Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Hardware Description - Rack Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.5 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A9130 BSC Evolution Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going on Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before You Start (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Complete BSC Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Install Boards in ATCA Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Check Boards Position in LIU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.3 Check the ATCA-LIU Ethernet Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.4 Check the JSXLIU Shelf Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.5 Connect PCM Cables to JSXLIU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Hardware Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Check the Equipment Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Check the JAXPC Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.3 Check the JBXFAN Switch Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5 Powering Up the BSC Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.1 Check the Customer Power Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.2 Check Polarity of DC Cables on BSC Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.3 Powering Up the BSC Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.4 Check Power Line Redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6 Check BIOS Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7 Software Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8 Check the Firmware Version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9 Commissioning Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.1 Option: LMT Installation (O1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.2 Connect the LMT to the BSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.3 Option: Connect O&M cables from MFS to BSC (O2) . . . . . . . . . . . . . . . . . . . . . . 2.9.4 Perform the Rack Inventory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.10 Connect the OMC-R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11 Option: Check the Connection with the CBC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.1 Open a Telnet Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.2 Ping the CBC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.12 End of Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 7 8 8 11 12 12 13 14 14 14 15 16 16 16 17 19 20 20 20 20 21 21 25 27 29 30 31 31 31 33 34 34 34 36 37 38 38 38 39 39 39 40 41 41 42 42 43 43
IN PREPARATION
3 / 44
Contents
4 / 44
IN PREPARATION
Preface
Preface
Purpose Whats New
This document describes the configuration and verification procedures to be carried out when commissioning the A9130 BSC Evolution in release B9.
In Edition 20
The reference to IO 114 was removed. Figures 2, 3, 12 , 15 and 18 were updated. Description update in Powering Up the BSC Rack (Section 2.5.3).
In Edition 01
First official release of the document.
Audience
This document is addressing to the following: Site administrators Supervisors Project managers Field service technicians Occasional users
Assumed Knowledge
The personnel involved must be familiar with: Commissioning tools Personal Computers using the Windows 2000/XP environment Digitals UNIX operating system environment.
IN PREPARATION
5 / 44
Preface
6 / 44
IN PREPARATION
1 Overview
1 Overview
This Overview gives information needed by project managers and foremen, for presentation to the customer and for site planning.
IN PREPARATION
7 / 44
1 Overview
1.1 Presentation
1.1.1 Hardware Description - Rack Configurations
The following figure shows the rack layout for an A9130 BSC Evolution in 600 TRX configuration.
JSXPDU
CLOSED
OPEN
H/S
OOS
CLOSED
OPEN
H/S
OOS
CLOSED
OPEN
H/S
OOS
CLOSED
OPEN
H/S
OOS
Not Used
Not Used
XLIU XLIU
4A
JBXOMCP
JBXOMCP
JBXSSW
Not Used
JBXSSW
JBXCCP
JBXCCP
JBXCCP
2 3 4
XLIU XLIU XLIU
5 6 7 8
XLIU XLIU XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XPEM
LIU Shelf 1
JBXCCP
48 / 60 VDC
48 / 60 VDC
4A
8 / 44
IN PREPARATION
Not Used
JBXTP
JBXTP
ATCA Shelf 3
1 Overview
The following figure shows the rack layout for an A9130 BSC Evolution 600 TRX configuration /A9130 MFS Evolution 9 JBXGPU configuration in case of rack shared configuration.
JSXPDU
CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS
JBXOMCP
JBXOMCP
Not Used
Not Used
JBXOMCP
JBXOMCP
JBXSSW
JBXSSW
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
5 6 7 8
XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU
LIU Shelf 2
XPEM
XLIU
XLIU
XLIU
XLIU
48 / 60 VDC
4A
2 3 4
XLIU XLIU XLIU
5 6 7 8
XLIU XLIU XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEM
LIU Shelf 1
XPEM
48 / 60 VDC
48 / 60 VDC
4A 4A
graphics/174223121003.cgm
JBXGPU
ATCA Shelf 3
Not Used
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXTP
JBXTP
ATCA Shelf 4
IN PREPARATION
9 / 44
1 Overview
The following figure shows the rack layout in case of rack shared by two A9130 BSCs Evolution 600 TRX configuration.
JSXPDU
CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS
JBXOMCP
JBXOMCP
Not Used
Not Used
JBXOMCP
JBXOMCP
Not Used
Not Used
5 6 7 8
XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU
XPEM
XLIU
XLIU
XLIU
XLIU
LIU Shelf 2
48 / 60 VDC 4A
1
XPEM
2 3 4
XLIU XLIU XLIU
5 6 7 8
XLIU XLIU XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEM
LIU Shelf 1
48 / 60 VDC 48 / 60 VDC 4A 4A
graphics/174223121006.cgm
Figure 3: Example of Two A9130 BSC Evolution Rack Layout - Front View
10 / 44
IN PREPARATION
Not Used
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXTP
JBXTP
ATCA Shelf 3
Not Used
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXTP
JBXTP
ATCA Shelf 4
1 Overview
The following figure shows the back rack layout for an A9130 BSC Evolution in any configuration.
JAXSSW
JAXSMM
JAXSMM
OOS OK ACT
JBXPS
(POWER)
JBXPS JBXPS
(POWER) (POWER)
OK ACT
+(RETURN)
+(RETURN)
+(RETURN)
+(RETURN)
Handle
Closed Open
Closed Open
H/S
OOS
OOS
H/S
OK
Handle
OOS
JAXPC JAXPC
JAXPC JAXPC
GND
OK
graphics/174223121002.cgm
1.1.2 Cases
None.
IN PREPARATION
11 / 44
1 Overview
1.1.3 Options
The following option applies: O1: Install LMT O2: Connect O&M cables from MFS to BSC, in rack shared configuration
1.1.4 Restrictions
None.
12 / 44
IN PREPARATION
1 Overview
Boards installation
Hardware check
Power up rack
Commisioning test
End commissioning
graphics/174213121opprinc.cgm
IN PREPARATION
13 / 44
1 Overview
1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply: The site must conform to the "Safety rules" (see BSS Methods Handbook). The site must conform to SPP- 59, Specification for Site Preparation A9130-BSC The OMC-R must be operational and ready for connection to the BSC. The router must be configured and ready for connection (if applicable).
14 / 44
IN PREPARATION
1 Overview
1.3 Scheduling
The following table gives the duration for each task. Task Preliminary checks Preparation before leaving for the site Before starting (on arrival at the site) Boards installation Hardware check Set LIU shelf address Powering up the BSC rack Check the power panel Check the polarity on the BSC side Powering up the BSC rack Check power line redundancy Check firmware version Commissioning tests Option: LMT installation Connecting LMT to the BSC Software installation Perform rack inventory Connecting the OMC-R Option: Check the connection with the CBC End of commissioning Total Table 1: Scheduling 20 2 65 15 10 5 10 4h10 5 10 5 10 30 15 10 20 10 5 Duration (min)
IN PREPARATION
15 / 44
1 Overview
1.4 Resources
1.4.1 Tools
1.4.1.1 Hardware Tools
The following table is used to check, at base, the availability of the necessary tools. SeeTools Catalogue for Field Activity for checking the content. Kit name Basic kit Test cables and plugs (BSC) Utility PC (IMT) Digital multimeter Reference OUT 001 OUT 013 DES 002 DES 001 Calibration NO NO NO NO
1.4.1.3 Forms
None.
1.4.2 Supplies
None.
16 / 44
IN PREPARATION
1 Overview
IN PREPARATION
17 / 44
1 Overview
18 / 44
IN PREPARATION
IN PREPARATION
19 / 44
20 / 44
IN PREPARATION
Note:
Shelf filling is done from center to shelf sides. The following tables gives the JBXCCP boards allocation in ATCA shelf. Physical slots 1 2 3 4 x 5 x x x 6 7 8 9 10 x x x 11 x x 12 13 14 -
Boards
JBXCCP
Table 2: JBXCCP Position in ATCA Shelf The ATCA configuration is described in the following figure:
CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS
CLOSED
OPEN
H/S
OOS
CLOSED
OPEN
H/S
OOS
Physical 1 slot
9 10 11 12 13 14
JBXOMCP
JBXOMCP
Not Used
Not Used
Not Used
Not Used
21 / 44
JBXCCP
JBXCCP
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXTP
JBXTP
IN PREPARATION
2. Put on an ESD wrist strap and connect it to the shelf by attaching the front or rear ESD jack. 3. Ensure that the lower and upper handles are in the outward position. 4. Insert the board into the shelf by placing the top and bottom edges of the board in the card guides of the shelf. Ensure that the guiding module of shelf and board are aligned properly. Press the lower and upper parts of the handle together.
graphics/174213111018.cgm
Figure 6: Insert the Board 5. Slide the board into the shelf until you feel resistance.
22 / 44
IN PREPARATION
6. Simultaneously move the top and bottom handles to the inward position to lock the board to the shelf.
graphics/174213111blade.cgm
Figure 7: Board in ATCA Shelf, Secured with Handles to the Inward Position
IN PREPARATION
23 / 44
7. Install one by one all the boards for the requested configuration. During boards insertion: Holes on back side of the board must be in line with guiding pins on the back plane
graphics/174213111008.gif
Figure 8: Holes in Line with Guiding Pins EMI stripes must not be damaged when inserting the boards
graphics/174213111009.gif
Figure 9: EMI Stripes 8. Tighten the front plate screws to secure the board to the shelf. 9. Insert a filler (JBXFILL) in each unused slot. 10. Tighten the front plate screws to secure the filler to the shelf.
24 / 44
IN PREPARATION
JBXDUM 19 20
48 / 60 VDC
48 / 60 VDC
4A 4A
graphics/174213121001.cgm
Figure 10: LIU Shelf for BSC with 200 and 400 TRX Configuration
IN PREPARATION
25 / 44
The following figures show the LIU shelf for different A9130 BSC Evolution 600 TRX configuration.
JBXPEM JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXMUX JBXMUX JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXPEM
48 / 60 VDC
48 / 60 VDC
4A 4A
.cgm
Figure 11: LIU Shelf for BSC with 600 TRX Configuration
26 / 44
IN PREPARATION
ETH 1
ETH 2
ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
ETH 2
ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
OK
OK
ACT
ACT
Test
Test
GbE
GbE
.cgm
IN PREPARATION
27 / 44
ATCA Shelf 4
ATCA Shelf 3
FRONT
Free Space (LIU Shelf 2)
REAR
LIU Shelf 1
123456789012345678 123456789012345678
graphics/174213111014.cgm
Figure 13: JLCAT6 Cable Routing 3. Connect the first JLCAT6 Ethernet cable (1AB 22983 0005) to the GbE port on JBXMUX1 (slot 10) in JSXLIU shelf 1/2. See Figure 12. 4. Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) on ATCA shelf 3/4, JAXSSW2, Ethernet port 2. See Figure 12. 5. Run the cable under the JSXLIU shelf 1. See Figure 13. 6. Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) to the GbE port on JBXMUX2 (slot 12) in JSXLIU shelf 1/2. See Figure 12. To connect the OMC-R Ethernet cables: 1. Identify the OMC-R Ethernet cables 2. Connect the first OMC-R Ethernet cable to the ATCA shelf 3/4 JAXSSW1, Ethernet port 3 3. Label the cables near the connectors.
28 / 44
IN PREPARATION
MUX A
PEM A
LIU 16
LIU 10
LIU 14
LIU 12
LIU 13
LIU 15
MUX B
10
11
12
13
14
15
16
17
18
19
20
graphics/174213111001.cgm
Figure 14: Slot 11 Back Panel Jumper Numbering 3. If the shelf address is set to 1 continue with step 8 4. If the shelf address is not set to 1, set it following the next steps 5. Remove the JBXMUX boards and some JBXLIU boards to have better access to the back panel 6. On the slot 11 on back panel remove the jumper from position 1, if equipped, in order to set the shelf address to "1 (See Figure 14) 7. Insert the JBXLIU and JBXMUX boards and secure it with the screws 8. Fix the dummy panel on slot 11 and fix it with the screws.
PEM B
LIU 11
LIU 6
LIU 4
LIU 7
LIU 8
LIU 2
LIU 3
LIU 5
LIU 9
LIU 1
21
IN PREPARATION
29 / 44
30 / 44
IN PREPARATION
S2
S1
.cgm
IN PREPARATION
31 / 44
5. On the JAXPC board set the S2 switch to 0. 6. On the JAXPC board set the S1 switch to 3 for shelf 3 and to 4 for shelf 4. See Figure 2 for shelf numbering. 7. Carefully insert the JAXPC card in the slot. 8. Tighten the screws fixing the JAXPC card to the ATCA shelf. 9. Place the JAXPC board handle switch to Closed position.
32 / 44
IN PREPARATION
graphics/174213111011.gif
Figure 16: JBXFAN Cover Fixing Screws 2. Remove the JBXFAN cover plate.
graphics/174213111012.gif
Figure 17: Remove JBXFAN Cover 3. Check if JBXFAN switch is set to Closed position otherwise set it to Close position. 4. Perform the check for all four JBXFAN units and for all equipped ATCA shelves. 5. Fit back the JBXFAN cover and fasten the fixing screws.
IN PREPARATION
33 / 44
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
Shelf 4
Shelf 2
Shelf 3
Shelf 1
Shelf 4
Shelf 2
Shelf 3
Shelf 1
graphics/174213111pdu.cgm
34 / 44
IN PREPARATION
Breaker
BATR
GND
to ATCA shelf
cover.cgm
Figure 19: Connections for One Single Breaker 4. Check the power line connections for both lines A and B: Blue cables in the BATA and BATB position Black cables in the BATR position Yellow-green cable in GND position 5. Check that nothing can cause a short circuit between the BATA, BATB and BATR connectors.
Line cable from power station (branch A) 35 mm 2 diameter 14 mm Line cable from power station (Branch B) 35 mm 2 diameter 14 mm
BATA BATR
BATB BATR
Earthing (GND)
75A
10A
75A
10A
75A
75A
10A
75A
10A
75A
Racking braket
con.cgm
IN PREPARATION
35 / 44
6. On the site power panel, connect the power supply line, using fuse holder A first. Circuit A is connected. 7. Test the A circuit. Check with the multimeter the presence of -48V and the polarity between BATA and BATR. 8. On the site power panel, disconnect the power supply line, using fuse holder A. 9. Repeat the previous operations for circuit B. Check the presence of -48V and the polarity between BATA/B and BATR on each circuit, then leave the circuits disconnected. 10. Replace the PDU cover plate.
4. If ATCA3 shelf is used, switch ON (engage) the breakers A3 and B3. 5. Check on each JBXPS front panel that Rev. Power LED is OFF. If Rev. Power LED is ON switch OFF the breakers A3 and B3 and check power polarity on JBXPS terminals. 6. Switch ON the breaker on all JBXPS modules.
7. If ATCA4 shelf is used, switch ON (engage) the switches A1 and B1. 8. Check on each JBXPS front panel that Rev. Power LED is OFF. If Rev. Power LED is ON switch OFF the breakers A1 and B1 and check power polarity on JBXPS terminals. If two shelves are used for the MFS, both shelves must be powered up. 9. Switch ON the breaker on all JBXPS modules.
Power Up JSXLIU1 Shelf 10. Switch ON (engage) the switches A4 and B4, if JSXLIU1 shelf is used.
Power LED on JBXPEMs in JSXLIU shelf switches ON.
Power Up JSXLIU2 Shelf 11. Switch ON (engage) the switches A2 and B2, if JSXLIU2 shelf is used.
Power LED on JBXPEMs in JSXLIU shelf switches ON.
36 / 44
IN PREPARATION
IN PREPARATION
37 / 44
position position
position position
38 / 44
IN PREPARATION
OK
ACT
HS
rtm.cgm
IN PREPARATION
39 / 44
2. Check on the front panel that the LED corresponding to the connection port is lit (for the port Eth8 the corresponding LED is situated on row 8 column C).
A B C
1 2 3 4 5 6 7 8
B A S E
I N T E R F A C E
graphics/174223121005.cgm
ETH 1
ETH 2 ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
OK
OK
ACT
ACT
JAXSSW 2
JAXSSW 1
ETH 1
ETH 2 ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
OK
OK
ACT
ACT
12345678901234567890 12345678901234567890
graphics/174213111interatca.cgm
JAXSSW JAXSSW 2 1
40 / 44
IN PREPARATION
4. Wait for the telecom boards to finish their initialization Check the equipment status.
IN PREPARATION
41 / 44
42 / 44
IN PREPARATION
IN PREPARATION
43 / 44
44 / 44