You are on page 1of 2

Allai Khwar HPP Contract No.

AC03

Updated Bill of Quantities (For Information)

Dahitar Hydropower Project


Bill No. 1 Page No. 1 Pay Item
1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 Performance Security Insurance in accordance with CC Clauses 21 and 24 Detailed Design (Civil Works and Hydraulic Steel Works) Detailed Design for additional new items Total for 1.1, Obligations under CC CONTRACTOR'S TEMPORARY FACILITIES AND GENERAL ADMINISTRATION Provision of Contractor's camps, offices, workshops, stores, crushing, screening and batchingmixing facilities plus other plant and equipment 1.2.2 Provision of Contractor's facilities for water supply, electricity supply, sewerage, communication, solid waste, etc. 1.2.3 1.2.4 1.2.5 1.2.7 All temporary road works within the site not covered by the Bill "Site Roads" All laydown and plant areas required for the Works Maintenance of all access roads within the Site boundary Contractor's survey. General survey, control of bench network, traversing, establishing of control points and bench marks, setting out of all works, levelling, quantity survey, etc 1.2.8 1.2.9.1 1.2.9.2 1.2.10.1 1.2.10.2 1.2.11 Provision of other temporary works which are not provided for elsewhere in the BOQ Provisional sum for power supply for other contractors i.e. E&M Contractor and others Contractor's overhead and profit on item above Provisional sum for power supply to the Employer and the Engineer Contractor's overhead and profit on item above Operation and maintenance of camps, workshops, stores, site tesitng laboratory, supply facilities and other temporary and permanent work 1.2.12 1.2.13 1.2.14 1.2.15.1 1.2.15.2 1.2.16 Contractor's supervision and administration on Site and off Site, execution drawings and calculations Removal of all temporary works, clean up of Site and move out Supply of specified laboratory and testing equipment Prvisional sum for additional site testing equipment Contractor's overhead and profit on item above De-watering at the powerhouse site including powerhouse pit and tailrace channel Total for Bill 1, Page 1 LS LS LS sum % LS LS sum % sum % LS LS LS LS LS LS LS

Bill of Quantities, Lot C&HS, Contract No. AC 03


1 Preliminaries and General Provisions All Structures Dimension Quantity Unit rate Amount Rs/Unit (Rs)
LS LS LS LS 1 1 1 1 5,000,000.00 2,500,000.00 1,000,000.00 2,000,000.00 5,000,000 2,500,000 1,000,000 2,000,000 10,500,000

Chapter : Structure : Description

OBLIGATIONS UNDER CONDITIONS OF CONTRACT

1,500,000.00

1,500,000

1 1 1 1

1,000,000.00 1,000,000.00 264,692.89 700,000.00

1,000,000 1,000,000 264,693 700,000

1 1 1

1,000,000.00 1,000,000.00 1,000,000.00 20

1,000,000 1,000,000 1,000,000 200,000 600,000 120,000

600,000.00 20

1 1 1 1 1 1 1

800,000.00 750,000.00 1,000,000.00 1,000,000.00 500,000.00 20 500,000.00

800,000 750,000 1,000,000 1,000,000 500,000 100,000 500,000 13,034,693 23,534,693

Total for 1.2 Contractor's Temporary Facilities and General Administration

1/2

Allai Khwar HPP Contract No. AC03

Updated Bill of Quantities (For Information)

Dahitar Hydropower Project


Bill No. 1 Page No. 2 Pay Item
From Page 1 1.3 1.3.1.1 1.3.1.2 1.3.2.1 1.3.2.2 1.3.3 1.3.4 1.3.5.1 1.3.5.2 1.3.6.1 1.3.6.2 1.3.7.1 1.4 1.4.1 ASSISTANCE AND SUPPLIES TO THE EMPLOYER AND THE ENGINEER Provide Employer's office Provide Engineer's office Maintenance of Employer's office Maintenance of Engineer's office Provision of Engineer's portable field office cabins Maintenance of Engineer's portable field office cabins Diesel supply to Employer's and Engineer's vehicles Gasoline supply to Employer's and Engineer's vehicles Provisional sum for contingency item for various Site supplies ordered by the Engineer Contractor's overhead and profit on item above Provisional sum for other Contractors transport to sum % m m

Bill of Quantities, Lot C&HS, Contract No. AC 03


1 Preliminaries and General Provisions All Structures Dimension Quantity Unit rate Amount Rs/Unit (Rs)

Chapter : Structure : Description

80 80 4000 4000 2 80 15000 3000 1

15,553.14 15,553.14 516.03 516.03 470,758.61 17,046.89 88.83 93.50 777,638.00 20

1,244,251 1,244,251 2,064,120 2,064,120 941,517 1,363,751 1,332,450 280,500 10,534,961

m - months m - months pcs pcs - months l l

Total for 1.3, Assistance and Supplies to the Employer and the Engineer OTHER COSTS Any other lump sum for any work or temporary work in the Tender Documents not included elsewhwere in BoQ and for which the Contractor considers a seperate charge is required. The works or obligations covered by the item shall be specified. (Details of such work, including temporary works as given above are defined in Attachment 2 to Memorandum of Understanding) Total for 1.4, Other Costs LS 1 4,000,000.00

4,000,000 4,000,000

2/2