You are on page 1of 3

TABLE WITH THE RHYTHMS OF WORK AND THE TEAMS OF WORKERS

CONSTITUENT WORK ITEMS


No.

0
1

Activity
Denomination

Symbol

1
2
Vegetal Layer TsC18A1
Excavation TsC22A1
(V.L.E.)
General Pit
Excavation
(G.P.E.)

TsC04F1
TsC04C1

Description
3
Mechanical Excavation by Buldozer
Extra hours for transportation
Mechanical Excavation by excavator with
discharge in autovehicles
Mechanical Excavation by excavator with
discharge in deposit

U.M.
4
100m
100m

100m
100m

Work
quantity on

WORKING TIME CONSUMPTION


Total time work

Total work
quant. Qi

Number of
Sectors (n)

5
1.87
6.93

6
1
1

sector (Qil)
7
1.87
6.93

3.9

3.9

1.35

5.265

1.55

1.55

1.40

2.170

TsE01B1
Manual Diggings
TsA02E1
(M.D.)

Levelling the bottom of the pit


Manual digging in narrow spaces

100m
100m

3.74
74.30

1
1

3.74
74.30

TsD02B1
TsD05B1
Soil Fillings (S.F.) TsD01B1
TsD04D1

Manual spreading the soil (bulldozer)


Mechanically ramming up the fills (ram)
Mechanically spreading the soil (shovel)
Mech. ramming up the fills (manual ram)

100m
100m
1m
1m

1.91
1.55
92.10
74.30

1
1
1
1

1.91
1.55
92.10
74.30

CA01B1
CB10B1
Foundations (F.) CA02D1
CC01C

Casting B50 in continous foundations


Formworks for foundations
Casting B150 in construction elements
Placing the OB37 and PC52 reinforcement

1m
1m
1m
kg

74.30
70.50
29.20
1750.00

1
1
1
1

74.30
70.50
29.20
1750.00

CB12I1
CB23B1
CC02B1
CC02B1
CA02G1
CB44A1
Basement
CB45B1
Structure (B.S.)
CB13I1
CC02C1
CG32C
CG18B
CC02F

Wall and diaphragm formworks


Formworks in black metal sheet
Fixing the OB37 reinforcement
Fixing the PC52 reinforcement
Casting RC B200 walls and diaphragms
Metallic extensible props type PE 3100R
Metallic extensible trusses
Formworks for slabs, beams and columns
Fixing the OB37 and PC52 reinforcement
Fills in compacted layers
Concrete floors casted on site
Fixing the STNB reinforcement

1m
1m
kg
kg
1m
pieces
pieces
1m
kg
1m
1m
kg

525.00
13.50
2490.00
1495.00
49.80
196.00
90.00
410.00
4911.00
22.10
269.00
806.00

1
1
1
1
1
1
1
1
1
1
1
1

525.00
13.50
2490.00
1495.00
49.80
196.00
90.00
410.00
4911.00
22.10
269.00
806.00

CB12I1
CB23D1
CC02A1
CC02B1
CA02G1
Superstructure
CB44A1
(S)
CB45B1
CB13I1
CC02C1

Formworks for walls and slabs


Frame formworks in black metal sheet
Fixing reinforcement bars OB37
Fixing reinforcement bars PC52
Casting B200 walls and slabs
Metallic extensible steel props PE 3100R
Metallic extensible steel trusses
Formworks for slabs, beams and columns
Fixing reinforcement bars OB37

1m
1m
kg
kg
1m
pieces
pieces
1m
kg

2,280.00
61.00
5,173.00
8,621.00
173.00
980.00
450.00
2,465.00
28,580.00

5
5
5
5
5
5
5
5
5

456.00
12.20
1034.60
1724.20
34.60
196.00
90.00
493.00
5716.00

volume (Vi call)


man/hours
man/days
8
9
10
0.517
2.21
4.133
1.152
1.33
9.217
TOTAL
13.350
1.669

Unit time (Nti)

TOTAL
14.04
1.19
TOTAL
0.90
10.88
0.55
0.75
TOTAL
3.05
1.00
4.15
0.02
TOTAL
0.88
0.45
0.048
0.041
4.04
0.44
2.31
0.88
0.03
0.92
0.48
0.031
TOTAL
0.88
0.53
0.048
0.041
4.04
0.44
2.31
0.85
0.033

7.435
52.510
88.417
140.927
1.719
16.864
50.655
55.725
124.963
226.615
70.500
121.180
35.000
453.295
462.000
6.075
119.520
61.295
201.192
86.240
207.900
360.800
162.063
20.332
129.120
24.986
1,841.52
401.280
6.466
49.661
70.692
139.784
86.240
207.900
419.050
188.628

0.929
6.564
11.052
17.616
0.215
2.108
6.332
6.966
15.620
28.327
8.813
15.148
4.375
56.662
57.750
0.759
14.940
7.662
25.149
10.780
25.988
45.100
20.258
2.542
16.140
3.123
230.19
50.160
0.808
6.208
8.837
17.473
10.780
25.988
52.381
23.579

Team of
workers
(ri)

Planned work
norm fulfilling
index (Pi)

11

12

13

0.834

0.929

1.174

1.041

1.049

23

1.112

21

1.160

Rhythm of work
l

(ti ) (days)

Superstructure
(S)

21

CA02J1

Casting B200 columns, beams and slabs

1m

260.00

52.00

3.54

184.080

23.010

1.160

(S)

TOTAL
8

Closures and
Partitions (C.P.)

Carpentry
Works
(C.)

CD07C1
CP15C1

Cellular concrete masonry


Placing the cellular concrete strips

1m
1m

183.00
721.00

5
5

36.60
144.20

3.20
1.20
TOTAL

CK01B1
CK01B1
CK04A1
CK03F1
CK14J1
CK09B1
CK09A1
CM02B1

Wooden windows
Wooden windows
Wooden doors for balconies (exterior)
Wooden doors for interior, exterior
Metallic doors
Wooden boards, sills and rods for doors
Wooden boards for windows
Glass for windows and balcony

1m
1m
1m
1m
1m
m
m
1m

Interior plastering for walls and columns


Interior plastering for ceilings
Floated plastering

1m
1m
1m

12.60
124.60
37.80
288.70
5.00
1,134.00
119.00
269.00

5
5
5
5
5
5
5
5

2.52
24.92
7.56
57.74
1.00
226.80
23.80
53.80

2.69
1.25
1.48
1.31
1.31
0.07
0.27
0.45
TOTAL

10

11

CF01C1
Interior mortar
CF03A1
plastering
CF10C
(I.M.P.)

Flooring
(Fl.)

CG01D1
CG03E1
CG06D1
CG07B1

2,473.00
2,465.00
5,232.00

5
5
5

494.60
493.00
1046.40

1.12
1.03
0.38
TOTAL

Supporting layer for floors


PVC plasting flooring including sills
Mosaic cast in place flooring
Mosaic cast in place plinth

1m
1m
1m
m

898.00
898.00
497.00
295.00

5
5
5
5

179.60
179.60
99.40
59.00

0.46
0.73
2.23
1.20
TOTAL

12

12

219.22
14.640
21.630
36.27
0.847
3.894
1.399
9.455
0.164
1.985
0.803
3.026
21.57
69.244
63.474
49.704
132.72
10.327
16.389
27.708
8.850
63.273

253.208
305.976
302.432
559.18
342.440
2563.600
2906.040

31.651
38.247
37.804
69.90
42.805
320.450
363.255

1.010

1.173

11

11

1.050

10

1.050

1.092

34

1.187

Insulation

CN02B1
Interior surface CN09B1
finishings (I.S.F.) CI06S1

3ply interior painting for walls and ceillings


3ply interior painting for door and win.
Mounting faience on walls and columns

1m
1m
1m

4,084.00
1,342.00
1,454.00

5
5
5

816.80
268.40
290.80

0.31
1.14
1.04
TOTAL

13

1,753.78
117.120
173.040
290.16
6.779
31.150
11.189
75.639
1.310
15.876
6.426
24.210
172.58
553.952
507.790
397.632
1,061.74
82.616
131.108
221.662
70.800
506.186

CB48A1
Exterior
CF08A1
finishings (Fa.)

Self lifting metallic scaffold


Exterior plastering in artificial stone

1m
1m

1223
1160

1
1

1223
1160

0.28
2.21
TOTAL