARD SPECrfrCATIOHS)
A
B
c .
L
w .
L (12" m'lf\)

'ZI:.-;"'. ETCH OR WASTE

<{ Slots
NICK BREAK.
face of weld
-----------
FREE BEND
Sc.ribed_ga2! lines
FREE BEND
Scri bed
ETCH OR WASTE
Weld reinforcement .5ha/1 be machined flvsh wilh
base mela/. "
Machined, preferably by millin;
I'--.It cvl
J
Y6"min, shall be machined f'rom edges .
.L..-_ Edge may be flame wI.
7,(. ,Y. 0;,/ S/,' 11/ ,3 .... '.3/ 7/ '51 I
lGO i Z ,'1<1> e "',<I>!"-4 /, .. : /8, fiG,
3/ 3' , "
2 73Z 2 ;lf6 2 '2 /8
I
1 \ I
,12 12 12 12 12. 12 1213Yc.13Yz 13;tz
(NOTE: FOR WELD TEST SPECIW1ENS LESS THAN SEE A208Z.
WELD TEST SPECIMENS -BUTT WELD PLATE
1/4 - T '4_ TIt<
r
i'
F.
D
fi
p
d
H
I
l
;
1
,
.
\
,
,


\'.::;;: :.: .
"SS" "DL" ilLS"
TYPICAL SLIP JOINTS
TYPE SS JOINT IS FOR PIPE SIZES UP TO AND INCLUDING 24 INCHES
IN DIAMETER"-'
TYPE LS JOINT IS FOR PIPE OVER 24 INCHES IN DIAMETER
TYPE DL JOINT, WHEN SPECIFIED, IS FOR EVERY TENTH LENGTH OF
PIPE OVER 24 INCHES IN DIAMETER
NOTES
1. Ou7SIDE EDGE OF PLAIN END AND INSIDE EDGE OF BELL SHALL
BE SCARFED OR GROUND SLIGHTLY
2. LONGITGDINAL WELDS ON THE Ou7SIDE <F THE PLAIN END AND
THE INSIDE OF THE BELL SHALL BE TO PLATE THICK-
NESS FOR THE LENGTH OF THE LAP-
3. INSIDE DIAMETER OF BELL SHALL BE BETWEEN 1/32 AND 1/16
OF AN INCH GREATER THAN OUTSIDE DIAMETER <F THE PLAIN
END FOR THE LENGTH OF THE BELL
- 4. LENGTH OF BELL SHALL BE NOT LESS THAN 1-1/2" FOR TYPE SS
5. LENGTH OF BELL SHALL BE NOT LESS THAN 3" FOR TYPE LS AND
TYPE DL
THIS DRAWING SUPERSEDES A 6765-8.
WELDED SLIP JOINTS 0 11>
J
CO
WATER SYSTEM CITY OF LOS ANGELES
..
O"'OH<O ./.5. eRR 0'= R.<. 11;. A , '-/
D .... _... .H/ /. .3/6'3 F ,-.... (J -
CMLC"lD t./S. ! PA. 3/G':' >.
NO. DATI: .NTt.
REVISION'S
DEPARTMENT OF WATER AND POWER
B5-1
Department of Water & Power
of The City of LoS Angeles
STANDARD SPECIFICATIONS
For
CEMENT: PORTLAND, TYPE II
Speo.No. G 331-1'6
(Fewri tten 6- 23-15)
Supersedes
Spec. No . G 331-F5
---------------------------,------------------------------
1 . The portland cement shall meet the
requirements of C 150, Type II. as last revised, except as
modified and supplemented herein .
2 . f:I:ee Cali.l.!J!! The free calcium oxide
content shall not exceed 1.5 percent for cement .
3.
The total alkalies, considered as the sum of the sodium oxide
and potassium oxide, with the latter calculated and included as
sodium oxide, shall not exceed 0.6 percent.
4 . and Testing:
a. The Contractor at his own expense shall provide
for sampling and testing the cement under the direct supervision
of a civil engineer registered as such in the State of
California and qualified as an expert in cement testing. Cement
mill laboratories may be approved by the Department for this
purpose when evidence has been submitted to show that they are
qualified to perform such tests.
b. All sampling and testing shall be done in
accordance with ASTM C 183, as last revised, except as modified
herein. Methods of chemical analySis shall be in accordance
with ASTM C 114, as last revised. Unless otherwise specified in
the order or required by the Engineer, a test sample of cement
taken from bulk storage in a bin, silo, the conveyor delivering
to bulk storage, or from sacks from the jobsite shall represent
not more than 200 tons (4,255 sacks) .
c.. Tests shall be made and reported covering all
standard and optional chemical requirements and standard
physical requirements, as set forth in C 150, as last
revised.
d. A 2-pound sample of cement for each 200 tons,
(4.255 sacks) or fraction thereof, of cement furnished shall be
delivered to the Department' 5 Materials Testing Laborator}', 510
East SeCOnd street, Los Angeles, California. Samples shall be
taken in the manner provided for in subarticle qb above.
B5-2
Std. Spec. No . G 331-1<6
----------------------------------------------------------------
e.. All samples shall be clearly identified as to
the test reports that apply to the lot with the lot. number
indicated on each sample, .
5 . Te!:..-!H!.I2orts: Three certified copies of reports
of the required tests shall be mailed to the Department of water
and Power, Water System, Materials Testing Laboratory, 510 East
Second Street, Los Angeles, California 90051 .
6 . Los Before delivering
each order of cement within the City of Los Angeles, the
Contractor shall file with the superintendent of Building the
certificate of identification required in Section 91.2610 of the
Los Angeles City Building Code.
7. fackaging: Unless otherwise in the
order, the cement shall be d.elivered in sum.tantial paper sacks,
each containing 94 pounds net weight.
(END OF STANDARD SPECIFICATIONS)
B6-1
Department of Water ,
of The City of Los Angeles
SPI:CIPICATIONS
For
AGGREr;l'ITE: FOR CONCRETE
ANn OTHfl'l US:cs
Spp.c. No. G 391-R3
12-10-70)
SUT"ersedes
Spp.c. No. G 391-R2
1. Scol?e: These specifications cover the followina rock
products and untreated base material:
a. Rock Products:
(1)
(2)
uses.
(3)
(4)
(5 )
other uses.
Sand for mortar and plaster.
Sand for portland cement concrete and other
Sand for gunite COncrete.
Concrete aggregate for portland cement concrete.
Crushed rock for portland ceMent concrete and
* b. Untreated Base Material: Crushed Aggregate Base
for use under slabs, for sUbbase, driveways parkina areas,
as track ballast, and as a base course for pavement
2. General Reauirements: The aggregate shall he in
accordance Wl.th Section 200-Rock l'1aterials of the Standard
Specifications for Public Works Construction, as last revised,
except as modified herein, written and promulgated by the
Southern California Chapter American Public Works Association
and Southern California District Associated General
of California Joint Cooperative Committee.
3. Alkali-Reactive Substance Test: Aggregate for use
in mortar, plaster, qunite, and portland cemenF concrete shall
not contain alkali-reactive substances in amounts which will
produce a ratio of SciRe greater than 1.0, when determined
by AST1! C 289, as last revised.
4. Soundness: Aggregate for use in mortar, plaster,
gunite, and portland cement concrete shall meet the requirements
for soundness as specified in ASTH C 33, as last revised.
S. Requirements for Tests: All tests provided for herein,
or deemed necessary by the Engl.neer to determine compliance
with these specifications shall be made at the Contractor's
expense, except as to the compensation and expense of any
representative of the Department. All tests shall be supervised
B6-2
std. spec. No. G 3 9 1 - ~ 3
------------------------------------------- -----------------
and approved by the Engineer, or at his option, certified
factory tests may be accepted in lieu thereof. The Engineer
shall have the right to be present to check and record data
obtained so long as no delay or extra expense is caused the
Contractor.
6. ruU!m2.U: Three certified copies of reports of,
the required tests shall be mailed to the Department of Water
and power, Water system, Specifications Section, Room 1Q52,
P.O. Box 111, Los Angeles, California 90054.
1. !nsnection: Inspection may be made at the screening
plant, the bunker, or upon delivery of material to the building
Site. No material shall be delivered until the pit source
has been approved, and the plant capacity and. facilities to
produce a uniform and continuous product have been verified.
8. Rejection: In case material submitted for any of the
tests does not comply with these specifications in every
respect, the entire lot from whicb the samples were taken shall
be replaced at the expense of the Contractor with material
which will meet all requirements. Tbe expense of removing
rejected material shall be borne by the Contractor, and upon
notice of rejectim of any such material, he shall remove the
same promptly from the premises. If the Contractor sbows lack
of diligence in promptly removing said rejected material, the
same will be removed by the Department and the expenses incurred
therein shall be borne by the Contractor. Neither inspection,
waiving of inspection, nor the Department's acceptance shall
relieve the Contractor from the obligation to furnish material
in full accordance witb these specifications.
9. peliverY: Delivery shall be as follows;
a. all Aggregates: The quantities of all aggregates
required and delivered will be specified in tons of 2000 pounds.
Each truck shall be loaded from ODe bunker or ,tockpile and
the size distribution of the aggregate sball be consistent
throughout the stockpile or bunker. The contractor shall
assume full responsibility for delivery of correct grades in
quantities as ordered. A Public Weighmasterts certificate
shall be furnished with each load of IIilterial.
b. Sand: Sand shall not be loaded, weighed or delivered
directly from-the washing process, nor shall the sand te weighed
or delivered While containing an excessive amount of water.
The method of deterDlining the .water content shall be to fill
a vertical walled container to one-fifth its depth with water,
pour the sand to be tested into tbe water slowly, stirring
continuously to eliminate entrapped air, and bring the level
of the sand to the rim of the container. If the water level
B6-3
Std. spec. No. G 391-R3
---------------------------.----------------------------------------
has not passed the rim of the container, the moisture content
of the sand shall be deemed to be within the allowable limit.
The sample for the test shall be taken from the bottom of the
load at any such point as the Engineer may choose. This test
allows approximately eight percent by weight of water, based
on dry weight of the sand.
Note: Asterisk (*) indicates changes in a paragraph.
(END OF STANDARD SPECIFICATIONS)
I
I
B7-1
Deoartment of water & Power
of " The City of Los
SPECIFICATIONS
FOR
Spec. W 1021-RS
(ReWritten 10-11-79)
TOBING: COPPER silpersedes
Spec::,. W 1021-R7
1. General: These specifications cover the
requirements for 3/Q-inch. 1-inch, 1-1/2 inch, and 2-inch
seamless. annealed, Type K. copper water tubing.
2. National Copper tubing shall meet the
reauirements of 88, as last revised. except as modified
herein.
3. Dimensions and Tolerances: Copper tubing shall be
furnished in coils or straight lengths and shall to the
dimensions and tolerances as follows:
standard
Sioze

Nominal MinimulII Coil
Length Length

Furnished Tn
--
H:eetl
U!
Coils
60 or 100 +2 feet 211
1 Coils 60 or 100 +2 feet 24
1-"2
Straight Lengths 20 +1 inch
2 straight Lengths 20 +1 inch
Each nominal length of copper tubing
shall be furnished in the annealed condition in accordance with
the mechanical property requirements of ASTM B 8a. Straight
lengths shall be annealed after being drawn. Coiled lengths
shall be annealed after being coiled.
5. Product In addition to meeting
the identification requirements of ASTM B 88, each nominal
lencrth of copper tubing shall have the letters "DWP" stamped
into the metal at intervals of approximately 12 inches .
6. Packaging:
a. General: Each packaged unit shall contain one
sioze of tubing only. unit shall be packaged so as to
provide maximum protection in the process of shipping. handling,
forklift handling, and stacking as utilized in standard
warehousing procedures.
QQ
30
30
B7-2
Std. Spec. w 1021-RS
------------------------'-----------------
b. Tubing in Coils: Tubing specified to be
furnished in coils shall be coiled flat and shall be in standard
nominal lengths. The copper tubing shall be packaged in wooden
boxes or on pallets. Tubing furnished in wooden boxes in bulk
packaging shall have each layer of tubing separated by a sheet
of corrugated cardboard at least l/S inch thick. The boxes
shall have dunnage boards attaehed parallel to the outside edges
of the box. dunnage boards shall be a minimum of 30 inches
apart. Tubing coils furnished on pallets shall be packaged in
individual cartons plainly marked to show type, size, and
length. Each pallet shall be approximately 1000 pounds when
fully loaded.
c. Tubillil-in s!:!:aighLLeng!J:l.!!: Tubing specified
to be furnished in straight lengths shall be packaged in wooden
boxes. The wooden boxes shall be constructed and braced for
stacking and storing a minimum of 4 high and shall have 5 full-
width 2-inch by 4-inch dunnage boards attached to the bottom of
the boxes. The boards shall be parallel to each other and at
right angles to the length of the box approximately 5 feet
apart.
d. Truck-Delivered Material: Material delivered
by truck shall be-set-on-dunnage-boards of sufficient size to
provide a 3-inch to 4-inch clearance between the material stack
and the truck bed. Truck-delivered material shall be loaded so
that a forklift can readily unload from the side as well as the
rear of the truck.
7. Inspect!2n: All materials or equipment furnished
and delivered under the contract shall be subject to inspection
bvthe Engineer. If any items or articles are
found not to meet the requirements of the specifications, the
lot. or any faulty portion thereof, may be rejected. Before
offering a lot for inspection, the manufacturer sball eliminate
anv items which in his opinion are defective or do not meet the
requirements of the specifications. The fact that the materials
or equipment have been successfully inspected, tested, and
accepted by the Engineer shall not relieve the Contractor of
responsibility in the case of later discovery of flaws or
defects.
B7-3
S t d ~ S p e c ~ W 1021-R8
Materials or equipment purchased under the contract
will be inspected at the Department's specified receivinq points
and there accepted or rejected. Inspection will inclade tbe
necessary testing for determininq compliance with the
specifications. All expense of initial acceptance tests will be
borne by the Department. The expense of subsequent tests due to
failure of materials or equipment first offered will be charqed
against the Contractor..
(END OF STANDARD SPECIFICATIONS)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
88-1
Department of Mater & Power
of The City of Los Angeles
STANDARD SPECIFICATIONS
For
FITTIXGS' BRONZE MATER MORKS,
2-IKCH AND SnALLEl
t jienu a1 :
Spec. M 10ZZ-111f
(Rewri tten 9-10-86)
Supersedes
Spec. M 102Z-R3
a. These specifications cover bronze water works
fittings, Z-inches and smaller in size, for cold-water service
ZOO pounds per square inch working water pressure.
b. The term -fittings as used in these
specifications shall apply to machined or assembled bronze
castings, including certain valves for water service.
c. The bronze fittings shall he constructed to the
style and dimensions as shown on the drawings. Dimensions shown
on the drawings are minimum dimensions unless otherwise
specified. ninor variations may be made in the configuration of
the fittings, provided that the operation and use 'of fittings is
not affected, and the strength under various tests shall not be
less than the strength of the fittings would be if constructed
to the exact dimensions as shown on the drawings.
d. The specifications and drawings referred to are
intended to supplement each other and any details indicated in
one and not in the other shall be executed the same as if
indicated in both. In case of conflict between these
specifications and the drawing referred to, the latter shall
govern in determining the point at issue, with the exception
that the tolerances for weight and composition as specified
herein are the governing factors.
Z. National Standards'
accordance with ASTn B 6Z, as last
C83600, except as modified herein.
The fittings shall be in
revised, Copper Alloy UKS No.
3. DBterials and HorRmanship'
a. The material shall be as specified and the
fittings shall be manufactured in a thoroughly workmanlike
manner. The fittings shall be sound, clean, free from blow
holes, porous places, cracks, or any other defects indicative of
inferior workmanship or poor quality.
b. All threads shall mesh snugly, he clean cut, be
of unifora pitch, and Where they are to be used in connection
with standard pipe, they Shall be AXSI taper pipe thread, XPT.
All other threads shall be as shown on the drawings and shall
B8-2
Std. Spec. W 1022-1ij
exactly fit the various parts with which they are to he
connected.
c. All valves shall he carefully cored and
machined to insure evenly balanced walls. The keys shall be
properly machined and ground and shall be well covered by a non-
corrosive non-toKic grease.
ij. Hydrostatiq Test: All valves ~ h a l l be given a
hydrostatic pressure test of 200 pounds per square inch under
which they shall be easily opened and closed and under which
they shall be entirely free from leaks at any point.
5. Weiohts: All weights shown on the drawing are
nominal weights. and the weights of the fittings shall be not
more than 5 percent under the nominal weights nor more than 8
percent greater than the nominal weights.
6. Identification Or MarKing: All hronze fittings
shall be identified with the letters -LAW east into the
fittings. where practicable. The letters LAW may be stamped
where they cannot be cast into the fittings.
7. 2uality Assurance: The Department's Engineer
shall at all times have the right to inspect the work in the
course of manufacture and maKe such tests from time to time as
may he deemed advisable, providing no delay in production of
acceptable materials or equipment is caused thereby. The
contractor shall notify the Contract Inspection Engineer on
Telephone Humber (213) ij81-6208. The Contractor shall furnish,
at no cost to the Department, reasonable facilities including
tools and instruments for so doing and for obtaining such
information as the Engineer desires respecting the progress and
manner of the worK and the character of the materials used.
However, final inspection will be made upon receipt at the
Department's specified receiving pOints.
All materials or equipment furnished and delivered
under the contract shall be subject to rigorous inspection by
the Engineer. Before offering any material or equipment for
inspection or testing, the Contractor shall eliminate all items
which are defective or do not meet the requirements of the
specifications. If any items or articles are found not to meet
the requirements of the specifications. the lot. or any faulty
portion thereof. may he rejected. The fact that the materials
or equipment have been successfully inspected, tested, or
accepted by the Engineer shall not relieve the Contractor of
responsibility in case of later discovery of flaws or defects.
88-3
Std. Spec. V 1022-RQ
The expense of the initial acceptance tests will ~ e
~ o r n e ~ y the Department. The expense of subsequent tests will
be charged against the Contractor when due to failure of first-
offered materials or equipment to comply with the
specifications.
(END or STANDARD SPECIFICATIONS)
J"
i'6
SIZE
1/2
A- min. 112
RHmin. 5/16
1.0.
112
H"min. 7116
or' .
min. I
N.P.T. 1/2
Size onA9309 112
SEE DWG.A9309
SPUD TAIL PIECE
AMERICAN NATIONAL TAPER
PIPE THREAD
MINIMUM THREAD LENGTH
EQUAL TO EFFECTIVE
STANDARD THREAD LENGTH.
<VNOTE: THIS DRAWING
SUPERSEDES M.S. DWGS.
736.729,696,697,798,
791,965.
DIMENSIONS IN INCHES
112 I 3/4 3/4 I
Jl
/
2
2
314 3/4 I
1112
2
3/B
3/B 7/16 1/2 9/16
1/2 11/16 7/8 13/8 17/B
9/16 SIB 11/16 3/4 314
I 1/8 I 1/4 15/8 21/4
27/8
1/2 3/4 I 11/2
2
314 3/4 I 11/2
2
WORKING TITLE' ELL, ass.
ELBOW- BRONZE- MALE COPPER TUBING FITTING TO MALE STD, N.p.T.I)!.
,
"11" .... ,010
...... ,.. .......... .. .... fI'I"fOM
FSM TITLE "'VISED
11.72 RFC A N
u ........
DEPARTMENT OF WATER AND POWER I V
AT "'na ..
... -
S.lra.
CITI' OF s.o.t A ... a .....
14 "7"0 Jj"rAPC'R
Pt:7i'Fr. O/v'.DIA.
~
TOP VieW
5 ~
8
" T.
.2 N.P. .
/
DIMS. MARkeD Ti-Ius 7f
ARE TO BE t ~ : . ALL
OTI-IERS ARC. /vtINIMUM.
MIN. TorAL WEIGHT
14 Ll3S. - 0 OZ.
WOl:fKING TITLe: FlANCeD COR13 VALVe
110 SCALe
I .'
-zJA'A.-;
I
i
I
I
I .;:.
i J..{OL E S
'..... I /f"
r
,
,
!
"
2
/.3
Je

i\.!j
,
I

TOP V/C'W
-
WORXINti nrLe: FLANCieD CU;:;;S VALVe:
..
,
-,....o::::!----..I...;:oo"'f. . I
1
I
j
I
;
13" 1
... 0----2 i6- -- .
4 (1..toLDL......:
,
.
. ,
I"
----- 5;;,-----....,
- '
MIN. TOTAL WE/GNT
9 LB5. "" 0 oZ.
NO ..sCAL.I:
VALVE CUJ2f3 82.
l I
'l-
/A ME-TEi? FLA/l./G TO F.e:, "ALE /II..:;:J 1:
t!
:-, .. : ...
,
".VI.'ON.
..... 'f ............
oc.c.........,.. .......0
DEPARTMENT OF WATER AND PqWER
.
WAT "ST._ CnY Oft LOa ANG .... a.
.
,
..,1:, H- I: 4 Ji .I"-!-.C
1..0:
..... ....
'"'
-
....... ....
.........
.,.. ( ....
;::. $ to/.
'. -
..... t. ..
-
..... It
), ; "'..::.. 'J<::
.:,.-. 1'_c.J.t
1-11<
.,..,

e .. te ....
A
t;.$ ,
It' "./ .
. , .
-
.
(

(J)
-......J
... - ---------
Lri

'"
II"
jooo---1it
VE KEY , Kcl'hf-f Y
IAZ)ICA'7CJ) i --16'-,
MOl f- I
JlJ
8
MIN. I
..
OPENING
.
"
J N.I?T.
'-r--+-..."......,":--t--'----'
11 "rOJ} "'TAPeR . -: - /'" .
F7. CW DIA, .1
7
-
EJ1
.tI. "1.1
OMI MFeR
NOTe: I i!.. I .j .
w tI LOCk WMIC Cf!)SED AS s#owN,. FOR .
;.OCK WING OPeN ROTA'" KcYWlNG "":
.J.. /' 16 DIJi. JlCtfS
1 .. - ,I i LINE DRIlLED
_ J__ ". (\f I
-' i :il./ I. -

; '.."" \. I
, \r/ \ \ ' I ,
.- _ ... Y \ ,>---1 '.
1-1- Y- " D i
J

\; I I. : \ ">'ii'
'--' ..... '
\ \( 'I : I
L..---r---",!... I : /' I , __ J
i I i
I 2 ":DIll" , I
! t""-2r, -!;
--1----1
'7,111 i
"",I __ ----_:>.L.
""J6
TOP VIEW
DIMS. MARY:ED T.4US 6
A '2= TO l5.! '! J:j,z. A t.l..
OTI-I;:t:(S MINIMUM. .
MIN. TOTAL W:IGJlT
.3 LBS. -.5 oz.
WCRKINC TITLe: CURB V.4LVe NO SCALf!

- ...
:r
.. -;.
-.
... , .
AMERICAN NATIONAL TAPER
PIPE THREAD
- I
WORKING TITLE: STREET ELBOW BR.
NOMINAL
SIZE A
1
2. 2.
3
4
2
3
. -
4
7
8
I
c
,...!-
4

8

8
E
I-I
4
,.1..-
2.

16
2-1 2-'
4 2.
3
F
I
4
1
4
3
8
7
8
2
G
9
16
5
8
3
316
H
I
4
''"4
,- -'
2
2

8
All. DIMENSIONS IN INCHES
R
I
2.
I ..
2.
t
2.
5
8
II
16
E LBO W S, 5 T R E E T B R.
MIN.
T
3
16
3
16
3
16
3
16
7
32
.
-
3
16
3
16
3
16
7
32
J>

f-T:.;.. .. ..::...C:..: DEPARTMENT OF WATER Il1o POWER W
I BUREAU OF WATER WORKS 8c SUPPLY --It.
i- (:,,1,.*-,
WATER DISTRIBUTION SYSTEM
.
WCRi(.NG TITLE:
/ '
..
RELIeVE KY i !<FY j
WAY AS INDIC);,ED \

-- ....,

G
I
SPUD' TAli,
f:iE'F: .cNa,. A
.,
,
;. <A fJ,{'PEi2 n-: 0
I'i"""'
,,""" ,,>(./ .,' -" -' ............
. '/'"
t
' .. ' . , ,/:..:;...
.(,v
1" .......... __ . '
\: / .." ,,:.' . '-
\ I 1 ',.,''': 7.:
T
:
YI6 MIN.

1-- ... '\. <' '. ...,,<"\ .
\
. .t'i '.
\
JfJ; ,.;. " ..
-
-- --
9SC9
. .

,
... -J
_ ....
DU/.
N
i
"
H
_.-....
,., CCM/fA':.I.' i.. Y ,..;:FERRW
NOTE: AS lv1l.':"':' E 12 4
t HVALVE
TO
IN .2 C.ONC:NT.;".?!::'
",-r':::-
_,I"'t"_L .....
ft;- VIJL',E

Fli IN C,!:)NCENTR!C;
-.-/"/ -

n;o
SiZ! A
B c
D'! E
r I MC!N. l.tlN. i JIN! ,.,{, ... ! ,..f,: Ivf,. 1 11.
"'.J...
""',,. I
I / '/2
.. 7/,,, I 7/.52!
/.1
#o .. 78: '7;$2 !/5//6
'/4-
/ 'It, 5/8
-
I
1'/2
':'.'11:1

7-:3 W I Jle Z Y$!Z /J/4 i
IJ;.s sIS JIB -/'S
Z i Yo:; - ,-
I
i
AU DIMENSIONS IN It.lCJ.lES

,
VALVE:",
CORPORATION BRD/liZE
-..
t",
J ff:
STAll J:;A RD.J" .
> .....
CORPORATION THKCAD To TUB/Nt;
<D
... NT ......... .
.aYI ONS
DEPARTMENT OF WATER AND POWER
C"'IPYlO.
. .. ,..". .
W
J
t: '.r:! :;"oEtI.E::'# io .....
WATla .ynlll e," 0,. LO. AHOCUS
. , I ..
::1. 'w
.. _TO
.,.,..OYU. . '"

i .<:

o. ....... A.K W.
.... -o;:s
R,'/"'7 ?? /;:;' ". ___ /:.-.c-
"
1-<!' ." J;
,..,. .... ':- '" t . :!'; "7".;:,-.:';: ;,r:
'T""
'" E . 2!'.
Ul
_ ....
7-
,/.J, . "f;; /.r>
'1,,,_
# /1-7/ #C. ,/!I.it: &/H. ' (;,1./ .1:'4". .....
CMK"'.O
F' _" M 16'"
--
'"
..> r:-... ... '::, T .... t rf"O ,''', # ..... r,e
r--c--'-l
1 I
! I -;
I
c
I---E DIA.----'
"/OTE:130TH ENOS IOEN7ICA!.
- .
-.-
.5IZE A.
C D
-
.
( -
"
?
Ii.
2
,-'
- ! .
2 /6
. (,4
e 32
. "
.
..
3"
. 7
- " 1}2
I
,
tr::
4 4
, -
-
..
-
)1 '"
,
,
I
<'
,'.'
1
. - ' -
.
.;;!
I
/16
-'
" 32
I
I
/6
-
"
8
,
.
7

1ft
.3
/1 ..
2i;
. '2- 16 oj
2"

7
2!
I:;'
4
Sz
4- i6
DIM/fNSION,:) IN
.
...
\
I
i
t-- r DIA.
, I - ....
-:-.- ON / Z 1/ !: ONLY
t F
G H
l.
;I
'/Z"-14 ,9
1
3
-
2
N.o.r.
i6
;
7
,!i
j/4:t,J
!:I
,
1
16
!

MAT. 16- .....
,
l!l
I":: /I 'h
12-
.1
I.J

NAT. 16
(j 16
S IYz:/I .3 7
_2ro
i 216
-
. UP. T.
4
3
2 29
If Yt /5
32 16
INCHES
.
NOTE: THIS OI2Wc; SUPE2CEOE .5 14.5, D.c,'da:i 846,8J4, 646; 6J3
.
i
I
i
"
"
18JO
-
WOIJJ::'INC; 71 Tl.E: GLL 812. 'I/O .seA':':
f;Zt!JOH,:"Bi20NZE. ;30:.
NO. ... , ....
tIt,VIIIIO"'.
DEPARTMENT OF WATER AND POWER
oc.c.Jt ....,..o ..
._ ... 0
I '1-14 t:.J;
Tlr.:.!; CHA,w:iEC
- ..
WATCR STtI"'''' CITT or \.OS ANGet..l.
..... & .....
, .' '.r-:;. . .
Iii
OtfiG .. ca
.; N.,!; !-J .Iv
J,': 'h U4., ..,r''''
" ....
,..
. ", , .;"j...., ",
<o... c
.'" ; ,," .....
({-
"
,,<I.
-,
.
. ,
..
.
1-


VJ
r\)
(J1
-
70 8E rl..l12A1ISHED WITH A9309 TAIl.. PIECE
o
r-
2. "COPPER. TLlEe THO .
.sEE A 9309
I iZ"O'A
. I
:::
/
, ' L
I .. _.... _.,." "

I
'11- r,,,",nD_" I 'IF-.,. ,N,.
_""",r. _, .... ....
j "HE-XAGO/../---I/-.s== owe;. A9309
3CALE-: r-U!..L SIZe
B9-1
SPECIFICATIONS FOR
BlUaE SERVICE CtN4PS Pal ASSESTa;...Q)!ENl'
CR WA'reR PIPE
1. Gene;al: rhe bzon:e clamps shall be
designed use on asbestos-cement cast izon pipe and shall
fit the and have the number of straps corresponding to
the nominal pipe sizes as follows:
Hominal Outside Diametezs Humbez
Pipe Sizes
!
of
(Inches )
"inimum
Mal!imum Straps
4 5.00 S.:U 1
6 7.10 7.36 1
8 9.30 9.68 1
1: 13.50 14.18 Z
rhe pipe diameter range of the claap shall be aarked
on its saddle.
2. Ope;atinq Requireaents: Each bronze service clamp
shall pzoduce a wateztight seal under 200 psi hydrostatic
pressure with the strap nuts tightened to 10 foot-pounds.
Each bronze service clamp shell not leak nor damage
the pipe When 6,000 inch-pounds bending mo.ent foz a one-inch
outlet or 8,000 inch-pounds bending moment foz a 1-1/2-inch
outlet is applied to the clamp or longitudinally
thzough the outlet and when under 200 psi h,dzostatic
with the nuts tightened to 50 foot-pounds.
3. Saddle' rhe saddle shall have a shape and
flexibility to permit the eazs to close fir.lv against the pipe
when the strap nuts are tightened to 20 foot-pounds. rhe saddle
shall extend not less than 150 degzees azound the outside
diameter of the pipe.
rhe outlet shall be tapped "uellez Corporation thzead
in accordance with Dzawing A9311.
rhe shall have oval holes for the stzaps and
shall have full bearing surfaces for the nuts. On one side of
the saddle the strap holes ma, have open slots. using washezs oz
washez-type nuts to provide a full bearing surface.
4. stzaps and Huts' rhe stzeps shall be for.ed from
S/a-inch diellletez zod and shell lIIatch the pipe contour and
B9-2
provide not less than 3/4-inch bearing width over the length of
the strap in contact with the pipe.
The strap ends shall have National Coarse. Class Z
threads. The starting thread shall have a t/16-inch. q5-degree
chamfer. When the strap nuts have been tightened to 50 foot-
pounds. there shall be not less than 1/2 inch of thread
remaining for tightening when installed on minimum OD pipe; and
there shall be not less than 1/2 inch of thread projecting
through the nut when installed on maximum OD pipe.
All nuts shall be hexagon. ANSI heavy. Washers or
washer-type nuts shall be furnished for use on strap holes
having open slots.
5. Material' The materials of the various parts of
the service clamps shall meet the following requirements'
a. Saddle: The saddle shall be of bronze meeting
the requirements of ASTH B 62. Copper All01 Mo. 836. as last
revised.
b. StraDS' The straps shall be of copper-silicon
alloy meeting the requirements of ASTH B 98. Copper Alloy No.
651. 8-12. as last revised.
c. Nuts and Washers: The nuts and washers shall
meet the requirements of ASTH B 62 or ASTH B 98. as last
revised.
d. Gaskets' The gaskets shall be rubber. Buna-H.
or neoprene.
TOLeRANCE': RING- OR PLUG GAGE FACE SHAl.l.
BE WlrHIN ONE iURN ! OF BEING
FLf.lSI<I WlrH FACE OJ:" '=-/7'T/NG.
EXTERNAL
THREADS
NOMINAL THREADS TAPER
.l D.
L.
NORMAl.. 'PITCH 'DIA.
I..ENt;1JI
SIZE PER IN. PE:R FT.
AT SMI/LJ.
!'""
MIN.
.
BY HIIND
.t 14-
114
.755 1.047

l
12 11; .835 1.265
t-t


.. 1

1.,658
It
t% J. .864
1.934

I!. - 1.
.994- 2lS07

"COMMONLY RE'FE1!i'RE'D TO AS MIJELLER
INrERNAL
THREADS
Dz Ll
'11111;11 1)104.
AT J
Milt
EN./)
1.157
.18
/,.387

1.730 t

1.
2.590
STAN])ARD- CQRP()kJATION THREADS
.l>
B10-1
SPECIFICATIONS FOR
MAGNESIll'l .lINODES
PACKAGED \4ITH BACKFILL
1. ~ e n e r a l : The anodes shall be Dow Chemical Company
Galv'omag- mag-nesium anodes, shall weigh appl:oximately 32 pounds
each. and shall have 10-foot long. TW-insulated Mo. 1'2 AWG solid
copper lead wires. The lead wires shall be silver soldel:ed to
the COEes of the anodes and shall have the soldered connection
sealed with a coal-taE enamel compound.
The anodes shall be made from a magnesium alloy
containing- mang-anese and the following amounts of metals and
impuzities'
Aluminum, maximum. percent ................. O.Ol
Coppel:. maximum. percent ................... O.02
Iron. maximum. percent .................... 0.30
nang-anese. peEcent ....................... o.SO to 1.30*
Mickel. maximum. percent ................ O.OOl
otheE metals and
impuzities each. maximum. percent ........ O.OS
Total amount of otheE
metals and impurities. maximum. percent .. 0.30
* nang-anese content shall rang-e fxom 0.50 percent to
1.30 percent as follows: When aluminum is less than 0.005
percent. the minimum mang-anese content shall be 0.50 percent
plus 60 times the percent of aluminum pEesent; when aluminum is
0.005 peEcent OE more. the !lIang-anese content shall rang-e between
0.80 pexcent to 1.30 percent.
2. Ppckaging: Each anode shall be packag-ed with
backfill in a white cotton bag- with the anode centered in the
backfill and enclosed in an unused wateEproof bUElap bag- with an
innez lining- to pEotect the anode fEom damage and to exclude
moistul:e until the anode is installed. The total Weight of each
packaged anode shall be not less than 70 pounds.
follows:
B10-2
the chemical composition of the backfill shall be as
Gypsum ................... 7! percent
8entonite ............... ZO percent
Sodium Sulphate .......... ! percent
B11-1
Department of Water and Power
of The City of Los Angeles
SPECIFICATIONS FOR
I-INCH AND 1-l/2-INCH STEEL WELDING COUPLINGS
Couplings, steel, welding, "mueller" thread. 1-inch and
1-1/2-inch.
In accordance with DWP Drawings A9364 and A9365, respectively.
TAP I" STANDARd CORPORATION THREAD
i2 Tf-{READS PER INC;"; -. 11;" TAPER PER FT.
MEAStJRE, P. D. Ar FACe-
OF
CJ.lAMFER START/Nt;; THFi'EADS
TO 101':"&175. STD.
PRACTICE.
..
t.900-DlA .

llo4--.:::J Yz. 1<-
II
1 BLACK STEEL PIPE
DOUBLE EXTRA I-IEAVY.
GAGE' TOL.ERANCE: PLUG ro FIT WITI-f/N .
ONt: TURN 'PL.U.s or rI..USJI.
.. COMMONLY REfi:Iifi>D "" AS MtJI.LI!R
SCALE : FUL.(
1/
TAP 1 % STANlJARD* CORFORATION TJ-IREAD
V>
t 1 Yc. TMRE ADS PERI NC 1-1 -. 1 n TAPER PER FOOT
2:
r---- e
o MEASURe P. D. AT FACE I I


1
T:
t
:::!J .. ':: ;;:;.i'" 7
;" : : '. :".'::. ;' :: i ! I '
I. I ' . '"
. , . 'L' I, II
, .,,', : i: I

;:. "I, ,JoI;'
I I "1'" .'lll
p.n
: i; : '::! f,!:; .;. :; II I
2.6
'., .. -1-, . T
I I' , I, ' II
-3Yz"
i:Ll."i',r .. ':'1'
'R.
'1"1'''' :,.; ,1,
'iq J::,. I, II , :'!!j' CI'
I II' j , ! , "." j
'II .. . ",'. ,'I' ,,, .
I; Illi'l ,;01 i' .,.'
.I",., " '\ I I",' 'II "." .. 1 "';,'!'
.1 I" i' ' . :.,. ." ",
I" ;1, ". I' 0';' "'.,"
I :,1 . , !
Z5"DIA.
/
11'16 TI-IRE'ADS CHAMFeR START
ACCORDING TO M FGRS. STD.
I
PRACTiCe:.
.2 STEeL McCh'ANICAL
TUBIN4 - ..375" WALL THICKhc55.
GAGE TOLERAIJCE" PLUG GAGE TO FIr WI7,YIN
ONE: TURN PLUS OP n U.:5H.
SCALE: FULL
B12-1
Department of Water and Power
of The City of Los Angeles
SPECIFICATIONS FOR
2-INCH CAST IRON COMPANION THREADED FLANGES
Flange, cast-iron, companion, screwed, serrated, flat-faced and
drilled to 12S-pounds. 2-inch.
Standard finish in accordance with manufacturer's standardization
society (MSS). Shall have a minimum depth of O.OOS-inch.
",, -
,...----------- fI'" ...... e<l
-#-----+ ----;1-
I "X ', s "
OVAL hOLE
(TYA)
j!-AMcRICAN STANDARD
TAPeR PIP/!: THREADS
(tV.P.r.)
r
----------4.S0 ''8. C;c-. ---------!---t..,
If '! ygu
I (4-1---3
I
,
jI
ii
L
I
I
"
"
. ;
I
"
"
I
I
I I
I
I
II
II
I I
I I
I
I
I
I II
"
I
I
I
1
i !!
.. :
,
.6
Notes:
1. Serrations shall cover entire
2. Serration. depth 0.016
3. Pitch of serrations (crest to crest)
4. Flange to be asphaltum dipped
S. Serrations may be concentric or spiral
O
,..,..,. +.005
.......... -.0/0
LINES TYLE PEN
PROPOSED WATER MAIN
:3
EXISTING WATER MAIN
1
TO BE ABANDONED WATER MAIN
:3
METROPOLITAN WATER DISTRICT (MWD)

1
PROPERTY LINE
2
E A SEMEN T LINE
---------------
2
PORMER PROPERTY LINE
- - - - - - - -A:- - - - - - - - 0
STREET CENTERLINE
l
00
CURB LINE
0
PORMER CURB LINE
----------------
00
SANITARY SEWER (S.S.)
---55-- 0
SOUTHERN CALIFORNIA GAS (SCG)
(SCoG)
- - 0
SOUTHERN COUNTIES GAS
DwP POWER SYSTEM (DWPPS)
--- --- 0
SOUTHERN CALIFORNIA EDISON (SCE)
PACiFiC TELEPHONE & TELEGRAPH (PTT)
- --
---
0
WESTERN UN/ON (WUT)
ELECTROLIER LIGHTING CONDUIT (L)
- - -L- - - -L- - - -L- - 0
TRAPPIC SIGNAL CONDUIT (TS)
0 --- --- --15-- - -----
POLICE & PlRE ALARM CONDUIT (PA)
OIL OR GASOLINE PIPE LINES (OIL) ---OIL--- 0
STORM QRAfN (SO) ----- --- --- ------- 0
MISCELLANEOUS SUBSTRUCTURES
-----------------
0
(USE APPROPRIA TE LABEL)
TEMPORARY UTILITIES - ................................... -
0
NOTE:.- USE DOUBLE LINES TO SHOW LARGE DIAMETER SUBSTRUCTURES
WHERE SCALE PERMITS.
LINSTYLE STANDARDS
l>
REVISIONS
DEPARTMENT OF WATER AND POWER
ill
NO. DATE INIT APP"O
.j:::..
WA TER SYS TEM CITY OF LOS ANGELES
NAME DATE
A P P ~
VJ
DESIGNEO V. TOROMANWI 9-91
B. WEINSTEIN JUNE '92
0
DRAWN V. TOROMANIAN 9 91
CHECKED L NUNO 2-92
ES ..... -l
SHEET 1
GA n:s AND FI TTiNGS
LINE GA TE OPEN - SHUT
LINE GA TE: WCrH BYPASS - WITH REDUCERS
SEASONAL OPERA TlONAL GA TE OPEN SHUT
SERVICE GA TE - BLOW-OFF GA TE
AIR VAL VE (MANUAL) AIR RELEASE VAL VE (AUTO)
AIR VACUUM VALVE: (AUTO) COMB, AIR VAL VE (AUTO,)
ROTO, PLUG, GLOBE, CONE, BALL, &: SPHERICAL
VAL VE:S OPEN SHUT
BUTTERFL Y VAL VE - AL TlTUDE VAL VE
CHECK VAL VE - CLAPPER REMOVED
REGULA TORS - RELIEF VAL VE:
PRESSURE RECORDER
OUTLET PASS HOLE
MAINT. HOLE - AIR VAL VE IN MAINT. HOLE
(SHOW MAINT. HOLE ON WA TER MAIN ONL Y)
VENTURI METER - PITOT TUBE
SPARLING, ORiFiCE. &: FLOW METERS
SLIDE, LIFT Of? SLUICE GA TE REDUCER
TEE CROSS
CLAMP DOUBLE CLAMP
HORIZONTAL BEND - OFFSET
VERTICAL BENDS - OFFSET
WELDED CONNECTION WELDED TEE
MECHANICAL COUPLING
MAINS NOT CONNECTED
STANDARD DRAFTING
SIZ OF
Y!v1BOLS

, ,
'A, V.
, AI? V.
----.0)---
-_=l---
---(0)----
24"' /?G, -

24 I? V.
CI:W V. ",-",-c.--+---

T T
24" OU7l.T
___ O,a-AiR
B- P.H.
r;;C." A, V.

20" v'M.
I ... F!..QW--
.:11 ...
,24" SJ,(. 70" aN
now--
$,(;
'......., ... ,--
15..!':;'
. ..
p.T.
. ..
f".AI.
SYMBOLS
REVISIO"lS
DEPARTMENT 0, WATER AND POWER
AP"""C NO CATE IN1T
i :
WA TC::R SYSTEM CITY OF ,-OS ANGELES
NAME:
i :
OE SIGNED L NUNG
OA'!E , APPROveO
9-9' i B, JUNE '92
I----'-_+i _+ ___________ +-._+DRAWN V. TOROMANtAN I) 9';
i I CHECKED: L. NUNG :; 91 r'"
SHEET 2A
FIRE HYDRANTS,
WATER
2 7/2" SINGLE BUlL T-UP FIRE HYDRANT
4" SINGLE BUlL T-UP FiRE HYDRANT
2 1/2" SINGLE OU T Fl.RE HYDRANT
4" SINGLE OUTLET FIRE HYDRANT
2 7/2" X 4" DOUBLE OUTLET FiRE HYDRANT
4" X 4" DOUBLE OUTLET FIRE HYDRANT
"DEPT. 2 7/2" OR 2 7/2" ANGLE VALVE
,. DEPT 4" OR 4" ANGLE VALVE
CONCRETE THRUST BLOCK
THIMBLE OR CONCRETE ENCASEMENT
CRADLE - SLAB
CONDUI T - TUNNEL
CA THODIC PROTECTiON - INSULA TED JOINT
MAXIMUM STA TIC PRESSURE
MAINS,
p
~
cp
E?
<l'
~
l
~
'r
ETC.
1 6 ~ sa. tTHlM6LC
I == I
, t. CONDO IT
--'$-
,.
<148' C <73"
r- - ---.
j
-_111-1--
FOR FIRE PROTECT/ON OF DEPARTMENT PROPERTY AND OTHER AGENCIES
NOT BiLLED TO L.A. FiRE DEPARTMENT.
STANDARD DRAFTING SYMBOLS (CONT'D)
SHEET 2B
6" PIPE & FITTINGS
6" D.I. R.G. FLG./BELL ADAPTOR
6" STL. ANCHOR BOX ASS'Y
6" X 11-1/4' D.I R.G. BEND AWWA (B-B)
6" X 22-1/2' 0.1. R. C. BEND AWWA (B-B)
6" X 4S' DI. R,G. BEND AWWA (B-B)
6" X 90' 01. R,G. BEND AWWA (B-B)
6-S/8" W. X S/16" X 6" SiL. BUTTSTRAP
6" STL. tlf"LD CAP
6" CAST TRANS. MECHANICAL COUPLING
6" STL. MECHANICAL COUPLING (NON-INS.)
6" X 6" 0.1. R.G. CROSS AWWA
6" X 4" 0.1. R.G. CROSS AWWA
6" X 6" SiL. tlf"LD CROSS
6" X 7S'SiL. tlf"LD ELBOW
6" X 30' SiL. tlf"LD ELBOW
6" X 4S' STL. tlf"LD ELBOW
6" X 90' STL. HHO ELBOW
6" X IS0# SiL. BLIND FLANGE
6" X 300# SiL. BLIND FLANGE
6" X 150# SiL. WELD NECK FLANGE
Ii" X 300# S n. WELD NECK FLANGE
6" PRE -ASS'D INS. JOINT TYPE II-D
6" PRE -ASS'D INS. JOIN T TYPE I-E
(Sn. SPIGO T / AWWA R. G. BELL)
6" X 0.31" X 18" LONG D.i. I?G. NIPPLE AWWA
6" X 037" 0.1. R.G. PIPE AWWA
6-S/8" 00. X 1/4" EN UC., CL &: C,
S.J., WELDED sn PIPE
6" X 2" 0.1. R.G. TAPPED PLUG AWWA
6" 0.1 R.G. PLUG AWWA W/l" CORP. COCI<:
NOTE. FfTnNGS IN OTHER SIZES ARE AVAILABLE.
COMMON PIPE &
F*EVISIQNS
DeSIGNEO
I
DRAWl'.
I
CHECKED
L
V.
L
6" X 4" D./. R.G. REDUCER AWWA
6" X 4" STt. tlf"LD REDUCER
6" X 6" X 17S# C.I. FLG. TAPPED SLEEVE
6" X 4" X 17S# C.I. FLG. TAPPED SLEEVE
6" X 6" 0.1. R.G. TEE AWWA (B-B-B)
6" X 4" 0.1. R.G. TEE AWWA (B-8-B)
6" X 6" 0.1. R.G. FH TEE AWWA (B-B-S)
6" X 6" STL. WELD TEE
6" X 4" STL. tlf"LD TEE
6" X 200# CI. R.G. GA TE VAL VE
6" X 250# DJ R.G. GATE VALVE
(U.s. PIPE "METROSEAL" OR EOUAL)
6" X 200# C/. FLG. GA TE VAL VE
6" X 250# C/. FLG. GA TE VAL VE
6" X 350# C/. FLG. GA iE VAL VE
6" BELL YOKE W/RODS
6" SAFETY YOKE W/ROOS
OTHER PIPE & FITTINGS
32# MAGNESIUM ANODE
2" STL. tlf"LD HALF COUPLING
4" X 0.29" 01. R.G. PIPE AWWA
8" X 0.33" D.i. RG. PIPE AWWA
12" X 0.37" 0.1. R.G. PIPE AWWA
4-1/2" 0.0. X 1/4" EN UC., C.L. &: C.,
S.J., WELDED SiL. PIPE
8-5/8" 0.0. X 1/4" EN. UC., C.L. &: C,
S.J, WELDED SiL. PIPE
12-3/4" 0.0 X 1/4" EN UC. CL &: C.,
SJ., WELDED SiL. PIPE
2" STOP-COCK &: BLOW-OFF ASS'Y
TEST S7A TION
FITTING TERMS
NAME DATE
A P ~
NUNO 9-9'
;
e. WEINSTEIN JUNE
TOROMANIAN 9-91 I
NUNO 9-91
'92
SHEET :3
AC
ARV,
ASS'Y
AV,
A V, V
AWWA
B-B-B
B-B-S
CAV
CL &: C
D.F:H.
Di
EN. ue
F&B
F.L
FiG.
G. V
10.
I J
- ASBESTOS CEMENT
- AIR RELEASE VAL VE
- ASSEMBLY
- AIR VAL V1:
- AIR VACUUM VAL VE
- AMERICAN WA TER
WORKS ASSOCIA TlON
- BELL-BELL-BELL
- BELL-BELL-SPIGOT
- COMBINA TION AIR VAL VE
- CAST IRON
- CEMENT LINED &: COA TED
- DOUBLE-OUTLET
FIRE HYDRANT
- DUCTILE IRON
- ENAMEL UNDERCOA TED
- FLANGE &: BELL
- FLOW LINE
- FLANGE
- GATE VALVE
- INSIDE DIAMETER
- INSULA T/NG Jo.lN T
INS
LB, #
L.R.
MC
MECH.
MH
- INSULA TING
- POUND
- LONG RADIUS
- MECHANICAL COUPLING
- MECHANICAL
- MAINTENANCE HOLE
MJ. - MECHANICAL JOINT
NF T. - NA TlQNAL PIPE THREAD
NTS - No.T TO SCALE
00. - OUTSIDE DIAMETER
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SOUARE INCH
R.G. - RUBBER GASKET
SB.UFN. - SINGLE -OUTLET BUlL T -UP
FIRE HYDRANT
S.C &: BQ. - STOP-COCK &: BLOw-o.FF
S.D.
S.J
SJ?
S.S
STL
- STORM DRAIN
- SLIP JOINT
- SHORT RADiUS
- SANITARY SEWER
- STEEL
COMMON MAIN EXTENSION PLAN ABBREVIA T/ONS
REVISION'S
"'AME OATE

APPRQVe::C
OES'GNS::O L. NUNC 9-9;
8. WEINSTEIN
W
,jUNE '92
i
ORA",""" V. TOROMANIAN 9-91
I
CHECKED L. NUNO 9 9'
SHEET 4
.
DUCTILE IRON
WELDED STEEL
CONDITION PIPE
PIPE
(UP TO 200 PSI) (ABOVE 200 PSI)
NO UNUSUAL CONDiTIONS

CORROSIVE SOILS

HILLSIDE AREAS

HIGH PRESSURE AREAS

CD
FILL OR UNCONSOLIDATED ALLUVIUM



SHALL OW OR VERY DEEP PIPE COVER

RIGHT-OF-WAY; EASEMENT

@

OFFSETS OVER OR UNDER SUBSTRUCTURES

@

BRIDGE CROSSINGS


OPEN DITCH (CLEAR SPAN) CROSSINGS

CROSSINGS


ADJACENT TO MAJOR MERCANTILE AREAS

MAJOR THOROUGHFARES

CUT-FILL TRANSITION AREAS

CHANNEL CROSSINGS

(J)

CD
PRESSURE OVER 250 PSI REOUIRES ENGINEERING ANALY.5iS OF PIPE WALL AND FLANGE THiCKNESS
@ IF NO LA TERAL MOVEMENT IS ANTIC/PA TEO.
@ IF iN STREET CONFORMING TO CITY ENGINEER'S STANDARDS
@
IF SUFFICIENT PIPE COVER EXISTS AND OFFSET CAN BE MADE WITH STANDARD OJ. PIPE BENDS

ENCASE AND GROUT PIPE ADJACENT TO ABUTMENT.

ENCASE AND GROUT PIPE
(J) USE LOCKING GASKETS
SUGGESTED USE OF PIPE MA TERIAL

REVISIONS
DEPARTMENT OF WATER AND POWER
to
OATE 'NIT API'>'
.p-
I
>IVA Tt;;R SYSiEM CITY OF" LOS ANCC,-ES
I
NAME
:;A ":C:

(.N
Oe:SIONF.O v. TOROMANlAN 'j-91
B W,lNSTflN ...
JUNE '92 .p-
i OR AWN v, TOROI,lANiAN

,
CHECKED L NUNO ,1;2 9!
SHEET 5
CONCRETE CURB ANO GUTTER
GUTTER F.L.

78" MIN.
io
:;;
':!
- 48" MAX /36" MiN. FOR IT DIA, AND LARGER PIPE
42" M,4X / 30" MIN FOR 8" CIA, AND SMALLER PIPE
'-
Ct:
'S
Vi
'"
~

>?
~ <:i
,
e
Vi
OJ
TYPICAL TRENCH SECTION
NO DATE INiT
DEPARTMENT OF WATER AND POWER
CITY or LOS ANGELE:S
CHECKED L. NUNO 3-92
SHEET 6
4" MIN CLEARANCE CLEARANCES LESS THAN 6"
MUST Be SePARATED BY A 2' SQUARE ASPHALT-
IMPREGNATED FELT PAD OF THE SAME THICKNESS
AS THE CLEARANCE
CROSSING
SUBSTRUCTURE
5' /
/
/
/i
/ I
/
\
\
\
I \
L _____
- - - - - - - - - - - - '" "/// INSTALLATION'
i /'" USE APPROPRIATE flTTtvGS
, J , _ AND INSTALL OFFSETS AS
"'" - - - - - - - - - - - - - - -\ j INDICATED
I
\,//'
- 48" MAX /36" MIN FOR 12" DIA, AND LARGER PIPE
42" MAX / 30 MIN FOR 8" DIA AND SMALLER PIPE
" 6" MIN CLEARANCE FOR 12" DIA, AND SMALLER DWPWS PIPE
12" MIN CLEARANCe FOR LARGER THAN i2" DIA DWPWS PIPe
NOTE:
THE MINIMUM CLEARANCeS FOR UNDERCROSSINC SHOWN HEREON SUPERCEDe
THE MINIMUM OF 'I" SHOWN IN STANDARD DRAWINC A9438,
SEE STANDARD DRAWING A94J8 FOR SPEClflCS OF SeWER CROSSINC
TYPICAL SUBSTRUCTURE CROSSING DETAIL
REVISIONS
DEPARTMENT OF WATER AND POWER
WA 'fER SYSTCf.r. CITy or LOS ANGELES
NAME
OESICNEO L, NUNO
: OA T : APFPOVED
1,90 : B, W[lNSTEiIN
DRAWN II TOROMANiAN 3-92:
CriECKC:;) L NUNO I 3-92 ,
JULY '92
SHEET 7
FIGURE 1 - PARALLEL CONSTRUCTION
Note: Zones identical or: e;ther side of center iines_
Zone "p" is c proh:Di:ed zone, etien 64630(e)(2)
Califarnic Administrative e, Title 22.
//
SPECIAL
PERt:'WSSION

L'

/ ,
/ ),
/ /1
/ / / A
-,

b
"BH
/7 :
ZONE
/
. ,/
/
SPECIAL

PIPE

/
CASE 1
NEW SEWER
w
z
0
N
"
, '
0
w
I-
m
n::
Q
I
if.
w
z
0
N
";:>I!
9
'
OJ
n::
Q
SPECIAL
PIPE
ZONE "8"
/)
3' 6'----;
//
/ /
/
,
ZONE "A" \
//0
2
/
CASE 2
NEW WATER MAIN
SEWER AND WATER MAIN PARALLEL SEPARA nON
_______ __ ANTD __ W_(_FA_R__A_G_N_'C_Y_._D_P_A_R_IM_,[_NT __ __ __ ) ______
REv'S'ONS DEPARTMENT OF WATER AND POWER "-'
NO. DATE IN'T -"PP'!') t-..
__ __________________ __ 1-___ __ ____ ____ -l
t- NAMe OA T: ; APClROvEO V'4
DeSIGNED v rOROMAllJiAN 9-9;: 8 WD/vSTDN nr!.: JUNE '92 '-J
:'" ..... -----...... . ................ ----
CHt:CKt:O L NUNO 9-91 ,
ESM-8
SHEET 8
FIGURE 2 CROSSINGS
f\;ote: Zone "p" is Q prohibited construction zone,
NO
T
'I
--L-

I
JOII,
-L'
CASE 1
NEW SEWER
IN WATER MAIN!
I ;,
I Z,ONE "D"
,
ZONE "P"
CASE 2
4'
NEW WATER MAIN
NO JOINTS IN SEWER
'<t

-r
I '
6'
I
SEWER AND WA TER MAIN PERPENDICULAR SEPARA nON
1-____ ('-P_EF-;:
IS
c=-TA"'T"'E:;::o':':r:;:-C_A_Ll_ro_R_N_fA_,_H_V_M..."A_N_A_N"TD_W_E_LF_A_R_r_A_G_EN..,C_Y __ ,_D_f_PA_R_T_M __ ['_Vl_0_F_H_f_A __ L_TH_' ____ -i 'f:.
RvrSIONS DEPARTMENT 0;':" WATER AND POWER '-.l.J
API"'O WA TER SY$"re;V ::11''>" or LOS ANceLES
NO INtl
NAME OATS LN
1--+-+-j-------------1 _-};;;;OE;;.:';;.:fONED v. rof?OMANIAN i 1-''-'-==':::'-'--J= ___ ..:.J.:.U...;NE=-'9::.:2'--1 CO
DRAWN v. rOROMANlAN 9-9J
CH(CKO ,L NUNO 9-91
SHEET 9
OEFLECTION e ANO CORRESPONOING CURVE RAOIUS
I
OEFLECTION e
PIPE
o 0'43'
. 0"54' i r 11'07' i 1'40" 2" i Y 4" 5' . 6'
T. 8"
g" I 10' >10'
SIZE
' I ,
(573') I (3821 (229,) I (f9f")
I
(co' ) (/599') (1273') I 0146,).
(t026') . (688') (286')
(/64 ')
4"
I
I

-'- N
9"
5n: J! J,.,
i5" I .. I i5"
"6 I
- : -
2 8 8

0' I
5" 7" , .!u [ l!u 13$' ; 1 ., I
it"
i6 iii 15 , 15 i6

f6
I
sn; ,]p;
8"
.
7", 5" 7"
12 # !l" 2.
n
;6 I
iif ..
I
.. Ie 8 I 16 4
.z ... !,2
v
1" I r
,'-
12"
3
7"
1111
,.::In
1.2" 1.1.#
'8 iif
.
;5"
8 ; 8 II f.
8
16
n
1 " 5"
I
7" 9" IS"
;.1"
fin /Ju ;
I"
1f": li" ;;
iif iii iii iif 8 iii iif
20"
5"
i
fn i
9" 11"
,1
n
J lH :
7"
1.1." 1
2
'"
,.:!..": ,.": J.:1#
iif 16 16 flf 16 ... f. 4 8 ; 16 ! 4
I-
PULL AMOUNT OF CUT "C" AMOUNT OF CUT Er
USF
JOINT CUT SPICOT AS SHOWN ON DETAIL A 8EVEL PIPE AND FORM MITER JOINT ELBOW
AS SHOWN ON DE/AIL 8
USE EL80W (OPTIONAL)
CI./RVE RADII./S R 15 BASED ON 20' PIPE JOINT LENCTH
o(D
(iO' ,."IAX)
\

'- :-... --iiuRN
180'
'/2 (, !
DETAIL A
DETAIL 8
NOTES:
I INSTALLED PIPE SHALL NOT DEVIATE MORE THAN ONE FOOT AT ANY POINT
ALONG THE PIPF FROM THE LOCATION SHOWN ON CONsmUCTION DRAWING.
Z BEVEL PIPE AT 5' MAXIMUM VE'RTICAL ANGLE' JOINT SHALL BE BUTT WE'LD TYPE'.
PIPE SHALL BE' CUT SMOOTH! Y WITHOUT DAV.AGE TO THE CEMENT LINING.
3 AS AN AL TERNATIVE. SHORT LENGTHS OF PIPE U4Y BE USE'D TO ACCOMPLISH
THE DESIRED CURVATURE.
TABLE OF ALLOWABLE JOINT DEFLECTION IN STEEL PIPE
};>
RCVISIONS
DE:PARTMENT OF WATER AND POWER
<.D
NO O ..... TE INL'l' ;ll..PQ"C
.f:>.
I
I .
WATER SYSTEM =:lTY OF LOS ANGELES
I
1
NAME OA1CJ APPROvE:D
("N
=
DESICNED L Nf)NO : ;-90 B.
W)NSTEIN

JUNE '92
<.D
I DRAWN
"
TOROMANJAN 1 J-9?
I
i
CHECKED L NUNO 13 92 '
SHE:ET 10
-
FIGURE 1
FIGURE 2
.. I ICE I. <6
-
FIGURE 3
FIGURE 4
1. Cut clear-colored", 8-mil thick polyethylene tube to 0 length approx/mote/y 2 feet langer than that of
the pipe section. The minimum flot tube width shall be '6. 20, 24, JQ and 37 inches for 4, 6, ! 2,
and '{i-inch pipe respectively"
2. Ensure the pipe is clean prior to installation of the polyethylene tube. Slip the tube around the
centering it to prOVIde f -fOOl overlap on each at;fjacent pipe section. Toke up the slack width to make
snug, but not tight, fit along the barrel of the pipe, securing the fold with 2-inch wide and fO-mil
thick dielectric adhesive tape at quarter points (Figure fJ.
.]. Lower the pipe into the trench ond make-up the pipe joint w/th the preceding section of pipe.
A shallow bell hole in the bedding must be made at joints to focilitote installation of the polyethylene
tube (Figure 2) pipe may be IOJa on sand bogs tn the trench.
4. Pull the bunched polyethylene from the preceding length of pIpe, slip d over the end of the new
length of pipe, and secure it in place (Figu/"e 3). Then slip the end 01 the polyethylene from the new
pipe section over the end of the first wrop until /t overlaps the io/nt ot the end of the precedmg
length of pipe and secure it in place (Figure 4).
5. Repair ony rips, or other damage to the polyethylene with dielectric adhesive tape or with
o short length 01 polyethylene tube cut open, wrapped around the pipe, and secured in place. Proceed
w/th t'nstallaHon of the next section of pipe in the same manner.
o. Cover bends, reducers, offsets; ond other pipe shaped appurtenances with polyethylene in the some
manner as the pipe.
7. When valves. tees, crosses, and other odd-shaped pieces cannot be wrapped practically in 0 tube,
wrap with a llot sheet or split length 01 polyethylene tube by passing the sheet under the appurtenance
and bring,ng it up around the body. Make seams by bringing the edges together, folding Doler twice,
ond tapmg down. Handle width and overlaps at jo/nts descf"lDed above. Tape polyethylene securely in
place at valve stem and other penetrations.
8. Provide openings lor bronches, servt"ce taps, blow-ofls, air valves, and similar appurtenances oy moking
on cut in the polyethylene and tempororily /old.':'7g boCk the Ilim. After the appurtenance is
installed, tope the slack secua:1y to the polyethylene, with tope Cover all exposed clamps ond other
appurtenances with polyethylene to the trench wall or 3 leet beyond the pipe using the method
descr/bed in step 7 above.
9 Extend the polyethylene wrop to cover od/acent D!/C!/AC pipe 0 min/mum 01 2 feet and adJacent steel
pipe to the DI side of the pre-ossembied /nsulating flange Secure the end with cfrcumlerenftol turns
of dielectric adhesive tape.
POL YTHYLN WRAP INSTALLA TlON INSTRUCTIONS
REVISIONS
DEPARTMENT OF WATER AND POWER
WA TEf"1 SYSTE:M CITY OF LOS ANCELS
NAME OA7E APPROvE
l--l--+--..j ... ____________ -+_-{O:SIGNE"D V. TOROMANiAN ! 6-92 S, WEINSTEIN JUNE: '92
OR A WN : v TOROMANIAN
CHf<:CKED C. HAMVAS 6-92
SHEET 11
/ J.

'-
""" {
p " >" ;:s
. /' '"
J
' .
BEAl'INfj
(}
, "
, '


"
I/' . .,"'
f> : "
.... ".
,
,
.. '
f> J
.. , ". ,
...
BEAl'IN6 SURFACE .:
.....
. "AIr-'
", - . -, .
lIND/ITlIRIlED

SOIL

"-

'AU%:
8ENIJ DEAD END
r
WAItINIi
SlHtFACE

I .
"
I"i""\ "-.i;
I ,.,':,'.;

I 1 ' -,.,
-BEARINt;
\. .l; ...
';'P SURFACE
' '. . ..... ;::
, ',- ' ' ' ...
.. 'T /.I "r V' /,
8EODINIi
(,INOISTURBEP SOIL NATEltlAl
TEE/CLAMP/WELD NIPPLE TYPICAL &AlII SECT/ON
TAIJI.E I TAIIE JT
MINIMUM 8EAltlNG SV/tJ:"AC MEA
.....
***.

(IN SOUAIlE FliEr)
:lOlL Ty,./E

"'_AlfEM
IN 1
61ZI!
.!lENDS
"I!, &I.IIMI",
t(l(JSI! SANI) 5,nl 1"$'
"
"

l.tlt "I 1/5
'0

IICFT SANOY ClAY 1##, 1/
,.,- MNAl>_
,tI,1I1 1"$'
II!
4#
I
I i I
2 2
"tiM",.'" ,_ SAND
1/,1110

I
6-
I
e a
"
-3
('_l"1li&' //NO I,I/()
,
__ s,,# ",AY
"(10 If'tSF
I
8- I
2 4 8 5
le-
a 5 9
/6 II!
..... , (/11' __ "1{ SMfI.I. __ ..... 11'_4 _
16" 4
i 8
1(;
2!1
21
_ 'I!IfMINHIIG TNI! S _ _ ..,,,en., II"M.V4t1
A/IID rw I"'tIS'T_ AIIII NZII ___ EM.
20'
7 J 13 25 45 -32
...... * _S411 '''' II! 14' M/NlAII_ 4I!!1W _ ev1l'811'
NOTES .'
,,,/!It TN" ,-y,.,
I. AU F'lTTlN6S SU8JECTE" Td AN UN8ALANCE" NY.o.wJS7J!IT7C .Ft1A'CE SHAlt. It'ESTHillNEO
IffITH ,PS/ CONCRETE 7NRuST I!UtJC'If"S SEARIN6' A6A/NST UNt:VSTVlf6E" SO/L.
e.
8EAli'IIVG VAt.VES SHOWN IN J:4&E I AHE .BASE" ON 2001"51 IJIITE.HNItIl PiPE
I"HESSURE ANO OdNtJT CQIVSIOt:R THE EFFECT OF HESTRAINE" d/i' HARNESSEO JO/JIITS
.
CONCRETE THRUST Bl.OCK
l>
4EA
C',
IUC'Y'A",""IAU
CD
'-, ............ ,
""V'.'O".
.... .0
__ "''''". OF WATER ANI) POWER
...
WATCIt C:rTY 0" ...... u.
...
ZN /'Z};.
-
-" .
.
..IL o..(ff
12
4-"ANO 6' GATES
6"/2' SPLIT .fLEErE
(VNWELlJEO .fT.1NOPIPE)
_S,rAA'OP,fPE NOT LESS THAN
#1(1 VA6 .fTEE/' PLATE
rACK WE/../) WHERE 6ATES
ARE 5' OR OEEPER _ ~
~ 8"6' STANIJI"IN 110170,1(
STANDPIPE BUlTUN .JIIAI.L BE
IH.f(/LATEO FRON, .INO NUT
REST OIRECn Y PH, TilE VATE
6ONNET.
-'-----' r----..L ("ST/) . .sTEEL P.fPE IM-
Dtla"0 TO FIT JTANDPfI"t"J
1/" AN/) /2' GATES
NOTES:
6' WELDED STANOPIPE FUNNISNEO IN
12',11/", 24-', .10 .1(1' LENtiTN.f.
!i'VNWELOEO .fTANOPIPE (SPLIT SLE/,VE)
IS FVRNISHEO IN 1FT. LEJYGTH.f .
.sTANDPIPE FOR ",,1/2- .lINE YAi.VES
Y,.,o .. s
MO .... n ...-no... ... c 1 f'IOM
... -
_ ....
DEPARTMENT OF WATER AND POWER
... -
I..N. 11/.
A.SAI/IIUJlN
I
SHEET 13

I I
I I
I I
H
570-13
16
/ASu::'A77/11G 16
I
24.
P/P" S/ZES6"ANL)l!!l"C/S 70 ?""a'p..ro.os x,52 .... L01.-G, T#Rb,
h?'';.o/.PE (,/S TH1? x.:Je'LONG,r,:;Ye-7C//!IC T#R<?'
. PLAN //lEW
M""CNANKAL COOPL//VG---,
s/ZES LARGER
7.Zr'A/I/ /,?":"WG/ST EN.o //JEW
8 Y
.o.:S/G/V.o.
ANCh'OR
Anchors to be fabricated from
6" x 4" It 3/8" hollow struc-
tural sections (4 required).
Drill all holes in the shop.
Anchors with 2 different hole
sizes will be fabricated --
1 1/4" and 1". Torch cut pipe
radius at installation site .
4"vChOR 80rASSE"w&y FOf' /wECht4/V"cAL a::A:::/",q;M/G
Sk?5 6'" TA/RV /C'
OF WATER AND

10/15/68
SHEET 14
./"\ 2-6*6ATE CAl'S, STAND PIPES
/ \ t SPLIT J'l.EEJlES
... :;. -.-. --:--
..
. .
, .
. . : .. :
PROFILE
!'flU" tiE OFFSET To MEET rlElO CDNOITIDNS.




"\



...
......

....
.

....
-



'"


,
"


q

If





I


i
N


ti
4:

;::j q::

....

,. ,
'" '"
'"
.....
'0
......


1

, ,


i
"i


..
t

\:



".;



't. ."
'"
....
...
.....
'"
l

I
,


, ,

2" STOP-COCK &. BLOW-OFF INSTAI.I.ATION FOil 0.1. PIPE
... .0


::t
"')




N
t




;S it



,
J: ij

t l..

'"
.....
..... .....
..
0\


a
,. ,
1







!Ii
'"


-.:

9i


qs


....
t
9..:
iO:

-
to

I()
\:.
(. (.
'" .....
....
......
...,


, 1

.



It
1&.1
StlEET 15

'!" .. p
...
.D

; .:,
.c.
, '.".
',.
.....

. p
'.'
v '
r:-:.
PLAN
COAT !'ITTINtiS AS REQUIR!'O I1Y TIf!' tJl'PT
( L)" f)ENOTES i TRENCH HlIf)T/(
-..
S!






i(\t"
I I 2' CUii'IJ 411J.i. K4t.YE
Z I 2"" (YARI!'S) NIPPt.E STD. Bii'.
.J z Z"-!lQ" ElIJON STD. Bii'ASS
4 I NIPPLE STf). Bii'ASS
5 2 2'''6' NIPPlE STO. BRASS
6 2 2'..!JOfI ELBOIV STD. BRASS
7 I Z'x20
H
NIPPL!' STO. BRASS
8 I 2'COOPLIN6 STO.IJRASS
9 I 2" PiUti STO, BRASS
10 I 2'".{" NIPPLE STD. BRASS
Z" STOP-COCK a. BLOW-OFF INSTAllATION FON STEEL PIPE l>


.... OF WATER AND 'D _
I- CITY o.
.rA.' .,flo
_... A.
SHEET IS
6"
MIN
_
__ PIPE 0.1. PIPE
________
MATERIALS:
NOTES:
"
6
5 5
7 7
- 7-7/2" BRONZE OOUBLE STRAP CLAMP
(j) - 7-7/2" BRONZE CORP THREAD TO COPPER TUBING CORP. BALL VALVE

o - 2" X 1-7/2" BRASS A[JAPTOR (A9367)
- 2" BRONZE FEMALE B&S TO FEMALE STD. NP T.
!J) - 2" BRONZE STD. NIPPLE PIPE
() - 2" X 90' BRONZE STO. ELBOW

CD 2" X 250# COMPANION FLANGE
- 2"" X 400# FLANGED "NOl?DSTROM" VALVE WITH GATE NUT AOAPTER
7. 2-INCH BYPASS IS REQUIREO Fo.R a-INCH ANO 72-INCH LWE VALVES WHEN THE
MAXIMUM STATIC PRESSURE ExaTOS 185 AND 725 PSI, RESPECTlVEL Y
BYPASS IS NOT REOUIRED ON FIRE HYDRANT LATERALS AND S'INCH MAINS.
2. PROVIDE STANOPIPES FOR BOTH, MAIN VALVE AND BYPASS VALVE IN ACCOROANCE
WITH DWPWS STANDARD DRAWING A9442.
3 USE LOCKING TYPE RUBBER GASKETS AT THE GATE VALVE
2-INCH BYPASS FOR
1-__ __ __ N_E __ __ ' '_'_P_' P_E ___ -t
DEPARTMENT OF WATER AND POWER "'-'
NO. OATE .!,.,N'-C"..,-____________ r'AO!:P:::?"'j'D wA7CR SYSTEM CITv 01"" LOS ANOC ... ES
NAME: DATE APPROVEO
(-_l-_+_-'-_______ ... _______ +f--__ j.:D;::R:,:A;,,:W::.:''-j...'C."..:T:::OR:,::O:::'':::.::.:N':::'N::.j...:5:::-",.92'-.j
C ... e:;CKEO C. HAMVAS 5-92 t------
DESIGNED V TOROMANIAN ,4-92 B, WDNSTlN JUL Y '92

.f:.
U1
rs .... -17
SHEET 17
ORIENT ANCHOR BOXES
VERTICALL Y WHEN MECH.
COUPLINC IS l?EOUIRED 7
2'
STEEL
MATERIALS:
NOTES:
.]
(j) - 4" X 4" X (PIPE THICKNESS) STEEL WELD PAD
o - 2" SCHEDULE 80 STEEL PIPE
Q) - 2' X 90 EXTI?A HEAVY STEEL WELD ELL
o - 2" X 400;f STEEL WELD NECK FLANC,T
- 2" x 400;f FLANCED "NORDSTROM' VAL VE W/ OPERATING NUT ADAPTOR
I. 2-/NCH BYPASS IS REOUIRED FOR 6-INCH. 8-INCH, AND 12-INCH LINE VAL f1:S
WHEN THF MAXIMUM STATIC PRESSURE EXCEEDS 250. 185, AND 125 PSI, RESPECTIVELY
BYPASS IS NOT REOUIRED ON FIRE HYDRANT LATERALS AND 4-INCH MAINS,
2. UNE, COAT. AND WRAP BYPASS PIPE AND n!TJNGS WITH CEMENT WASH, DIELECTRIC
COATING, AND "OZENBERG' CLOTH, RESPECTlf1:LY
.] PROVIDE STANDPIPES FOR BOTH. MAIN VAL VE AND BYPASS /AL VE IN ACCORDANCE WITH
DWPWS STANDARD D.RAWINC A9442
INCH BYPASS FOR
6-INCH, B INCH,
2
AND LINE VALVES IN STEEL PIPE
C""!"y OF" LOS ANGELES
ReVISIONS
DEPARTMENT OF WATER AND POWER
APP' NO DATE lNI-
SHEET 18
r- PRO.10E HORIZONTAL "GOOSENECK"
I IN LATERAL (APPROX. 12" RAD)
16" RAO.
! TO ENSURE FLEXI81L1TY
III 8
/9
TAP MAIN AT TOP
NOTES:
1. METER 80XES SHALL 8E LOCA TED AT LEAST 4 FEET
OUTSIDE THE TOP OF THE DRIVEWA Y "X".
2. LA TERAL SHALL RISE A WA Y FROM THE MAIN TO ALL OW
PPOPER AIR RELEAS.
3. SOLDER AND FLUX SHALL NOT CONTAIN LEAD.
4 LA TERAL SHALL 8E FWS.HED WiTH WA TER TO REMOVE
FLUX RESIDUE
5. CURB VAL VE MA Y 8E INSTALLED IN ROADWA Y SECTION
UNOEl? A 6-!NCH STANDPIPE IN UEU OF METER 80X
WHEN AUTHORIZED 8Y DYWWS !NSPECTOP.
6. SEE STANDARD DRAWiNG A9476 FOR PIPE CONNECi/ON
REOUIREMENTS.
MATERIAL
ITE:M OTr. DESCRIPTION
1 :
#2 CONCRETE: H!NGE:D COVEl"
.. -':;- ..
L 7 #2 PLAS TIC METE:R 80X
LIST
J 7 2" 8RZ FLANGE CURB BALL VAL ('F W/WCKWING
4 1 2"' 8RZ STREET ELBOW
5 1 2" 8l"Z MALE COPPER TU81NG TO MALE NP. T. ELBOW
5 VAR. 2" COPPER TUBING
7 VAR. 2" COPPER SOLDER COUPLiNG
8 1 2"' X 1-1/2" SPASS ADAPTOP
9 1 1-1/2" BRONZE FE:MALE TO MALE COPPEP TU81NG ELBOW
70 I
1-1/2 BRONZE MALE CORPOPA TION THRE:AD TO MALE
COPPER Tue/NG CORPORA nON BALL VALVE
DWG. NO. MAT. CODE
8-5050-4 39-01-210
A-9420 ]9-0i-250
------- 42-29-494
A-9314 42- 09-939
4-9237 42-09-230
---_ ... -- 42-09-663
------- 42 i82
A-9361
------- --------
----- 42-28-464
2" AIR VALVE INSTALLA TlON FOR 0.1. PIPE
DEPARTMENT OF WATER AND POWER
APP'O f\lO OATE l:>llf
WA TE'" SYSTEM CITY OF LOS ANGE.,--;::S
CA,E
APPROV:O
DESIGNED' V TOROMAN/AN i
B. WEINSTEIN JULY 92
DRAWN v. TOROMANlAN 7-9?
CHEC)(EO c. HAMVAS 7-92
SHEET 19
i2"
\ Pi?OVIDE HORIZONTAL "GOOSENECK"
\ IN LA TERAL (APPROX, 12" RAO)
16" RAD
, TO ENSURE FU:XIBILITY
\ 8
TAP MAIN AT
NOTES:
I. METER BOXES SHALL BE LOCA TED A T LEAST 4 FEET
OUTSIDE THE TOP OF THE ORI\lEWAY
2, LA TERAL SHALL RISE A WA Y FROM THE MAIN TO ALLOW
PROPER AIR RELEASE
o
3. SOLDER AND FLUX SHALL NOT CONTAIN LEAD.
4, LATERAL SHALL BE FLUSHED WITH WATER TO REMOVE
FLUX RESIDUE.
5 CURB VAL \IE MA Y BE INSTALLED IN IWADWA Y SECTION
UNDER A 6-fNCH STANDPIPE IN LIEU OF METER BOX
WHEN AUTHORIZED BY DwPWS INSPECTOR.
6. SEE STANDARD DRAWING A9476 FOR PIPE CONNECTION
REOUIREMENTS.
MATERIAL
ITEM QTY. DESCRIPTION
1 1 #2 CONCRETE HINGED COVER
2 1 #2 PLASTIC METER BOX
LIST
3 7 2" BRZ FLANGE CURB BALL VAL Ve W/LOCKWING
4 1 2" BRZ STREET ELBOW
5 1 2" BRZ MALE COPPER TUBING TO MALE N,P T. ELBOW
6 VAR. Y COPPER TUBING
7
VAR. 2" COPPER SOLDER COUPLING
8 1 2" X 1-1/2" BRASS ADAPTOR
9 7 /- 1/2" BRZ INSULA TlNG COUPLING
10 1 7-1/2" BRONZE FEMALE TO MALE COPPER TUBING ELBOW
i1 I
i - 1/2" BRONZE MALE CORPORA 710N THREAD TO MALe
COPPER TUBING CORPORA nON BALL VAL \tF
12 1 1-1/2" STeEL CORPORATION THRCAD WELD COUPLING
owe, NO. MAT. CODE
B-5050-4 39-07-210
A-9420 39-07-250
------- 42-29-494
A-93i4 42-09-939
A-9237 42-09-230
------- 42-09-663
-------

A-9361 42-09-002
.. _------
42-00-05/
------- --------
.- 42-28-464
A-9365 13-08-/71
2" AIR VAL VE INSTALLA TlON FOR STEEL PIPE

- DEPARTMENT OF WATER AND POWER
WATER SYSTEM C:TY OF LOS ANGELES .p..

OEStGNCO V ... TOROMANIAN 1 ? ..--;9;-;2:-,I.:::,:B-"W::.[/.:,:N::.S:..:TE::..:IN,-' .!>C"'-____ --'":c;"v,;:'L_Y_''''9<:.,?., CX'l
r __________ ________ ,.. ___ f..C:.:R.:cA:.::.WN i v TOROMANIAN : 1-92 ,
CHEC;(;O I c. f!4MVAS : 7-92 I
ES .... -20
SHEET 20
...

.JcO'IlA/),
r 24" IIAI'IHOLI! !'PAIIE, NIN6 , ClWEIl
'.
STD, C6t!'6
til
"f;


- lill'(JUND SUI?!'ACc
"'!:
f
-
t
t '1
"lilt

""
.. ,I
r
---n

P-
.'
__ ...I
-
\.
---
, ,
Itf'"
./f' 0./-
6"0'
-6'-
SIZE A 8 C
j


1 I.fQ' 4r

I 6"
t;
xr w
\
,
I
IJ" 5
.....
,.,
r ,-
-

II!"
1l:!:1.
I
I 5'-1/.' /1UIII,
J -.,vf: -I" 11M
'J
"<It. /IUI'f (!!
J: 'Y Ie' c.c.
Itr c.c. EACH WAY
lOW PRESS

:

HI{;N MESS
111M' DNAIL

J r'l .r
,...
!'
y
- -"
,
\}
-
-V
-
,
"
'" '"
A. .A.
___ I
cIJ
... L;x. / ..... ;( /
"
(f) (() C!J '\..:./ /'
SECTION A-A
NOTES:
I. AI./. !'rig-ON Jt)IHT;f HfALi. lIE !'ITTEQ WITH ./I)11I'l' fI All fUIIII': "Ali''',
I.tJeK 6<UKE T. INTENNIJIATI! ti*Ai'. A,I.T.II - Alil5 c;RAIJE <10.
Z. A /IY-MSS NAY N NQUINlJ WHEN THEil'!! 1.tN() 5. &'QNC. ClASS 5(j(J-C-,JZSO
ALTENNAT J'V-.:Y J7) THE UlWEI'I' .srS1'EN DIIIfIIll6 6. lIlAc/! NETAL WEHI!'S AN() !'fl.T IN SPACE TlJ
_ lIVTIIIi g: IT.Y SOUNCE,
I'W'EYENT NINu /W()N JiIIlnlNIl.
1. E//fAMEI. Ai./. EXP(JSED SUIf'FIlUS PElf AJj(W,A, 7.
STANDPIPE SNAtJ. "If l.ECTI'I'ICALL Y
STO. SNC. N' C M.J ISOLATED FIfOM WArEN MAIN.
NATIUAL LI,fT

IITT.
rJ.
.In "TI" N
I I C.1. riA, YALYE
2 2
zr LlJNti 0.1 R.I;. Flu./ BEl./.
3 2 /' 8RZ. 8. t'.s. THRO.
.fAll 1/",,1
.,.
2 0.1 1i'.1!I. :E AWWA
5
e
C.I. Ii'. (J, (JArE YAlYE
CHECK YAI.YE INSTALI.ATION FOR 0.1. PIPE
l>
CD
_._ ........ ' VI.'ON_
__ '"D
, , "'""'" I OF WATER AND
...
.ATInt "IT'( _ LO_ AI
...
i.N
CD
_ ....
.J/l. .......
SHEET 21
'iii;f 6 C
7
6" 6 .1(}' 48"
8"S3tJ'48"
7 eM' N'J'
NOTES:
. .
I
- D/.
l{YAT/ON
I
3. ALl If'fl'HVF. i3ARS :
ADD''''
MIND WAIl.
IA/TERMEDIATE (;IfAI>I!,A.S.T.M. -AGIS G-'PADI! 4f),
'. A IIY-PASS NAY 81! If'l!'q(I/If'I!'P WHEH TNERE IS
NO ALTERNAT .1VPPl.Y f1l TNE /.OWER JYJTl!N
IJtIIWN6 AN QtlTA6E Or /TS SlJURCt!.
4. CdNC. ClASS 560'C-3250
5. PLACE METAl.IYEOGS AND FELT IN SI"'ACE TO
I"'REVNT ;rING .... ROM 5N/pr/NG.
Z. tHANEL AU tP(JSEP SUJl?lt:"ACES A!R A.IV IVA. sri). G. STANDP/P!! SNAl./. IIJE EU!CT-'P/CAU.Y
/SOlATELJ .... ROM STEEl. MA/N. SPl!C. H' C 20.J.
MATERIAL LIST
ITEN tHY. oSCIi'IPTIQN
I I C.I F"t.AN6N) CHECK .-Ai.YE
Z Ii WELOINti NECI( F"LANGE
J 2
r I1RZ. 8. r $. CORP THR/). CORP 8ALi. PHtYE
4 2 I' STt.. CORP THR/). WELOINti COQPLlN6
5 I STi.. NECR. COQPLlNu
Ii I ANCHOR BOX ASSENBLY
7 2 Col. ;::LANtiE/) GATE VAL 11'
SHEET 22

f.---- INSTALLATION BY CONTRACTOR
f /-RELEASE ANY PRESSURE
'\ EXIST A. c., CJ 8 PRIOR TO REMOVING \ PROP.
OJ, PIPE
_\.. OR OJ PLUG OR CAP \ "-/ \
-t -= = = = =
1\' 1 'L TEMPORARY BLOW-OFF
I L{2J LOCATION (TESTING &-
10' MAX. CLOSURE
CHLORllVATING POINT)
DETAIL 1 - CONNECTION TO EXISTING SPIGOT END
INSTALLATION BY ---1--- INSTALLATION BY CONTRACTOR
THE DEPARTMENT OR
DEPARTMENT-APPROVED
TAPPING CONTRACTOR
i


0, \j f?L /7', (7),
\:Y7 G I\V ,-I \
----
,.1 II J
I
' J
b
l
"K/
.,' '%, / t-= ",J
v I I I I \"'--t8\ \

V:V L TEMPORARY BLOW-OFF
i 4, LOCATION (TESTING &-
EXIST AC, C.I. 10' MAX. CLOSURE CHLORINATING POINT)
OR OJ PIPE------------....;
DETAIL 2 - WET-TAP CONNECTION TO EXISTING A.C., CI. OR OJ PIPE
(;)
'0
1
CAST TRANS. MECH COUPLING

FLANGED GA TE VAL VE

Of NIPPLE
CD
OJ R FLANGE/BELL ADAPTOR
is\
0
CONCRETE THRUST BLOCK
0
SAFETY YOKES &- RODS
(4)
/""'
TAPPING SLEEVE
: 8 '\
01, R,G, NIPPLE
"---/
D.I. PIPE CONNECTIONS TO EXISTING A.C., C./., OR DJ. PIPE

I , < "" APP'O DEPARTMENT OF WATER AND POWER
I --i--..I-- __________ _ ___I_-.-:.:W;;;"A Tr=':.:.'"
t- NA'-'IE CA TE , API"POVEO
i DESIGNED t. HUNO 7.!N ! 8. WEINSTEIN ,. p;,;;, JUNE: '92 --a-
"5','-2.3
SHEET 23
INSTALLATION 8Y CONTRACTOR
1 DIMENSIONS 0 de b TO BE DETERMINED
t
DIELECTRIC I b I AND RECORDED DURING INSTALLATION
C04TING
REOUIRED S!A !ION
<:> ,PROP. 0.1. PIPE
(ANODE)-+I I' :1 J f?
i /
---
EXIST. - - - - \
(ANODE)- <\ 1 2 (2) \....TEMPORARY BLOW-OFF LOCATION
:;:;: (TESTING &: CHLORINATING POINT)
)-' 10' iU4X CLOSURE

DIAIL 1 - CONNECTION TO EXISTING STEEL PIPE
INSTALLATION BY THE DEPfiRTMENT \ ' INSTALLATION BY CONTRACTOR
OR DEPARTMENT-APPROVED
TAPPING CONTRACTOR h DIMENSIONS Q de b TO BE DETERMINED
-DIELECTRIC AND RECORDED DURING INSTALLATION
COfiTING b
is:' 8 I'" REOUIRED
TEST STA TION
i! + 1 , JV __
-'\
+-,,_.:.-' ._ \ " I _ _ u
0:;-;, I J. ""'cL I , \ l
, ,
(6') , (5J - 3 L TEMPORfiRY BLOW-OFF LOCATION
'-- (TESTING &: CHL ORlNA TING POINl)
A I 10' MAX. CLOSURE
1,1 '" I-

DETAIL 2 - WET-TAP CONNECTION TO EXISTING STEEL PIPE
CD STEEL BUTTSTRAP
PR-ASS'D INS. FlG. TYPE 1-
@ 0.1 R. G. NIPPLE
o CAST TRANS MECH. COUPLING
@ CONCRETE THRUST 8LOCK
@ STEEL WELDING PAD
(J) STEIL NIPPLE
WELD NECK FlANGE
FLANGED GATE VALVE
@ SAFETY YOKES &: RODS
NOTE, SEE DRA WING NO.'S A9455-/ THRU A9455-4 FOFI CA THODIC PROTECTION NOTES AND DETAILS.
D.I. PIPE CONNECTIONS TO EXISTING STEEL PIPE

DEPARTMENT OF WATER AND POWER ....
J WATER $Y$i;?:M CITY OF LOS A"iGELES .,...-
en
__ t-________________ r: __ ..:J:":U':::N::.E_':::9;'_j' N
DRAWr. V; rOROMANlAN ',11-91\
NO. OATI: lNIT
I
c ... e;o.:e:o L NUNO ! n 91,
SHE:E:T 24

INSTALlATION BY CONTRACTOR
I DfLCTRIC COATING ROUIRD
EXIST. AC. CI. 2 @.:.
OR 01 PIP2:
+
--- -- II ,++-r-l-_
II .J L
"{ROP
STEEL PIPE
RL(AS ANY PRSSURE: Y "'-, r---{ ANODE: I c/"
PRIOR TO RMOV!NG (]) I ',' Y 4 i '-TEMPORARY BLOW-OFF
PLUG OR CAP + LOCATION (TSTlNG '"
DIME:NSIONS a '" b TO BE
OETE:RMINED AND RECORDED
DURING INSTALlATION
DETAIL
,. TE:ST STATION- CHLORINATING POINT)
10' AMX CLOSURE
:..: - NOT REOUIRED WHEN CONNECTINC TO AC. PIPE
! - CONNECTION TO EXISTING SPIGOT END
. r; INSTALLATION By CONTRACTOR
DIELECTRIC COATINC REOUIRD
3 ::1 -{ANOD I
STE:H PIPE:
-E=___ - t .J++-=+-
I....j J' RLEASE ANY PResSURE /
PRIOR TO REMOViNG PLUC
J
DIMENSIONS c 4: b TO BE:
OTt:RMINE:O AND RECOROD
DURING INSTALIA TIDN

- -{.ANODE) I '-TMPOJ?ARY BLOW-OFF


L' .Y LOCATION (TSTlNG '"
TEST STATION- ..,.. CHLORINATING POINT)
10' A<4X CI.OSURE:
DETAIL 2 - CONNECTION TO EXISTING PUSH-ON BELL END
INSTALlATiON By
THE: DEPARTMENT OR
OEPARTMENT-APPROkED
* - NOT REOUIRED WHEN TAPPING TO EXISTING AC. PIP,.
USE WELOING NECK FLANGE /N LIEU OF ADAPTOR AND NIPPLE
T"'PPING CONTRACTOR---+--INSTALLATiON BY CONTRACTOR----
<'
!$J Fi cp Cf> @
OIHE:CTRIC COATING REOUIREO
DIMENSIONS 0 &- b TO 8E
DETERMINED AND RECORDt:D
DURINC INSTALLATION
,Ii \
: "CJ I'\./ ,r
-- ' I- -rlh --- - --,--1:- -- -I H:-- - -- -
\ROP STEEL PIPE
... . CJ V" -!-f---;--7'ti----L.J:;4;.L .1-------'
1 I\.-" I to. (/ BLOW-OFF
l...b \) j', X -<-ANCOE)@LOCATiON(TeSTlNG&
I \ .' ( ::. CHLORINATING POINT)
EXIST. A.C . c.!. j * TEST STATION---
OR 0.1 PIP 10' MAX CLOSURE
DETAIL 3 - WET-TAP CONNECT/ON TO EXISTING A.C., C/. OR 0.1. PIPE
CD CAST TRANS. MCH Cou.PUNG
@ 0.1 R C. NIPPLE
GD PRE -ASS'o INS FL C. TYPE: 1-
@ STE:H BUTTSTRAP
CONCRETE THRuST BLOCK
TAPPING SLEV
o FIANCEO iN<lT VALVE:
OJ R. C. FIANG, /BELL ADAPTOR
NOTE: SE ORAWINC NO'S A9455-1 THRU A9455-4 FOR CATHODIC PROTECTION NOTES "'NO Ot:TAILS
STEEL PIPE CONNECTIONS TO EXISTING A.C., C.I., OR DJ PIPE
NO. OA TE N:"
REVISIONS
DEPARTMENT OF WATER AND POWER
WA TER SY$l'EM CITY OF LOS ANCELES
}>
ill
.j::..
" NAME: : DATE I (J1
'--+ __ __ -r ____________________ -t' __ ______ eN
I
I I DRAWN V. TOROUANjA,'J 12-91'
CHE:CKEO L NUNO : 12-91:
SHEET 25
DIMENSIONS a &' b
TO BE DETERMINED
AND RECORDED
DURING INSTALLATION
rl BY CONTRACTOR ----_
I 10' MAX CLOSURE
I' ( ""o,nr} .
-( ANODE)
EXIST. STL PIPj' G 2 J . . PROP.
t
----- lr I - ____ LJI
- ----------;-;----1--r-l,--IH+---r-i-" - 'J ; -L-t--------
- - - - - -t...;;:J...=L:....I----t'"""'--t-1
I .., III\.
G) ( ANODE )- I a r- -{ ANODE) G) TEMPORARY BLOW-OFF
&
LOCATION (TESTING &-

CHLORINATING POINT)
--TEST STATION I'
1------DIELECTRIC COATING REOUIRED
DETAIL ! - CONNECTION TO EXISTING STEEL PIPE
INSTALLATION BY
THE DEPA.RTMENT OR
DEPARTMENT-APPROVED
TAPPING CONTRACTOR BY CONTRACTOR -----__
!h U<lx. CLOSURE
+ - TEST STATION
'" ,
'" I' " K ANODE)
I II I
L
--t----1 -1 TEMPORARY BLOW-OFF
l;:, I .., a - LOCATION (TESTING &- PROP
f- __
- ... I I 2:0 -H-I":AP 1
3 : I:
YOi
DIMENSIONS a &' b TO BE
L......{ ANODE) DETERMINED AND RECORDED
DURING INSTALLATION
1--------DIELECTRIC COATING REOUIRED --------1
DETAIL 2 - WET-TAP CONNECTION TO EXISTING STEEL PIPE
G) STEEL BUTTSTRAP
(i) PRE -ASS'D INS FLG. TYPE II-D
(] CONCRETE THRUST BLOCK
@ STEEL WELDING PAD
CD STEEL NIPPLE
WELD NECK FLANGE
o FLANGED GATE VALVE
STEEL MECHANICAL COUPLING (NON-INS)
ANCHOR BOX ASSEMBL Y
NOTE: SEE DRAWING NO.S A.9455-1 THRU A9455-4 FOR CATHODIC PROTEC710N NOTES AND DETAILS
STEEL PIPE CONNECTIONS TO EXISTING STEEL PIPE
G;
DEPARTMENT OF WATER AND POWER

____
I I WA TE;:R SYSTEM CI TY OF' LOS ANCELES (Jl .....
NAME OA TE I APPROVED
-+------------1
1
______
ORAWN V. TOROUANIAN 12-91:,
CHCKED L NUNO 12 91 '
-.25
SHEET 26
1 .. All steel water mains shall be placed under a galvanic cathodic protection system
installed and tested by 0 Corrosion Eng:neer registered by the State of California,
a Corrosion Specialist certified by the National Association of Corrosion Engineers,
or someOne under the direct supervision of a Registered Corrosion Engineer.
2. Twa-inch (2") and smeller service laterals connected to steel pipe sholl be
installed and coated as shewn Oil Standard Drawing A9477.
3. The Contractor shall protect the cothodic protection system including, but not
limited to, insulating joints, anodes, Wife leads, and test stations.
4. Test stations shall be located, in order of preference, adjacent to fire hydrants,
adjacent to line valves, and adjacent to insulating joints.
5. Test station locations sholl be recorded.
6. Test station wire leads sholl be properly identified using N, S, E, and W directions,
and be capable of ollowing current readings uSing 0 0.01 ohm, 6 amp. capacity
shunt installed on the terminal block.
7. Test station wire leads shall have a minimum of four feet (4') of excess wire
measured from the gate cop.
8. Anodes sholl be 32-lb. Dow Golvo POCk, or equol.
9. Anodes sholl be installed in accordance with the following conditions:
o. A minimum distance of two feet 12') clear from the water main.
b. A minimum distance of five feet (5') clear from eoch other.
c. Verticolly or horizontally.
d. On either or both sides of the woter main.
e. Watered prior to being covered with soil.
f. Nested against, ond covered with a minimum of SIX (6") of
soil, ond 0 minimum cover of tr.ree feet (3') from finished grade.
10. Bond wife shall be 8 gouge, THHN, 600V, blue solid.
1 1. Wire leads sholl be ',2 gouge, THHN. 600V, blue stranded.
12. All norllnsulating mechonicol couplings coonecting steel pipe to steei
pipe shall be bonded across and through.
13 Wires sholl be connected to steel pipe woils us!ng 0 thermite welding method.
14. Connection of two (2) wires shall be done by using salderless cnmp connectors.
Where three (3) or more wires are connected, a split bolt connector sholl be used.
A Direct Bury Splice Kit - 3MDBR or equal may be used fa' a three (3) or four
(4) wire connection.
15. AI, w,re splices sholl be tightly wroppeo with a minimum of four overlapping layers
of electrical plastic tope under a woterproof electrical coating.
STEEL PIPE CORROSION MITIGA TlON NOTES AND DETAILS
REV'SION$
NO OA TE IN'! APP'O
I
DEPARTMENT OF WATER AND POWER
WA TER SYSTEM
NAME DATE:
WElNsrtN AW
EO
DESJCNED L NUNO
8.
JI)Nf: '92 I I
DRAWN
"
TOROMANlAN 2-92
CHECKED
L NUNO 2-92 ;
J>
<.D

(J1
(J1
I
SHEET 27A
16, Wire leaes sholl be toped together every three feet (3') to form a wiring
harness, The harness sholl be strategically located to minimize possible
future damage to the wire leads, Minimum depth must equal the pipe Cover,
17, The Joints of cement-mortar caoted and enamel/dielectric undercaated
steel main sholl be coated with a dielectnc cooting under a minimum
one-inch (1") thick cement-mortar coating,
18, The Contractor sholl coot 011 bore portions of steel pipe and appurtenances
with a dielectric coating,
19, The dielectric coating on welded sholl overlap the original coating
by a minimum of two inches (2") on each end,
20, !nsulotin';l joints shall have the cielectric coating extended a minimum
of two (2) pipe diameters onto adjacent nan-steel pipe,
21, Fittings that connect steel pipe to A,C, pipe shall be fully coated with a
dielectric coating,
22, All field enameling or wrcpping shall be tested by the Contractor uSing on
electrical holiday detector in accordance with AWWA C203 Section 2,.4,12 for
enameling and AWWA C209 Section 4.4 for wrapping, Any flaws or holidays
found sholl be repaired by the Contractor in accordance with AWWA C203
Section 2,15 for enameling and AWWA C209 Section 4.4 for wrapping,
23, The cement-mortar coating reinforcing wire sholl:
a, Not come In contact with the steel pIpe wall.
b, Overlap the original cement-mor:ar caat'ng a minImum of two inches
(t') on each edge,
24, The cement-mortar coatina on welded joints sholl overlap the cement-mortor
coating rei"forcing wire by - a minimum of twa inches (2") an eoch end,
25, As an alternative, welded steel joints and mechanical couplings on welded steel
pipe may, be protected with .. Roychem Heot Shrink Joint Protection Sleeve GAP
T and 'Roychem Thermolit Dresser Sleeve", respectively, or equal,
26, The following tests sholl be performed ono certiliec by the Corrosion Engineer:
a, Test soil resistivity at 500 foot intervals, ol! street intersections end
cul-de-sacs, and both sides of cui and fill areas,
b, Test the cathodic protection system for pipe-'Ia-sail values ard current
output at ail cathodic protection statIons, and submit a report inc:uding
the data to the Deportment,
c, Test the cathodic protection system to ensure a m,mmum theoretical life
of 75 years (odd as many anodes as necessary to conform)
d, Test 01: insulating joints to ensure electrical isolotion,
e, Test all servIce laterals to ensure no seorts are present.
27, The Corrosion Engineer sholl prepare and submit for Deportment opproval
on accurote as-constructed recora of the cathacic protection system installed.
As-constructed recora sroll have 011 test stc:ions ond anodes located and
referenced to the centerline of the rr,ain and [(Ie insuloting joints,
STEEL PIPE CORROSION MITICA TlON NOTES AND DETAILS (CONT'D)
REVISIQ:"'$
DEPARTMENT OF WATER AND POWER
.tI.O, DATE ;N,T
APP'
CI TY OF LOS ANCELES WATER $v$ rEM
I
I DRAWN : 'I. rOROMANfAN 2-92
o A 1"
2-92 S, WEINSTEIN i'fW
; NAME
OESICNED j L. NUNO
JUNE '92
T CHECKEO ; L NUNO : 2 92,
l>
tD
-J:::.
(J1
(J1
I
N
ESM-Z78
SHEET 27"

/
,/---TRENCH "------1.
'
BACKFILL tr MIN.
AROUND ANODE
WITH NATIVE SOIL
'.

'lY>;Y'Y> I - -;
, ..,JANODEI
OPTIONAL ANODE I I
PLACEMENT L __ J
ANODE PLACEMENT PROFILE
DETAIL NO. 1
(ANODE )-
NO SCALE
PRASSEM8LED
INSULATING FLANGE
TYPE II 0 -
-.;
,(ANODE)
-:
( STEEL STEEL 0
0
"-
(ANODE: }-
K.ANODE)

UN N b 1i 01 E 510 5 " &- 1) 8E: TEST STATION
DETERMINED AND RECORDED
DURING INSTALLATiON
STEEL PIPE - STEEL PIPE
ANODE AND TEST STATION SCHEMATIC
DETAIL NO.3
NO SCALE
)

8- PAINTED WHITE
x 12' SPLIT
STANDPIPE
BURLAP BAC STUFFED
INTO BOTTOM TO KEEP
DIRT OUT AND PROTECT
WIRES FROM DAMAGE
X 18' STANDPIPE
NOT LESS THAN
16 CAUCE STEEL
PlATE
TEST
STATION -
__ -jU PIPE AND ANODES
TEST STATION ASSEMBLY
DETAIL NO.2
NO SCALE
_____ -"'STE."'L _____ ____ _
c

NONINSULATING
MECH COUPLING
(IF REOUIRED)
FIRE: flYDi?ANT
DIMENSION C TO BE:
DETERMINE:D AND
RE:CORDED DURING
INSTALLA TlON
FIRE HYDRANT
ANODE AND TEST STATION SCHEMATIC
DETAIL NO.4
NO SCALE

<.0

DATE IN!T. APP'O WATER SVSTt"M CITY OF" LOS ANGELES (J1
STEEL PIPE CORROSION MIT/GA T/ON NOTES AND DETAILS (CONT'D)
en
DE:S;(';td:;:r> L. NUN(J , 2-92: B. WEINSTEIN JUNE '92 I
ORA'wN V. TOROMANfAN 2-92; tJ.J
CHECKED L HUNG
SHEET 27C
-
TEST STATION-
11
b
I
c- PREASSEMBLEO

INSULATING
r{ANOD}
FLANGE TYPE I-E
{ANODe}
CASING
'" '" "
{ SJ;
"L I
0
(
i 0
o 0/,
!
"""
I SJ;"L OJ, I
0 STEEL Of. O,I./CJ)
.r--
'"
"'''-
--.:
PREASSEMBLED (ANDOE)-
'" PREASSEMBLED
lANOD)-
INSULATING
INSULATING FLANGE
FLANGE TYPE I-E
TYPE /-E
DIMENSIONS 0 de b TO BE
DETERMINED AND RECORDED
DURING INSTALLATION
D.1. PIPE-STEEL PIPE IN CASING-D.I PIPE STEEL PIPE - DUCTILE IRON PIPE
DIRECT CONNECTION SCHEMATIC ANODE AND TEST STATION SCHEMATIC
DETAIL NO. S
DETAIL NO. 6
NO SCALE NO SCALE
{ DJ/C.I.
0
- ..
0 I
\ PREASSEMBLEO
INSULATING (ANODE)-
[
FLANGE TYPE I-E
'"
,
j
'"
i2:
t
"1
STEEL <t 0
i'"
,
lANO[)}---
o OJ
!
0/, I
\ I.J.
,
PREASSEMBLED
'"
I

1
INSULATINC
'"
I
PREASSEMBLEO
\
FLANGE TYPE I-E

INSULATING j
(",)
Tfj
FLANGE TYPE I-E
i:':i

'"
OIR[CT CONNECTIQN

l!:

{FIRE HYDRANT
1 ANODE < 50'
(r;
2 ANODES 50' '" 100'

DIR[(;.r CONN,-(;.TlQN
1 ANODE < 50'
2 ANODES 50' '" 100'
D,1. PIPE - STEEL PIPE - D.1. PIPE STEEL F.H. LATERAL - 0.1, PIPE
DIRECT CONNECTION SCHEMATIC DIRECT CONNECTION SCHEMATIC
DETAIL NO. 7 DETAIL NO. B
";0 SCAcE "10
STEEL PIPE CORROSION MITIGATiON NOTES AND DETAILS (CONT'D)

(i)

DEPARTMENT OF WATER AND POWER
.j:::..
NO" OAT INIT APP'O
()l
! I
WA TER SYSTEM eliy ot:'" LOS ANGELES
i
NAME OA U:: APPROVED
()l
I DESIGNED L NUNC 2-92
8. WDNSTiN hw" JUNE' '92
I
DRAWN I/. TOROMANIAN 2-92 '
.j:::..
.
I CHE::<ED L NUND 2-f)2 :
SHEET 27D
SEE DRleNTATIDN DETAIL


if GATeCA? STANDPIPE.

, I 2'-0" X 2'-0" X r
I -10. CDNCRETe S'IOCK SlAB
AND SPLIT SLeEVE: PeR
! ' (DIRT PARKWAY DNLY)
STANDARD DRAWING A9442
-
"
I
\ \
,i

,
''i::
.
" T .
-j ..
-
I
.
.
. ,
I
""
!

'"
FH, TCE: IAVU
2"
I
.I
"
2
-
,;;:' 1
1
'1/

"
-0)=: _:f

.. I I
.
..L_--41J"-+-
--' ....,
'-CDNCRETe THRUST BLDCK
/0.. L CDNCRETe THRUST BLDCK
ELEVATION
NOTES:
I. THIS FIRe HYDRANT INSTALIATlDN IS GeNeRALLY USeD WHeN CDNNeCTING TO. A PROPDSeD
DUCTILe IRON MAIN eXTeNSIDN.
2 ALL PUSH-ON JOINTS SHALL BE ReSTRAINeD WITH JOINT-LOCK GASKCTS
.3.
LeNGTH DF lATeRAL IS DeFINeD AS THe DISTANCe MeASUReD ALDNG THe LATERAL FROM
THe MAIN TO. THe CURB FACe DR TO THe FIRe HYDRANT IN THe ABSeNCe DF CURB,
4, See STANDARD DRAWINGS A9459 AND A9460. FDR PLACeMeNT OF FIRe HYDRANTS IN THe
ABSENCE OF A CURB.
S See STANDARD DRAWING A9461 FDR PlACeMeNT 0.1' FIRe HYDRANTS IN THe ABSeNCe DF
A Leva PAD.


ORIENTA TlON
ITEM ory. MATERIAL DESCRIPTION
i / 0" X 20.0# C! RG, CATe VALVe
DETAIL 2

6" X 0. 3. J" DJ, R C. PIPe A WWA
3. / 2-1/2" X 4" (OR 4" X 4") DOUBLe-OUTur rH. ASSeMBLY
DOUBLE -OUTLET FIRE HYDRANT INSTALLA T/ON (OJ PIPE)

c..o
REVISIONS
DEPARTMENT OF WATER AND POWER
.p..
NO. 0,6. Tt: IN'T APP'O
CITY OF LOS ANCELES
(J1
I
I
WA, TER SYSTEM
NAME
I,E
AF''''''ROVEO
0)
! I OESIQNED; D. S. WALL , 4-92
B WEINSTEiN w' JUNE '92
I
ORAWN I D, S. WALl.. : 4-92

I
: C. HAM'VAS
i
r:S","-26A
SHEET 28A
SEE ORIENTATION DETAil

?;
or-!
if" GATECA?, STANDPIPE,
,


I
-2'-6" X 2'-6" X 5'

CONCRETE SHOCK SLAB
AND SPUT SLEEVE PER
i
I
,\
(DIRT PARKWAY ONLy)
STANDARD DRAWING A9442

,
J;
I \ \ ,'1
"'-..

"
I i
.
-L. "
"
.
I
,
,
,
1'-4" i
I
""

TAPPING
I
I
I
C.1.
JDl
2"
SLEEVE

0
I
1117
,

TIl
"y I
'"
I' ,
;-'!""
q
.
I
I I
_'-- __
. .
-
k,\,
CONCRE:r THRUST BLOCK
..
lo"LeONCRETE THRUST BLOCK
ELEVATION
NOTES:
1. THIS FIRE HYDRANT INSTALLATION IS GENERALLY USED WHEN CONNECTING TO AN EXISTING
DJ./CJ WATER MAIN.
2. ALL PUSH-ON JOINTS SHALL BE RSTRAINEO WITH JOINT-LOCK GASKTS.
#3.
LENGTH OF LATERAL IS DEFINED AS THE OISTANCE MEASURED ALONG THE LATERAL FROM
THE MAIN TO THE CURB FACE OR TO THE FIRE HYDRANT IN !HE ABSeNCe OF CURB.
4. SeE STANDARD DRAWINGS A9459 AND A9460 FOR PLACEMENT OF FIRe HYDRANTS IN THe
ABSENCE OF A CURB.
S SEE STANDARD DRAWING A9461 FOR PLACEMENT OF FIRE HYDRANTS IN THE ABSNCE OF
A LEVEL PAD.
FACING CURB


/"' '"
)\
ITEM I OTY . MATERIAL DESCRIPTION
ORIENTA TlON
1
,
I r 6" x 20cii CJ FLANGD CATE VAL VE
2 I 16" 0.1. R.C FLANGe/BELL ADAPTOR AWWA
DETAIL
J

,6" X O.Y" 0.1 R.G. PIPE AWWA
4 ! I 2- 1/2" X 4" (OR 4" X 4") DOUBLE-OUTLET TH ASSEMBLY
DOUBLE -OUTLET FIRE HYDRANT INSTALLA TION (OJ, CJ PIPE)

to
REVISIONS
DEPARTMENT OF WATER AND POWER +>-
NO DATI: lNtT AeoP"
C'TY Of..- LOS ANCE_ES
(Jl
I !
WA TER SYSTEM
. I
NAME
; OATE I
APO
(J'J
OESIGrO D. S, WALL I 8. wEINST!N JUNE '92
I
1
!
ORAWN D,S, WALL 4-92 i
N
T
T 'c kAMV,t,S 4-92
SHEET 286
SEE DRIENTATIDN OErA!!
;:
r;- GATEC4P, STANDPIPE,
AND SPLIT SLEEVE PER
STANDARD DRAWING A9442
1'-1)
HOLL OW BOLTS
(A9/53)
(THREADS UP)
STEEL TEE OR
PAD (SEE STD.
DWG. A9458)
\.. 2'-6 X 2'-6" X 3"
CONCRETE SHOCK SLAB
(DIRT PARKWAY ONLy)
3
.'
COAL TAR ENAMEL
OR TAPE WRAP
..
CONCRETE THRUST BLOCK
ELEVATION
NOTES:
I. THIS FIRE HYDRANT INST:4LLATION IS GENERALL Y USED WHEN CONNECTING TO AN EXISTING OR
PROPOSED STEEL WATER MAIN WiTH A MAXIMUM ST:4TiC PRESSURE OF 200 PSI OR LESS
2. PROVIDE C4THODIC PROTECTION IN ACCORDANCE WITH LATEST DWPWS STANDARDS
3. LENGTH OF LATERAL IS DEFINED AS THE DISTANCE MEASURED ALONG THE LATERAL FROM
THE MAIN TO THE CURB FACE OR TO THE FIRE HYDRANT IN THE ABSENCE OF CURB
4. SEE STANDARD DRAWINGS A9459 AND A9460 FOR PLACEMENT OF FIRE HYDRANTS IN THE
ABSENCE OF A CURB
5. SEE STANDARD DRAWING A9461 FOR PLACEMENT OF FIRE HYDRANTS IN THE ABSENCE OF
A LlYEL PAD.
FACING CURB
ITEM QTY . MATERIAL DESCRIPTION
1 2 6" X 150# STEEL WELO NECK FLANGE
2 I 6" X 200# CJ. FLANCED CATE VAL V1:


3

6-5/8" Dj} X //4" EN UC, C.L &: C., SJ. WLO ST!.
ORIENTA TION
DETAIL
__ 4
,
1 . 6" STEEL MECHANICAL CDUPLING (NON-INSULATING)
--5 I I i ANCHOR BOX ASSEMBL Y PER STD. owe. A9194
6 I .6" X 90' LONG RADIUS STEEL WELD ELBOW
7 : Jz 6-578" 0.0 X 1/4" EN. UC, CL &:c. SJ, WLD STL.
8 I
i 6" rH. STEEL WELD NECK FLANGE
'(6 11/16" HOLES EOUALLY SPACED ON 9.375" BC)
9 I 2-1/2" X 4" (DR 4" X 4') DOUBLE-OUTLET FH TOP
.. REOUIRED ONLY IF LENGTH OF LATERAL EXCEEDS 10'
PIPE
PIPE
DOUBLE -OUTLET FIRE HYDRANT INSTALLATION (STEEL PIPE)
REVISIONS
DEPARTMENT OF WATER AND POWER
NO OAT: IN IT
I
WA TE'" SYSTE;:M CITY OF LO'S ANGE:...ES
NAME: I OJ"''': APPFtOve:O
Ot:S1C"IED D. ;'.5.,-",WAL=L _-;-' .24_-9"'2-1-B':': .
i:)#?AW'N D. 5, WALL i 4-92
CHECKED C. ,l-JAMvA$ 4-92
SHEET 28C
SEE ORIENTATION DETAIL
9
f---.
1
'-6"
I BOLTS

G4TEG4P, STANDPIPE, , : /'_/0' (A9!53)


. AND SPLIT SLEEVE PER I /1'0\ (THREADS UP)
STANDARD DRAWING A9442 ')!!J
""-".""'---. . -l;. ". t : - r . ! \
1'- 2'-6' X 2'-0 X Y
STEEL TEE OR 0--'Lc CONCRETE SHOCK SLAB
PAD {SEE STO. ;y:;.." (DIRT PARKWAY ONLY)
D.WG-,A
o
9458) 4 r-! k'\
" .} r---l!)'.,. 0- COAL TAR ENAMEL
D
'1Th-r--L-...l,--fi':t":Jj'l"HfI-----....... ' 'y ". OR TAPE WRAP
, , __ <i b I"" . " .
-. A ' ..
THRUS/ BLOCK
CONCRETE THRUST BLOCK
ELEVATION
NOTES:
I. THIS FIRE HYDRANT INSTALLATION IS GENERALL Y USED WHEN CONNECTING TO AN EXISTING
OR PROPOSEO STEEL WATER MAIN WITH A MAXIMUM STATIC PRESSURE GREATER THAN
200 PSI BUT EOUAL TO OR LESS THAN 210 PSI
2. PROWDE CATHODIC PROTECTION IN ACCORDANCE WITH LATEST DWPWS STANDARDS
-3. LENGTH OF LATERAL IS DEFINED AS THE DISTANCE MEASURED ALONG THE LATERAL FROM
THE MAIN TO THE CURB FACE OR TO THE FIRE HYDRANT IN THE ABSENCE OF C(lRB
4. SEE STANDARD DRAWINGS A9459 AND A9460 FOR PLACEMENT OF FIRE HYDRANTS IN THE
ABSENCE OF A CURB.
5 SEE STANDARD DRAWING A9461 FOR PLACEMENT OF FIRE HYDRANTS IN THE ABSENCE OF
A LEVEL PAD.
CURB
__

2! 0 X 250# CJ FLANGEO GATE VALli.!:"
"S- 4! 6' STEEL MECHANICAL COUPLING (NON-fNSULATING)
ORIENTATION
DETAIL
.. 5 I ANCHOR BOX ASSEMBL Y PER STD DWG. A9194
f--'6':----l---':1c-:--t6" X 90' LONG RADIUS STEEL WELD ELBOW
7 3':i: 6-5/8' 0.0. X 1/4" EN. (lC, C.L &: C .. SJ, WLD STL. PIPE
6" FH STEEL WELD NECK FLANGE
8 I (6 II/l{)' HOLES EOUALLY SPACED ON 9.375' B.C.)
f-""9::---+.-"',-+i!'-'/2" X 4' (OR 4" X 4') DOUBLE-OUTLET FH TOP
.. REO(J/RED ONLY IF LENGTH OF LATERAL EXCEEDS 10'.
DOUBLE -OUTLET FIRE HYDRANT INSTALLATION (STEEL PIPE)
I
SHEET 28D
6" GATECAP, STANDPIPE.
AND SPLIT SLEEVE PER
STANDARD DRAWING A9447
10
'\l=f
1'-10"

COA T THREADS WITH I
RED OXIDE
---., :::::::'.:rl--. '. ' i
I.." "
1 '-2'-6" X 2'-6" X 3"
f7Y" r CONCRETE SHOCK SLAB
STEEL TEE OR PAD '0 ;::::;:::: PARKWAY ONLY)
(STD DWG A9458) 0 Is 0 r-'
,..., \ "'t I _ COAL TAR ENAMEL
: .. I A" " .... " .. " OR TAPE WRAP
CONCR;E THRUST
CONCRETE THRUST BLOCK
ELEVATION
NOTES:
I. THIS FIRE HYDRANT INSTALLATION IS GENERALLY USED WHEN CONNECTING TO AN EXISTING OR
PROPOSED STEEL WATER MAIN WITH A MAXIMUM STATIC PRESSURE GREATER THAN 210 PSI
BUT EOUAL TO OR LESS THAN 250 PSi
2 PROVIDE CATHODIC PROTECTION IN ACCORDANCE WITH LATEST DWPWS STANDARDS
,,3. LENGTH OF LATERAL IS DEFINED AS THE DISTANCE MEASURED ALONG THE LATERAL FROM
THE MAIN TO THE CURB FACE OR TO THE FIRE HYDRANT IN THE ABSENCE OF CURB.
4. SEE STANDARD DRAWINGS A9459 AND A9460 FOR PLACEMENT OF FIRE HYDRANTS IN THE
ABSENCE OF A CURB.
5 SEE STANDARD DRAWING A9461 FOR PLACEMENT OF FIRE HYDRANTS IN THE ABSENCE OF
A LEVEL PAD
ITEM I OTY, MA TERIAL DESCRIPTION
I 2 6" X 3.00# STEIL WELD NECK FLANGE
2 I 6" X 250# C! FcANGED CATE VALVE
3.

6-5/8" 0.0. X 1/4" EN. Uc., CL & c.. S.J. WELDED STEEL PIPE
.. 4 I 6" STEEL MECHANICAL COUPLING (NON-INSULATING)
--5 I ANCHOR BOX ASSEMBLY PER STD DWG. A9194
6 I 6" X 90' LONG RADIUS STEEL WELD ELBOW
7 I 6-5/8" 00 X 1/4" X 3.8" EN. Uc., C.L & c., STEEL WELD THREADED NIPPLE
8 I 6" STANDARD GALVINIZED STEEL COUPLING
9 I 6" X 4" X 24" STEEL SWAGED NIPPLE
10 I 4" X 2-1/2" FIRE HYDRANT ANGLE VALVE
.. REOUIRED ONLY IF LENGTH OF LATERAL EXCEEDS 10'.
2- J/2" BUILT-UP FIRE HYDRANT INSTALLA TlON
REVISIONS
DEPARTMENT OF WATER AND POWER
APP'O NO DATE INIT.
WA TER SYSTEM CITY OF LOS ANGELES
NAME DA TE APPROVED
DESIGNED D S. WALL
4-92 8. WC/NSTDN IlfW"" JUNe '92
DRAWN D. S. WALl 4 92
CHECKED C. HAMVAS 4 92
SHEET 29A
6" GATECAp, STANDPIPE.
AND SPLIT SLEEVE PER
STANDARD DRAWING A9442 ---,
/
CDAT THRDlOS WITH
REO DXIDE LADUER-
/'-10"
STEEL TEE OR PAD
(STO DWG. A9458)
X 2'-6" X 3"
CDNCRETE SLAB
,,(DIRT PARKWAY DNLY)
"
"'- COAL TAR ENAMEL
OR TAPE WRAP
, ,
THRUST BLOCK
CONCRETE THl?UST BLOCK
ELEVATION
NOTES;
,. THIS FIRE HYOi?ANT INSTALLATION IS GENERALLY USED WHEN CONNECTING TO. AN EXISTING OR
PROPOSED STEEL WATER MAIN WITH A MAXIMUM STATIC PRESSURE GREATER THAN 250. PSI
2. PROVIDE CATHODIC PROTECTION IN ACCORDANCE WITH LATEST DWPWS STANDARDS
3. LENGTH OF LATERAL IS DEFiNED AS THE DISTANCE MEASURED ALONG THE LATERAL FRDM
THE MAIN TO THE CURB FACE OR TO THE FIRE HYDRANT IN THE ABSENCE OF CURB.
4. SEE STANDARD DRAWINGS A9459 AND A946o. FOR PLACEMENT OF FIRE HYDRANTS IN THE
ABSENCE OF A CURB
5 SEE STANDARD DRAWING A9461 FOR PLACEMENT OF FIRE HYDRANTS IN THE ABSENCE OF
A LEVEL PAD
ITEM QTY, MATERIAL DESCRIPTION
1 2 i 6" X 300/ STEEL WELO NECK FLANCE
2 7 ! 6" X 350# C! F' ANGED CATE VAL VE
--
3
I

i 6-5/8" 00. X 7/4" EN. IX., CL &: C, SJ WELDtD STEEL PIPE
*,4 ! . 6" STEEL MECHANICAL COUPLING (NON-INSULATrNG)
u 1 ANCHOR BOX ASSEMBL Y PER STD, DWG. A9794
L 7 16" X 90.' LONG RADIUS STEEL WEW ELBOW
7 i 6-5/8" 00. X 1/1" X 38" EN UC, CL &
r
STEEL WELO THREADED NIPPLE
8
1 6" STANDARD GALVIIV17J;D STEEL CDUPLING
9 I 6" X 4" X 24" STEEL NIPPLE
/0
,
,
,4" X 2-1/2" FIRE HYDRANT ANGLE VALlIE
.. REOUIRED ONLY IF LENGTH DF LATERAL EXCEEDS /0'
2-! /2" BUlL T -UP FIRE HYDRANT INSTALLA TION
DEPARTMENT OF WATER AND POWER
WA TEf:? SYSTEM CITY OF LOS ANGELES
NAME APPROv!::D
OES'GNEO I D, S. WALL 8. WEINSTEIN JUNE '92

1-_+ _+._+ ___________ -"--_+D:::R:::A:::W:::N:......;.I
CHECKEO C HAWAS : 4-92

<.0
,.!::..
()l
--.J
,
N
SHEET 298
4
2
ALL MAIN SIZES B
n
MAIN OR LARGER
ITEM QTY. MATERIAL DESCRIPTION
! , 1 i 12" X ! 2" WELD PAD
2 i -
i 6-5/8" 00. X 1/4" EN UC, CL & C., S.J., WLD STL PIPE
3
i
1
I 6 c,/.
FLANGED GATE VALVE
4 2 i 6" stiiL WELD NECK FLANGE
*5 1 . 6" stEEL MECHANiCAL
COUPLING (NON-INSULATING)
*6 J ANCHOR BOX ASSEMBLY PER STD. DWG. A9194
, REQUIRED ONL Y IF LENCTH QF LA TERAt EXCEEDS
FIRE HYDRANT CONNECTION TO STEEL PIPE
RE::VJSJQNS
OEPARTMENT OF WATER ANO POWER
WA TER SYSTEM CITY OF LOS ANCE::Lts
NAME.: i OAT: APPROVE;)

<..0
.j::.
(J1
________ .. ..... l-'D::.... :-:4-::::9!:...L2 B. WEINSTEIN JUNE '92 (Xl
DRAWN D, S. WALL '
CHE;CKED C . .H4MVAS 14-92
SHEET 30
tl. OF S

EDGE OF PAVEMENT

INST
CONCRETE
PLACED AGA
UNDiSTUFl8E
D SOIL,
-
\\
\,
/,.('
.
':""7:
' ,I
''(
:1
1
.
I
5<;
" 1
1
1 "

, 'I
1
>

1
,
/;<
: 1
1

,I I',
/;< 1 t..
>i
' L..J '

.
"0 >Y/)Y::/:?i
18"
:
MiN.
6" STEEL PIPE POSTS
FILLED WIT,,-/ CONCRETE--_
I
PLAN
N TS
J
r\(
30"
NOTES:
I
--1----'-
,
I
,
, I
i. PIPE SHALL CONFCRM TO ASTM A 53,
TYPE E, GrlADE 8. BLACK, SCHEDULE 40.
PLAIN ll/D.

A<
2 APPL Y A MINIMUM OF TWO COA TS [ACH OF'
RED OXIDE PRIMEFI AND CHROME YELLOW
ENAMEL PAINT (FEDERAL SPEC TT-C595,
COLOFI NO T 3558).

)(
A'




'A\
/
:
I
,
\0:
l'<Ji
1

3. CONCF?T SHALL BE CLASS 500-C-2500
IN ACCORDANCE WiTH "STANOARG
SPEC!FlCA nONS FOR PUBLIC WOi?KS
CONSTRUCTiON" LATEST EDmON,
SUBSECTION 201-1.l.2.
4. DISTANCE OF FIRE I,YDFlANT FROM FACE
OF CUFIB Ol? EDGE OF PAVEMENT MA Y 8E
GR[A TER DUE TO UNUSUAL COtVOI nONS
POST fNSTALLA TfON
N. TS.
LOS ANGELES CITY FlFlE OEPAFlTMENT
2-POST
R'!;VI$ION$
APPROVED
FIRE HYDRANT GUARD
DEPARTMENT OF WATER AND POWER
APP'D
WA TER CITY 01'" :..os ANGELES
; NAME DATE: APPROVED
Ot;;SIG"I!:i:O I L NUfYO 10-91; B, WEINSTEiN JUNE '92

tD
.f'..
()l
tD
I-+--i--f------______ t--I0RAWN : V. TOROUANIAN ,'10-91
CHECKED; L NUNO ! ]v-s! :
SHEET 31
-----u
CONCRETE
PLACED AGAINST
UNDiSTURBED SOIL
MiN
TYPICAL 6 ~ ' STEEL PIPE POST
FILLED WITH CONCRETE
3/4" X 3
PLAN
N TS.
MILD STEEL BAR
i. PIPE SHALL CONFORM TO ASTM A 53,
7YPE . GRADE B. BLACK. SCHEDULE 40.
PLAIN END
2 APPLY A MINIMUM OF TWO COA TS EACH OF
RED OX/DE PRIMER AND CHROME YELLOW
ENAMEL PAINT (FCDERAL SPEC. TT-C595.
COLOR NO 13538).
3. CONCRerE SHALL BE CLASS 500- C 2500
IN ACCORDANCE WITH "STANDARD
SPEC/FiCA nONS FOR PUBLIC WORKS
CONSTRUCTION" LATST EDITiON.
SUBSECTION 201-1.1.2
... 4, DISTA/',,'C OF nRC HYDRANT FROM FACE
OF CURB OR EDGE OF PA '/FMEN T MA Y BE
CREA TER DUE TO UNUSUAL CONDITiONS
POST INSTALLA nON
N. T.S.
LOS AI\fCELS CITY FIRE DEPARTMENT
APPROVEDC
3-POST FIRE HYDRANT GUARD
REVISIONS
!;-!5? OAT: INIT
DEPARTMENT OF WATER AND POWER
APP'O
WA TER SYSTEM C1l'Y OF LOS ANGELES
NAME: , PATE
A ~ E D
DESIGNED L NUNO : 10-91 i
B. WEINSTEIN JUNE '92
DRAWN :v JOROMANIAN : JO-91 ,
CHECKED! L MUNG
1 10-
91
SHEET 32
I-
MIN 10' WIDE EASEMENT
,---------------------
,
i
I
I
--I
I
I
I
I
I
I
TOE OF SU!'PE
Telt OF SLOPE
I I
,f31@ 16" TYP
I
4" THICK CONC.
CURB FACE
NOTES:
HORIZONTAL SECTION
NTS
1 HEIGHT OF WALL SHALL BE
ONE BLOCK ABOVE GROUND
2. FILL ALL CELLS WITH G.ROUT
3. CAP ALL CELlS WITH MORTAR.
4. CONCRETE SHALL BE CLASS
560-C-3250 IN ACCORDANCE
CAP TYP7
I
I
WITH "STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION"
LA TEST EDITION, SUBSECTION
201-7.7.2.
5 WALL OVER 5' HIGH WILL
REQUiRE SPECIAL PERMIT
WALL SIDE SECTION
NTS
FIRE: HYDRANT RETAINING WALL

APP'O DEPARTMENT OF WATER AND POWER

I- NAME: DA i: , APPROVED
--i __ --I-0:::::ES1GN:O I( TOROMANIAN 4-92 i 8. WEINSTEiN .,JUNE: '92
ORAWN v: TOROI.IANIAN 4-92
CHCf<D C HAMVA$ 4-92 ;
SHEET 33
lIlT
I-I!f' 1llANN0if I
/-IIEMilAilLE INIIII; "2
/-K_NOd
...... _.r .... 1-8UN" !'UNliE .
2- I"UNtJn
-t. 1'-4'
HINO
CONCRETE IMTE
SUPPORT
/2' P/P OIIi'IIIN
GRAVEL FILLED

P'AN
,

/- sr,,: SNMr 1tiU1. WEU
4-':r JrAN411#4 /"IN
JllYN (.sA{.YJlH)
2./; evlllC YA""S 01" &t/KCltETE
2S3 , Ilt'IIIfF()1I(;HII6 .sTHL
Z!06' LlN.1"!". lY
li.l' A\'I.-
AMIJ NSKETS AS
Ii'qvllf't'o.
I - JOLlI) WEINlE DATE YALYt'
24' 'EMOYJlIJI.E KANNO Qll'EIl III!,
HINII
. SE O/MWINO CU6
V;-.J"N/J"PlE ()If' WELOINO
ELIIDW
LINED
MO COAL TAIt
ENAIIEL COATED
LAlJIJEII IiUNt;
6J.OW-IJFF INsrAUATloN ANI) srEE/. PIPE
SHEET 34
6" GA TE CAP AND
6" STANDPIPE PER
DWPWS STANDARD
DRA WING A9442

",
AIR VAL \1:
2'-6" X 2'-6" X ,J" CONCF?ETE '
SHOCK SLAB (DIRT PARKWA Y ONL Y)
STREET SURFACE
SOLID WEDGE
GATE VALl![
3" LONG NIPPLE
'-"1--;--'--' "-----r:-'--:f : . 'l
- CGNCRETE '--'.....:..::,.....z''1-''' "''0'
#"7''''-. GATE SUPPORT I
WEID PAD
A-A
NTS
NOTES:
POUR CONCRETE
BLOCK AGAINST
FIRM Gi?QUND
I. ENAMEL AND APPL Y CEMENT MORTAR CGA TlNG
AND LiNING IN ACCGRDANCE WIT.H AWWA
STANDARD SPEC/FICA Tlo.N NO. C-20J
2 USE SHGRT RADIUS WELDING ELBo.WS (90.').
3 FLANGE DIAMETER AND DRILUNC; SHALL
Co.NFo.RM TO. ANSI B-16.1 FGR CLASS 125
AND CLASS 250 CAST IRo.N FLANGES.
STEEL WA TER MAIN
CURB
I


, I
'''''''
AIR VAL I![
SCREW
COUPLING
en
4. APPL Y A MINIMUM o.F TWO Co.A TS EACH o.F
RED o.XIDE PRIMER AND ELUS PAINT CO"
HYLUX NO. 3548 METALLIC GREEN PAINT
TO. GUTSIDE SURFACES OF EXPo.SED METAL. A ............ J
------------
PLAN
NTS
AIR VAL V ASSMBL Y

REVISIONS DEPARTMENT OF WATER AND POWER
NO DA!-"',-l"'NC!J'T,-__________ ... APpO SYSTEM CITY OF LOS AKGELES
NAME APPROVED (j)
___________ ___ eN
I--t-+-+ DRAWN v. roROMANIAN
CHECKi:O ; L. NUNQ
SHEET 35
DR!LL & TAP FOR
;# CORP. COCK
MUELLER THREAD.
WELDD STEL PIP MoH. SCTION
NTS
J.
0
I
0
0 0
-,=
0

0

'"'

0
i
0
-'-=
0 0
o
o
o
'--...PIPE: AXIS
MoHo COVER PLAN
NTS
WORKING PRESSURE: F:D.
175 PSI
25#
250 PSI 28"
B.C.
22-3/4'
24-3/4"
NOTS:
I. FLANGES DRILLED AND FACED AFTER WELDINC.
2. FURNISH HEXAGONAL HEAD BOLTS AND NUTS.
3. FLANGES SHALL BE FULL FACED AND HAVE A
SERRATED FINISH OVER THE ENTIRE FACE OF
APPROXIMATELY 32 SERRATIONS PER INCH
APPROXIMATELY 1/64"' DE:EP
4. APPLY 1/4"' CEMENT MORTAR LINING TO
!NTE:RIOR SURFACES.
5. COAL TAR ENAMEL PRIMER E:XTERNAL SURFACES.
TI i BOLTS SI2E BOLT HOLES
15/16"! 16 1-1/8" 1-1/4"
1-5/16" I 24
1-3/8#
18" WELDED STEEL PIPE MAINTENANCE HOLE

DEPARTMENT OF WATER AND POWER

__ ____ __ 0
WA TER SvSTf:M CITY OF LOS ANCLES
1 4/92: DSW: REV1SD OLI) A90i3 ..-..lo.
r NAM lOA TS: :
OESIGNEC : Do S< WALt 4-92 : 8. W[!NSTEIN
DRAWN ,D. S. WALL , 4-G2 :
JUN[ '92
I CHECKED I C. Ii4MVAS I 4-92 :
SHEET 36
-..L __ ....IIL ___ oJ. "
4
""liS tU(J"C.(;.I!ACN WilY
atT IN I'II!LIJ
I'IT OYEIt "AI.VE
6(}NNET

IMJ.IIE ANI)
MAIIV).
BASE NALF PLAN
18" .R.IKP, 6" DEI!P
S{CTION
lADDER
RVNfi DETAIL
NOTES:
I. 1,11 ANO TO 6,t"
IIY TNI' NPT .
.t. ,t"NAM,t"/. ,Ui. I!KP()HO .fVltI'IIa-S
/,f A,W. IVA, STO. ,J'/",t"/:.,w &' 6l.J.
i. A" HINI'i IlAItS,
INTE'NED/ATE 6IUNJ,S.T.It.-II"
GRADE '" t:I
4. t:4NC, CI.ASS Sf#OC.J1!!i(J
5. I"r.At:E W/fD6ES ANOJ&'/fJ.T
IN SPACE TO I"If'/fVENT If'/lIIt;
,ellfilM "NI""FINIS.
SHEET 37
12" RAD,

PROVIDE ,HORIZONTAL ""GOOSENECK"
IN LA TE:RAL (APPROX 9" RAD)
TO E:NSURE FLEXIBILITY

NOTES:
L TAP MAIN AT IS- FROM
HORIZONTAL PLANE:
METER BOXES SHALL BE LOCA TED A T LEAST 4 FEET
OUTSIDE THE TOP OF n-iE DRIVEWA Y "X".
2 SOLDn? AND FLUX SHALL NOT CONTAIN LEAD
J LA TERAL SHALL BE FLUSHED WITH WA TER TO REMOVE
FLUX RESIDUE.
4, SEE STANDARD DRAWING A9476 FOR PIPE: CONNECTION
REOUI.REMEN TS.
MATERIAL
ITEM OTY. DESCRIPTION
i 1 #2 CONCRETE: HINGED COVER
2
1 #2 PLASTIC METER BOX
LIST
.3 1 /" BRONZE FEMALE NP. T. CURB BALL VAL VE W/LOCKWING
4 1 i" BRONZE MALE COPPER TUBING TO MALE N.P. T. ELBOW
5 VAR. i" COPPER TUBING
6 VAR T" COPPER SOLDER COUPLING
7 1
i" BRONZE MALE CORPORA TION THREAD TO MALE COPPER
TUBING CORPORATION BALL VALVE
DWG. NO. MAT. CODE
B-5050-4 39-01-210
A-9420 39-0/-250
------- 42-26-484
A-9237 42-()6-230
-----:::.-
42-06-660
-----::::::
42-75-169
------- 42-26-464
1" DOMESTIC SERVICE INSTALLA TlON (0.1. PIPE)

DEPARTMENT OF WATER AND POWER
NO DA""E INn
WATER SYSTEM CITY OF LOS AN::;;:ELES

to
.f:>..
NAME , OA T : APPRovEC (j)
.--+ __ ,-__ +-____________________ +-__ ______ en
1--+ __ -l-__ -I-___________________ -I-__ v. TO.ROMANIAN '1'1/-91
CHECKEO f.. NUNO 3-92
SHEET 38
12" RAD.
- PROVIDE HORIZONTAL "GOOSENECK"
IN LA TERAL (APPROX. 9" RAD.)
TO ENSURE FLEXIBILITY
NOTES:
1. METER BOXES SHALL BE LOCATED AT LEAST 4 FEET
OUTSIDE THE TOP OF THE DRIVEWAY
HORIZONTAL PLANE
2 SOLDER AND FLUX SHALL NOT CONTAIN LEAD .
.l LA TERAL SHALL BE FLUSHEC WITH WA TER TO REMOVE
FLux RESIDUE.
4. SEE STANDARD DRAWING A9477 FOR PIPE CONNECTiON
REOUIREMEN TS.
MATERIAL LIST
ITEM OTY. DESCRIPTION
1 1 #2 CONCRETE HINGED COVER
2 1 #2 PLASTIC METER BOX
3
.. -:;-
1 I" BRONZE FEMALE N P. r CURB BALL VALVE W/LOCKWING
4 1 7" BRONZE MALE COPPER TUBING TO MALE N.P. T. ELBOW
5 VAR. I" COPPER TUBING
6 VAR. I" COPPER SOLDER COUPLING
7 1 1" BRONZE INSULA TlNG COUPLING
8 7
I" BRONZE MALE CORPORA TlON THREAD TO MALE COPPER
TUBING CORPORA TlON BALL VALVE
9 I (" STEEL CORPORA TION THREAD WELD COUPLING
DWG. NO. MAT. COD[
B-5050-4 39-01-270
,0-9420 39-01-250
._----- 42-26-484
,0-9237 42-06-230
------- 42-06-660
------- 42-75-169
...... ;:;:---
------- 42-00-050
--
"-- -- 42-26-464
,4-9364 13-06-771
1" DOMESTIC SERVICE INSTALLA TlON (STL. PIPE)
P!E:VI$IONS
tNIT
DEPARTMENT OF WATER AND POWER
WATER SYSTEv CITY OF LOS ANCELES
NAME : OAT: ; APPROVEO
DES!GNEr) , L NUNO 11-91 i 8" WEINSTEIN JUNE '92
: v TOROIAANJAN i 1 ;-9;
CHECKED L NUNO I 3-92
SHI;:ET 39


,
76" RAD.
-I PROVIDE HORIZONTAL "GOOSENECK-
I
IN LA TERAL (APPROX. 12" RAD.)
TO ENSURE FLEXIBILITY
NOTES:
7. METER BOXES $HALL BE LOCA TED AT LEAST 4 FEET
OUTSIDE THE TOP OF THE DRIVEWA Y X".
2. SOLDER AND FLUX SHALL NOT CONTAIN LEAD.
3 LATERAL SHALL BE FLUSHED WITH WATER TO REMOVE
FLUX RESIDUE.
4. SEE STANDARD DRAWING A9476 FOR PIPE CONNECTiON
REQUIREMENTS.
MATERIAL
ITEM OTY. DESCRIPTION
;
1 #3 REINFORCED CONCRETE POL YMER COVER
2
;
CAST IRON CENTtRPIE:CE
3
;
#3 PLASTIC MtTR BOX
LIST
4 / I 1/2" BRZ. FLANGE CURB BALL VAL VE W/LOCKWING
5 7 7 1/Z' BRZ. STREET ELBOW
6 1 7-1/Z' BRZ. MALE COPPER TUBING TO MALE N.P. T ELBOW
7 VAR. I-I/Z' COPPER TUBING
8 VAR. 1 1/2" COPPEl? SOLDER COUPLING
9 I
1-1/2- BRONZE: MALE CORPORATION THREAD TO MALE
COPPER TUBING CORPORA nON BALL VALVE
0'/
LAP MAIN AT 7S- FROM
HORIZONTAL PLANE
owe. NO. MAT. CODE
B-5D96 39-0/-357
1.-9290 39-01 790
1.-9422 39-01 258
------- 42-28-494
A 9374 42 08 939
A 9237 42-08-230
._------ 42-08-663
._---
42-75-177
---- 42-28-464
1- 1/2" DOMESTIC SERVICE INSTALLA TlON (0.1. PIPE)

< DEPARTMENT OF WATER AND POWER
.. __ ____
WA 1"E:R SYSTEM CITY LOS ANCELES -r--
; NAME OATE APFROV D
__ __ ___
DR A WI'\! it; TOROMANIAN i 11- 91
CHE::KCD L. NU/'JO 3-92
SHEET 40

S7 12"



0
.
.
.

l...,

.. ...:! "" "
,

--
a

0-
"1

16" RAD.
, PROVIDE HORIZONTAL -GOOSENECK-
!
\ IN LA TERAL (APPROX 12" RAD.)
TO ENSURE FLEXI81L1TY
11
, ,

9
NOTES:

I. METER 80XES SHALL 8E LOCA TED A T LEAST 4 FEET
OUTSIDE THE TOP OF THE DRIYEWA y 'X" TAP MAIN AT 75' FROM
HORIZONTAL PLANE
2. SOLDER AND FLUX SHALL NOT CONTAIN LEAD
3, LA TERAL SHALL 8E FLUSHED WITH WA TER TO REMOVE
FLUX RESIDUE
4 SEE STANDARD DRAWING A9477 FOR PIPE CONNECTION
REQUIREMNTS.
MATERIAL LIST
ITEM OTY, DESCRIPTION owe, NO, MAT, CODE
7 7 #3 REINFORCED CONCRETE POL YMR COVR B-5096 39-01-357
2 1 CAST IRON CENTERPIECE A-9290 39-01-190
3 1 #3 PLASTIC METER BOX A-9422 39-01-258
4 r 1-1/2" BRZ FLANGE CURB BALL VAL VE W/LOCKW!NG ------- 42-28-494
5 r 7 - 7/2" 8RZ S TRE! ELBOW A-9314 42-08-939
5 1 7 -1/2- 8RZ MAL COPPER TU81NG TO MALE NP. 7. ELBOW A-9237 42-08-230
7 VAR, 1-1/2" CQPPER TUBING ------- 42-08-663
......
8 VAR 1-1/2" COPPER SOLDER COUPLING -------
42-75-777
9 1 1-1/2" BRZ INSULA TING COUPLING ------- 42-00-051
10 I
1-1/2" BRZ MALE CORPORA nON THREAD TO MALE
42-28-464
COPPER TU81NG CORPORA liON BALL VAL VE
i1 7 7-1/2" STEEL CORPORATION THREAD WEW COUPLING A-9365 73-08-171
1 - 1/2" DOMESTIC SERVICE INSTALLA TlON (STL. PIPE)

REVISIONS
DEPARTMENT OF WATER AND POWER
lD
NO DATE: IN!T, APP'
WATER SYSTEM CITy OF LOS ANCELES
I
...... - NAME OATE; I APPROVED
())
OI;SIGNEO: L NUNO :
B. W[lNSTIN
'I7W"
JUNE '92
OJ
DRAWN v: rOROUANIAN 12 91J
I
, CHCKtO L HUNO J 92
SHEET 41
16" RAD.
NOTES:
1 METER BOXES SHALL BE LOCA TED A T LEAST 4 FEET
OUTSIDE THE TOP OF THE DRllICWA Y "X".
2. SOLDER AND FLUX SHALL NOT CONTAIN LEAD.
3 LA TERAL SHALL BE FLUSHED WITH WA TER TO REMOVE
FLUX RE:SIDUE
4. SEE STANDARD DRAWING A9476 FOR PIPE CONNECTION
REOUIREMENTS
MATERIAL
PROVIDE HORIZONTAL "GOOSENECK"
IN LA TfRAL (APPROX. 12" RAD)
TO ENSURE FLEXIBILITY
LIST
ITEM OTY. DESCRIPTION DWG. NO. MAT. CODE
I 1 #3 RDNFORCD CONCRETE POL YMER COv[R B-5096 39-01-357
2 1 CAST IRON CENTERPIECE A-9290 39-01-190
3 I #3 PLASTIC METER BOX A-9422 39-07-258
-
4 1 2' BR? FLANGE CURB BALL VAL V W/LOCKWING ------- 42-29-494
5 1 2" BRZ STREET ELBOW A-9314 42-09-939
6 1 2" BRZ MALE COPPER TUBING TO MALE NP. T. ELBOW A-9237 42-09-230
7 VAR. 2" COPPER TUBING ------- 42-09-553
8 VAR 2" COPPER SOLDER COUPi./NG ------- 42-75-182

9 1 2" X 7-1/2' BRASS ADAPTOR A-9361 42-09-002
JO 1
1-1/2' BRONZE MALE CORPORA TION THREAD TO MALE
COPPER TUBING CORPORA nON BALL VAL lIC
------ 42-28-464
2" DOMESTIC SERVICE INSTALLA TlON (0.1. PIPE)
REVISiONS
DEPARTMENT OF WATER AND POWER
APP'O
WA TR SYSTEM CITY OF' LOS ANCELE'S
NAME: DATE
JUNE '92 --ir--t __________ --r_-t-"o:::.cs:::.'e::::N.:.:;<"'O+"L .. ..:::NU:.:.NO::....._-t .. "...:-9 J 8. WEINSTEIN
ORAWf-.. v: iOROM/lNIAN
CHECKED L NUNO 3-92

to
.j::>..
O'l
to
I ,
NOTES:
I. ME:TE:R 80XE:S SHALL 8E LOCATED A T LEAST 4 FEET
OUTSIDE THE TOP OF THE DRiVEWA Y 'X",
2. SOLDER AND FLUX SHALL NOT CONTAIN LEAD.
3. LA TERAL SHALL BE FLUSHED WITH WA TR TO REMOVE
FLUX RESIDUE.
4. SEE STANDARD ORA 'WING A9477 FOR PIPE: CONNECTION
F?EOUIREMENTS
r PROil1DE HORiZONTAL "GOOSENECK"
IN LA TRAL (APPROX. 12" RAD)
TO r,/ .

,
HORIZONTAL PLANE
MA TRIAL LIST
ITEM OTY. DESCRIPTION OWG. NO. MA T. CODE
1 1 #3 REINFORCeD CONCRE:T[ POLYMER COVER B-5096 39-01-357
t-... __ __ __________________________ 39-01-190
3 1 #3 PLASTIC MUER BOX A-9422 39-01-258
4 1 2" BRZ. FLANGE: CURB BALL VALVE W/LOCKWINC ------- 42-29-494
5 1 2" BRZ SlF!T ELBOw A-93/4 42-09-939


7 VAR. 2" COPP[R TUBiNG ------- 42-09-653
__
t---::9:::-+----:1 __ t-?: X 7-7/2" BRASS ADAPTOR A-9361 42-09-002
42-00-051
11 1 /- 7/2" BRONZE MALE CORPORA TION T.'IREAD TO MALE: _______ 42-28-464
COPPER TUBING CORPORA TlON BALL VAL VE:
12 7-1/2" src:a CORPORATION T.'IREAD WELD COUPLING A-9365 13-08-171
2" DOMESTIC SERVICE INSTALLA T/ON (STL. PIPE)

DEPARTMENT OF WATER AND POWER
NO OAl"e:; INIT.
! WA rEF!: SYSTEv CITY OF LOS ANCELES
.... ..--{-----_r,
.. ()
i DRAWN : v TOR()MANW'J 12-91:
! CHECKED I L NUNO I J 92 '
SHEET 43
, 2'-11 1/2'
I.
,
,
MIN
I
2'-6"
23/4"
I i
r-8
i
TYP.
I I
,-
.----
----,
I
-..l.
I I
\J]JJ
I

I

I I
,
'"
I I
-
;;,: . ,
I
I I
T
I
"

,,),
,
1 1/4! t- I
I I
-
-'
I I
'"
, ______ .J
DETAIL
-------
Nrs
-
'--8
PLAN
NTS
#5 METER
SEE DUAIL Ha?EON,
" ,,' )-

\' .,,: t :
' .


,
.. ' . ' .
1/2" "- " ,'. ""
2'-.]
7/2"
""
,
1'-7
" .
I
" ,
' .1
,
-
.
-
,
"
: ,
.
. .
.
.
-
I 4" MIN.
--1
4" MIN.
TYp.
,
TYp.
SECTION A-A
SECTION B-B
Nrs Nrs
NOTES:
I. CEMENT SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR PORTLAND CEMENT ASTM C-150, TYPE II
2 CONCRETE SHALL BE ClASS 560-B-3250 IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTION" lATEST EDfTION, SUBSECTION 20/-1.1.2.
3. COVER SHALL CONFORM TO DWPWS STANDARD DRAWING B5096.
4. COVER SHALL NOT ROCK WHEN PLACED ON THE ... IETER COlER OPENiNG.
S WALL TOP SHALL HAlE A NON-SKID SURFACE (BROOM FINISH)
6. INLET AND OUTLET PIPING SHALL BE ENCASED IN WALLS
7. INLET AND OUTLET PIPING SHALL BE WRAPPED WITH TAR PAPER PRIOR TO CASTING WALLS.
NO. 3 CONCRETE METER BOX
(SIDEWALK LOADING ONLY)

REVISIONS
DEPARTMENT OF WATER AND POWER
ill
NO OATS ,NIT APP'O
CITY OF LOS ANOElS .f>.. WA TER SYSTEM
I
-.....J
I
NAME DATE APPROve:O
DESIGNED v. rOROMANIAN 4-92 :
B.
WEINSTEIN ___ ...
JUNE '92
CRAWN v. TOROMANlftN 4-92 :
:--
,-...

CHECKED C 4-92 ;
SHEET 44
I OUTLET MANIFOLD
!




FLOW
1ft
...,
,

'"
2
12
JI
,
I
,
""
FLOW 3'
17

t'0
leb .. $j
3
HORIZONTAL SECTION
NOTES:
NTS
I. CONNECTIONS TO WATER MAIN SHALL BE
ft
IDENTICAL TO 2- SERVICE CONNECTIONS
2. MANIFOLD AND METERS ARE SUPPLIED
BY DWP-WS AS AN ASSEMBLY FOR
@( fU "'""
]
DEVELOPER-INSTALLED SERVICE.
12 J2.1
3 SOLDER AND FLUX SHALL NOT CONTAIN
LEAD.
Ii1E
4. SERVICE LATERALS SHALL BE FLUSHED
FLOW ]l[lIDIt
".
WITH WATER PRIOR TO iNSTALLATION OF
(!f
-'II I
METERS TO REMOVE FLUX RESIDUE.
5. METER BOXES SHALL BE LOCATED
3
AT LEAST" FEET OUTSIDE THE TOP
OF THE DRIVEWAY x.
PROFILE
NTS
MATERIAL LIST
ITEM OTY. DESCRIPTION DWG. NO. MAT. CODE
1 VAR. 2" COPPER TUBiNG ------- 42-09-663
2 2 "" 8RZ MALE COPPER TUBING TO MALE NP.T. ELBOW . A-9237 42-09-2.30 L
.. ,
3 6
2" X 90' BRZ ELL PIPE A-9325 42-09-224
4 4 2" X 6" BRZ. STD. v/PPLE PIPE ------- 42-09-366
5 4 2"
SRZ. FLG. CURB BA!..!.. VALVE W/ LOCKWING 42-29-494
6 2 2" METER
..
44-83-901
7 2
2" X 2- 1/2" 8RZ STD. NIPPLE PIPE ------_. 42-09-360
8 2
2" X J 2" 8RZ. STD. NIPPLE PIPE ------- 42-09-369
9 2
3" X 2" BRZ. HEX. BUSHING ------- 42- J 1-039
10 1 3" BRZ. STD. TE[ PIPE ------- 42-11-620
n 1 3"x IS" BRZ. STD. NIPPLE PIPE
.:------- 42-11-372
/2 2 #3 PLAS77C METE,C( BOX A-9422 39-0/-258
IJ 2 #3 REINFORCED CONCRETE POL YMER COVER (CENTER HOLE) 8-5096 39-0/-357
...
14- 2 CAST IRON CENTERPIECE A-9290 39-01-190
3"
EQUIVALENT SERVICE IN PLASTJC METER BOXES
(SIDEWALK LOADING ONL Y)

REVISIONS
DEPARTMENT OF WATER AND POWER
1O
NO DATE I'N:T APP'Q
.J:>..
-+
i
WA TER SYSTEM G! TY OF ,-OS ANG(LS
NAME ; OATE APPROVED -....J
,
DES1GNEO L NUNO 12-91
B. WEINSTEIN (t#Jl' JUNE '92
N
I v: TOROMANIAN
' ..
!
CHECKED : L_ NUNO I 92
E$I.t_4!1
SHEET 45
NOTES:
T. CEMENT SHALL CONFORM TO THE STANDARD
speCIFICATIONS FOR PORTLAND ceMeNT
ASTM C - ,50, TrPE II.
2. CONCRETe SHALL BE CUSS 51)0-8-3250
2 I 1-1 __ --..,
, ,

;
I:
0
,
..
,
\
to 3/4-
MIN.

:
, IN ACCORDANCe WITH -STANDARD SPECIFICATIONS
FOR P(J8L1C WORKS CONSTRUCTIO/>/, LA TeST
EDmON. SUBSECTION 20, - I. 1.2.
cd
,
,
,
, :..
,
,
,
,
., -
J. COVERS SHALL NOT ROCK WHeN PLAceD ON
THE MTJ:R CDVER oPeNiNC.
4. WALL ToP SHALl. HA VE A NON-SKID SURFAce
(8ROOM FINISH)'
5. CONNeCTIONS TO WATER MAIN SHALL Be
IDENTICAl. TO 2" SERVIce CONNeCTIONs'
6. ENCASE OL/TLET MANIFOLD PIPINC AND INLET
NIPPLes IN VAULT WALL AS SHOWN
7. MANIFOLD AND METeRS ARC SUppLlE:O BY
DWI"-WS AS AN AsseM8L Y FOR DVE:LOpeR-
INSTALLED SERVICE
8. SOLDER AND FL(JX SHALL NOT CONTAIN LeAD.
9. SERVICE LATERAL SHALL Be FLUSHeD WITH
WATeR PRIOR TO INSTALLATION OF METeR
TO REMOVE: FL(JX ReSIDUE
10. MaeR BOXes SHALL 8e LOCATeD AT LeAST
4 FeET OUTSIOe THe TOP OF THe oRIVeWAY -x-
,
L WRAP NlPPLS
WITH TAR PAPeR
PROFILE
NTS
SE:E: OCTAIL
.. '.
C::::l; 1

,
,
,
,
,
I
,
0
I
, ,
, ,
, ,
I
,
L _____ _ _____ ...1
PLAN
NTS
OUTLET MANIFOLD
HORIZONTAL SECTION
NTS
i-;;:;::7T"=-r------;;' M A T RIAL LIST
DETAIL
NTS
-
,
;.,

,
:..

-

I
"-
:..
-
3" EQUIVALENT SERVICE IN CONCRETE METER BOX
(SIDEWALK LOADINC ONi Y)
"'<EViS:CNS
DEPARTMENT OF WATER AND POWER
-I
;,.
,
"
'"
I
;.,
WATER SYSTEM C1TY OF" LOS AN::;ElES

1 OSH:;NEO L NUNO 12-9'1 8. WEINSTEJN JUNe '92
ORAWN Z TOROUANIAN 1-92
CHECKEO i NUNO 1-92
ES ... -,us
SHEST 46
7 I 12" I
- PROVIDE HORIZONTAL "GOOSENECK"
IN LA TE:RAL (APPROX. 12" 'lAD)
TO ENSURE FLEXIBILITY
, 7 I 15' "\


NOTES:
I, METER BOXES SHALL BE LOCA TED A T LEAST 4 FET
OUTSIDE THE TOP OF THE DRIVFWA Y 'X",
2 SOLDER AND FLUX SHALL NOT CONTAIN LEAD,
3, LA TERAL SHALL 8E FLUSHED WITH WATER TO REMOVE:
FLUX RESIDUE,
4, SEE STANDARD DRAWING A9476 FOR PIPE CONNECT/ON
REOUIREMEN TS,
MA TRIAL LIST
HORIZONTAL PLANE
ITEM OTY. DESCRIPTION DWG. NO. MA T. CODE
1 1 #3 RDNFORCm CONCRUE POL YMER COVE:R (CENTER HOLE) B-5096 39-01-357
__ ------- _________________ 39-0/-190
3 1 #3 PLASTIC METER BOX A 9422 39-01 258
4 I 2" X 8" PVC SCHEDULE 80 NIPPLE -,----- 7J '01-728
5 I 2" C.I. MUER COMPANION FLANGE A-9005 11-09 292
5 1 2" DETECTOR CHECK w/ BYPASS METER ------- --------
2" 8.'12 FLANGE CURB BALL VAL VE: W/WCKWING ------- 42-29-494
__
-190 1 2" BR2 MALE COPPER TUBING TO .::M",A",L::.E...:'\-""'-P-", T::.., ...:E:.::L:::8"'0"'W'--__ -I---"'A_--"9"'2::.3::..7 ____ .
VAR 2" COPPER TUBING ------- 42-09-663
i1 VAR 2" COPPER SOLDER COUPLING ------- 42-75-182
1--_12=-+-_'--;2" X 1-1/2" 8RASS ADAPTOR ----------+-A-9361 42-09-002
1 1-1/2" BRONZE MALE CORPORATION THREAD TO MALE ______ 42-28-454
COPPEr? TUBING CORPORA TiON 8ALL VAL VE:
FIRE SERVICE INSTALLA TION (0.1. PIPE)
REViSiONS
DEPARTMENT OF WATER AND POWER
WATER SYSTEM CITY 0"" LOS ANGELES

lD
.j:>..
NAME: CA;E I APPROV:O
I--t
i
__ __ t-____________________ t-__ ____
H._.. OR A V\IN V. TOROIJANlAN 12-91'
i i CHCKD L NUNO ] 92 :
SHEET 4.7
10
15" RAD.
NOTES:
I. METER BOXES SHALL BE LOCATED AT LEAST 4 FEET
OUTSIDE THE TOP OF THE DRllltWA Y "X".
2. SOLDER AND FLUX SHALL NOT CONTAIN LEAD
], LA TERAL SHALL BE FLUSHED WITH WA IER TO REMOVE
FLUX RESIDUE.
4 SEE STANDARD DRAV.1NG MU77 FOR PIPE CONNECTION
REOUiREMENTS.
I [...0 r '
MA TERIAL LIST
r PROVIDE HORIZONTAL "GOOSENECK"
IN LA TE,RAL (APPROX. 12" RAD.)
TO ENSURE FLEXIBILITY
,
- / V .-+-
Q!)W/ /!
LTAP MAIN AT IS' FROM
HORIZONTAL PLANE
ITEM OTY, DESCRIPTION OWG. NO, MA T. CODE
1 1 #3 REINFORCED CONCRETE POLYMER COVER (CENTER HOLE) 8-5096 39-0; 357
2 I CAST IRON CENTERPIECE A-9290 39-01-190
3 1 #3 PLASTIC METER BOX A-9422 39-01-258
4 I 2" X 8" PVC SCHEDULE 80 NIPPLE ------- 13-01-728
5 1 2" C.I. METER COMPANION FLANGE A-9005 71-09-292
6 1 2" DETECTOR ----+-.-._-_""_.:._"'_"-_-_-I---'_-_-_=_-_"'_"-_=--;
7 ; 2" 8RZ FLANGE CURB BALL VALVE W/LOCKWING -------. 42-29-494
8
9 1 2" BRZ MALE COPPER TUBING TO MALE M.P. T ELBOW A-92J7 42-09-230
-W--VAR. 2" COPPER TUBING ----. -- 42-09-653
11 VAR. 2" COPPER SOLDER COUPLING _--:-' -.. .. c
_________
13 I 1-1/2" BRZ INSULATING COUPLING ------- 42-00-05/
14 1
1-1/2" BRONZE MALE CORPORATION THREAD TO MALE ______ 42-28-464
COPPER TUBING CORPORATION BALL VALVE
J5 J 1-1/2" STEEL CORPORATION THREAD wt:LD COUPLING A-9J65 /3-08-/71-
2" FIRE SERVICE INSTALLA TlON (STL. PIPE)
t;
DEPARTMENT OF WATER AND POWER

WATER SYSTEM CitY Or. LOS ANGELES ..-
.- - NAME IDA ,I;;: APPR,9vEO
1
__ r--i __ -t _____________________ en
: DRA,W!'.1 v. TOROMAN1Ar,; I r2 91
CHECKED LNUNO 1392
SHEET 48
/
/,\
I }
DUCTILE IRON PIPE
I--
()
ILtP LtP
)
DIRECT INSERTJ ~
~ ~ BRONZE CLAMP
o 1" CORP. VALVE
~
D} 1 1/2" CORP. VAL VE
~
~
ADAPTOR FOR
,
2" SERVICE ONL Y
CONNECTION REQUIREMENTS - NEW MAIN
CORP. VALVE SIZE 0./. PIPE SIZE CONNECT/ON TYPE
4" THROUGH ! 2" BRONZE SERVICE SADDLE, DOUBLE STRAP
r OR 1-1/2"
16" AND LARGER DIRECT INSERT
CORPORA TlON VALVE INSTALLA TlON (0.1. PIPE)

REVISIONS
DEPARTMENT OF WATER AND POWER
tD
NO. OA"l"'C INIi APP'
.f:>..
!
I
WA TER SYSTEM CI TY o ~ LOS ANCELES
NAME DATE' , AI"PROVO '-l
:
OESH'JNEO v. 70R0UANiAIi 4-92 ; 8. W[lNSTElN-;;;; JUNE '92
(J) ... ~ .....
, ORAW'N V. TOROMANtAN 4-02 I
I c .... e;cKP C. HAMVAS 4-92 :
SHEET 49
L
STEEL PIPE
...... CPI.6.----1 .... 'J:iliir'

&l't.1I. ASSEN.
INSULAT/HI}
C1't.6. ASSEN.
211X Ifl If
2"
TAIL PIECE
CONNECTION NEIIVINENENTS
SrEEI.. "'PE
SIZE
"'OA' fi,REATER WELD/kif &tNI1f./1f1i
CORPORATION Y.4/.YE INSTAI.I..4TION (STEEL PIPE)
-.__ A.SAYUI../AN II
SHEET 50

1
1

!
I
\
I
I
n
-
! I
.---+P-r-----------
: !-4!-0
-----------1 I
I I
.. -,
I I
,
@ : !
/ / '--i n ....r-f VAUL T
'I
fF
2
-----
r-.J
, '
, '
, '
e-- ;-' ..-;+t"'1,IL- AND PfP
V - -" -iJ
\tRAP PfP Mf 1'H
" . ..;;:.
.' .....
1/4- rLl txPAHSION
.;aNT MATERM!. .AND
- " ,
Ij-!C
FlU Il'00)$ ., J'H
,
CDlENr GROtJr
,
i-i
I ,
, ,
I , ___________ ...1
I
TOP VIEW
PLAN
NOTES:
1, CRUSHED AGCREGA TE SASE MA TER/Ai
SHALL BE IN ACCORDANCE WITH TI-iE
"STANDARD SPECIFICATIONS FOR
PUBLIC wORKS CONSTRUCTION
LATeST EDmON. SuBSECTION 200--2.
.. 2. 4- TURBINE METER REOUIRES 4
STRAINER(iNCLUDED IN 1'-1'"
OIMENSION).
.... 3. USE LOCKING GASKET WITH THE
FLANGE/BELL ADAPTOR.
4. THIS DRAWING is NOT TO SCALE
I
,
__ .J
4'-6"
SIDE VIEW
II
6'-7'; ..

J
I
I :: /
I
ELEVATION
MATERIAL LIST
'TeMOTYI OE'SCRIP TION
--;:--- 1 I 4" X 2"/ 0_1 R. C. FLC./BLL ADAPTOR AWWA
I
II
\1
I
I
CODE
11 13 003
2 - i 7/4" FEL T EXPANSION .JOINT MATERIAL 65-75-603
.3 2 4"'")( 1-1/2" BRZ CL4MP ,42 13 078
4- 2 1_ 1/2" BALL VALVE ,42-28-464
5/5.4 1 4" X C).SPOOL / 4" x 1.2" C f SPOOL 111 3-600/11 13-602
6/6A 1 COMP METER / 4# TURBINE METER.. 144 84 221/44-84-SJ2
7 2 X 200# C.t. FLC. GATe VALV[' '12 U 989
B 1 ! 4- X 24'" c./. SPOOL (OR OTI-iER OUTLeT FITTfNG) J 1 U 504
"
1 4' 0" X c'-D" PLASTiC VAULT AND COvER 39 01 276
10 J 1 C.I. CENTERPteCE
J9-01-19D
4" DOMESTIC SERVICE IN PLASTIC VAULT (0.1. PIPE)
(SiDEWALK LOADING ONLY)
REVlS'ON$
DATE i INIT
I I
I i
DEPARTMENT OF WATER AND POWER
WATeR SYSTEM CITY OF-"' '-0$ ANGELSS
NAM
I DATE AP;;J!rED
DESIGNED, L. NUNO 3-91
13, WEiNSJ!N __ JUNE '92
DRAWN
18 DoNG & v. T.
. J 91
I I I
C'"'Ie:CKED 1 L NUNO i 3-92 ,
SHEET 51
I
I
,-- ------
--------- .,
,
:
.----1+-- r---------c-
U-4-
1--+- -----
I '
,._J
, I
I I
I I
I I
, ,
-il H
-U
Ii VAUL T
AND PIP:
,- ;tRAP PIPE w/
1./ 1/';"'FLT
/" EXPANSION
""_ JOINT MA!FRiAL
1'. AND F"JU
rrt ' V0/05 WI TH
, ,
, ,
, ,
-:'''11, CEMENT CROUT
: -.,:.;
L-_tft-- L __________ _
, ,
___________ ...J I
I
,
L ____________ _ _ ___________ ..J
4'-6"
TOP VIEW
6'-0-
9-" 9"
PLAN
NOTES:
1 CRUSHED AGGRGA TE BASE UA TER/AL
SHALL B IN ACCORDANCE WITH THE
SPEC/FICA TlONS FOR
PUBLIC WORKS CONS [RUCTlON*
LA 7Esr eDITION, SUBSECTION 200-2.
.. 2 4- WRBtNE METER REOUIRES 4"
StRAiNER(fNCLUDD iN
DIMENSIONJ
..3 rHlS ORA WING JS NO T TO SCALf:.
SIDE VIEW
6'-7f"

'r/ ____________ ________________ 4:
.-----1 \
I
ELEVA TlON
MA TERIAL LIST
ITEM Dry! DESCRJ.C'TION CODE
1 4-1/;- O.D, x 1/4 EN. uC, C.L &: C, 5.J., r.LDO ST:,.. PIPE tJ-IJ-477
2 i/4" FELT EXPANSiON JOINT MATERIAL 65-75-603
3 r 4 X 4" X 1/4" STL WELD PAD -------
4 I , 1- 1/2" STL W"LD COUPUNC 1 J DB ,71
5 2 CORP. BALL VAL V 142-28 454
5/5A I
7/lA
r 4" COMP. M71;::f? / 4'" TURBINE: MTE:R.. 144 84 221/44 84-532
8 2 4N x 200# CJ nG. GATE VALve ; 12-13 989
9
,
4
n
X 150# STL. WCLD NECK FLANCE '1..3-1.3-307
'0
,
r 4" PRE: ASS"O INS. FLANCE TyPE: {I D 1.3 63-298
11 i 4' 0" x 6' 0" PLASTIC VAUL T ANO COVER 39 01 275
12 J C.I CNTRPIECE
/J
,
4" X 24"" Ct. SPOOL (OR OTHER OuTLET FiTTING)
14 I 4"' x 1-1/2" BRZ CLAMP 13-078
4" DOMESTIC SERVICE IN PLASTIC VAULT (STL. PIPE)
R"VISIONS
t>lO DATE': lNrr.
i I
I :
!
(SiDWALK LOADiNG ONLY)
I
I
I
AI':>P'O
DEPARTMENT OF WATER AND POWER
WA SYSTEM CITY OF' LOS ANCELES
CRAWN
I NAME: I DATE APPROvED
L. NUNO : 9-90 B ____ JIJN "92
8. DONe", v. T ' ""-,------==-""'---j
CrlECKEO : L. NUNO ; J 92
SHEET 52
NO,
II n /tl VAULT
ANDPJP!:
!
r-------
--i'lll
,I 1:
: I
I
: iii
I
: I

I
I ,
:s. f"'-! :
I I ,
O-i
I ,
,.,
ri-----"
I
v-li:
..

'"
I
I
I
! I:
: I
I
I I
I
I I 6 Ii
I
: I
I I '.
1'----
I
I '
- --
____ ..J
-
TOP VIEW
4B"
16-1/.1' , II"
'"
I

i
..
'"
ow
,

I
@Q5 --()
5: 12> SUMP
USE LOCKINC CASKET
PLAN
NOTES:

i'?
,
\j'


,
.
@
f't


"---4,',
'1
:
,

n - H1?;4P PiPE WITH 1/4'" FELT
EXPANSION JOINT MATERIAL AND
ALL VOIDS WITH CEMENT CROU T
INLET VIEW
AU BLOCKS AND (;4P
WITH CONCRET GROUT
FOR PROPER BEARINC
ELEVATION
MATERIAL LIST
CRU5HlJ ACCRCAT 8AS MAlFRlA1..
SHALL B IN ACCORDANCE WITH THE
HSTAJIIOAi?O SPC/f7CATIONS FOR PUBUC
WORKS CONSmucTJQN" LATEST EDmON.
SuBSECTION
ITCM. DlY DESCRIPTION
4" X 27 0.1 Re. FiG/BELL AOAPTOR AWWA
2 x 200.1 C.I FtC. CATE VALlI
CODE
12-1J-989
Z !HIS DlMWlNG IS NOT TO SCALE J DETECTOR CHECK IffH BYPASS MTER ANI) f1rrINGS : 44-73-600
5
4_"-:-X
7
2"4,,,':,C:.,/:., ______ -+; "-!J-504
J/.r FELT ExPANSION JOINT MATRI4 i 65-75-503
6 C:! CENTERPIECE : .J9-0f-l90
7 4' X 4' PLASTIC VAt.{T ANfJ COVER J9-0!-274
FIRE SERVICE IN PLASTIC VAULT (D. I, PIPE)
(SIDEWALK LOADING ONLY)
REVI$lON$
DEPARTMENT OF WATER AND POWER
W,," TER SYSTt!M CiT .... LOS ANCF.Lt::S
NAME ; OA TE
I--t_-! __ t-____________ --'--_-!!-'O""E:!HGNEO L. NUNO 3--91 8. WfNST!N .lUL Y '92
I--!t--I---' ____________ -!-_-! OR .... WN V. TOROMANIAN 7-92
CHECKEO C. HAMVAS 7-92
SHEET 53
54-3/4"
i r-----
-
, ' ,
,
' ,
, ,
,
!
,
,
,
,

,
,
m
:
&i
,
..,
If---
,
'1lt""" . ,
"
,
'"
: ,

,
"
,
, I
,
:: 8
,
,
, ,
t.. ___
----
TOP VIEW
I 48'
i i
PLAN
NOTES:
! CRUSHED AGGREGATE BASE MATERiAL
SH4LL BE IN ACCORDANCE WITH THE
SPEClncATtONS fOR PUBlIC
WORKS CONSTRUCTION" LAlrST EDITION.
SUBSCTION 200-2
2. THIS [)RAWJNG IS NOT TO SCAL.
,
,
,

,
j1I
I
I
,
,
,
,
J
n
-
'0

ITM OTY.
J vA.<'.
2 I
r1 VAULT
AND PIPE
,

::?
'"
m
"
,
"
w
-
i
",I i.,!
I
\
I
I
9"
I-'-
IW?AP PIPE WITH 1/4" FELT
EXPANSION JOINT MATERIAL AND
FILL VOIDS WITH CEMENT CROUT
INLET VIEW
u - FILL BL OCKS AND G4P
WITH CONCRETE CROUT
FOR PROPER BEARINC
ELEVATION
MA TRIAL LIST
DSCRIPTION
4-1/2 OJ), X '/4" EN uc.. CL &' c.. 5.J., waOED STL PIPE
CODE
!J-1J-477
4" PRE-ASSEMBLED INS. lIANG' TYPE l/-D 7,J-6J-298

-=_-'--C-+4-c";-X !SOI sri.. WELD NECK nANG' 13- iJ-307
4* X 200# Ct. f.1G fiAIE VAlVE
j
!
!
4
,

4* DETECTOR CHECK WlTfi BYPASS METER ANI) FlTTINCS , 44- 73-600
I
5 1
6 !
!
4" X 24" CJ SPOOL (OR OTHER oula:? nmNC) J! - 13-504
7 iVA;?:
8 2
1/4* ,CELT EXPANSION ..JOINT MATCR/Al fiS-75-50J

CI, CENTP.PIFC J9-DT-/9()
9 J 4' X 4' PlASTIC VAULT AND COVER 39-01-274
FIRE SERVICE IN PLASTIC VA ULT (STL PIPE)
(SIDEWALK LOADING ONL YJ
RV:SIONS
DEPARTMENT OF WATER AND POWER
CITy OF LOS A"':::;E:LES
, NAME: OA TE I
1--+_-+_--+ ____________ -f __ t-0 :::<::;sc:,e;;::N:."ec":.;:..:':.....:N"U,::N.::O __ +3::-:.;9"'-l 8,
t--t--t--f-------------T--t::O:::RA:.-=C-: 'I. fOP.OUA.N/.A.N 7-92:
I CHECKED "I c. H4MVAS 7 92 ;
JULY '92
SHEET 54
I
54-3/4"
I
I ,
r - -- -,

, ' , ,
, ' , ,
, ,

,
,
5
,
,
t[ VAULT
,
, ' ,
,


, '
,
"
, '
, , AND PIPE
<:,
..,
t-
Ii- :
' ---+ --
.. ----
. -:."
,
.....r--
' ,

'"
..,
, '

u
'"
, '
, '
, ,
, '
: 6 I
g"
, '
, '
, '
L _______ I , '
.. - WRAP PIPE WITH 1/4" FELT
_______ ...1
EXPANSION JOINT MA TERIAL AND
FILL VOIDS WITH CEMENT GROUT
TOP VIEW
INLET VIEW
48"

-
11-//2" 7-1/7
10-1/2"
-
,
"-

I
2
$=i


,
im n
..,

'"

4
.,

..,
.,
-
Yt--.,/i lUi

u
..,
P& -JL-II
-
.
5 2 U U ,
5
J
..,
L.. '<]) =--0
'"
;.,1 ;.,1
SUMP
.. -
FILL BL OCKS AND GAP
WITH CONCRETE GROUT
.. -
USE LOCKING GASKET
{J)
FOR PROPER BEARING
PLAN ELEVATION
NOTES:
MATERIAL LIST
!. CRUSHED AGGREGATE BASE MATERiAL
ITEM OTY DESCRIPTION CODE
SH4LL 8E IN ACCORDANCE WITH THE
wSTANDARD SPECIFICATIONS FOR PUBLIC
I 1 0' X 2T DJ. R.G. FLG /BLL ADAPTOR AWWA 11-16-003
WORKS CONSTRUCTION" LATEST EDITION.
SUBSECTION 200-2
1 1 0' X 2001 c/. nc. GATE VAL vc 12- 16-989
2. THIS DRAWING IS NOT TO SCALE. J 1 0' DETECTOR CHECK WITH BYPASS METER AND FITTINGS 44-15-600
4 1 6
w
X 24 C./. SPOOL (OR OTHER ouna FITTING) 11-16-604
5 VAR '/4 FELT EXPANSION JOINT MATERIAL 65-75-603
6 2 c./. CENTERPIECE 39-0'-190
7 1 4' X 4' PLASTIC VAULT AND COVER 39-07-274-
6"
FlR SRVIC IN PLASTIC VAULT (D. I. PIP)
(SIDWALK LOADING ONL Y)

REVISiONS
DEPARTMENT OF WATER AND POWER
ill
NO DATE INIT. APPO
.J::>.. WA TER SYSTEM CITY OF LOS ANGELES
NAME DATE

OJ
DESIGNED L. NUNO 3-97
B. WClNSTE/N JULY '92
N
DRAWN V. TOROMANIAN 7-92
CHECKED c. HAMVAS 7 92
1:5 .... -55
SHEET 55
I
54-3/4"
I
,
L
I
r--
- -,
,
' , ,
,
' ,
,
,
' , ,
, ,
, , ,
S.
m
, ' , ,
,
' ,
, -"1
t VAULT
AND PIPE

..., , ,
---;
I
' ,
--
,
"
'"
,
I
I
I
,
,
, , I

I
I
' ,
I
' ,
I
' , 8
I
' ,
I
"
9"
I-'--
L _______
"
_______ ...J
- WRAP PIPE WITH 1/4'" FELT
EXPANSION JOINT MATERIAL AND
FiLL VOIDS WITH CEMENT GROUT
TOP VIEW
48"
22-1/7

PLAN
NOTES:
, CRUSHED AGGREGATE BASE MATERIAL
SHALL BE IN ACCORDANCE WITH THE
STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTIOtV LATEST EDmON.
suBSECTION 200-2
2. THIS DRAW/NG IS Nor TO SCALE.
I
INLET VIEW
.- - FILL BL OCKS AND CAP
WITH CONCRETE GROUT
FOR PROPER BEARING
ELEVATION
MA TRlAL LIS T
ITEM OrY. DESCRIPTION
1 VAR. 0.0. X EN. Uc.. C.L & C. S.J .. WELDED sn. PIPE
2 1 6" PRE -ASSEMBLED INS. FLANGE TYPE /1-0
J D x /50# STL. WLD NECK FLANCE
4 1 D x 200.1 CJ FLC. CATE VALVE
5 7 D DETECTOR CfiECK WITH BYPASS METER AND FITTINGS
6 7 6
H
X 24- c./. SPOOL (OR OT/iER OUTLET FITTfNC)
7 VAR 1/4 FElT EXPANSION .JOINT MATERIAL
8 2 C I. CENTERPIECE
9 J 4' X 4' PlASnC VAULT AND COVER
6" FIRE SERVICE IN PLASTIC VA ULT (STL. PIPE)
(SIDEWALK LOADING ONL Y)
REVISIONS
NO DATE INIT. APP'O
DEPARTMENT
WA TER SYSTEM
OF WATER AND POWER
CITY OF LOS ANGELES
DA TE APPROVED
COOE
JJ-66-298
J)-16-J07
12- 16-989
44- 16-600
"-76 604
65-75-603
J9-01-190
J9-01-274
NAME
DESIGNED L. NUNO
3-91 8. WC/NSTE/N (ltIAY' JULY '92
DRAWN V. TOROMANIAN 7 92
CHECKED C. HAMVAS 7 92
S"'-56
SHEET 56
II
I
r-
l
I
I
-,

I
j 1:1
I

I
I
5
I
, I 111
I
/t VAULT
S- """'
I III
I

I II
I
AND PIPE
L
I

..,
---- i- ... ::
- -- "- I
'>
: :
I
.... ---1:: ...
'"
./ I
", L.;
I
I II
I

II
: I I 6
I
I
II
I
L. ___
II
_J, ..
- WRAP PIPE WIT/f 1/4" FELT
---
- --
!
EXPANSION JOINT MATERIAL AND
FILL VOIDS W!T/f CEMENT CROUT
TOP VIEW
INLET VIEW
48"
!:..
28-1/T
f-
-I-
J/-I/f
I
,
T
1"- I

F=

I
"
;, Cl\
J
,
'"'

y'

'"
"
- -
,

V
r-
.., ....,
-
/i\
-
;;I-"@'

"
: 4 ..
12" 0 SUMP
,,1
_.1 I
-
"I
" -
FILL BLCCKS AND GAP
WITH CONCRE7F GROUT
.. - USE LOCKING CASKET
7
FOR PROPER BEARING
PLAN ELEVATION
NOTES:
MATERIAL LIST
I CRUSHED AGC/?GAT BASE MAlRv.L
1TEM' orr' DESCRIPTION
I
CODE
SHALL BE IN ACCORDANCE WITH THE
"STANDARD SPCJFlCATJDNS FOJ? puaLlc
J 7 $" x 2r OJ. R.G. FLG_/BELL ADAPTOR A1f1t'A : 11-17-003
WORKS CONSl1?UCnoN" LATEST CDmON.
SV8SCT!ON 200-2.
2 7 !J'" x 2001' C J FLC. GAlF VAl Y.t , 12- t 7-989
;; THIS DP.AWWC IS NOT To SCAl: J J 8" DETECTOR CHECK WITH 8rPASS METe!? AND FITTINGS ; 44- /1-600
,
4 1 X 24'" CJ SPOOL (OR 01H!? OUTLCT FITTING) i !/'-!
5 VAR. '/4" FCU eXPANSION .JOINT MATeRIAL ! 6;1;-60J
6 2 CJ CE:NiE:RPIC

7 T 4' X 4' PlASTlC VAl4T AN[) CO''!/? , 39-01-214
8"
FIRE SERVICE IN PLASTIC VAULT (OJ. PIPE)
(SIDEWALK LOADING ONLY)

REvl$lO""S
DEPARTMENT OF WATER AND POWER
LO
"'0 CATt ''''IT
A'PP'O
.j:l..
WA 7EI:i!' SYSTEM CITY OF' LOS ANGELES
NA.ME DATE
AWO
OJ
DSIGNO L NUNO 3-91
B W!NSTDN JULY '92
.j:l..
I DRAWN V TOROMANIAN 7-92
i
CHECKED c. HAMVAS 7 92
SHEET 57
-------,
\ 1,1 I
l 1:1
, "
I I!
l
(

I I !'
I I 8:
. VAULT
ANI) PiPE
I :: I
L ______________
" - wRAP PIPE WITH 1/4' FELT
EXPANSION JOINT MATERIAL ANI)
FILL vOIDS WITH CEMENT GROUT
TOP VIEW
PLAN
NOTES:
i, CRUSHlJ AGGREGATE BASE: MATERiAL
SHALL 8 IN ACCOROANC WITH THt
wSTANOARO SPECIFICATION'S FOR Neue
WORKS CGNSTRUCTfOtl" !,ATES T EDmON.
SuBSECTION 200-2.
2. TfllS [)IV:WfNC 15 NOT TO SCAI ...
9
INLET VIEW
FILL BL OCKS AND G4P
WITH CONCRETE GROUT
FOR PROPER BEARINC
ELEVATION
MA TERIAL LIST
m:",' QTY OE'SCRIPTION
vAl? o.f) X EN. (.Ie. CL &.- C. $...1., W"LDED STL PIPE
2 1: l!" PRE -A5SE.MBLE1J fliS" FlANCE TYPE II-/;
x 750/ STL WW NECK FlANGE
4 8" x 2001 Cj FLG CAlC VALL-F
5 8'" OTCTOI? CHECK WITf{ BYPASS METER AND FITTINGS
6 X 24" C.!. SPOOL ('JR OTHER OUTLET rrrrlNG)
7 VAR.; '/4"" FELT XPANSION .IalNT MATERIAL
8 2
9 4 X 4' PI..A577C VAUL T ANO COvER
FIRE SERVICE IN PLASTIC VAULT (STL. PIPE)
(SIOEWALK LOAOING ONLY)
APP'D
REV,S,ONS
DATE:. lN1T.
DEPARTMENT OF WATER AND POWER
WATER SYSTEM CI'""y OF LOS ANGELES
"''''ME 0;. l"E , APPJ'<OvED
COOE
, lJ-il-471
, lJ-5?-2ge
tJ- J 7-JOl
44-i7-600:
i
: 65-7,5-60J !
__ _________ ....;f-__ '.'..!''''"UN'''O'---_--+.J-91 : B. W[NSTEIN JULY '92
I---I .. __ _____ .. ______ ... iOROMANfAN 1-92'
CHECKE:O C . .HAMVA$ , 7-92
SHEET SB
79-t/4'"
r------- ___
---------- ..... ,
"
,
,
"
,

"
,
" tt VAiJLT
,
,
"

,
"
, ,
AND PIPE
,
"
, ,
,
"
, ,

,
"
,
"
,
"
,
"
,
"
TRIM OPENINC TO Fff PIP;
" -----------'
H1UP PIPE: WITH FELT
TOP VIEW
72-
/4" 15" 30'

"
I
4
'.,

;:!;
,
,
1....
1,r 0 SUMP
use: LOCKING CASKET
PLAN
NOTES:
7, CRtlSHED ACCi?EGATE BASE MATRiA.L
SHALL BE IN ACCORDANCE WITH THE
"srAN[JARf) SPEC/FICA TiONS FOR PUBLIC
WORKS CONSTRUCTION'" LATEST EDmON_
SUBSECTION 200-2
2 THIS DRAWINC IS NOT TO SCALE
ITEM
2
3
4
5
6
7
e
EXPANSION .JOINT MAJERiAL AND
FILL YVlDS WITH CEMENT GROUT
INLET VIEW
1
4

,
/
2
"
Orr.
VA.R:
2
, I
E:LEVATION
MATERIAL LIST
DESCRIPTION CODE:
x 27" OJ RG: FLG/BELL ADAPTOR AMrA "-79-003
X ICi Ct. FLC TAPER REDlJCER -------+/1-19-565
to" )( 200.1 CI. FtC GATE VALItf" ,
I
10" D[TEcrOR CHECK WITH BYPASS MGER AND FIJ7WGS
10" )( lr C.l SPOOL (OR OTHER DUllEr nmNC) 11- 78-603
{/4'" FaT ExpANSION .JOINT MATERIAL ,6.5-7.5-603
c.1. CENTERPieCE : 39-0:-190
4' X 6' PLASTIC VAULT AND COVEl? J9-01-270
JO"
FIRE SERVICE IN PLASTIC VAULT (DJ. PIPE)
(SIDEWALK LOADING ONL Y)
REVISIONS
DEPARTMENT OF WATER AND POWER
WATER SYSTEM CITY OF" LOS ANCELES
NAME: I OATS APPROVCD
OE:SI("NE:O : L. NUNO 3-91
8 WEtNSTHN JULY '92
DRAWN , TOROMAN!Afl 7-92
CHECK(:O : c. HAf,NAS
17-92 I
SHEET 59
I
19-1/4"
I
I
'--..
\
I
,
,....-----
----
-----------. !
, , ,
i
, , ,
, , , ,
r!


,
V f VAULT
1
-
,
-

,
ANO PIPE
,
-
: : '-"
"

::.;
'-'
- , 1
,
, ,
L
1
,
, ,
.. - TRIM OPENING TO Fff PIP, , ,
----
WRAP PIPE WITH 1/4" FEL r
EXPANSION JOlin' AlAT:R/Al ANO
riLL VOIDS WITH CEMENT CROUT
TOP VIEW
INLET VIEW
72"
4-1/7 14" , If' . Sfi" 4-1/2"
i i
I
A
! fi'
I

l'
L1

'"
"'
10
1



-
I-

- - ...
r--
---
I-

I
\ID
;'!; @
u:;;;:.;r

10
1
10
1 ,.
- FlU BLOCKS AND GAP
WITH CONCRETE CROUT
l8l
FOR PROPER BEAR/file
PLAN ELEVATION
NOTES:
MATERIAL LIST
" CRUSHEO ACCPCAT[ BASE MATERIAL
ITEM OTY. DESCRIPTION CODE
SHALL BE IN ACCORDANC[ WITH THE
"STAN1)ARD SPEc/RCAlIQNS FoR PUBLIC
I VAl? AD. X 1/4" [N UC., C,L Jr C., SJ., WEWO STL PIPE 13-i9-471
WORKS CONSTRUCT!ON" LATEST EomON,
SUBSECTION 200-2
2 I PRE -ASSEMBLEo INS. FLANCE TYPE 11-0 13-69-298
2, THIS DRAWING IS NOT TO SCAL. J I 12" X 150,1 srL. WELD NECK FLANGE /3-19-301
4 ! 12" X ur C.1. FL(;, TAP!:!? I?OUCER
5 I x 2001' c.!. FLC. CATE VALVE : 12- 18-989
.-
fJ f JO D7CTOR CHECK WITH BYPASS METER AND FImNCS : 44-18-500
7 I x JO'" c.1. SPOOL (OR OTHER OUTlEr FllTlNC) : !, - fS-60)
8 vAR 1/4'" FELl ['xPANSION JOINT Al4TR/Ai. 65-75-60)
._ ...
9 2 c.l. CENTERPIECE 39-01-190
_.
fO
I
f
:
4' x 5' PLASl1C v,oQUL T ANi) COvt:R .19-01-276
10" FIRE SERVICE IN PLASTIC VAULT (STL. PIPE)
(SIOEWALK LOAOING ONL Y)

REVISIONS
DEPARTMENT OF WATER AND POWER
(.()
..t:!O. D':',!: INIT API"'
.j::>.
i i
,
WA TER SYSTEM CITy OF LOS ANGELES
i i
NAME I DATe:: AI"'I"'ROVEO OJ
DES'GNED L. NUNO 13-97
B.
WE!NSrElN
JUl Y '92
'-.J , ,
DRAWN v. rOROMANlAN! 7-92
i
C. H4WAS 7-92
SHEET 60
----_ .... -
TOP VIEW
PLAN
NOTES:
1. CRUSHED AGGREGA TE BASE VA T:RIAL
SHALL BE IN ACCORDANCE WI TH THE
"STANDARD SP:CfFiCA nONS FOR PUBLIC
WORKS CONSTR(JCTlON# LA TEST EDITION,
SuBSeCTION 200-2.
;: VAUL T ANO ACCESSORIES SHALL MEET THE
DEPARTMENT'S LA rr:ST HSPCfFICA TiONS
FOR PRECAST CONCRETE SuBSTrfuCTURES
AND
"3 TURBINE METER REOUIRES A- STRAINER
(INCLUDEO IN DJMENSlON)
...,. 4 USE i. OCKING GASKET WI TH THE
ADAPTOR.
5, THIS DRAWING IS NOT TO SCALE
AD.JUSTASU (ryp. ALL CORNERS)
i : .... - 7/8" W rJBING
i
FlU GAP KfTH ." .. 3/4" BOl T
CEJ.fNT CROUT"
AFTER FLAT WASHER
. ,..0 J/4
H
NUT
-=r l-LD1'
DETAIL
:----y--
-
I

,
I
,
t
I
I i
Y
L- /tRAP PIPE w/
"
'-
I
I
:
;.,
,

,
eXPANS/ON
'"
I
,
I
,
i
JOINT AlA TRfAt
'-
,
I AND FILL
i I
VOWS wr1H
I I
CEMENr GROUT

1..-. ___ ., _ _______ J
, ,
INLET VIEW
SEE DETAIL
ELEVA TiON
MA TERIAL LIST
ITEM DrY DESCRIPTION CODE
____
2' 1/4" FEL T EXPANSION JOINT MATERiAL 75-603
J 2 4" x 1-1/2" BRZ CLAMP 42-13-078
1-1/2" Ct.;JRP. BALL VAL\I 42-28-4$4
5/SA 1 X 6" C.!. SPOOL /4- x 12" C.I SPOOL111-13 602
6/6.4 f "',4" CaMP, MTER / 4" TURBINE METER... 144-84-221/44-84-532
? J;: 4" x 200# C.! Ftc. GA iE VAL \1 I 12'-13-989
8 i: 4'" x CI SPOOL (OFe OTHER OuTLET FITTING) 11-13 604

9 !
, X 6'-5" PRECAST CONCRt:TE: vAUL T WfTH
1 I ,- #3 STEEL HINGED COlIER (OWP OwG C5181)
i 39-01-245
4
U
DOMESTIC SERVICE IN PRECAST CONCRETE VAUL T (0.1. PIPE)
(TRAFFIC LOADING)
REVISIONS
APP'O
!
i NAME OA'TE
__ f ___ __ +-______________________ ___ L NUNO 3-91
T DRA""",Ta DONG &: V.7: 3 92
T CHE:CKEO L NUNO 3 92
C,TY OF LOS ANGELES

8. WEINSTEIN JUNE '92
SHE:T 61
i
j
-------------------1
1
1
1
ADJUSTABLe (TYP. ALL CORNI!RS)
(: kj:;.7/8" 1.0. 1U8ING

J/." BOLT
FILl... GAP .4 r .'
CEMENT GROUT"
AFTER FLAT WASHER
... 4 3/4" NUT
-
L f' VAULT

I rt_ ANDPfpt
1 -1-1-,,,,- -jHi=it

I. J'TYP.
DETAIL
,
,
1

TOP VIEW
Qij;
t -C-
o
)
,I
"
\
'" , .. lInr.,,,,,,.t II "iNn--m- JII-, b
ct' ,I
lflP 1Jt"';
"
c,
05
,
1iW5 7 7 !ffs'
"
4 88A66 T<.:Y
Is
PLAN
NOTES:
1. CRUSHED AGGRGA T BASE MA TERIAL
SHALL BE IN ACCORDANCE WITH THE
#STANDARD SPOFlCA nONS FOR PU8LIC
WORKS CONSTRUCTION'" LATEST ED/nON,
SUBSECTiON
2 VAUL T AND ACCESSORIES SHALL MET THE
DPARTMENT'$ LATEST MSPEClFICATiONS
FOR PRECAST CONCRETE SU8STRUCTURES
AND ACCESSORIES"
*;: 4"' TURBiNE METER .REQUIRES 4- STRAINER
(INCLUDED IN 1'-11- DIMENSJON)
4 THIS DRAWING IS NOT TO SCALE.
,

,
-
2
.
J
,
I
4 I
5 2
5/6
A
,
7 1 2
8/8.1. :
,
----
1 1 1
, ,
1
---
-.
1 1
,
1 %>
1
1 1
.- iM?AP PIPE W/
: I 1/4-- FL r
,

1 EXPANSION
1
" '
1
JOIN T IJA TERlAL
1
Lj;';'f-
,
1
,
AND FlU
1
,
VOIDS WfTH
"
,
;,
'-
,I
..,
"
1
'-
,,1
CE4tNT CROUT
1 ,
J..._r-t- L., ___ , ________ .1
, 1
INLET VIEW
SE [)TAIL
(
ELEVA TlON
MA TRIAL LIST
DESCRtP nON
;-1/2"" sn. WELD COUPLING
CORP" BALL VAL'v
4" MTR / 4" rURBiNE UTER .,
coDe
13-08 In
1 11-1.3-6DO/1 1-:: 1.3 602
12 1.J-989
J 44 84-221/44 84-532
F
,
,e
,
4- w X 50" S TL w'l.O NECK FLANGE:
1-'-:-+-':-1""4;;- PRE-ASS'O INS_ FlANCE TYPE IJ-D
: 1.3 /J-307
6J-298
: J9-0,-245
"
,
12
,
13
,
x t;'_6
M
PReCAST CONCRETE: VAULT twTH
1M #:!. STEEL HINOEC COVER (OlIoIF' owe. C5181)
4- X C,t SPOOL (OR 07k[R OUTLET FITnNC)
x 7 1/r &RZ. CLAMP
! 11-13 604
42 13 078
4" DOMESTIC SERVICE IN PRECAST CONCRETE VAULT (STL. PiPE)
(TRAFFiC LOADING)

DEPARTMENT OF
WA TEl'< SYSTEM
I
NAME
I DATE: I
DESICNED L. NUNO 9"-90 '
ORAwt',j 8. DONG &' VT. i J-92
CHECK:O L. NUNO
13 92
1-+----\--.
WATER AND POWER
C:TY 0"" LOS ANCE:LES
APPROVED
8.
WEINSTEIN ..
,JUNE '92

lD
.p..
(Xl
lD
SHEET 62
I
TOP VIE:W
PLAN
NOTE:S:
I. CR!.)$HED AGGRGA TF: BASE MATERIAL
SHALL 8 IN ACCORDANCE Wi TH THE
"STANDARD SPECiFICATIONS .cOR PUBLIC
WORKS CONSTRUCTION" LA TST comOt .
SUBSECTiON 200-2
2 V,4UL T AND ACCESSORiES SHALL MEET THE
DePARTMENT'S LATEST "SPECfFICA TlONS
FOR PRECAST CONCRETE SuBSTRUCTURES
AND ACCESSORiES"
.. J 6" TURBINE METER REOUIRES 8"' STRAINER
(INCLUDED IN DJMENSION).
... 4_ uSE LOCKINC GASKET IMTH THE
FLANG/8ELL ADAPTOR
.5 THIS DRAWlNe; IS NOT TO SCALE.
ITEM OTY
AD.JUsrAfL (TYP. ALL CORNRS)
: I :.1---7/8" w. ruBING
..
FiLL GAP KflH .. .<I :1
CFMCNT GROUT .. oj!
AFTER AD')('}S7MNT-\--{
J/4 FUH WASHER
NUT
;,
,
;,
'-
I
.,

;,1
. ""
-
I
J- PIP.
DE:TAIL
---- ---
I
, , ,
, , ,
----
, ,
,
t
,
,
9)
,
'- Hi?AP PIPE W/ ,
! I FFL T
,

,
XPAI'lSiON
I

,
JOINT JJA TERJAL , ,
, ,
AND FiLL
, ,
vtVDS WITH
I
,
I
CHIEN r GROUT
'i
_., ______
,
INLE:T VIE:W
SEE DETAIL
=_ -- =-;====_ ( I
"-r-
V
Q-
E:L E: VA T/ON
MATERIAL LIST
DESCRIPTION ! CODE

1 J B
P
X 2r 0.1. R.G. P"LG./BLL ADAPTOR AW,A ,11-16-003
2 ! '/4" FEL T i'XPANS/ON JOINT MA TERIAL --- :.:.::c.:.:.----t'::16S'::-_c:
7
C:
5
:-":6:'O".3:-1
J 2: $'. x 1-1/2- 8RZ. CLAMP : 42 16-078
4 ! 2 1 1-1/2" co,c?P BALL VALVE
; 42 28-464
5 I 8" x 6" C.I. SPOOL 111-15-500
6/6A i 1 8" COMPo METER / 6" TUR81NE M[:TR .. ; 44,84 527/44 84 533
7 2 5'" x 200# C.I. PI G. GA T VAL VE
8 1 X 24" C J SPOOL (OR OTHR OUTLET FfTTlNC)
4'-0" X 6'-0" PRECAST CONCRTE VAUL T wITH
j" #..3 STEEL HINGED COVER (DwP D"""G. C51(1)
12- .5-989
11 16 604
J9-01-245
6" DOM[STIC S[RVIC[ IN PRECAST CONCRET[ VAULT (D. I. PIP[)
(TRAFFiC LOADiNG)
REvISIONS
DEPARTMENT OF WATER AND POWER
APpD
!
NAME ' nATE API'l'POVE:D
! DESIG"iEO i L NUNO : 9-90 B. wtNSTEIN
INiT
WA TEl'<: SYS""EM C:Ty or L.OS ANGELES
! JUNE '92
1--j __ '-_t-_______ .. ______ t-I_-+::D:-R:-A.::W.::N:...-.lC DONG & vT. i 3-92
I! I I CI-'ECKED ; ( NUNO I 3-92
SHEET 63
____ __________
i
TOP VIEW
PLAN
NOTES:
1. CRUSHED AGGREGATE BASE MATERIAL
SHALL BE IN ACCORDANCE WITH THE
"STANDARD 5PECfnCATlON$ FOR puBLIC
WORKS CONSTH?UCriON'" LA TEST Eo/nON.
SUBSECTION 200-Z
2. VAUL T AND ACCESSORIeS SHALL MUJ THE
DPARlMENT"S LATEST
FOR PR[CAST CONCRETE SUBSTRUC,URS
ANO
-3 fr TURBINE MET[R REWIRES STRAIN[P
(INCLUDEO IN DIMENSION).
4 THIS DRAWING 15 NOT TO SCALE_
'TEM on
,
-
I

D
"
"
FlU CAP iWTH
CEM[NT CRCUT
AFTR 3/4" FLAT WASHER
3/4" NUT
. -=f TYP
DETAIL
, ,
, , J
I
, ,
'"
, ,
,
0
,
L- KR'AP PIPE w/
-
,
I Y
'"
,
'/4" n:L T ,
"
,


,
EXPANSION
:.,
, ,
,
, , JOINT MA TF:RJAL
-
,
y,.
O-f-
,
AND FILL
, ,
VOIDS IH'TH
, I ,
CMEN T GROUT

1.., ___ .., ________ .1
, ,
INLET VIEW
m
FLOW. '0" w
I
, '
>0, Ui -

1_'
, "
\ FILL BLOCKS AND GAP
WITH CONCRETE GROUT
FOR PROPER 8EAPJNG
ELEVATION
MA TERIAL LIST
DESCRIPTiON CODE
6 5/8- OD x EN, uc. C.L & C. $./. W Sf!.. Pipe 1:5-16 477
z ,-
3 1
FELT :XPA. ... 'SlON JOINT MATERIAL
._ 4
M
X 1(4- sn. Kt:LD PAD
65-75-60.3
4 ;
S 2

1
7 2
tJ/BA
;
9 ;
10 1
"
,
12 1
I, 1
!
,
1_1/2M STI. WELD COl)PL!NC 1"-08 171
l_J,/2
W
CORP BALL "VA";'ICVE"'-_______________ +4.;:';C-,,":';B;:.i;"";:;4;-1
rr x c.r SPCOcL-_'==-c;:==-______________ +1 ;.:";-,',:;.,---;.,,0;:;0;;
)( 2001 C I rLG. GATE VAL\.'t" r2 16 989
0" )t 150# sn wELO NECK FLAN(;
4'-0- X 6' is- PR(CASr CONCRETE VAULT WfTH
1" if:> STEEL HINGED COliER (OW? !nvc. C5J8;)
X 24
K
C.!. SPOOL (Ol? 07HER OUTLET ArTINO)
13 16-J07
'11 16 604
42 r6-{)76
6" DOMESTIC SERVICE IN PRECAST CONCRETE VAULT (STL. PIPE)
(TRAFFiC LOADING)
REv:SiONS
I NAME ;:)ATE APPFo:C>VE:,o
___ .. ..
_.__ i DF<AWN i 8. DONG k v T. I 3-92
NO, OAT
DEPARTMENT OF WATER AND POWER
WA TER SYSTEM CITY OF .. os At>;CEI..ES
INn
I
CHECKEO L NUNO I 3-92
SHEET 64
SEE DETAIL
r-r---- ------ - - ;-1
:
t.. __ _ J( I)
I I 1 1
C:. ) I ! \
.t E= ;:; rl PIPE
" _lL
_ I 1 ______ r--. I I _
;, 1<-4 ---r;:::J '-..../ \.--I!t
:: ",'" .... : : Ltt AND COVl'"R
I t I I I I ...
I I I I
, , ,
: I " I I
...!._L_-I!'-L ________________ -:: ,
l ___________________ jl
TOP VIEW
I-
5'-0-
1-1/2- IT
I II'" lli-l/r ' wi

I
!
!
i.e
"'I

I
.'
i\
I-
'I-
-
l=c m m
"'
, -
H - -
<::>
I
...
'"
,
"
l
w

-
<I - USE LOCKING GASKET
PLAN
ACVVSTABL (TYP ALL CORNERS)
J/4'" FLAT WAStiER
J/4- MIT
.TrtP.
NOTES:
f. CRUSHCD AGGREGATE 8ASE MATERIAL
SHALL BE IN ACCORDANCE WITH THE
"STANDARD SPECIFICATIONS FOR PU8UC
WORKS CONSTRUCTION" LATCST OITION,
SU8SECTION 200-2
2. VAULT AND ACCESSORIES SHALL MEET
THE DEPARTMENT'S LATEST "SPECIFICATIONS
FOR PRECAST CONCRETE SU8STRUCTURES
AND ACCESSORIES"
J THIS DRAWING IS NOT TO SCAL.
,
-
u
- WRAP PIP WiTH 1/4- FLT
EXPANSION JOINT MATERIAL AND
FILL VOIDS WITH CEMENT CROUT
INLET VIEW
f- n
ELEVATION
MA TERIAL LIST
ITEM Orr:! OESCRIPTION COOE
; 4"-0- X PRECAST CONCRETE VAULT WITH
39-01-244 J 1
i I' #3 STCEL HINGO COVER (DWP DWG. C5189)
2 1 : "I" X 2 r D I R. G. FL G /8CLL ADAPTOR A WWA , fJ- 13-003
: -
3 J : 4" X '2"' C..!. SPOOL 11- 13-602
4 J 4- )( 200# C I FLG CATE VALVE 12-1)-989
"I' DETECTOR CHECK WITH 8YPASS METER ANO
I
5 1 : 44-1)-600
FITTINGS
6 f 4- X 24- C; SPOOL (OR OTHER OUTLET FITTING) 11-1)-604
7 , VAl?: : 1/4- FEL T EXPANSION JOINT MATERIAL 65-75-603
FIRE SERVICE IN PRECAST CONCRETE VAULT (DJ PIPE)
(TRAFFIC LOADING)

RE VI Si Ot-J S
DEPARTMENT OF WATER AND POWER to
I NO "
WP.'7ER SYSTEM CITY OJ:; LOS ANGELES "'f"""'"
I NAME I Oil.. Tt. <.0
..
DRAWN : li. rOROUANfAN i 4-92 i
CHECK.ED : C. HAAlVAS I 4 92-
SHEET 65
5' 0'"
I
TOP VIEW
5' {)'"
IHI>' 17 .. , 16-1/2' If"
1 I
PLAN
ADJUSTABLe (l'YP. ALL CORNERS)
NOTES:
I. CRUSHED ACGREGATE BASE MATERIAL
SHALL BE IN ACCORDANCE WITH THE
'STANDARD SPECIFiCATIONS FOR PUBLIC
WORKS CONSTRUCTION" LA TEST OITION,
SUBSECTION 200-2.
;> VAULT AND ACCESSORIES SHALL Ml7
THE DEPARTMENT'S LATEST -SPECIFICATIONS
FOR PRECAST CONCRETE: SUBSTRUCTURES
AND ACCESSORIES"
J. THIS ORA WING IS NOT TO SCALE
S DEJAI!
__ ..J ( ! )
, ,
" - WRAP PIPE: WITH 1/4'"' FELT
EXPANSION JOINT MATERIAL AND
FiLL VOIDS WITH CEMENT CROUT
INLET VIEW

- FiLL 8LOCKS AND CAP
WITH CONCRETE: CROUT
FOR PROPER BEARING
ELEVATION
MA TERIAL LIST
DESCRIPTION i CODE
,! !
4'-0' x !5'-0- PRECAST CONCRaE VAULT WITH 39-01 .. 244
r #3 STEa HINGED COVER (OW? DWC C5189)
3 ! 1
4 1
sf 1
4-1/2" 0.0. X 1/4- EN UC, CL &; C .. SJ,
WELDO STEEL PIPE
4" PRE -ASSEMBLO INS. FLANGE TYPE 11-0
4" x 150# STEEL WELD NECK FLANCE
4" x 12" C./. SPUOL
5 I 4" x 200# C.I. FLG. GATE VAL v.c
7 i 1
8 1
4" DTCTOP CHECK WiTH 8YPASS MEJER AND
FITTINGS
4" X 24" C.i SPOOL (OR OTHER OUTLEJ FITTING)
9 . VAR 1/4- FaT EXPANSION JOINT MATERIAL
IF6,j-298
13-13-307
1 !-lJ-602
12-13-989
44-13-600
11- iJ-604
55-75-603
4" FIRE SERVICE IN PRECAST CONCRETE VA UL T (STI. PIPE)
(TRAFFiC LOADING)

DEPARTMENT OF WATER AND POWER \0
NO. DA TEc !N!T' "-
I ! ..... WATER SYSTEM CITY OF LOS ANGELES :::.
I
I NAME DATE I APPROVEO '-l..I
__ ____________ .. -t __ ______ eN
DRAWN : v TOROMANIAN ! 4-92
t CHECKEOTc. HAMVAS 4-92 I
REVISIO ...... ;;;;
SHEET 66
5'-0"
SEE DETAIL
r --- - ------ ---- -,
'- - -'( ')
,
,
J

,
,
, ,
,
fir
'j-
I ,
, ,
=lR:
,-,

,
,
,
,-,
,-,
,
'oj
,


1_-:
,
,'-1,'"
,
,
f- "---
f---
,
,

"
, ,
-e

: '-I:. -,,K.J \,1
'"
I
, ,
;. -, "-'
It JAua AND COVER
,
;.,
,-,
i
,
, , ,

"
,
/
-
, I ,
I
, ,
I ,
"
I I I
I
, ,

_______________
,
- .... ----,..J
, , ,
, ,
l
-
----- ------
____ J
. - WRAP PIPE WITH 1/4' FEL T
EXPANSION JOINT MATERIAL AND
TOP VIEW
ALL VOIDS WITH CEMENT GROUT
INLET VIEW
5'-0'
IIf' 'vO-11l 22-1/7 ,
,,-

I ,
,
,
"'-
I
It-
'" I
1=
",ow
Ii.
;,..
r,
m m Ji
t-
n
?--.
, -
+ --II-


"
- J!"II ,
J-'
1=1 '1f
"
I'=

m

t=
Hi
;.
\c
.11 L,
3 4)rI 6
Ii. !J-
F=
ill
,- U
"
"-0 S:MP--O

..
-
-

I
. - USE LOCKING CASKET
"'I '4-. . .:": flLL BLO:KS AND GAP
PLAN
WITH CONCRETE GROUT
FOR PRoPER BEARING
A1JJUS1ABLF (lYP. ALL CORI/FRS)
ELEVATION
:
d;;/8' t.O. TllBlNC
,4
,
::-- 3/4" BOlT
FILl. CAP Wfl:J.f
,
.
4
CEMENT CROUT
AFTER AllIUSTMNT ')/4" FlAT WASHER

.'
J/'- NUT

I
r lYP
DETAIL
MATERIAL LIST
m:M' 0 TY. I OE.SCRIPTION COOE.
NOTES:
1
,
i 4'-0- X 5'-0- PRECAST CONCRETE VAULT WITH
39-01-244
I. CRUSHED AGGRECATE BASE MATERIAL
,- #3 STEEL HINGED COVER (DWP OWG. C5189)
SHALL BE IN ACCORDANCE WITH THE
2
,
6" X 2T 0.1. R.C. FLC/BELL ADAPTOR AWWA 11-16-003
"STANDARD SPEc/flCA TIONS FOR PUBLIC .,--
WORKS CONSTRUCliON" LATEST EDITION.
3 I : 6" x 0" CJ SPOOL J
SUBSECliON 200-2- r--.
i r x 2OC# C.1. FLG 12-16-989 4 I CATE VALVE
2- VAULT AND ACCESSORIES SHALL MEET
0" DETECTOR CHECK WITH BYPASS METER AND
THE DEPARTMENT'S LATEST 'SPECIFICATIONS
5 1 44-10-600
FOR PRECAST CONCRETE SUBSTRUCTURES
fiTTiNGS
AND ACCESSORIES'.
0 1 6" X 24" CI SPOOL (OR OTHER OUTLET FiTTiNG)
... -
3. THIS DRAWING IS NOT TO SCAL.
7
! VAR ; 1/4" FELT EXPANSION JOINT MATERIAL '55-75-503
6"
FIRE SERVICE IN PRECAST CONCRETE VAULT (D.I. PIP)
(TRAFFIC LOADING)

REVISIONS
DEPARTMENT OF WATER AND POWER
lD
NO o.n 'N'C _ APpD
CITY Of:" LOS ANGEL!r.S
.p.
I
! I
WATER: SYSTEM
"'AME I DATE: APPROVED lD
! O(SIGNI;:O: L NUllO : 3-91 8. WlNSTEIN . ;.;;r JUNE '92
.p.
!
!
DRAWf'.i : v TOROi.fANfAN ; 4-92
T CHECKEOj c. J{4M\1AS
T<-92
SHEET 67
5'-0"
,
I
i
SE DETAIL
r- - --- --- --
.J ( i)_ I I I L..
. r----------------- \
--.1.-
,
,
I
f..L
'l-'

I
I
, ,
Co c-,
"-"1

I
I
m
i
:--1
I j 18" I
I
'"
, ,

I
-
-
-&
f.----
\ i: "j I
i---
I I
-B--
..:..- .
1'-, ',,;;.[,j
,
-4
,-

I ;..,
... ,-<
.-<
t T AND
I
I
l:,
I I , I
I

, ,
/ -
, I I
I
I I
,
I I
:--r.l!.d r
I
"
,
I
, , i
I
I
I I I
I ,
I
i
--,J
" L _____________
--"
I I
I:
I
L_. ____
--- ---- --
- WiVOP PIPE WITH 1/4" FELT
EXPANSION JOINT MA /ERIAL AND
TOP VIEW
FILL VOIDS WITH CEMENT GROUT
INLET VIEW
5' 0."
r,O'
iI' O-I/2i 22-1/;" , ,,'

r
I
T
i
'" q
'"

If- I

12
:.. ,r 1, f- 'm m ,..;
f-
"
11,11
-+
Z
I
t::l u-Il f::
A
Co
III

I
'"
.In
I
n

I 2 5 6) r:J 8
I]
..
'"
7 -CJ
w
f-
'W .- u
i_ 14"0 SUMP I
:...

'4d . D-

PLAN

FILL BLOCKS AND CAP
WITH CONCRETE G.'?OUT
FOR PROPER BEARINC
A(JJUSTAl!L (rrP ALL CORNERS)
ELEVATION
( : J.D TUBING
,
3/4" BOU
FILL GAP WITH
CeMNT GR()fjT
.
.
AfTER AlJ./U5TMENT
'"
3/4- FlAT WASHER
MATERIAL LIST
'"
,
J/4* NUT
. ,-
iTEMI Orr.
-i
I
.r TYP
DESCRIPTION CODE
1 I
'4'-0'" X PRECAST CONCRETE VAULT WITH
I 39-0.1-244
DETAIL
! ," #3 STEEL HINGED COVER (DWP DWG. (5189) .
2 I VAR i 6-5/8" 00. X 1/4" EN UC .. C.L J; C, s.J ..
13-16-477,
NOTES:
. : WELOEO STEEL PIPE
.: i ..
<
CRUSHED AGGRECA FE B>lSE MATERIAL
J i ! : 6'" PRE-ASSEMBLEO !!IS. FLANGE: TYPE I/-D 13-1$6-298 :
,.
SHALL BE IN ACCORDANCE WITH THE
41'/
6" X /50# STEEL WELO NECK FLANGE 13- !6-JC7
"STAND;lRD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTiON" LATEST EDITION,
5 I : 6" X 6- C.I SPOOL /1-/6-600
SUBSECT!{)N 200-2
Ii
,
I 6- X 200# C.1 FLG. CATE VAL'- 12-16-989
2. VAULT AND ACCESSORIES SHALL MEET
6" DETECTOR CHECK WITH BYPASS METER AND
THE DEPARTMENT'S LATEST -SPECIFICATIONS
7
!
I 44-16-500
FOR PRECAST CONCRETE SUBSTRUCTURES
FlmNCS
AND ACCESSORIES".
8 i
I 6" X 24" C.1 SPOOL (OR OTHER OUTLET Fl.'7INC) 11- 16-604
3. THIS DRAWING is NOT TO SCALE.
9 i VAR 1/4- FELT EXPANSION JOINT MATERIAL 65-75-50.1
6"
FIRE SERVICE IN PRECAST CONCRETE VAULT (STL, PIPE)
(TRAFFIC LOAOING)

NO '>AT' 'WT
REVISIONS
APO',
DEPARTMENT OF WATER AND POWER
\.0
I
I
WA TEA: SYSTEM CITY Of'"' LOS ANCEL""S
.p..
I
I
NAME ! OATE I APPROVED \.0
Oe.:S'GNE:O L NUNO ; 3-91 !
8.
WEINSTEIN
JUNE '92
(J1
I
I

i OAAv..T.I II: TOROMANiAN ' 4-92 ;
-..
I
I 4-92
I

CHECKED C. HAMVA$
SHEET 68
SE DETAIL
'- JT ' )
Ii
-- ---,---iHr---------------- ---, :
I I I
I \ I I
r-
, t-:: I I ...... C"... r---. 1;
It PIP
1-_..iL..
I '" _4 : ----Cf i '-'
; J' , I 1
C;) I j /- ... I I
..l I I fit
I
' f\; :: : :
I I " / I I
-L_L.._-+_L _______________ I
, ,
L_____ __ ______ _ __ 1
TOP VIEW
- USE LOCKING GASKET
PLAN
ADJUSTABLE (TYP. AU CORNERS)
( : II) T"BlNG
3/4" BOLT
Ai. L G4P WITH
CeMENT CIWUT .",
AnER A/)./(JSTMNT r--:::.r ..1/4" FifiT WASH':!?
'-.I.. J/" WT
-1
DETAIL
NOTES:
! CRUSHED ACGRECATE BASE MATERIAL
SHALL B: IN ACCORDANCE WITH TH
'STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTIO." LATEST EDITION
SUBSECTION 200-2.
2 VAUL T AND ACCESSORIES SHALL MEU
TH DPARTMNT'S LATST 'SPECIFICATIONS
FOR PRCAST CDNCRU: SUBSTRUCTURES
AND ACCE:SSORI:S"
3 THIS DRAWING IS NOT TO SCAL.
.rr-
L f VAULT AND COVER
- WRAP PIP: WITH I/r F:LT
EXPANSION JOINT MATERIAL AND
FiLL VOIOS WITH C:MENT GROUT
INLET VIEW
:h- :

1 .. - FiLL BLOCKS ANa GAP
WITH CONCRETE GROUT
FOR PROPER BEAllING
ELEVATION
MATERIAL LIST
ITEMi orr'. DESCRIPTION CODE
2
J
4
5
J 4'-0" X 5'-0" PRECAST CONCRUE VAULT WITH 39-01 -244
r #3 ST::L HINCED COVR (DWP OWC. (5189) .
1 8" x 2r OJ R.G. HG /anL ADAPTOR AWWA I 1/-17-003
1 : 8' x 200# CJ FLC. C/lT VALV:
1
8' O[7CTOfl CHECK WITH BYPASS METER AND
FlTTINCS
8" X 24- CI. SPOOL (OR OTH:R OUTLET FiTTING)
12-17-989
44-17-600
11-17-604
6 i VAR . 1/4" FELT :XPANSION JOINT MAT:RIAL 65-75-603
8" FIRE SERVICE IN PRECAST CONCRETE VAULT (D.I. PIPE)
(TRAFFIC LOAOING)
RE";:VISIONS
DEPARTMENT OF WATER AND POWER
!:!.Q.- DATE IN1'. ....",p-:> WATER SYSTEM CITY OF LOS ANCt:LES
l--+--_o+-
OCS'ONe.:O I 1... NUNO ,J-91 8. W!N$liN JUNE '92
ORAWN I V. TOROMAN/AN i 4-92
i
I CHECKED I C, HAWAS I 4 92 ..
SHEET 69
f..
5' 0"
j
sa: DETAIL
r- , - ----.--- -,
U_
' I
,


r----
--- - - ---------, ,
, , , ,
;-
rr
,
I
,
r-,
f--'1L
l
PIPE
I 1 I I ; ,I
rr T
r-, ,-,
- , "',
'"
, I


.9::1:-
..1:,
--
-.--. - -
I I !
I
--&
' ,
1---+11'\: i\;;f'!! '
I _
"'CT -
41:: T AND COVER
1, I
"
;, >-; ,-,
: \" - :
\"
, , ,
, ,
,
-
,
,
I
'w '
, , , , ,
I
! 5' 12"' J'" I
'"
I
, , ,
,,,,- i-L,
;
,
I
, ,
, ,
'-_ ... / \
,
L___
L ___________________
I
,
I
,
I l _______
------
--, . - W!&<P PIPE WITH 1/4" FELT
EXPANSION JOINT MATERIAL AND
TOP VIEW
FiU VOIDS WITH CEMENT GROUT
INLET VIEW
5'-0'
I-ih ,,.,/7, 26-//2'
''''/2''

i
:
".;
,
"-
I'r-

'"
t::
now

I
-=-
-

1\1
'r-
, -
i
i=!='----i - --
f-
'"
V.
r; 8
,
'r- ! Ilf If 'r-

kif
' ,
d
'> '"
<b@
!
I-L J



'"
3)
4}
.Z
1<
14" 0 SUMP
-

i.,.
I'f;;
PLAN
..
- FILL BLOCKS AND GAP
WITH CONCRETE GROUT
FOR PROPER BEARING
A/)JUSTABLE (iYP. ALL cal?NERS)
ELEVATION
:
/0. TVB/NC
,
. BOLT
FlU .::;qp WITH . '
.' I
CMtr/T CROUT
.
AFTER ADJUSTMeNT

fLAT WASHER
'-.J.. ,.l
.1/4" NVT
MATERIAL LIST
-
:r IYP.
ITEM I OIY DESCRIPTION CODE
DETAIL
'4'-0" X 5'-0' PRECAST CONCRETE VAULT WITH I 44
/ 1
, I" #3 STEEL HINGED COVER (DWP Dwe C5189) ' 39-01-2
NOTES:
8-.5/8" 0,0. X 1/4" EN UC" C.L. &: C., s.J ..
j
13-17-477 2 VAR.
I. CRUSHED AGGREGATE BASE MATERIAL
WELDED STEEL PIPE
SHALL BE IN ACCORDANCE WITH THE
3 1 8- PRE -ASSEMBLED INS. FLANCE IYPE 1/-0 i 13-67-298
"STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTION" LATEST EDITION,
4 1 8" x 1.50# STEEL WELD NECK FiANGE 13-/7-301
SUBSECTiON 200-2.
5 1 . 8" x 200# C,I FlG. GATE /2-/1-989
2 VAULT ANO ACCESSORIES SHALL MEET
cr DETECTOR CHECK WITH BYPASS METER AND
THE DEPARTMENT'S LATEST "SPECIFICATIONS
6 1 44-11-600
FOR PRECAST CONCRETE SUBSTRUCTURES
FITTiNGS
AND ACCESSORIES'.
7 1 8- X 24" OJ SPOOL (OR OTHER OUTLET FiffiNe) ! 1- .11-604
J. THIS DRAWING IS Nor TO SCAL.
8 VAR. 1/4" FELT EXPANSION JOINT MATERIAL ,65-15-603
8"
FIRE SERVICE IN PRECAST CONCRETE VAULT (STL. PIPE)
(TRAFFIC LOADING)

REviSIONS
DEPARTMENT 0' WATER AND POWER
ill
"<0 DA Tl'" INlT. APP'O

-I
I
WATER SYSTEM CITY 0"'" LOS ANGELES
r T
I NAME : OAT. APPROVE:! ill
i DESiGNED' L. NUNO ; 3-91
B.
WEINSTEIN ..
JUNE '92
'-l
i
:
:;)RA"""" : v. TOROMAN/AN I 4 92
1 i
I c. ;.w,.NAS 1 4-92
SHEET 70
.---/- ----- --
, ,
C \ j
',,--' ",I I I'
;., I':=I--+---I--_l 1---6--- :
:---t 7
r
0 I:
I If?:
__ _________________ J
TOP VIEW

,
8"' 14" 18"
,:;; 3'-0-
r
100' SWP I'"
I I
I
iDI
11
-
I-

FLOW
I-- ... m
,
b r-t:::=::--
w H.u
,
",1 ;==
"
,

I 5 J 0
---
USE LOCKING
PLAN
NOTES:
L CRUSHED AGCRF;GA TE BASE MA fER/AL
SHALL Be IN ACCORDANCE WITH THE;
-STANDARD SPECftlCA nONS FOR PU8UC
WORKS CONSTRUCTION" LATEST EDITfOf-.'.
SUBSECTION 200-2.
n
,
7
, ,
2 I
J i 1
4 I 1
INLET VIEW
o OR tr CiWJEI :: i
RINGS TO ADJUST; 1..1r;:===-L::::::d::::::r----
TO GR<DE I I
!
b
,
b
;"
r....
,
'"
r'--
,-
V- -
"
m
,
-
I
,
t
,
WRAP PIP: W/
FaT
CXPANSION
JOINT M4TRIAJ.
AN() f1LL
VOIDS WfTH
CEMENT GROUT
/ilASE." :.;:.., i
I
'<or
""' - FILL BLOCKS ANO GAP
WITH CONCRETE GROUT
FOR PROPER BEARINC
ELEVATION
MATERIAL LIST
DESCRIPTION CODE
11 19 00.3
1/4" FEL T EXPANSION JOINT MA TERrAL 55-75 803
10'" x 200# C.f, FLG. GA T VAL '01 12 18-989
10" DETECTOR CHECK w/ BYPASS MeieR &: FlTnN(:;S 44 Ie 800 2. VAULT AND ACCESSORIES SHALL MEET THE
DPARTMENis LATEST "SPECIFICATIONS
FOR PREcAST CONCRfr SUBSTRUCTURES
JlND ACCESSORIES-,
CJ SPOOL (DR OTHR OUTLET FlTTiNC)
6 1 12" X 10" C.f TAPER ROUCER
'1 18 50J
11 19 555
J. THIS DRA WING 15 NOT TO SCALE,
7
8
0'-0'> X .e'-c" PRECAST CONCRETE VAUL T WITH
1-/N.#4 STEEL HtNCED COvER (DW? DWC. C5199)
STFEL LADDEF? ANO HANCINC HARDWARE
39 01 468
OR
: 39-01-469
; 39 07 J01
I AND
!..J9 01 :504
10" FIRE SERVICE IN PRECAST CONCRETE VAULT (D.I. PIPE)
(iRAFFiC LOADING)
REVISIONS
DEPARTMENT 0, WATER AND POWER
NO DATE !N1T APP'O
i 1
WA TEFl: SYSTEM CITY OF LOS ANGELES
NAME DATE APFl'ROVEO
ot:S!GN.D : L. NUNO __ -J..:.'_-91 8. WEINSTEIN
DRA'I'/N fa. DONG d: V T J-92 I
CHECKED I L NUNO J 92
i JUNE '92
1
I-- .. -11----'--
SHEET 71
... -
8' 0"
i
__ .X [
.' r;::===+:-= '
' 101 J. 1 : l-li PIP
"'}, -lliJB: ---e---
'.- ----f '
l_ ___ Oj
TOP VIEW
s'-(r
8" 14- 18" 13" J'-fT T
'5"if; su"p- i 1
" I
INLET VIEW
6" OR GRADE .J I H lI!:!f
RINeS TO A.f)JUST h-.. II I
TO GRA[) I -=::::::::::;
b
I
b It)
,
m
,
w
r---

rn
-
0"
, u
FLO,' rw
WRAP /=IfP/: W/
1/4-. nLT
EXPANSION
JOINT IMT'R/AL
AND ALL
VOIOS WITH
CEMENT CROUT

"
171>--
!-
--<..,
b
, '
'-:
PLAN
NOTES:
1 CRUSHED ACGRGA T BASE MA TRIAL
SHALL BE IN ACCORDANCE:: WfTH THE:
NsrANDARD SPCIF/CAnONS FOR PUBLIC
wORKS LATEST EDITION,
SUBSE:CTlON 200-2.
2. VAUL 1 AND ACCESSORIES SHALL MEET THE
DPARTMNi"S LA reST nONS
rOR PRECAST CONCRETE SUBSTRUCTURES
AND
..3. THiS DRAWING 15 NOT YO SCALE.
:
T 2' "IN
t.ADDI? OFFseT
ELEVATION
MA TERIAL LIST
ITM orr DESCRIPTION
1 _' 12-3/4" OD x 1/4" eN UC., CL &; C., SJ, If'ELDED STL PIPE
J 1 x 200# C.I. FLC. GATE VALVE
.: 1 fer DETECTOR CHECK wi BYPASS MTR &- nmNCS
5 2 X 18- C! SPOOl.. (OR OTHER DUT!.l FITTINGS)
6 1; r2" x C.I TAPER REDUCER
7 6'-0- X PRECAST CONCRETE VAULr WITH r 14 STL
COw:R (OWP OWG. C5' 99)
t 12" PR-ASS'D INS FLANG[ 7YPE: II-D B
;) 1 f r x 150# STL wLD NECK Fi..#IG(
10 1 STL l..Af)DR AND HANGING HARDWAi?
i
CODE
13-19-477
65-75-603
12-18-989
44-'8-600
i r '-!8-603
1 i
.39-01-458
OR
39-07-469
IJ-69-298
tJ-19 J07
39-01 301
AND
39-01-J04
10" FIRE SERVICE IN PRECAST CONCRETE VAULT (STL. PIPE)
(TRArnc LOADiNG)
CITY OF LOS ANGELES
RCVISIONS
DEPARTMENT OF WATER AND POWER
APP'D NO DATE:
NAMe: DA'rl: i
I. __ _________________ ____ __ 4
1-__ ,.-_l--_1+ ____________ -+ __ R DONG v T 3-92
);>
lD
+:>-
lD
lD
1 ! CHECKCO : L. NUNO I 3-92
SHEET 72
5' 6"
I
"
fO"
"_10"
J"
=-

--=-j
r-
- I
:.,L
:I


!
j r- --
-------



::j\=} 1' COV!:RS
r--
I I I '
I I I
AND PIPE
;., V-
I ,"
-Ki; VAULT
12."

, I

, '
_@>::i __ @r-J ::
'------

DETAIL
I
,
1 I L ______________________
"I
TOP VIEW
..
6'-0
'2"@ $ OrrAiL ABOYI: (TYP)
9t" 9"
2',5"
II 9- 9';''': 7j-
... ..
.. 4J:"
. .. ...
fL
@t-U .....
i "" I

l:r SUMP _
.L
rs
".-,'
PI
']@IOO
It:
IQ:
100
.
'--
L

,
y
y
.. I
1-


,
- rq
i--
'",
4
flOW
b
'"
rj -C +-$ Ir"'l
I

I



-
- Oil
..m...m.
:.
\,
r- -.. JJ
,
- -it-

:.,
z0dB';
1'"
V- 'i-
fLow
f
!1l
I
"T
w

w

"
'-
J " ,I
-----
'0
J
"
t

. \
'I I
I I
0'00
ooloOloOIQo OJ
.

.
2,
CRUSHEIJ jAGGRCGA rr
"" <:>':''''''
t;l c"" <l>"" at '
'.
-:r-
\J
L FiLL BLOCKS #If) GAP
'e
95%
mTk CONCRETE GROUT
PLAN
r::OR PROPf? BEARING
ELEVATION
NOTES:
MATERIAL LIST
1 CRUSH!) AGGREGATE BASE MATERIAL
fTEM QTY: DESCRIPTION CODE
SHALL 8 IN ACCORDANCE WliN THE
-STANDAi?D SPCIFlCATIONS F'DR PUBLIC

1 I ," X 2/ D.( f?,G. FLG /BELL ADAPTOR AWWA l1-1J-00J
WORKS CONSTRUCTION'" LATST EDmON,
SUBSECTION 200-2. 2 4
,
7/tr PIA. VAULT ANCHOR ROO W/ NUT 58-4J-930
2. CONCRT. CEMENT, f?)NFORt;MENT,
J 4 #7 x .:;ur STL. REBAR 18-08-506
MORT;4.R, GROUT, ANO MASONRY SHALL 4 - FLT EXPANSION JOINT MATERIAL 55-75-50J
BE IN ACCORDANCE WITH DwP DRAWINGS
5 2
X ,
8RZ CLAMP : 42-13 078
81985-S-! AND 04J5J-S-IA.
,
6 2 , - 1 CORP. BALL
:
3. COVERS SHALL NOT ROCI{ WHN PLACED
7
i
4 4" STL. GATE FLG. BAR
lIS
13 021
ON THE METER COVER OPNlNO.
8/8A
,
4
8
X 6'" C.l SPOOL / 4
D
X C,I. SPOOL I 11-1J-600/11-1J-502
4. rap SLAB SHALL HAVE A NON-SKID
g/9A I 1 : 44-84-22 1/44-134-532
SURfACE (BRODM FINISH).
COMPo METER / 4
w
TURBINE METeR .-
70 :: x 2001 C.L f?LG. CATE VALVE ! 12-/3-989
S. TURBiNE METER REOUfRES STRAINER
4'" X CJ SPOOf.. (OR OTHR DUTLc'! FrrrlNG) I 11-13 604
(INCLUOED IN DIMENSION)'
"
,
THiS DRAWING IS NO T TO SCALE.
12
I
2 /3 RDNFORCED CONe: POLYMeR COVCR CENTER HOLE (85096) 139 01-J57
5
lJ
,
IJ CONGo POL '<"MER COVER OFFSIDE HOLE (85096)
; 39-01 J39
14 i J CJ. CCNTERPflX J9-01 190
15 96+ 8" X 8'" x H[AW STD. CONC. BLOCK 75 04-265
4"
DOMESTIC SERVICE IN BLOCK-TYPE VAULT (0./, PIPE)
(SiDEWALK LOADING ONLY)
P-
REVJSIONS
DEPARTMENT OF WATER AND POWER
ill
I
APP'D
U1 WA TER SYSTEM CI';Y OF LOS ANGE'_ES
DESIGN EO! L
NAMe ; DA'fE
APPROVED 0
I NUNO i 3-91
B.
WfINSTfN . W' JUNE '92
0
I
OR AWN 18.
DONG <k v r ' :i-:::92
I I
CHECKEO IL
' .----'C..
NUNO '3-92
SHEET 73
5"-0'
1'- ttY'
"I
,-_.
TOP VIEW
PLAN
NOTES:
1 CRUSHO AGGREGATE: BAS MATERiAL
SHAJ.L 8 IN ACCORDANCE: WITH THe
"srA/Vf.),tlRD SPCtFlCATiON5 FOR PUBLIC
WORKS CONSTRUCT/OW" LATEST EDmON,
SUBSeCTION 200-2.
2. CONCRt:T, CfMm, ReiNFORCEMENT,
MORTAR, cRour, AND MASONRY SHAi.L
8 IN ACCORDANCe WiTH DWP ORAWlNGS
8/985-$-1 AND 04J!jJ-S-1A
j. COVE'RS SHALL Nor ROCK PLACED
ON THe MITER COVeR OPENING.
4 TOP SLAB SHAJ.L HAV A NON-SKID
SuRrACE (BROOM FINiSH).
.. 5 TURBINE: MTR REQUIRES STRAINER
(INCLUDeD /N 1'_liw DIMENSiON).
IS THIS DRAWING IS Nor TO SCALE
-Ir-
l::JL> I .r COveRS
'-it---"'LL AND PIPe
VAULT
DETAIL
'b
I
;,
..,
b
I
"-
>..
I
-
..,
:-
4 FILL BLOCKS ANO GAP
'II/TH CONCRETE GROUT
FOR PROPER BEARING
ELEVATION
MA TRIAL LIST
DESCRIPTION I CODE
1 1-
2 i 4 7/8- OJA VAULT ANCHOR ROD w/ NUT I 58-43-930
3 I #7 X STL. RBAR 18-08-50e
J
FELT EXPANSION .JOINT MATERIAL : 65 75 603
5 1
6 ,
1- Iff STL CORP, rHRCflD WELD COUPLING
lJ-08 i71
7 2 1 1/2" CORp B4LL VAl. vc I 42-28-464
11-13-600/11- 13-502
9/fJA: T I 4-4-84-221/44-84 5.32
10 2 x 2001 C.I. FLG. GATE vALVE I 12-;J 989
"
I 1J- rJ 021
12
1 i 4- x 1501 STL. WELD NECK FLANCe J07
13 i 1 I 4- PRE ASSEMBLED IN$. FLANGe TYPE: It-O 13 6:3 2.8
14
2 I #.3 RtINFORCD CONC POLYMER COVER CENTER HOLE: (85096) 39-01 357
'5 j #3 R1NFORCE:O CONC POL YMt.R COI/E':R ot:'F'SJOE: HOLE: (85096) :39-01-:359
3 1 CJ CENTERPieCE J9 01-190
17 196+: x 8* x ttr HE:AW 5TD CONe. BlOCK : 75-04-266
16 : 1 I 4- X 24- C.r. SPOOL (OR OTHER OUTU::r FlTnNG)
I : x 1 1/2- Bf?Z. CLAMP : 4; 1.3 078
4" DOMESTIC SERVICE IN BLOCK-TYPE VAUL T (STL. PIPE)
(S:DEWALK LOADING ONL Y)
REVISIONS
","ppo
DEPARTMENT OF
WATER SYSTEM
NO DAT( !N>T
NAME CIA TE:
;:)S'GNED L. NUNO 3-90
DRAWN B. DONG v. r 3-92
CHECKO L NUNO 3-92
WATER AND POWER
CITY Of" L.OS ANGELES
APPROVEO

<.D
(J1
o
Ii?
WEINSTEIN JUNE "92
SHEET 74
I
5'
,
"
"),, /"-10"
"

"I
i
II I
TOP VIEW
10"
-
L.!!:..
i
HI \" i r I: CO"",RS
__ ANe P,PE
, r \..{ VAULT
9"0
DETAIL
5EE DTAlL ABOI (lYP)
7'-4" r "-If r "-r@
..

10r (i) J'-';'- ,I -r 71",
''I
H
r--

1rib SUMP", @2-S. :
f--
,
c
'"
, '
f--
1 I-i
BIlE 31 JOIOOI[ I[ IE: 0
1
PLAN
NOTES:
1, CRusHD AGGRGA rt: BASE I.IATrRtAL
SHALL 8 IN ACCORDANCE WtTH T.H
SPECIFICATIONS FOR PuSuc
WORKS CONSTlWCnoN" LA TEST EDiTlDt.',
SUBSECTiON 200-2.
2 CONCRETE, CEMENT. RlNFORCEMENT.
MORTAR. GROUT, AND MASONRY SHAU
BE IN ACCORDANCE WiTH OwP DRAWINGS
87985-$-1 AND D4J5J-S-1A.
J. COVR5 SHALL NOT ROCK WHEN PLACED
ON THe /JETER COVR OPENING.
4 TOP SLAB SHALL H4VC A NON-SKID
SURfACE (BROOM FINISH).
5. cr TURSINE METER REOUIRES STRAINER
(INCLuDED IN 2'-3'" DfMNSION)_
o. THIS DRAWING is NOT TO SCALE
;.
I
."
iT
,
'-
ELEVATION
MA TERIAL LIST
/TEMlory OESCRiP nON CODE:
. ______ +-I
2 -4 7/8- {)fA. VAULr AJJCHOR RoO w/ NUT i 511-43-930
J -1 '7 X J(j STL (8-08-506
4 </4" FELT EXPANSION JOINT MATERIAL 65-75-60J

-' _ X 1_ 1/2" BRZ. ClAMP 42 16-078
6 2 1-1/r CORP, BALL VALVE
7 4 I sri... GATE FLC a4R
8 2: OW x 2001 Ct. FLG GATF vALvE 12-16-989
9/gA 1 6- COMP M1'CP / TUR81Ne !dOER ..144" 84-521/44-{J4-5JJ
10 i 5- x 12
w
C.I SPOOL I ; 16 602

12 -3 13 RElNrORCED CONe. POLYMER COVER OFrSlDE HOLE (85095) ,39-01-359
lJ .J I C,I, CNT[RP:C i ]9-DJ-19D
: 75 1)4-265
6" DOMESTIC SERVICE IN BLOCK-TYPE VAULT (D.!. PIPE)
NO OATE: lNn
I
(SID:WALK LOADING ONL Y)
APP'O
DEPARTMENT OF WATER AND POWER
WA TCR SYST,... M CITY OF LOS ANGE\,..ES

t{)
NAME ClATE: I APPROVED
J-_f-__ t-_T ____________ -t ___ "".. JUNE '92
en
o
N
i DRAWN 8. DONe .. T 13-92 .
CHECKED L NUNO 3-92
SHEET 75
f'_row 1'-10"

,j . II
'"'::::' ==1= r--------
c
-------- _____ ,
: i _!
---+, f-i(!S!- --- HI-
t-e:: U
: -----':1
,
,--------------_._---.. _---"
TOP VIEW
PLAN
IS
NOTES:
t. CRUSHED AGGReGATE BASE IJATRJAL
SHALL B IN ACCORDANCE WITH THE:
*STANlJARD SPECIFJCAT1CWS FOR PUBLIC
WORKS CONSTRVCTIDf>I' LATEST EDITION.
SuBSECTiON 2DO-2.
ITEM
I
2
orr
-
4
r
f
CDlIFRS
AND PIPE
VAULT
;,.
,
b
'"
,
;,

m
,-
r----..---,-1

7-}' I I-
DETAIL
SEE DETAiL ABOW: (TYP.)
"r--'-\ ,1""---1 r .

H -
I--
Mr"'i
I--
I--

i=-
,-0.

_L
FLOW"," -.l. ..,
WiT
t
,
"-
1M
ELEVATION
MA TRIAL LIST
DESCRIPTION
-II
H
CODE
6-5/fT O.D x EN. UC., CL & c., $.J .. WELO. STL. PIPE 13-16-477
7/8'< OlA. VAULT ANCHOR ROO W/ NUT 58 4.3 9.30
2. CONCRETE CEMENT, RlNFORCEMNT..
J 4 : 17 X 36- STL REBAR 78-08-506
MORTAR, GROUT, AND MASONRY SHAll
B IN ACCORDANCE WITH DWP DRAWINCS
81985-$-; AND 04J5J-S-1A
J COveRS SHALL NOT ROCK wHEN PLACED
ON THE MarR COVER OPNtNG.
" TOP SLAB SHALL H4Vf' A NON-SKIO
SURFACE (BROOM nNiSH).
" 5. 6 ruR8JN METER REOUIRES STRAINER
({"'CLUDED iN 2'-:; DIMENSION).
6 THIS [JRAWlN(; IS NOT TO SCIILE.
4
5 1

I
1/4'" FELT EXPANSION JOINT MATERIAL 65-75-60-3
4'" X 4"X STL WELD PAD
1.3
7 2 1- t/2
ri
CORP. BALL VALVE 142 28 464
B I
0'" X 150# STL WELD NECK FlANGE ! 13 16 307
9/9A I tr COMP. METER / TURBINE METER ,. : 44-84-521/44 84 53:!
10 :t x 2001 C!. FLC CAT[ VALVE 12-16-989
"
4
12
.
I
13

1 --'-"--'---'--+-. ,,6" PR-ASS'D INS. FLANGE TYPE Ii-V : 1J-55-298
"
J i 13 RlNFORCO CONe. POL YM(.R COVER OFFSIDE HOLE (85096) .39 01-J59
15 I J CJ CENTERPIECE 39 01-HJO
0'
I. :t08.:t 75-04-266
17 I
1 6- X C I. SPOOL (OR OTHR OUTLET FITTING) r r-16-604
18 I I 5'" X 1- 1/2" BRZ. CLAMP 42- 18-078
6" DOMESTIC SERVICE IN BLOCK-TYPE VAULT (STL. PIPE)
(SIDF:WALK LOADING ONL Y)

tD
()1
REVISIONS
NC. OATE INIT. .... PP'o
I
SI.l-76
DEPARTMENT OF WATER AND POWER
WA TER SYSTEM CitY OF LOS ANGELES
o
LN
SHEET 76
! I"-UY' 1'-10' I
, - rL L.jl-


TOP VIEW
PLAN
NOTES:
J CRUSH() AG6RCAT BASE MATERJAL
SH4l..L 8 IN ACCORf)ANCE WITH THE
-STANl)4RD SPC1F/CATlONS FOR PUBLIC
WORKS CONSTRucrJOI !.ATEST E[)JT/ON.
SUBSeCTION 200-2.
2. CONCR[7 CEMENT. RlNFORCCi.lENJ.
MORTAR. CROUT. AND MASONRY SHALL
IJ IN ACCORl)ANC WITH OW? DRAWINGS
8]985-5-1 AND 04J53-S-U
.J COVERS SHA1,.! NOT ROCK WHEN PLACED
ON THE METER OPENING.
4, TOP SLAB SHALL HAV A NON-SKJI)
SURFACE (BROOM FINISH)
5 tHIS iJR4WING 1$ NOT TO SCALE:
-:-11 :1Lt PIPE
U I-'
L t VAIlLT AND


DETAIL
SEE DETAJL HEREON
';+.-- f-: :...:..1-----+-1-"-'1'-
-
-

I-
I-
n
U
CRIlSHED
AGGREGATE
BASE
. - FILL BLOCKS AND CAP
.wrH CONCR7r GROIlT
FOR PROPER BEARING
ELEVATION
MATERIAL LIST
ITEM DrY DESCRIPTION CODE
I
, ,7 4'" X 27 j)j, R.C. FLC /8LI. ADAPTOR AWWA !! - 13 003

..
J I OJFCiOR CHECK WITH 8rPASS UftiER ANO nmNGS 44-13-600
I-- ... .. -:--:-
;$ 1 4" X 24" c.1. SPOOL (OR OTHER ouno FlTTlNC) , 11-1.:5-604
f--5 __ ,-2_. +4'" SfL CAT FLANC BAR j /3-13-021
9 2 1/8"" Di4.. ANCHOR ROD WITH NUT 158-43 9JO
7 2 '7 X 3D SrEL ReBAR : 18-08-506
8 VAR;' 1/4 FELl EXPANSION JOINT MATRw. 65-75-603
... : 7 i fJ ReINFORCED CONe-. ""PO--'-"'-C-R-'-CO-vr.-'-"-O-;;-rs-I-O--,,-01.---(85,--09--6)----+-39-.-0-'---35-9-1
10 1 I fJ REINFORCED CONe POLYMER COveR ceNTER HOLE (85099) J9-01-357
11 2 I CI CENrERPIEC 39-01-190
12 72:f: 8" x t:r x 16" HEAVY SHY- CONe BLOCK 75-D4-266
4" FIRE SERVICE IN BLOCK-TYPE VA ULT (D. I. PIPE)
(SIDEWALK LOADING ONLY)
<Pp.D DEPARTMENT OF WATER AND POWER c.D
t
:
N
:Ol' __ oun
t-- ... ! NAME =-".-rE: I
t--f __ -f __ -f ________________ . ______ tl ____
I DRAWN I v. TOeoUANIAN : 5-92 ;
'<EVISIOI\:S
ES"'-??
SHEET 77
1'-10", 1'-10"

IT ---- -- 11
m ii G{ : --n. PIPE


1-1/4"
DETAIL
11 11 Uj T
:J0]r-' Lrf. VAULT ANO COVERS
11.______ __ _JI
TOP VIEW
!-S/8" ,
lYP, I
i
!I" , r 1$- 1/2'"
12" 0
PLAN
NOTES:
" CRI./SHD ACCRECAT BASE MATeRIAL
SHALL BE IN ACCORDANCE WITH THE
SPECIFICATIONS FOR PI./BLIC
WORKS LATt:Sr EDmON.
SUBSeCTION
2, CONCR7 CEMENT. R['lNFORCMNr,
MORTAR. GROt/T. AN!) MASONRY SHAll
BE IN AccORDANCE WITH Dwp DRAWINGS
81985-5-1 AND IJ4J5J-5-!A
J. COIlERS SHAl.L NOT /?OCt( WHEN PLACED
ON THE METER COVER OPENING
4 TOP SLAB SHALL HAVE" A NDN-SKIO
SURFACE (BROOM FJNISH)
5. THIS DRAWING IS NOT TO SCALE.
ITEM! OTY.'
SEE OUAIL HEREON
'" >1 V'
m
.,:-.
i
-'
';< .. I--'
;:.; i .. -4'1
'" I-i:-'-.,.T"" ,-:":-'- :,:, -.,-'-;.-, ,:1-"", ""'.-!- __ 0'
,
u
j_
,'" AGGREGATE
n _ FILL BLOCKS CAP
95% CO,UP4C;ryOIV"/ WITH CONCRETE GROUT
FOR PROPER BEARING
ELEVATION
MA TRIAL LIST
DESCRIPTION CODE
, : vAR i 4'" J/r O.D x 1/4" EN UC., C.L &-- C, S.I., WELDED STEEL PIPE: 13-13-477
.2 1 4" PRE-ASSEMBLEO INS. FLANGE TYPE II-D i 1,J-6J-298
I
31 1 4'" x ISO; SfL WELD NECK Pt.ANCE ! lJ-JJ-307

__ 'N_c'-s ________ ---1r-'='_--:-' 3-;:-_6=:-:-1
6 ' 1 i "," X 24" C.1. SPOOL (OR OTHER OutUT F!T71NG) 11-1J-504
7 i 2 4" STEEL CAl[' flAN(;E BAR JJ-1J-021
8 ,2 7/8" DVt VAULT ANCHOR ROD WITH Ni./T 58-43-930
9 2' #7 X ,Jo STeEl RB4R 18-08-506
-;0 "VAR::-l-"-, --------------------+, "'6$'=-"-;:':5:-"-':.0'-J:-1
---'f
/13 REINFORCED CONe. POLYMER COIIR OFFSIDE HOLE (85096) . 39-01-.;..;9
12 i 1 if.} REINFORCED CONe. POLYMER COIIR CENTER HOLE (85096)
J 3 2 c./. CENTrRPICCE
74 72:1 8" x tr" x 10 H4W STD. CONC, BLOCK
; 39-0J-357
.}9-07- '90
75-04-266
4" FIRE SERVICE IN BLOCK-TYPE VAULT (STL PIPE)
(SIDEWALK LOADING ONL Y)
REVISIONS
DEPARTMENT OF WATER AND POWER
WATER SYSTEM CITY OP LOS ANGELS

(!)
(J1
o
(J1
SHEET 78
Y-8"
, '-70"
/'-10"
-
r--L
2-
-"-
f-
i
-------t

-J
-----

1 1
l r---
-- - - -, 1
4
1

II
_ 1-.1 r . PIPE
; "

1
r@i
'
--ll
" . '"
d
iT- "
1 1
1
r "

1
-=irZT '-1/'-
1 1 1 1
1 I@-"
I 1
. VAULT AND COVERS
1 1 9 1 I
I L ___
-
._-
-
JI
DETAIL 1 1 L _______________ J
",I i
TOP VIEW
sr:r: DVAIL HEfION (TYP )
!,
4'-0'
\,
: ,I V,

tt-J/T r
..
I
!()-f/7

f-
r-
-
12" 0 SUMP
lIS
DQ


r-
:-
'.
:Ii

10
--0
r


-
...JI
) + now
- " n
;..,
"
+: /i 11.
.


r-
u
1 - --/-- - t- -':--+
'0. @J Jl il i""@' ![jl"
'"
;', ":, "'-'-." '
11_1
51
6 5 (1 ,D \.:

AGGREGATE
GJ Q[]ju::JIQ[] d
' eMSE
.. - nLL BLOCKS AND GIIP
d
95% COMPACTION WITH CONCRDI: CROUT
FOR PROPER BEARING
PLAN ELEVATION
NOTES:
MATERIAL LIST
I
1 CRuSHED AGGRCCATC BASE IMT[RlAL
fTEM' Orr: DESCRIPTION
I
COOE
SHALL B IN ACCOR[)ANC WITH THE
SPECIFICATIONS FOR PuBLIC
r 1 ! .. x 27 OJ R.C. FLG/BELL ADAPTOR AW}fA I ll-16-00J
WORKS lATEST COITiON.,
SuBSeCTION 200-2.
2 r () x 200/ C.I. FLC. CATE VAlt1.: 12-15-989
2 CONCRT. COlE NT. RCINFORC4IENT. J 1 6'" OE7CTOR C!iCK WITH SYPASS MaER AND FlTTINCS ! 44-16-f$OO
MORTAR, CROIJ'. AND MASONRy SHALL
5'" X 24 C.I. SPOOL (OR OTHER OUTLET FITTlNC) : JJ-15-604:
8E IN ACCORl)4NC WIll.{ DWP ORAW/NCS

1
B'985-$-1 AND D4JS,}-S-JA.
5 2 C'" STtEL CATt: FLANGe OAR 13- 16-027 !
.. _--
3 COVRS SHAlL NOT ROCK WHEN PLACED
ON TH .iTFI COVR OPENINC
6 2 7/lr /)JA, VAUL T ANCHOR ROO WlTf/ NuT 58-43-930 '
7 2 #7 x 36" STEEL ReBAR 18-D8-505
4 ToP SLAB SHALL HAV A NON-SKID
7/4" FELT eXPANSION .I01NT MATR-IA.L
SURFACE (BROOM FJNlSH)
8 VAIi'. .
5 THIS DRAW/Ne IS NOT TO SCALE
rg.
1 I #3 REINFORCD CONe. POL YAIR COV('R CENTER HOLE (BS095) 39-01-357
ID I ' /J R!NFORCcD CONe POLYMeR COVER OFFENlJ HOLE (B5096) 39-01-,}58
11 2 $.1. CENTERPIECE ,J9-0t-.!90 I
12 78::t tr x fI" X 15 HEAvY STD. CONC. BLOCK 15-04-2&51
6"
FIRE SERVICE IN BLOCK-TYPE VAULT
(D"I.
PIPE)
(SIDEWALK LOADING ONL Y)

REVISIONS
DEPARTMENT OF WATER AND POWER
1O
INI ..... ._- A,=.'::J?
WATER SYSTEM CITY OF LOS A"JCELES
(J1
I
0 ' NAME: , DATE Ai"PRovED
i
"
O:SIGNED ! L NUNO ; J-91 8. WflNSTlN ..
JUNE '92
en
1
DRAWN ; Y. TOROMANIAN
5-92
1 1
CHECKEO 1 c. H4MVAS i 5-92
CSM-79
SHEET 79
I
3'-S"
"-10"
! I' JO-::1
Ci

-,
L
j I
.
----
-------H
'\J]71
r
I
I

-., --l
I
m
I
d
.' ,
I I I
I' 'I- '"
I ::_

-:-:.
---
w
I , -- ,
FIlLT
' ,
, ,
, '0--"
, ,
t/. Ul T AND COVERS
I I 11
,
I
I _____
-----
J
,
DETAIL
, ,
W
L _______________ J
TOP VIEW
SEE DETAIL HEREON

,
4'-0"
10 ,.. ,. ,I
V
I
J'IP.
I
r!.
22-I/?' T'
-
to-I/?,
I
r- r-
r- r-
12"0
SUMP"j5; Q Q(,' QQ
"
!
! "
.-

m
A
ill-
r-
- ill!!!-- n
.J\.. +,} "01>'
';

r----u
'. II
;,
-rh- /1 T::
'!V
-
I ::.
..,
'2
10 II 6
I
2
'i', "'<'"
:
- 7 a

-CRUSHED
, "
AGGREGATE
,.
i0:OIQQIOCO
'"
BASE
.. - FlU BLOCKS AND GAP
,
95% COMPACTION
WITH CONCRETE GROUT
14
FOR PROPER BEARINe
PLAN nEVATlON
MATERIAL LIST
I
NOTES:
iTEM: OlY:: DESCRIPTION COOt
I
! I V.4!? 6-5/8" 00. x J/4- CN. l.IC . CL ". C, S . .l, waOEI) STEEL PIPE ' 0-16-477 1
r. CRUSHED ACCRGATE 84$ MATER1AL
2 L I
6'" ME-ASSEMBLED INS. FlANGE TYPE /I-D ;
SHALL BE IN ACCORDANce W'fTH THE
"STANDARD sP['CIF/CIITlONS FOR PUBLIC
J I 1 6" x '50/, ST!. wna NECK FlANGE 0-16-307
WORKS CONSTRUCTION" LATS! EDmON.
SUBSECTION 200-2.
4
:
7 6'" x 200f CJ n.c. GATE VALVE ; 12 16-98.9
2 CONCI?TE; ceMNT; R'!NFORCMNT. 5 I 1 6'" DETECTOI? CHECK W1JH EJrPASS IrIno? AND FIrT/NCS 44-1S-800
MORTAIi', GROUT. AND MASONRY SHALL
61 1
6" X 24'" C.l SPOOL (OR OlHR [)()1lT FllTINC)
BE IN ACCORtJANC WITH OwP /JRAWINCS
'7-16-604,
9/985-5-1 AND D4353-S-JA.
1 2 6'" STCEl CAlC FLANC !JAR !
.1. COvERS 5.I-IA/..L NOr ROCK WHEN PLACED
8 I 2
,
7/8"" DiA, VAUL T ANCHOR ROD WllH NUT 58-43--9.10
ON THE MTER COI-!"I? OPEN/NCo
9 i 2 I P x JIr" STEH 18-08-506
4 TOP SLAB SHALL ,>i..<\L-f' A
10 i VA;? I"" 1/4'" JOINT MATERIAl.
SURFACE (BROOM nNISH)
, 65-75-603
5 TI115 DRAWING 1$ Nor TO SCAL.
11 L
1 ;3 R/NroRCED CONC, POL rJIR COVER CENTER HOL (85096) i 39-01-357
12 J 1;3 R!NFORCD CONC. POLrJIR COVER OFFEND HOLE (B5096) .19-01-.558
I J I 2 I C I, CENTERPIECE 39-01-1!JO
;4 1781: e- x s- x lr HEAVY srD. CONe_ BLOCJ< , 75-04-266
6"
FIRE SERVICE IN BLOCK-TYPE VAULT (STL PIPE)
I
(SIOEWALK LOAOING ONLY)

REVISIONS
DEPARTMENT OF' WATER AND POWER
ill

APP'D
(J1 ,
WA n::'R SYSTEM CITY OF LOS ANCELES
i
, NAME DATE APPROvEO 0
OESICr.e:D: L. MjNO J 91 8, WEINSTEIN W- JUNE '92
-....J
ORAWN

TOROMA!ViAN
5-92 i
I
CHECKE'.:> I c_ HAM'?AS 5 92
SHEET BO
_. 3'-S"
t'-fO" 1'-10" j
-j -E.: I .L.i f-
- ..--1
f-
1! r=4\-_ - !-r::
"I V, ---C' ,--I-

..
1-1/'" I
, ' ,
I(
l f \f!J I j
+ __ +_1 ..... ----- - __ ..J j
DETAIL
, ,
, ,
! t I -L ___ _________________ J
TOP VIEW
NOTS:
I. CRUSHeD ACCRECAT BAS IMleR/ilL
SHAI.!. B IN ACCORt;..wC WITH THE
-STANDARD SPECIFICATIONS FOP PUBLIC
WORKS CONSTRUCTION'" tArtST ED/TION.
SUBSECTION 200-2.
2. CONCRl[. CEMENT. REIN,7JRCOIENT.
AIOI?TAR, Ci?QI.IT. ANO MASONRY SHALL
BE IN ACCORDANCE wmf OWP ORAWfNCS
8/985-5- 1 AND [;.1,)53-5- IA.
J CO!>!"RS Sl1Al.L NOT ROCK WHEN PI,.ACED
ON THE MOE!? COVFR OPENINC
TOP st.AlJ SHALL HAv,: A NON-SKID
SURFACE (BROOM FW/SH).
5 TH/s ORAWING IS NOT TO SCAl.C
J
SEE D'TAiL HEREON ('Yo.;.
__ _______
I--
I--
+m I--
r
i....- " /' f---f-
I .. - (:::-n- r-
i,:: -.... '/ ,:" " "

.. - FILL BLOCKS AND GAP
WITH CONCRE:T CROUT
FaR PROPER BAR1NC
LEVATION
MA TRIAL LIST
fTE}i DrY. DESCRIPTION I eOl)E
, I 1 8" X 2T 0.1. p.c, FiC/BELl At)APrOR AM1t'A l 11-17 {)().]
r-:2_+-I.,.' +tr:;;-:X:::2=OO::",:::-::C_'CC' -:11::,0::' __ ' __ --Ci .: 2 f 7 989;
.J I 8" DETECTOR CHECK ;1m BYPASS UTD? AND FlTTiNCS ; 44-' 7-600 :
4- t 8"' X 24- CI. SPOOl. (OR O.?!R Ot..ITJ .. T Ffl7INC) fl-17-604
5 2 tr STEEL (;4T FLANG BAli' !J-!7-021
6 2 7/tr /)fA VAVi, r ANCHOR ROO WITH NVT 5B-4J-$.}Q
CONe POLYUR COVER CENTER HOLE (BS09S) J9-0:-357
fO , ,#3 I?EINFORCD CONe POLYUCR COVER OFFEND HOLE (85095) ';9-01-J58
!l ;1 C.l CENTRPlECE .]11 01 190
/2 !f2:t x B" x H6H sTD, CONe, BLOCK 75-04-266
FIRE SERVICE IN BLOCK-TYPE VAULT (DJ. PIPE)
(SIDEWALK LOADING ONLY)
REVISIONS
DEPARTMENT OF WATER AND POWER
pNO"',"',O"'A"-T'-'Cr'N,,'"'T-,--________ __,,_,, _ __,_"'A."P:;.'''t0 WATER SYSTEM CITY OF" LOS ANCe:u:S
__
I i OES'ONED, L, N;:;:U:;;NO;;;;;;::::,-:-I' ,.:W:::E::I:,:N.=S,::TE::I:,:N......!/In-'!:::::.... __ .....:J::;U::N:.:Ec..,:9:,:2'-j
1----+--+---+
1
, ______________ V. rOR(}jMNIAN i 5 92
I i CHECKED! c:' h'AMVAS : 5-92
):>
t.O
(J1
o
OJ
SHEET 81
,r-9"
f- 1'- ,0- r-fO:"
-
fo_o
,,-
t--
-"-

------ ------
-1
g-
r-
, ,
, ,
, ,
, ,
,
_ fQ----

,
_.-::lit PlP(
rr h-
, ,
f-
"1/4-,

,

"
-
' i
I \LL
!:e-
--
r-
"
I
j
,
-Zt !AUU AND COVCRS
DETAIL , ,
,
___ , ,
, ,

, ,
,
sec DCTAIL HCR(ON
TOP VIEW
\c
:,' ,.]
V:
!tff-
4'-9"
'..,..
-
Ii!' ,n-V";, 21i-f/Tr. ,'"
1'-1
....;
-
12"" ,UUP l.!.
i
!

-


-:-
If(]
ih I.-II


r-

rr 1
\S
CT
r-- -- r-
tlf2'!...
Q

\LL
r-.. ./
r--
f=
I-
\.In =
*
::.
1-:'41
'"
:I
'
\LL II -=- n
b,

io

i0 (0)".,' @@ """ IE li!
i.o

.. FILL BUXKS AND CAP
;
WITH CDNCRCT GROUT
..,., '-
FOR PRoPER BEARINC

ELEVATION

PLAN
MATRIAL LIST
NOTES:
ITEJ;/ DrY. f)'SCRIPTION cODe
1 CRUSHEo ACCRCGAT[" SASE MATERIAL.
!
i
,
8-5/8" O.D. x N UC. CL d: c .. Wt:.7.{)D STEIL PIPE 0- 17-477
SHALL BE IN ACCORI)ANCE WlfH THE
SPECiFICATIONS FOR PuBLIC
H'
PRE -ASSItfBl.D INS, FLANCE TYPE II-D 1.1-67-298
WORKS CONSTRucTION" LA TIT! EDITION.
SUBSECTION 200-2.
J , ! 0- x 7.50/ sri.. WELl) NECK FLANGE 72-17-989
2 CONCReTE. CEMENr. RlNFOfi'CMNT.
4 ,
! C x 200# C.l ll.e. CAT' VALl-!' : 12 '7-982
GRO(jJ. tWO MASONRY SHALl
5
i
I 8"' Ol7crOR CHECK WITH BYPASS KTR AND RTTINGS i 44-17-600
8 IN ACCORI)ANC WITH OWP DRAWINGS
I 11_17_604
B1g85-5-! AND 04J53-S-,JA. 6 ! tr X 24- Cf. SPOOL (OR OTHER OUTLET nnlNG)
,] COItf"Rs SHALL NOT ROCK WHN PLACED
7 2 8* STn c;4 Tl: FiANCE SAR 11J-/7-02'
ON THE Ili7ER coVE'l? OPENING-
8 i 2 7/11- ov. VAlll T ANCHOR WITH NUT !58-4J-9.JO
4 TOP SLAB SHAil HAvt' A NON-SKIO
9 2 ./7 X .16" STEEL REBAR I 18-08-506
SURFACE (BROOU FINISH)
10 : VAR. 1/4- FElT EXPANSION JOINT MATRb(l 5,.-75-60,]
.5 nuS' DRAWlNt; IS NOT TO SCALE.
i fJ REINFORCO CONe. POi. YM{'R CDliFR CN7l? HOLE (8.5096) J9 01 357 !I !
12 f /3 /fENFORCO CONC. Pol YJt"R COi.R DmND HOi. (B5tJ96) 39-01-J58
fJ
-'
c./, CNTERPlEC J9-01-190
f4 : l!2.f ;r X 8"" x fa H4W STu. CONC. BlOCK 75-04-255
8"
FIRE SERVICE IN BLOCK-TYPE VAULT (STL PIPE)
(SIDEWALK LOADING ONL Y)

REV,S'ON;;
DEPARTMENT OF WATER AND POWER
ill
NO. DA!E lNlT
APP'O
U1
I
WATER S .... STEM C1TY LOS ANGELES
f---
OESjGNEOJ L
NAME
DATe J
AP;;>ROVED 0
! NuNO
B, WlNS TlN filW" JUNE '92
1O
i DRAWN :v. 'OROMANIAN 3-92 i
I
CHE:CKEO I c. H4-'VAS 5-92
SHEET 82
TOP VIEW
PLAN
NOTES:
1 CRUSHEO AGCREGAT BASE MATERiAL
SH4i.l BE IN ACCORlJ4NCE WITH THE
"STANJ.l.fRO SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCT/OIY" LATCST EDmON.
SUBSECl10N 200-2,
2' COI/CR{TE; CEMENT. RONFORCEMENT.
M()RTA/r. GROUT, AND MASDNRY SHAlt.
BE IN ACCORDANCE wITH OWP DRAWINGS
liII985-S-! AND 04J5J-S-IA
J CDV/?S SHAl.l.. NOT ROCK WHEN PlACED
ON TH uETER COvcR OPENINC
4 TOP SLAB SHALL HAVE' A NON-SK/IJ
SURFACE (BROOM fiNISH)
5 TfilS ORAWING IS NOT TO SCALE
ITOf
,
2
3
4
5 1
6
7
8
9
!f)
11
12
13
OTY. !
1
1
!
12 X 27' 0.1. R,G
. ,

r'

r-
-..
-.l
I
-,-1/4' I I-
DETAIL
SE f)/"TAll HeREON I7YP )
I
. ---<[.:]
.' ' .. "

"" - FIlL BLOCKS AND G4.P
W/!H CONCRT GROUT
FOR PROPER SEARING
ELEVA TlON
MATERIAL LIST
[)SCI?fPT;ON CODE
FLC,/BELL Af)APTOR AWWA 111-/9-003
tL X 10' CJ FlC. TAPER REDUCER i 11-19-565
! ! X 200# Ct. FiG. CATE VAl\l!' 12-18-989
1 ! ()" DETCTOR CHECK WITH BYPASS 1.IFlEJ? ANO FfJTJNCS 44-18-600
1 8 X 18" c./ SPOOL (OR OTHER 0U7l.T FlfflNC) ! 17-18-60,)
2 12" STEEL GATE FlANGE BAR ;
2 7/8'" Oi't r ANCHOR ROI) WITH NUT 58-4,}-930
2 /7 X 30 STEEl. REB4R 18-08-506
; FELT EXPANSION ,JOINT UATERiAl 65-75-6OJ
1 13 REINFORCED CONe. POLYMER COVE'R OFFSIOE HOLE (8S09S) 39-01-359
1 '3 REINFORCE!) CONe. POUliER COUER OFfFNO HOLE (85096) .J9-(Jl-J5B
2 Col. CENTERPIECE ,39-01-190
133:.t 8" x $'" X H4W STO. CONe. BLOCK i 75-04-266
I
10" FIRE SERVICE IN BLOCK-TYPE VAULT (0.1. PIPE)
(SIOEWALK LOAOING ONL Y)
REVISIONS
APP'O
DEPARTMENT OF WATER AND POWER
WATER SYSTEM cny LOS ANGELES
NO. OA TE INIT
o
,
NAME DATE APPROvEO
DESIGNED L NUNO 3-91
B
.vONSTEIN .. V-
JUNE '92
DRAWN v.: TOf(QUANIAN
5-92
,
CHECKEo C. HAMYAS 5 92
SHEET 83
5'-6'" ,
1'-!()'" !'- to"
-I
r-L i
L
r-
----- 1------

. .J
r- -----

!
i
!

! !
l
H
!

-

,
. . '"

!
3!
,
_yi
P1P
,
f--:- --:-.
1-1/4" 1 f.-
1-+
! '-'
'-../
6:
7T
! !
!
:@"'"' -'-@
!
L- f. VAuLT AtlO COVf:RS
DETAIL
! !
! .
-----'
!
l.."
! !
! !
-.
! ! L ____________ ________ J
TOP VIEW
S /J7A1L HEREON

4'-8-
"
:.
Y'
/2" 14"
IT 3S"
..L I
. I
F
-
;2"0 SWP

..,:
- .
-.01 .Jb:
[;)(2)1 [;)(2)11
..

;1
-
(J
r:p

@C'-'.
7"
\:.
if<
fE +
r-
,
)-
1&W Q ,(I
T 1

11.11.11!!-
"

;i;
-
I
f-
1\/
-+
n
'r
'Q..L
1
f-

1--- -

L'Fl
r-
;,.
.. -
'.
"
u u

"
=.-.. 0.
J
.:<)
fro.
J "
@
GJ
0,,' I
.
D
'-",I
." " ,{<I
I ,. - FiLL BLOCKS AND CAP
@r" c,
OOIOOIQQIQ0IQ(2)IGJ
WITH CONCRETE GROUT
IVR
PLAN ELEVATION
NOTES:
MATERIAL LIST
I CRUSJ..fD ACCl?EGAT BAS MAT'RiAl
SHALL 8" IN ACCDRDWCE WffH THE ITeM orr:
i
[)SCRIPT/QN
I
CODE
STAtlfJARD spCiFlCAlJONS FOR PUBlIC
vM: 0.0. X 1.N. IJC,. CoL & C . 5..1., WELDED STEL PIPEJ.'J-19-477 WORKS CONSTRlJClJON'" IATST EDITION.
1
SUBSECllON 20D-2.
2 / 12" PM -ASSEMBLE'D INS. FLANC 'tYPE /1-0 : 13-59-298
2. CONCRETE; CEMENT. RINFORCMENT.
3 I T r x t 50; ST!. WELD NECK Fl.ANCE i 13-19-307
MORTAR. GROlJT. AND MASONRY sHALL
BE /N ACCORfJANCE WITH DWP DRAWINGS

i
1 17' x I tr c.1. rLG. TAPER !?WCR : /1-19-565
B1985-S-1 AND 04JSJ-S-1A.
S I /fY X 200/ C.I. fIG. GAT' VALl'F ; 12-18-989
.J COvERS SHAI.1. NOT ROCK WHEN PLACED
6 1 10'" DETECTOR CHECK WIlli B'lPASS JlE7ER AND FlmNG$ 44-18-500
ON THE ME7R COVER OPENING.
4 raP SLAO A NON-SKID
7 I 8'" x fa C.I, SPOOL (OR OTHER OUll.ET FITTING) /1-18-503
SliPFACE (8!>OOAI flNISH).
8 2 SlEEL CATE Fl.ANGE BAR 1.}-19-021
5 THIS ORAWING IS NOT TO SCALE 9
i 2 7/a alA. VAUL r ANCHOR ROD WITH NUT 58-4J-9']0
10 2 /7 x 36'" SlFEL REBAR '8-08-506
II ' VAR. ' 1/4* FELT EXPANSION .JOINT W.TERiAl 65-75-603
12 1 i 1.3" REINFORCED cONe. POL WR COVER OFFSIJ) HOLE (85095) : ':9-01-359
JJ 1 : 1'3 RlNfDRCED CONe. PDlWl:R COMER OFFEND HOLE (85095) i 39-0!-358
!4 2 C.I. CENTERPIECE : 39-07-190
/S lJ'J,r1 11 x a X te HEAVY STJ) CONe. BLOCK i 15-04-266
10"
FIRE SERVICE IN BLOCK-TYPE VAULT (STL. PIPE)
(SIDEWALK LOADING ONLY)

REVISIONS
DEPARTMENT OF WATER AND POWER
tD
NO. DATE INIT APP'O
CITy of' LOS ANGELES
{J1
I
WA TER SYSTEM
,
NAME . DATE, APPROVED

1---
I OESIC"'-IEO L NUNO
. 3-91 ;
8. WDNST[tN Ik<r- JUNe '92
i OlQAWN V. rOROMANIAN i 5-92
i
I
CHECK :0 C. HAMVAS : 5-92
SHEET 84
(
II}"
\------
I
1----1
I--
I
I
I
I
I
I
I
I I
I
--
I
I
-
I. I
I
I
1
I
I
1 I
I
L ___ I L __
I
L _____
...
.. AA"
;;. p ... 0 II
REVISIONS



00. "T( D .. e.,PTIO"
AND FI RE SERVICE
1;:17 iAD !/ <1<:11'. NDARD VAUL TSI
'7-'79 AD A .... '. :.5 AND ELEVATION'
I
a
SHEET 85
"
1
J
H
G
D
c



i ~
,.' .....
1
.',..". _ I,
..... l-
I.
V/I
I '\J!
" ",
r'- ..,
1/ I ~ . . ~ _ I
,.
,.
"
L
"
1
,
J
H
G
DOMESTIC AND FI RE SERVICE
STANDARD VAULTS
TOP SLAB 1tEINFORCING
I ,. I III I , .. ue I "
SHEET 86
I I
L SURFACF 2 SIDFS
NOTES:
J. 7" X 12" RANDOM LENGTH CONSTRUCTION GRADE DOUGLAS
FIR LUMBER SHALL COMPLY WITH STANDARD GRADING
RULES OF THE WEST COAST LUMBERMEN'S ASSDCIA TION. AND
SHALL BE IN ACCORDANCE WITH THIS DRAWING.
2. THE LUMBER IS USED FOR FORMING THE TOP SECTIONS
OF CONCRETF METER BOXES INCORPORATING COVERS PER
DWP STANDARD DRAWINGS A9259, A9260, A 9204- J & 2.
CONCRETE BOX FORM LUMBER

NO. OAT< 'NOT. DEPARTMENT OF WATER AND POWER '-'-'

___ __ :5-92 M.N. REY1SD ot1J DRAWING A9J02


APPROVED
___ 7.fP-.=z...=-l N
OESIGNEO
CHECKED
SHEET 87
EXHIBIT 1
SAMPLE ACKNOWLEDGMENT LETTER
Mr. Laurent McReynolds
Engineer in Charge
of Water Operating Division
Department of Water and Power
P. O. Box 111, Room 1450
Los Angeles, California 90051
Attention Cassandra Hamvas
Dear Mr. McReynolds:
Tract No. 3456789
Located North of Ventura Boulevard and
East of Louise Avenue
July 1, 1992
I/We hereby acknowledge that the p r o v ~ s ~ o n s of Section
2.05 ("Engineering") of the Water Operating Division's
"Engineering Standards Manual," as last revised, have been read
and understood.
JOHN DOE I - Applicant
JOHN DOE II - Design Engineer
EXHIBIT 2
City of Los Angeles
Department of Water and Power
Water Operating Division
REQUEST FOR CONTRACTOR PREQUALIFICATION
Contractor:
1. Enter the type and expiration date of all licenses issued to
you by the State of California that you wish to have
considered:
2. Provide a list and brief description of recently completed water
facility installations and references. Please be specific:
Notes: 1 The minimum liability insurance coverage required is
$1,000,000.00. The Department reserves the right to
require additional insurance coverage from the
Applicant when deemed necessary.
2. Prequalification is subject to yearly application and
renewal.
3. The Department reserves the right to require a per-
formance test for contractors or their subcontractors
who tap existing mains.
EXHIBIT 3
STANDARD DEDICATION CERTIFICATE
FOR ROADWAY EASEMENTS
We also hereby grant and dedicate to the City of Los
Angeles forever, for the use of the Department of Water and Power
of the City of Los Angeles, those permanent and exclusive
easements and r ~ g h t s of way, for the construction, operation,
maintenance and removal and replacement, at any time and from time
to time, of lines of pipe, of vaults, manholes, service and distri-
bution connections and of all appendages, structures and
equipment necessary or convenient thereto, and for the use and
operation in, on and over the easement area for its full width,
without obstruction or interference of any kind, of every sort
and type of machinery and equipment necessary or convenient for
such construction, maintenance, removal and replacement, for the
purposes of transporting, conveying and distributing water, in,
under, on, over and across each and every strip of land shown and
deSignated on said map as a water line right-of-way; and no
building or other structure shall ever be placed, constructed or
maintained within any such right-of-way.
The Department shall have no obligation for maintenance
or repair of the surface of any street or thoroughfare in such
Right-of-Way, except for the repair or replacement of surfacing
required to be cut or removed by the Department for the purpose
or maintaining, repairing, replaCing, or removing mains or
appurtenances.
EXHIBIT 4
STANDARD DEDICATION CERTIFICATE
FOR NON-ROADWAY EASEMENTS
We also hereby grant and dedicate to the City of
Los Angeles forever, for the use of Department of Water and Power
of the City of Los Angeles, those permanent and exclusive
easements and rights of way, for the construction, operation,
maintenance and removal and replacement, at any time and from
time to time, of lines of pipe, of vaults, manholes, service and
distribution connections and of all appendages, structures and
equipment necessary or convenient thereto, and for the use and
operation in, on and over the easement area for its full width,
without obstruction or interference of any kind, of every sort and
type of machinery and equipment necessary or convenient for such
construction, maintenance, removal and replacement, for the
purposes of transporting, conveying and distributing water, in,
under, on, over and across each and every strip of land shown and
designated on said map as a water line right-of-way; and no
building or other structure shall ever be placed, constructed or
maintained within any such right-of-way.
Grantor shall not modlfy grading, construct surface
improvements or structures, plant trees, reduce capacity or alter
path of existing surface drainage, park vehicles or store materials
directly over the main, or reduce or increase the depth of cover
over the main in the easement(s) hereby granted. Grantor will
exercise only such reserved rights in said land as will not inter-
fere with or prohibit the free and complete use and enjoyment by
Grantee, its successors or assigns, of the easement(s) hereby
granted.
Grantor hereby undertakes and agrees to release, hold
harmless and indemnify the City of Los Angeles and its Department
of Water and Power and all officers and employees of each from
and against any and all claims, loss, demands, expense, damage
or liability whatsoever for injuries to or death of persons or
damage to property in any manner arlsing out of any failure on
the part of Grantor to keep or perform any of the terms or
conditions hereof.
EXHIBIT 5
SAMPLE
AGRREMENT FOR INSTALLATION AND TRANSFER
OF TITLE OF WATER SYSTEM FACILITIES
AGREEMENT NO. WO-
This Agreement is entered into and effective as of
by and between the DEPARTMENT OF WATER
ANGELES, hereinafter referred to as
the "Developer", who agree as follows:
The Developer is the owner of certain land described as
Tract No. and as more fully (or further} shown on Exhibit "A"
attached hereto. In developing this land, the Developer is
desirous of obtaining a water supply adequate for domestic uses
and public fire protection purposes and is desirous of Water
System clearance for this project.
In order to provide facilities for a water supply to
said land, it is the intention of the parties to this Agreement
that the Developer will furnish and install those water mains,
fire hydrants, service laterals, valves, and all pertinent
fittings, and other facilities required for a complete water
system to serve the land shown on Exhibit "A".
In order to implement the foregoing and in
consideration of the terms and conditions herein contained, the
parties further agree as follows:
1.0 Developer shall design and construct, at the Developer's
sole expense, the water facilities and appurtenances in
accordance with Department-approved final plans, and in
accordance with Department-approved design standards and
specifications, and the terms and conditions of this Agreement.
1.1 Design shall be by a Professional Engineer registered in the
state of California, hereinafter referred to as the "Design
Engineer", in accordance with the Department's Water Operating
Division's latest Engineering Standards Manual and Standard
specification No. DWPWS-D101.
1.2 A copy of the Department's Engineering Standards Manual and
Standard Specification No. DWPWS-DIOl will be provided to the
Developer upon payment of applicable charges.
2.0 The Department, at the Developer's expense, shall review the
Developer's plans for the purpose of ensuring the adequacy of the
design and conformance with the Department's standards and
specifications. The Department reserves the right to add,
delete, modify, change, or amend any or all the plans and
specifications.
- 2 -
2.1 In the event that the property to be developed includes
multiple residential, condominiums, commercial or industrial
uses, site plans, grading plans and any available plumbing plot
plans will be furnished to the Department by the Developer.
2.1.1 During the course of the development and construction of
the project, it is recognized that the City of Los Angeles or
other regulatory authority may require, or the Developer may
agree to, changes in existing streets, facilities or
installations which in turn may require the relocation,
replacement or addition of water system facilities. In the event
that any such changes are required, or agreed to, the Developer
shall, within 30 days thereof, submit to the Department for its
review and approval the final plans and specifications detailing
the Developer's arrangements to accomplish such work. The
Developer shall perform any additional water facility work at the
Developer's sole cost. All work performed pursuant to this
paragraph shall be subject to the terms and conditions of this
Agreement and shall be considered a part hereof.
2.2.0 During the course of the development and construction of
the project, it is further recognized that unforeseen
circumstances including, but not limited to, surface or
subsurface geological and earth features and the presence of
artificial structures and/or equipment may prevent the
construction of the system as theretofore designed and that
changes in the design and construction will be required because
of the aforementioned unforeseen circumstances. In such event,
the Design Engineer will modify the design to accommodate said
unforeseen circumstances to the satisfaction of the Department.
The Developer will pay the Department any applicable costs associated
with such redesign in accordance with paragraph 12 herein.
2.2.1 The Department retains in its sole and exclusive
discretion, the option to perform such additional work itself.
In the event the Department exercises such option, the Developer
shall pay the Department's current costs in accordance with
Paragraph 12 herein, for such additional water facility work.
3.0 The Developer shall procure, at the Developer's own expense,
all licenses, guarantees, approvals and certificates of
inspection which are required by the laws, rules,
regulations or codes of all government bodies having jurisdiction
over said construction and property and shall, in addition,
comply with all the requirements thereof.
3.1 Excavation/resurfacing permits will be secured by the
Department at the Developer's expense. Permits/easements to
install, maintain and operate water System facilities in private
property shall be secured by the Developer at the Developer's
own expense.
4.0 The water system facilities to be installed pursuant to this
Agreement will become an extension of the distribution system of
the Department. All materials used must conform with Department
specifications for such materials.
- 3 -
4.1.0 Procurement of materials will be the sole responsibility
of the Developer.
4.1.1 The Developer may furnish a list of materials unobtainable
from other sources, which Developer desires to purchase from the
Department. The Developer will be required to show evidence,
satisfactory to the Department, that purchase of the requested
material is unobtainable through suppliers of such materials. In
the event the Department concurs that certain materials are
unobtainable, it agrees to supply those materials, which shall be
paid for by the Developer as provided herein.
4.1.2 The Developer may receive purchased materials F.O.B. at
the water System's after full prior payment therefor. An
advance notice of at least two (2) working days shall be given by
Developer to the Department for pickup of these materials by
contacting Mr. Terry Okamura at (213) 580-3890. All materials
are subject to availability, and delivery is guaranteed only on
Department-stocked materials.
5.0 Any notice, demand, request, consent, approval, or
communication that either party desires or is required to give to
the other party or any other person shall be in writing and
either served personally or sent by prepaid, first-class mail and
shall be addressed to the other party at the address set forth
below. Either party may change its address by notifying the
other party of the change of address. Notice shall be deemed
communicated within 24 hours from the time of mailing if mailed
as provided in this paragraph.
DEVELOPER:
DEPARTMENT OF WATER AND POWER:
Mr.
111 North Hope Street, Room 1425
Los Angeles, california 90012
Attention M
Phone No. (213) 580-
5.1.0 The Developer shall give written notice to the Department at
least five (5) days before initially starting work under this Agreement.
5.1.1 The Developer and contractor shall attend a preconstruct ion
meeting with the Department at the Department's General Office
Building located at 111 North Hope street, Los Angeles, no less
than fourteen days prior to commencement of work.
- 4 -
5.1.2 No work. on water facilities shall commence prior to the
completion of all required curbs and gutters.
6.0 All work and materials shall be subject to inspection and
testing by the Department at the Developer's expense. In the
event the Developer arranges to have materials fabricated for the
project, the Developer may be required to arrange for the
Department to inspect that material during fabrication.
6.1 All material fabrications must conform with Department
standards and specifications.
6.2 The Department's inspectors shall have unlimited access to
perform continuous inspection and have the authority to stop work
at any time, by written notice, without any liability whatsoever
to the Department, if, in the inspectors' judgment, the work
called for by this Agreement or the plans, or the specifications
are not being installed or performed in a satisfactory and
workmanlike manner according to Department standards and
specifications and/or in the event the materials do not comply
with the Department's standards and specifications.
6.3 Final acceptance by Developer of all material to be
purchased or fabricated by Developer under this Agreement shall
be made only with the prior approval of the Department. Approval
by the Department, however, shall not operate to relieve the
material supplier or the Developer of any guarantees, warranties,
or the duty of compliance with any of the requirements of the
approved plans and specifications or of this Agreement.
7.0 The Developer shall and by this Agreement does guarantee the
Developer's faithful performance of this Agreement and all of its
terms and conditions by providing the following:
7.1.0 The Developer shall provide the Department with a Letter
of Credit, presentable in Los Angeles, from a financial
institution licensed by the state of California and authorized to
do and doing business in said state, valid for the length of this
Agreement, approved by the city Attorney and accepted by the
Department.
7.1.1 The Letter of Credit shall be in the amount of $
7.1.2 The Developer shall, in addition, and by this Agreement
does guarantee to the Department that for one year after the
acceptance of the Developer-installed and completed water
facilities and appurtenances they shall be free from any and all
liens and encumbrances and free from any and all defects in the
materials or construction thereof. This one-year guarantee shall
be an Irrevocable Letter of credit in the amount of $, beginning
at the date of the acceptance of the water facilities by the
Department.
- 5 -
7.2 Upon acceptance of a Letter of Credit in the amount provided
herein and approval by the city Attorney and upon payment of
applicable charges, pursuant to Paragraphs 12.0, the Department
shall notify the City Engineer that said Letter of Credit has
been provided to the Department guaranteeing payment of the cost
of installing the water system facilities and appurtenances.
8.0 In order for the Department to accept the facilities, the
Developer shall provide the following:
8.1 The Developer shall submit to the Department a field notes
drawing prepared by the contractor or Developer's representative
in accordance with the Department's latest "Field Notes and
As-Constructed Manual".
8.2 The Developer shall, in addition, submit as-constructed
drawings prepared by the Design Engineer in accordance with the
Department's latest "Field Notes and As-Constructed Manual".
8.3 The Developer shall submit to the Department for accounting
purposes, the total cost for furnishing and installing the water
system facilities, itemized by size of water mains, type of pipe,
type of fire hydrants and size of service laterals.
9.0 The following options may be exercised by the Department:
9.1 The Department may require a Galvanic Cathodic Protection
system designed and installed by someone under the direct
supervision of or by a Corrosion Specialist certified by the
National Association of Corrosion Engineers or a Corrosion
Engineer registered by the State of California. The Department
retains the option of installing the Galvanic Cathodic Protection
System. Department personnel shall be permitted access to
perform the installation of Cathodic Protection facilities during
the construction of the water Supply System.
9.2 The Department retains the option to furnish all labor and
material to perform the required hydrostatic test of the water
system.
9.3 These options will be exercised by the Department, if at
all, at the time of plan approval.
10.0 The Developer accepts the responsibility for and the costs
occasioned by any reconstruction, relocation, damages to or
changes of water services or facilities caused or contributed to
directly or indirectly by any subsequent changes in the location
of any of said facilities or water meters or water services.
11.0 In no event will permanent water service be provided to the
Developer's installed system until all applicable charges have
been paid by the Developer and all facilities have been conveyed
to the Department, including any easements which may be required.
Such conveyance shall occur in a timely manner in accordance with
the terms of Paragraph 15.
- 6
12.0 The Developer shall pay the Department for all costs and
charges in accordance with the following:
12.1.0 Payment of 'actual cost' by the Developer shall be the
actual direct costs and indirect costs incurred by the Department
for such activities, work performed, materials acquired,
contracts let or permits obtained under the terms of this
Agreement.
12.1.1. Direct costs shall include, but not be limited to,
direct labor, materials and equipment cost used specifically for
work performed under this Agreement. Indirect cost shall
include, but not be limited to, administrative and general
expenses, retirement and death benefits, health care costs,
supervision and engineering and tool expenses. Indirect costs
shall be charged at the Department's in-house percentage rate
calculated by the Department's Accounting Division.
12.1.2 The cost for Department-supplied material pursuant to
Paragraph 4 will be at the current Department warehouse material
cost in effect at the time the material is issued, plus current
Department material handling charges for warehouse materials and
applicable taxes.
12.2.0 A charge of $6.00 per lineal foot of main to be
installed, plus $60.00 each for 2-inch and smaller domestic
service laterals plus $115.00 each for other service and fire
hydrant laterals as shown on Exhibit "B" shall be paid by the
Developer. In the event the aggregate of such charges does not
exceed $2,000.00, a minimum charge of $2,000.00 shall apply.
This charge will cover the following work items performed by the
Department:
Review of construction Plans and Specifications
Engineering Supervision
Review of Field Notes and As-Constructed Drawings
(Final)
Valve operation
Construction Inspection
Sanitization
Contract Administration
Preparation of Agreements
12.2.1 The costs for Department-furnished Cathodic Protection,
materials inspection and testing, and hydrostatic testing shall
be based on the actual time and materials used by Department
personnel.
12.2.2 Any applicable charges for meters and installation of
meters and meter boxes shall be the current cost from the
Department's Water Facility Charges.
- 7 -
12.2.3 All actual costs for (or from the Department's water
Facility Charges, if applicable) all Department work or material
performed pursuant to the provisions of this Agreement.
12.2.4 All existing water main charges, acreage supply charges,
and main connection charges.
12.2.5 All costs for all applicable water fees, permits,
licenses, material purchases, special estimates and other charges
or costs as may be required in accordance with this Agreement and
Department Rules and Regulations.
12.3 The Developer shall pay any or all taxes assessed upon the
water facilities being constructed pursuant to this Agreement.
12.4 The Developer shall make payment to the Department within
30 days upon presentation of any bill prepared in accordance with
this Agreement, unless payment prior to a service or delivery of
material is required. The calculation of all costs and charges
by the Department will be made on the Department's costs and
charges current at the time service is rendered.
13.0 The Developer acknowledges and represents that it assumes
full responsibility for any injury to any person or damage or
destruction to any property by reason of the work to be
performed, materials to be ordered and delivered, or the
obligations of the Department and the Developer undertaken
pursuant to this Agreement and expressly undertakes and agrees to
release and hold harmless and indemnify the Department and all
its officers, employees, and agents from and against all suits
and causes of action, claims, loss, demands, expenses, damage or
liability of any nature whatsoever, save and except for its sole
negligence or sole willful misconduct, for death or injury to the
Developer, its agents and contractors, their agents and
employees, to the Department, its employees, agents and
contractors, their agents and employees, or to third persons or
damage or destruction to any property of either party hereto or
of third persons in any manner arising by reason or incident to
the work to be performed, materials to be ordered and delivered
or the obligations of the Department and the Developer undertaken
pursuant to this Agreement whether or not contributed to by any
act or omission, active or passive, negligent or otherwise, of
the Department, or any officers, employees or agents thereof and
will make good to and reimburse the Department for any
expenditures including reasonable attorney's fees the Department
may make by reason of such matters and if requested by the
Department will defend any such suits at the sole cost and
expense of the Developer.
14.0 The Developer and/or the Developer'S primary contractor,
not later than the effective date of this Agreement and, in any
event, prior to the start of work, shall furnish the Department
evidence of insurance coverage in the form of the Department's
Additional Insured Endorsement form and/or a special Endorsement
- 8 -
form of insurance for certain designated coverages as specified
hereinafter which shall be maintained by the Developer's sole
cost and expense. The Developer's insurances shall be primary
and not contributing with any other insurance maintained by the
Department and shall include a severability-of-interest or cross
liability clause.
All such evidence of coverage shall be subject to the
approval of the Office of the City Attorney, water and Power
Division, as to compliance with these provisions. Each policy
hereinafter specified shall contain a provision that the policy
cannot be cancelled or reduced in coverage or amount without
first giving 30 days' notice thereof by receipted delivery, to
the City Attorney, c/o, Department of Water and Power, P. o. Box
111, Room 1425, Los Angeles, California 90051.
14.1 Workers' Compensation Insurance covering all of the
Developer's employees, and all contractor's employees, shall be
furnished in accordance with the laws of any state in which the
work is to be performed and including Employer's Liability
insurance which shall have a limit of not less than $1,000,000
each accident.
Evidence of Workers' Compensation and Employers'
Liability coverages shall be in the form of the Department's
Special Endorsement form.
The Developer shall require the carrieres) providing
Workers' Compensation and Employers' Liability to waive all
rights of subrogation against the City of Los Angeles, the Board
of Water and Power Commissioners of the City of Los Angeles, the
Department of Water and Power of the City of Los Angeles, and
their officers, agents, and employees.
14.2 The General Liability Insurance shall be of the
Comprehensive form if available and the Commercial form if not
and shall include Contractual Liability, Independent contractors,
Products/Completed operations, Broad Form Property Damage,
Personal Injury, and Explosion, Collapse and Underground
coverages and shall provide for limits of not less than
$1,000,000 Combined Single Limit. The Products/Completed
operations coverage shall be maintained for two y e a r ~ following
final acceptance of the work under this agreement.
The Comprehensive Automobile Liability Insurance shall
include coverages for owned, non-owned, hired, and leased
automobiles and shall provide for limits of not less than
$1,000,000 Combined Single Limit. The Comprehensive Automobile
Liability may be a separate policy or can be included with the
Comprehensive General Liability.
Evidence of Comprehensive General Liability and
Comprehensive Automobile Liability shall be in the form of the
Department's Additional Insured Endorsement forms.
- 9 -
14.3 The Developer may use an Umbrella or Excess Liability
coverage to meet coverage limits as specified in Paragraphs 14.1
and 14.2. Evidence of Excess Liability shall be in the form of
the Department's Additional Insured Endorsement form. The
Developer shall require the carrier for Excess Liability to
properly schedule and identify the underlying policies as
provided for on the Additional Insured Endorsement form,
including as appropriate, Comprehensive General Liability,
Comprehensive Automobile Liability, and Employers' Liability.
14.4 Each policy specified in Paragraphs 14.2 and 14.3 shall
include the City of Los Angeles, the Board of water and Power
Commissioners of the City of Los Angeles, the Department of Water
and Power of the City of Los Angeles, and their officers, agents,
and employees while acting within the scope of their employment,
as additional insureds with the Developer, and shall insure
against liability for death, bodily injury, or property damage
allegedly arising out of, or in connection with, the work to be
performed under this agreement.
14.5 The foregoing requirements as to types, limits and the
Department's approval of insurance coverage to be maintained by
the Developer are not intended to, and shall not in any manner,
limit or qualify the liabilities and obligations assumed by the
Developer under this contract.
15.0 The Developer shall furnish an itemized Bill of Sale or
other acceptable document transferring title and ownership of the
completed facility and shall request in writing the formal
acceptance of the installed facilities when all applicable
conditions of this Agreement have been completed. Upon compliance
with all of the terms and conditions of this Agreement, the
Department will mail a written notice of acceptance thereof, to
the address provided herein. Title to the ownership of said
facilities and appurtenances shall thereby be conveyed to the
city of Los Angeles and the Department of Water and Power. The
Department will thereafter operate and maintain said facilities
so as to furnish water service to the development (Exhibit "AIf)
in accordance with the Department's Rules and Regulations.
16.0 The Department's failure to enforce any provisions of this
Agreement or the waiver thereof in any instance shall not be
construed as a general waiver or relinquishment on its part of
any such provision, but the same shall nevertheless be and remain
in full force and effect.
DEPARTMENT OF WATER AND POWER OF
THE CITY OF LOS ANGELES
By ________________________________ __
DANIEL W. WATERS
General Manager and Chief Engineer
- 10 -
DEVELOPER
By __________________________ __
Title
Date ______________________________ __
COMPANY
STATE OF CALIFORNIA
)
) SS.
COUNTY OF ___________________ )
On before me, the undersigned, a
Notary Public in and for said State, personally appeared
personally known to me or proved to me on the basis of
satisfactory evidence to be the person who executed the within
instrument as the President, and
____________________________ personally known to me or proved to me
on the basis of satisfactory evidence to be the person who
executed the within instrument as the ________________________ __
Secretary of the Corporation that executed the within instrument
and acknowledged to me that such corporation executed the within
instrument pursuant to its by laws or a resolution o ~ its Board
of Directors.
WITNESS my hand and official seal.
Signature
INDIVIDUAL
STATE OF CALIFORNIA )
) SS.
COUNTY OF )
On before me, the undersigned, a
Notary Public in and for said state, personally appeared
personally known to me or proved to me on the basis of
satisfactory evidence to be the person(s) whose name(s)
subscribed to the within instrument and acknowledged that
executed the same.
WITNESS my hand and official seal.
Signature

You might also like