Six Sigma DMAIC Project

GEAE Account: Lynn MA Site

Project Leader/Green Belt: George Harris Project Leader Title: Customer Engineer Project Start Date: September 27, 2002

Master Black Belt: Steven Bonacorsi

Six Sigma in Action Software: Special Applications


Customer Profile 8,000 seat Aircraft Engines Manufacturing Company Business Problem & Impact GEAE shop floor end users experience unnecessary downtime during system replacement, due to incomplete configuration and uninstalled required applications . One shop floor workstation can be down for days as multiple help desk tickets are required to get the system 100% functional. Measure & Analyze Data Collection: Cycle time to complete 1 shop floor deployment was measured. Any deployment taking >60 minutes was listed as a defect Root Causes: There is no process or documentation detailing the Shop Floor Special Application Installation and Configuration MSA Results: An MSA was not performed during Measure for the following reasons: 1.Cost in labor to complete a measure MSA was to great to complete. 2. GE ITS did not control the process used in baseline 3. Infrequent cases also made MSA too costly. Improve & Control A Pugh Matrix was used to determine the best possible solution. Having GEITS technicians install special applications and configure shop floor systems prior to deployment, had the greatest positive impact on cycle time. A new shop floor deployment process was developed and implemented in March 2003, with training sessions and documentation provided to deployment techs prior to rollout. All data points collected were within the 60 minute specification limit. Results/Benefits Mean cycle time decreased from >59 minutes to <33 minutes while Sigma value increased from .02 to 2.99. This results in an expected customer indirect savings >$7,600 (annually)

Process Capability Before


T 15 USL

Frequency

10

Sigma (ZST): 1.52 Sigma (ZLT): 0.02

0 50 100 150

Total Cycle Time

Process Capability After


T 8 7 6 USL

Frequency

5 4 3 2 1 0 15 20 25 30

Sigma (ZST): 2.99 Sigma (ZLT): 1.49

35

40

45

50

55

60

Deploy Time

An ACFC Project with an Expected Customer of >$7,600 annually!