STANDARD OPERATING PROCEDURE (S.O.P) OSCILLOSCOPE ALIGENT 1000 SERIES DSO 1022A 200MHz, 2GSa/S
1. Connect the power cord to a power source. Use only power cord designed for your oscilloscope. Use a power source that delivers the required power. WARNING! To avoid electric a shock, be sure that the oscilloscope is properly grounded. 2. Turn on the oscilloscope. 3. Use the suitable probe for measurement. 4. Do calibration using Probe Comp (before making measurement) WARNING! Before turning on the instrument, you must connect the protective earth terminal of the instrument to the protective conductor of the power cord. The mains plug shall only be inserted in a socket 5. After using. Turn off oscilloscope power, remove all cables. Keep the oscilloscope correctly
Mr.
Mrs.
Mr.
1. Connect the power cord to a power source. Use only power cord designed for your Function Generator. Use a power source that delivers the required power. WARNING! To avoid electric a shock and standard pulse is achieved, be sure that the Function Generator is properly grounded. 2. Connect output to producers cord requirement 3. Turn on power supply 4. Choose suitable bandwidth for output 5. Choose suitable waveform for output 6. Connect output to circuit (make sure to avoid short circuit happening, correct pole dividing between Function Generator and circuit.) 7. After use. Turn off Function Generator power, remove all cables. Keep the Function Generator originally and correctly
Mr.
Mrs.
Mr.
STANDARD OPERATING PROCEDURE (S.O.P) DIGITAL MULTIMETER (SANWA) CD800a 400 Cout
1. Check battery (make sure to give correct measurement value) 2. Identify measuring units ( voltage, resistance, current and etc) 3. Select suitable measuring scale 4. Identify the pole of probe (if have) 5. After use, change Power switch and Function switch into Off WARING! To ensure the meter is used safely, be sure to observe the instruction when using the instrument.
1.
2. Never apply an input signal exceeding the maximum rating input value. 3. Always keep your fingers behind the finger guards on probe when making measurements. 4. Be sure to disconnect the test pins from the circuit when changing the function. 5. Before staring measurement, make sure that the function and range are properly set in accordance with the measurement. 6. Never use meter with wet hands or in a damp environment. 7. Never open terser case except when replacing batteries or fuse. 8. Do not use the device near an item of strong electromagnetic generation or a charged item. 9. To ensure safety and maintain accuracy, calibrate and check the tester at least once a year.
Mr.
Mrs.
Mr.
Y N
REPAIR
ENOUNGH QUANTITY? Y
END
RECYCLING
PANASONIC SEMICONDUCTTOR COMPANY (M) Sdn bhd Shah Alam, Selangor PREVENTIVE MAINTENANCE PROCEDURE
PANASONIC SEMICONDUCTTOR COMPANY (M) Sdn bhd Shah Alam, Selangor PREVENTIVE MAINTENANCE PROCEDURE
4. Create the trainning proposal of Automation system using Keyence PLC and PCB design and PCB etching TECHNICAL EDUCATION AND VOCATIONAL TRAINNING (TEVT) ENHANCEMENT PROGRAM TITLE OF THE COURSE: ELECTONIC INDUSTRY DATE: 3 JAN 2012 20 APR 2012 VENUE: CIAST, SHAH ALAM, SELANGOR
FEE PERSO N /DAY
No
TERMINAL PERFORMANCE OBJECTIVE Introdution to PLC Overview of Keyence PLC Wiring of Keyence PLC Set of command Applications of Keyence PLC Practical Introduce to Proteus 7.8 software Drawing shematic circuit Drawing PCB from shematic Introduce ETChing Machine PCB ETChing Practical
CAPACIT Y
DURATION (DAYS)
DATE
COURSE MANAGE R
Free
24
Mr Zaini
Free
24
Mr Zaini
SCHEDULE OF MODULE AUTOMATION SYSTEM USING KEYENCE PLC DATE: 16 FEB 2012 20 FEB 2012 VENUE: H-105
DATE Monday 16/2/2012 Tueday 17/2/2012 Wednesday 18/2/2012 Thusday 19/2/2012 Friday 20/2/2012 Saturday Sunday 08:30-10:00 Introdution to PLC Wiring of Keyence PLC Applications of Keyence PLC Practical Practical 10:00-10:15 10:15-12:15 Overview of Keyence PLC Set of command BREAK Applications of Keyence PLC Practical Practical REST REST LUNCH 12:15-14:00 14:00-15:30 Overview of Keyence PLC Set of command Practical Practical Test BREAK 15:30-15:45 15:45-16:45 Overview of Keyence PLC Set of command Practical Practical Test
SCHEDULE OF MODULE PCB DESIGN AND PCB ETCHING DATE: 16 FEB 2012 20 FEB 2012 VENUE: H-105
DATE Monday 16/2/2012 Tueday 17/2/2012 Wednesday 18/2/2012 Thusday 19/2/2012 Friday 20/2/2012 Saturday Sunday 08:30-10:00 Introdution to Proteus 7.8 Drawing PCB from shematic Introduce Etching Machine Practical Practical 10:00-10:15 10:15-12:15 Drawing shematic circuit Drawing PCB from shematic Introduce Etching Machine Practical Practical REST REST 12:15-14:00 14:00-15:30 Drawing shematic circuit Drawing PCB from shematic LUNCH PCB Etching Practical Test BREAK 15:30-15:45 15:45-16:45 Drawing shematic circuit Drawing PCB from shematic PCB Etching Practical Test
BREAK
Schematic design
PCB design Printed mirror film Etching Drilling and Via Cover ink UV Green PCB design manager PCB ecthing manager Head of department
: : : : : : : : :
To design schematic circuit follow order of custumer To convert from schematic circuit to PCB board on PC To print PCB design film and make negative film To etch copper on board To Make hole and connect 2 layout To paint ink UV green on surface of PCB board To ckeck and supervise PCB design To ckeck and supervise PCB Etching To plan, organize operation and overall manage of PCB department